Attached files
file | filename |
---|---|
EX-5.1 - EX-5.1 - BAETA CORP | v209931_ex5-1.htm |
EX-23.1 - EX-23.1 - BAETA CORP | v209931_ex23-1.htm |
EX-10.25 - EX-10.25 - BAETA CORP | v209931_ex10-25.htm |
EX-10.12.23 - EX-10.12.23 - BAETA CORP | v209931_ex10-12x23.htm |
EX-10.12.27 - EX-10.12.27 - BAETA CORP | v209931_ex10-12x27.htm |
EX-10.12.21 - EX-10.12.21 - BAETA CORP | v209931_ex10-12x21.htm |
EX-10.12.26 - EX-10.12.26 - BAETA CORP | v209931_ex10-12x26.htm |
EX-10.12.22 - EX-10.12.22 - BAETA CORP | v209931_ex10-12x22.htm |
EX-10.12.28 - EX-10.12.28 - BAETA CORP | v209931_ex10-12x28.htm |
EX-10.12.24 - EX-10.12.24 - BAETA CORP | v209931_ex10-12x24.htm |
S-1 - S-1 - BAETA CORP | v209931_s1.htm |
Project
Order #1
Statement
of Work #1.25
Submitted
by
Extranome,
Inc.
253 Warren Avenue
Fort Lee,
NJ 07024
Phone:
201 969-1651
Fax: 201
969-1651
October
1, 2010
Baeta Corp – Project Order #1 Statement Of
Work
|
Table of
Contents
1
|
Statement of Work
|
3
|
2
|
Scope of work
|
3
|
3
|
Expectations from Vendor
|
5
|
4
|
Expectations from Client
|
5
|
5
|
Intellectual Property
|
6
|
6
|
Change Management
|
6
|
7
|
Plan and Schedule
|
6
|
8
|
Pricing
|
7
|
9
|
Terms and Conditions
|
7
|
10
|
Support Files
|
7
|
Extranime, Inc
Proprietary –
Confidential
|
Page
2 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
1
|
Statement
of Work
|
This
Statement of Work for Project Order #1 (“Project Order #1”) is
made and entered into as of this 1st day of
November 2008 (the “Effective Date”), by and between Extranome Inc. (hereinafter
referred to as "Vendor"), and Baeta Corp, (hereinafter referred to as
“Client”) (collectively, the “Parties”). This Project Order #1 is governed by
the terms and conditions set forth herein and in the Agreement # soft.2/11012008
from November 1, 2008. In the event of a conflict between the
Agreement # soft.2/11012008 from November 1, 2008 and this Project Order #1, the
terms and conditions of this Project Order #1 shall prevail.
2
|
Scope
of work
|
The scope
of work is defined in the separate Software Requirements Specifications (SRS),
technical part defined as part of design documentation (DD) and all time lines
and milestones are defined by LOE and Project Plans per agreed scope of
work.
Actual
tasks fulfilled in September 2010:
MyHealthTrends
for Weight Control and MyHealthTrends for Pain (98%)
Quality
Assurance efforts
Following
releases have been tested:
MyHealthTrends
for Pain QA
None
MyHealthTrends
for Weight Control QA Environment
Server
S/W:
versions
1.4.0.4 through 1.4.0.9
CRA
S/W:
1.4.0.3;
Maintenance
the current SW in Production
Release
Web1.4.0.9/CRA1.4.03 has been moved in production at September 30,
2010.
HHC
v3.1 Battery Tests
The
electronic widget to test the lifetime of batteries has been designed and
assembled and two devices of model HHC 3.1 brought into testing. Test
conditions: number of clicks per day 200; battery model Sanyo
CR2450.
SW
Development Activities: Scope 13 “Merge Patient & Practitioner SW Phase
1”
Following
releases has been built and their bugs were fixed.
September
3, 2010 Web - 1.4.0.4
1) Bugs
fixed
Extranime, Inc
Proprietary –
Confidential
|
Page
3 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
4419 Link
"Add Patient Account to Your Census" is not disabled when device
unplugged
4423
Process of upgrading the version of CRA is not smooth for users and even not
works
4426
Errors while creating new Patient account
4427
Issue with trademark sign and correct CRA title
4429 The
device actions links should keep their state
4437
Close a product session when portal user logs out
4439
Uploading a huge batch of events to server failed
4443 IK
Cumulative issues Aug 31, 2010
4444 ED
Cumulative Issues Aug 31, 2010
4459
Incorrect welcome message for practitioner
4462
Census Management panel is showed in Practitioner profile
September
13, 2010 Web - 1.4.0.5, CRA - 1.4.0.3
1) Bugs
fixed
4427
Issue with trademark sign and correct CRA title
4434
Incorrect data appear after Practitioner sign out
4438
Links at "My Device" page are available when CRA is not running
4465
Message about other gateway running after upgrading CRA
4467
"Limit Dates for" drop-down overlaps with privacy text
4468
mhtgateway.exe crashes on resuming the Windows
4470
"Limit Dates for" select box does not work as expected
4502 Not
installed or disabled Java Plug-in cause the product be
non-operational
September
15, 2010 Web - 1.4.0.6
1) Bugs
re-fixed
4470
"Limit Dates for" selectbox does not work as expected
4502 Not
installed or disabled Java Plug-in cause the product be
non-operational
September
22, 2010 Web - 1.4.0.7
1) Bugs
fixed
4519
Creating a Patient account by Practitioner does not work as
expected
September
24, 2010 Web - 1.4.0.8
1) Bugs
fixed
4520
Include the mouse-over help for the controls. Automated but help system is not
applied
4521
Patient Pages Updates
4522
Practitioner Pages Updates
September
28, 2010 Web - 1.4.0.9
1) Bugs
fixed
Cosmetic
changes for Bz#4521 and Bz#4522
ITOPS
efforts [SEC]
IT
maintenance for PROD and QA environments has been performed.
