Attached files
file | filename |
---|---|
EX-5.1 - EX-5.1 - BAETA CORP | v209931_ex5-1.htm |
EX-23.1 - EX-23.1 - BAETA CORP | v209931_ex23-1.htm |
EX-10.25 - EX-10.25 - BAETA CORP | v209931_ex10-25.htm |
EX-10.12.23 - EX-10.12.23 - BAETA CORP | v209931_ex10-12x23.htm |
EX-10.12.27 - EX-10.12.27 - BAETA CORP | v209931_ex10-12x27.htm |
EX-10.12.25 - EX-10.12.25 - BAETA CORP | v209931_ex10-12x25.htm |
EX-10.12.21 - EX-10.12.21 - BAETA CORP | v209931_ex10-12x21.htm |
EX-10.12.26 - EX-10.12.26 - BAETA CORP | v209931_ex10-12x26.htm |
EX-10.12.22 - EX-10.12.22 - BAETA CORP | v209931_ex10-12x22.htm |
EX-10.12.24 - EX-10.12.24 - BAETA CORP | v209931_ex10-12x24.htm |
S-1 - S-1 - BAETA CORP | v209931_s1.htm |
Project
Order #1
Statement
of Work #1.28
Submitted
by
Extranome,
Inc.
253 Warren Avenue
Fort Lee,
NJ 07024
Phone:
201 969-1651
Fax: 201
969-1651
January
1, 2011
Baeta Corp – Project Order #1 Statement Of
Work
|
Table of
Contents
1
|
Statement
of Work
|
3
|
2
|
Scope
of work
|
3
|
3
|
Expectations
from Vendor
|
5
|
4
|
Expectations
from Client
|
5
|
5
|
Intellectual
Property
|
6
|
6
|
Change
Management
|
6
|
7
|
Plan
and Schedule
|
6
|
8
|
Pricing
|
7
|
9
|
Terms
and Conditions
|
7
|
10
|
Support
Files
|
|
Extranime,
Inc Proprietary – Confidential
Page
2 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
1
|
Statement
of Work
|
This
Statement of Work for Project Order #1 (“Project Order #1”) is
made and entered into as of this 1st day of
November 2008 (the “Effective Date”), by and between Extranome Inc. (hereinafter
referred to as "Vendor"), and Baeta Corp, (hereinafter referred to as
“Client”) (collectively, the “Parties”). This Project Order #1 is governed by
the terms and conditions set forth herein and in the Agreement # soft.2/11012008
from November 1, 2008. In the event of a conflict between the
Agreement # soft.2/11012008 from November 1, 2008 and this Project Order #1, the
terms and conditions of this Project Order #1 shall prevail.
2
|
Scope
of work
|
The scope
of work is defined in the separate Software Requirements Specifications (SRS),
technical part defined as part of design documentation (DD) and all time lines
and milestones are defined by LOE and Project Plans per agreed scope of
work.
Actual
tasks fulfilled in December 2011:
MyHealthTrends
for Weight Control and MyHealthTrends for Pain (98%)
Quality
Assurance efforts
Following
releases have been tested:
MyHealthTrends
for Pain QA
Server
S/W:
version
1.4.0.13
MyHealthTrends
for Weight Control QA Environment
Server
S/W:
versions
1.4.0.10 through 1.4.0.13
Maintenance
the current SW in Production
No new
bugs have been yet reported in production.
HHC v3.1
Battery Tests
The
electronic widget to test the lifetime of batteries has been designed and
assembled and two devices of model HHC 3.1 brought into testing. Test
conditions: number of clicks per day 200; battery model Sanyo
CR2450.
Testing
still continue.
Extranime,
Inc Proprietary – Confidential
Page
3 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
SW
Development Activities: MHT WC “Merge Patient & Practitioner SW Phase II,
Administration pages.”
Following
MHT WC releases have been built and their bugs fixed:
Dec
6, 2010 Web - 1.4.0.11, CRA - 1.4.0.3
Scope 13
Phase Two, Administration Interface, QA build:
1)
implemented "Change User Type" feature
2) added
pagination for log viewer
3) added
confirmation dialogs for important actions
4) fixed
javascript error on Windows 7
Dec
13, 2010 Web - 1.4.0.13, CRA - 1.4.0.3
1) Bugs
fixed
5086 User
can save account with incorrect password
5087
Misprint in message if user tries to delete account
5088 User
can not select date on the 'Accounts' tab (IE)
5091 User
can save negative Census Limit
5092
Issue with selecting dates on the 'Logs' tab
5094
Cummulative issues-2 from Lee
5096 Add
'Nothing found to display.' message for 'Accounts' tab
5097
Issue with locked account
5100
Issue with support role
5101
Incorrect session lifetime
5102
'HTTP Status 404' is displayed if root tries to add existent
account
5106 User
can save expiration date which will be earlier than creation date
5123
Practitioner can remove patient/reset patient password if expiration date has
expired
5124
Exception if root tries to add account
5129
'Expiration Date' is not displayed in IE
5138
Issue with warning message if root tries to edit employee
5143 Make
all child windows for the Admin functions operate in a single
window
5144
Downloaded Client Version is always UKNOWN at Support Page
SW
Development Activities: MHT Pain “Merge Patient & Practitioner SW Phases I
and II”
Following
MHT WC releases have been built and their bugs fixed:
Dec
27, 2010 Web - 1.4.0.13, CRA - 1.4.0.3
5212 Available
patient licenses are not displayed in message
5213 Issue
with viewing reports for patient
ITOPS
efforts [SEC]
IT
maintenance for PROD and QA environments has been performed.
