Attached files
file | filename |
---|---|
EX-5.1 - EX-5.1 - BAETA CORP | v209931_ex5-1.htm |
EX-23.1 - EX-23.1 - BAETA CORP | v209931_ex23-1.htm |
EX-10.25 - EX-10.25 - BAETA CORP | v209931_ex10-25.htm |
EX-10.12.23 - EX-10.12.23 - BAETA CORP | v209931_ex10-12x23.htm |
EX-10.12.27 - EX-10.12.27 - BAETA CORP | v209931_ex10-12x27.htm |
EX-10.12.25 - EX-10.12.25 - BAETA CORP | v209931_ex10-12x25.htm |
EX-10.12.21 - EX-10.12.21 - BAETA CORP | v209931_ex10-12x21.htm |
EX-10.12.26 - EX-10.12.26 - BAETA CORP | v209931_ex10-12x26.htm |
EX-10.12.28 - EX-10.12.28 - BAETA CORP | v209931_ex10-12x28.htm |
EX-10.12.24 - EX-10.12.24 - BAETA CORP | v209931_ex10-12x24.htm |
S-1 - S-1 - BAETA CORP | v209931_s1.htm |
Project
Order #1
Statement
of Work #1.22
Submitted
by
Extranome,
Inc.
253 Warren Avenue
Fort Lee,
NJ 07024
Phone:
201 969-1651
Fax: 201
969-1651
July
1, 2010
Baeta Corp – Project Order #1 Statement Of
Work
|
Table of
Contents
1
|
Statement
of Work
|
3
|
2
|
Scope
of work
|
3
|
3
|
Expectations
from Vendor
|
5
|
4
|
Expectations
from Client
|
6
|
5
|
Intellectual
Property
|
6
|
6
|
Change
Management
|
6
|
7
|
Plan
and Schedule
|
7
|
8
|
Pricing
|
7
|
9
|
Terms
and Conditions
|
7
|
10
|
Support
Files
|
|
Extranime,
Inc Proprietary – Confidential
Page
2 of 8
Baeta Corp – Project Order #1 Statement Of
Work
|
1
Statement
of Work
This
Statement of Work for Project Order #1 (“Project Order #1”) is
made and entered into as of this 1st day of
November 2008 (the “Effective Date”), by and between Extranome Inc. (hereinafter
referred to as "Vendor"), and Baeta Corp, (hereinafter referred to as
“Client”) (collectively, the “Parties”). This Project Order #1 is governed by
the terms and conditions set forth herein and in the Agreement # soft.2/11012008
from November 1, 2008. In the event of a conflict between the
Agreement # soft.2/11012008 from November 1, 2008 and this Project Order #1, the
terms and conditions of this Project Order #1 shall prevail.
2
Scope
of work
The scope
of work is defined in the separate Software Requirements Specifications (SRS),
technical part defined as part of design documentation (DD) and all time lines
and milestones are defined by LOE and Project Plans per agreed scope of
work.
Actual
tasks completed in June 2010:
MyHealthTrends
for Weight Control and MyHealthTrends for Pain (98%)
Quality
Assurance efforts
Following
releases have been tested:
MyHealthTrends
for Pain
Server
S/W v3.1.31, Client S/W v3.1.6.26 in QA environment
MyHealthTrends
for Weight Control
Server
S/W v3.1.31, Client S/W v3.1.6.26 in QA environment
New bugs
opened in May 2010:
Baeta Corp – Project Order #1 Statement Of
Work
|
3998
[SEC] nor [WC] Incorrect data is presented in reports for specific
user
Development
efforts of maintenance the current SW
Have been
resolved following bugs or implemented enhancements:
3853
[SEC] enh Do not display a tooltip "Online Service is unavailable" for end
user
3854
[SEC] nor The IprService flops fishily
3973
[SEC] min [MP] Wrong warning message when user save incorrect profile
data
3976
[SEC] nor [MP] Data in offline report and web report is not
identical
3977
[SEC] tri [MP] Only first name is presented in "Owner" field on web
site
3983
[SEC] min Report is opened after patient was deleting from census
3988
[SEC] tri [MP] Incorrect data in Email field while registering patient's
device
3991
[SEC] nor Error occurred if WCO and MPA installed in one folder
3993
[SEC] nor Entered password is not saved when Practitioner create new Patient
account
3995
[SEC] nor [WC] "Last Name" field is not marked as required in
application
3996
[SEC] nor "Print" button in offline reports is disable
4005
[SEC] tri User unable to view full Cravings Data if it is too long
4008
[SEC] tri [WC] My Census tab is not opened after creating new
Patient
4009
[SEC] nor [WCO] Patient's device is not detected when internet connection is
offline
4014
[SEC] min [MP] Telemetric report looks wrong after changing time
zone
4017
[SEC] nor [MP] Data is not uploaded to offline report
4021
[SEC] enh [MP] Limitation for "Scope of Practice" field
SW
enhancements which are not related to current SW
Firmware
v 3.1.4 has been tested.
Completed
development of PC Software to program naked devices v3.1at manufacture time and
passed to Customer.
Continued
coding a FW v5.1.
ITOPS
efforts [SEC]
IT
maintenance for PROD and QA environments performed.