Baeta
Marketing Pages Repository (1%)
ITOPS
efforts
IT
maintenance for PROD and QA environments has been performed.
Extranime, Inc
Proprietary –
Confidential
|
Page
4 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
MyHealthID
(1%)
ITOPS
efforts
IT
maintenance for PROD and QA environments is performed.
Tasks
planned to be performed in October 2010
ITOPS
maintenance
Perform
IT maintenance for products “MHT for Pain”, “MHT for Weight Control”,
“MyHealthID”, “Baeta Marketing Pages Repository”, hosted in QA and PROD
environment.
“MyHealthTrends
for Weight Control” and “MyHealthTrends for Pain”
3
|
Expectations
from Vendor
|
1.
|
All
Vendor personnel will be provided with a computer having a configuration
adequate to perform their respective
tasks.
|
2.
|
Vendor
will furnish weekly status reports. These reports will be based on the
tasks assigned to and performed by
them.
|
3.
|
Vendor
will bring to the notice of Client any issue, technical or otherwise that
may be a potential risk to the task to be performed and will keep Client
informed of the remediation steps taken to mitigate such
risks.
|
4.
|
Vendor’s
team will interact closely with the Client at all stages of the
Project.
|
5.
|
Vendor
will recommend changes to the environment, including the use of newer
releases of the system and framework software, if it can justify that such
changes will result in a better end
product.
|
6.
|
Vendor
will ensure that the work they do can be verified and
audited.
|
7.
|
Vendor
will provide all required environment for the work and support by IT&S
team for smooth development as needed unless dedicated resources
required.
|
4
|
Expectations
from Client
|
1.
|
Client
will determine the prioritization of the tasks to be
performed.
|
2.
|
Client
will provide all assistance required in the understanding of the scope
during the entire length of the
Project.
|
3.
|
Client
will cover, after mutual agreement, all costs for specific software,
systems, machines, technologies and licenses which are not part of
standard development tools and technologies and specific to Baeta Corp.
work.
|
4.
|
Client
will cover all travel related expenses and travel allowance at actual
costs if this is required and approved by Baeta Corp.
|
Extranime, Inc
Proprietary –
Confidential
|
Page
5 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
5
|
Intellectual
Property
|
Intellectual
Property of all work undertaken on behalf of Client shall vest with Baeta
Corp.
6
|
Change
Management
|
Once a
design document has been approved by Client, all changes in the scope of work
will have to be approved by both parties after due consideration to the impact
that it may have on the schedule and effort. Such changes may result in the
financial considerations for the Project to be revised.
7
|
Plan
and Schedule
|
The plan
for developing of the application as stated in the section Scope of Work is as
follows:
1.
|
Extranome,
Inc. will have assigned software engineers and designers for the projects
personnel at their own
premises.
|
2.
|
All
work will be performed based on separate Software Requirements
Specifications and Project
Plans.
|
Extranime, Inc
Proprietary –
Confidential
|
Page
6 of 7
Baeta Corp – Project Order #1 Statement Of
Work
|
8
|
Pricing
|
The
statement of work performs as time and materials (T&M) agreement with
initial team of:
|
·
|
1
Project Manager
|
|
·
|
1
Technical Lead / Senior Software
Developer
|
|
·
|
1
Graphic Designer
|
|
·
|
2
Software Engineers
|
The cost
of initial team is $30,000 per month. The costs covers costs of labor, base work
environment and license costs. All specific to the project licenses, machines,
parts or equipment are additional to this cost.
Any
additional resources are subject to a separate agreement or $50 per hour with
prior agreement by the Client.
9
|
Terms
and Conditions
|
The work
is based on 40 hours week, 12 months a year excluding official holidays and
vacations, from 9:00am EST to 5:00pm EST schedule. All vacation and holidays
will be communicated to the Client in advance and if this is required - Vendor
will provide adequate replacement during the member(s) leave of
absence.
/s/ LEONID PUSHKANTSER | /s/ ALEXANDER GAK, MD | |||
By:
|
/s/
|
By:
|
/s/
|
|
Baeta
Corp.
|
Extranome,
Inc
|
|||
Len
Pushkanster
|
Alexander
Gak
|
|||
Baeta
Corp.
|
Extranome,
Inc.
|
|||
1
Bridge Plaza Suite 275
|
253
Warren Av
|
|||
Fort
Lee, NJ 07024
|
Fort
Lee, NJ 07024
|
|||
Phone:
201.471.0988
|
Phone:
201.969.1651
|
Extranime, Inc
Proprietary –
Confidential
|
Page
7 of 7