Extranime,
Inc Proprietary – Confidential
Page
4 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
Baeta
Marketing Pages Repository (1%)
ITOPS
efforts
IT
maintenance for PROD and QA environments has been performed.
MyHealthID
(1%)
ITOPS
efforts
IT
maintenance for PROD and QA environments is performed.
Tasks
planned to be performed in January 2011
ITOPS
maintenance
Perform
IT maintenance for products “MHT for Pain”, “MHT for Weight Control”,
“MyHealthID”, “Baeta Marketing Pages Repository”, hosted in QA and PROD
environment.
“MyHealthTrends
for Weight Control” and “MyHealthTrends for Pain”
Do
maintenance for MHT Weight Control in production
Complete
QA and bug fixing for “Scope 13 – Merge Patient and Practitioner SW.” for MHT
Pain product and deploy on production server.
3
|
Expectations
from Vendor
|
1.
|
All
Vendor personnel will be provided with a computer having a configuration
adequate to perform their respective
tasks.
|
2.
|
Vendor
will furnish weekly status reports. These reports will be based on the
tasks assigned to and performed by
them.
|
3.
|
Vendor
will bring to the notice of Client any issue, technical or otherwise that
may be a potential risk to the task to be performed and will keep Client
informed of the remediation steps taken to mitigate such
risks.
|
4.
|
Vendor’s
team will interact closely with the Client at all stages of the
Project.
|
|
5.
|
Vendor
will recommend changes to the environment, including the use of newer
releases of the system and framework software, if it can justify that such
changes will result in a better end
product.
|
6.
|
Vendor
will ensure that the work they do can be verified and
audited.
|
7.
|
Vendor
will provide all required environment for the work and support by IT&S
team for smooth development as needed unless dedicated resources
required.
|
4
|
Expectations
from Client
|
1.
|
Client
will determine the prioritization of the tasks to be
performed.
|
2.
|
Client
will provide all assistance required in the understanding of the scope
during the entire length of the
Project.
|
Extranime,
Inc Proprietary – Confidential
Page
5 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
3.
|
Client
will cover, after mutual agreement, all costs for specific software,
systems, machines, technologies and licenses which are not part of
standard development tools and technologies and specific to Baeta Corp.
work.
|
4.
|
Client
will cover all travel related expenses and travel allowance at actual
costs if this is required and approved by Baeta Corp.
|
5
|
Intellectual
Property
|
Intellectual
Property of all work undertaken on behalf of Client shall vest with Baeta
Corp.
6
|
Change
Management
|
Once a
design document has been approved by Client, all changes in the scope of work
will have to be approved by both parties after due consideration to the impact
that it may have on the schedule and effort. Such changes may result in the
financial considerations for the Project to be revised.
7
|
Plan
and Schedule
|
The plan
for developing of the application as stated in the section Scope of Work is as
follows:
1.
|
Extranome,
Inc. will have assigned software engineers and designers for the projects
personnel at their own premises.
|
2.
|
All
work will be performed based on separate Software Requirements
Specifications and Project Plans.
|
Extranime,
Inc Proprietary – Confidential
Page
6 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
8
|
Pricing
|
The
statement of work performs as time and materials (T&M) agreement with
initial team of:
|
·
|
1
Project Manager
|
|
·
|
1
Technical Lead / Senior Software
Developer
|
|
·
|
1
Graphic Designer
|
|
·
|
2
Software Engineers
|
The cost
of initial team is $30,000 per month. The costs covers costs of labor, base work
environment and license costs. All specific to the project licenses, machines,
parts or equipment are additional to this cost.
Any
additional resources are subject to a separate agreement or $50 per hour with
prior agreement by the Client.
9
|
Terms
and Conditions
|
The work
is based on 40 hours week, 12 months a year excluding official holidays and
vacations, from 9:00am EST to 5:00pm EST schedule. All vacation and holidays
will be communicated to the Client in advance and if this is required - Vendor
will provide adequate replacement during the member(s) leave of
absence.
/s/
LEONID PUSHKANTSER
|
|
/s/
ALEXANDER GAK, MD
|
By: /s/
|
|
By: /s/
|
|
|
Baeta
Corp.
|
|
Extranome,
Inc
|
|
|
|
Len
Pushkanster
|
Alexander
Gak
|
|
Baeta
Corp.
|
Extranome,
Inc.
|
|
1
Bridge Plaza Suite 275
|
253
Warren Av
|
|
Fort
Lee, NJ 07024
|
Fort
Lee, NJ 07024
|
|
Phone:
201.471.0988
|
Phone:
201.969.1651
|
Extranime,
Inc Proprietary – Confidential
Page
7 of 7