Extranime,
Inc Proprietary – Confidential
Page
4 of 8
Baeta Corp – Project Order #1 Statement Of
Work
|
Baeta
Marketing Pages Repository (1%)
ITOPS
efforts
IT
maintenance for PROD and QA environments performed.
MyHealthID
(1%)
ITOPS
efforts
IT
maintenance for PROD and QA environments performed.
Tasks
planned to be performed in July 2010
ITOPS
maintenance
Perform
IT maintenance for products “MHT for Pain”, “MHT for Weight Control”,
“MyHealthID”, “Baeta Marketing Pages Repository”, hosted in QA and PROD
environment.
“MyHealthTrends
for Weight Control” and “MyHealthTrends for Pain”
Complete
release for Server S/W v3.1.32 and Client S/W v3.1.6.27 which will include the
fixes for bugs were fixed in June 2010 for both products and pass it in QA and
PROD environment.
Continue
bug fixing for bugs still not resolved in previous builds and for new bugs if
they be revealed during QA phase.
Perform
QA for new releases.
Tasks for
“Scope 11 – HHC v5.1”:
Complete
firmware HHC v5.1.1 which will allow accumulate and upload raw acceleration data
into PC and support second events.
Complete
PC Software to analyze raw acceleration data.
Start a
“Scope 13 – Merge Patient and Practitioner PC SW”
3
Expectations from Vendor
1.
|
All
Vendor personnel will be provided with a computer having a configuration
adequate to perform their respective
tasks.
|
2.
|
Vendor
will furnish weekly status reports. These reports will be based on the
tasks assigned to and performed by
them.
|
3.
|
Vendor
will bring to the notice of Client any issue, technical or otherwise that
may be a potential risk to the task to be performed and will keep Client
informed of the remediation steps taken to mitigate such
risks.
|
4.
|
Vendor’s
team will interact closely with the Client at all stages of the
Project.
|
5.
|
Vendor
will recommend changes to the environment, including the use of newer
releases of the system and framework software, if it can justify that such
changes will result in a better end
product.
|
Extranime,
Inc Proprietary – Confidential
Page
5 of 8
Baeta Corp – Project Order #1 Statement Of
Work
|
6.
|
Vendor
will ensure that the work they do can be verified and
audited.
|
7.
|
Vendor will provide
all required environment for the work and support by IT&S team for
smooth development as needed unless dedicated resources required.
|
4
Expectations from Client
1.
|
Client
will determine the prioritization of the tasks to be
performed.
|
2.
|
Client
will provide all assistance required in the understanding of the scope
during the entire length of the
Project.
|
3.
|
Client will cover,
after mutual agreement, all costs for specific software, systems,
machines, technologies and licenses which are not part of standard
development tools and technologies and specific to Baeta Corp. work.
|
4.
|
Client will cover
all travel related expenses and travel allowance at actual costs if this
is required and approved by Baeta Corp.
|
5
Intellectual
Property
Intellectual
Property of all work undertaken on behalf of Client shall vest with Baeta
Corp.
6
Change
Management
Once a
design document has been approved by Client, all changes in the scope of work
will have to be approved by both parties after due consideration to the impact
that it may have on the schedule and effort. Such changes may result in the
financial considerations for the Project to be revised.
Extranime,
Inc Proprietary – Confidential
Page
6 of 8
Baeta Corp – Project Order #1 Statement Of
Work
|
7
Plan
and Schedule
The plan
for developing of the application as stated in the section Scope of Work is as
follows:
1.
|
Extranome,
Inc. will have assigned software engineers and designers for the projects
personnel at their own premises.
|
2.
|
All
work will be performed based on separate Software Requirements
Specifications and Project Plans.
|
8
Pricing
The
statement of work performs as time and materials (T&M) agreement with
initial team of:
|
·
|
1
Project Manager
|
|
·
|
1
Technical Lead / Senior Software
Developer
|
|
·
|
1
Graphic Designer
|
|
·
|
2
Software Engineers
|
The cost
of initial team is $30,000 per month. The costs covers costs of labor, base work
environment and license costs. All specific to the project licenses, machines,
parts or equipment are additional to this cost.
Any
additional resources are subject to a separate agreement or $50 per hour with
prior agreement by the Client.
9
Terms
and Conditions
The work
is based on 40 hours week, 12 months a year excluding official holidays and
vacations, from 9:00am EST to 5:00pm EST schedule. All vacation and holidays
will be communicated to the Client in advance and if this is required - Vendor
will provide adequate replacement during the member(s) leave of
absence.
Extranime,
Inc Proprietary – Confidential
Page
7 of 8
Baeta Corp – Project Order #1 Statement Of
Work
|
/s/
LEONID PUSHKANTSER
|
/s/
ALEXANDER GAK, MD
|
||||
By:
/s/
|
By:
/s/
|
||||
Baeta
Corp.
|
Extranome,
Inc
|
||||
Len
Pushkanster
Baeta
Corp.
1
Bridge Plaza Suite 275
Fort
Lee, NJ 07024
Phone:
201.471.0988
|
Alexander
Gak
Extranome,
Inc.
253
Warren Av
Fort
Lee, NJ 07024
Phone:
201.969.1651
|
Extranime,