FLEET STATUS REPORT
Atwood Oceanics, Inc. and Subsidiaries Fleet Status Report as of May 8, 2017
Rig Name
Rated Water Depth
Location
Client
Estimated Contract End Date
Estimated Contract Day Rate
Additional Comments
ULTRA-DEEPWATER DRILLSHIPS
ATWOOD ADVANTAGE
12,000'
Israel
NOBLE ENERGY INC.
 August 2017
(Fixed term)
$581,000
Well in progress is estimated to be completed in late August or early September. The day rate for well in progress is lower than the contract day rate and is not disclosed.
A demobilization fee of $4.5 million will be paid if direct follow-on work is not secured.





ATWOOD ACHIEVER
12,000'
Mauritania / Senegal
KOSMOS ENERGY LTD.
November 2017
(Fixed term)
$595,500 (all applicable taxes to be reimbursed by client)

Well in progress is estimated to be completed in December.
The day rate for well in progress is lower than the contract day rate and is not disclosed.

ATWOOD ADMIRAL
12,000'
South Korea
---
AVAILABLE
N/A
Delivery to occur on or prior to September 30, 2019 at Atwood’s option.

ATWOOD ARCHER
12,000'
South Korea
---
AVAILABLE
N/A
Delivery to occur on or prior to June 30, 2020 at Atwood’s option.

ULTRA-DEEPWATER SEMISUBMERSIBLES
ATWOOD CONDOR
10,000'
In Transit to Australia
---
N/A
N/A
The rig is mobilizing to Singapore and will undergo maintenance prior to resuming mobilization to Australia.
 
 
Australia
WOODSIDE ENERGY LTD.
July 2019
(12 wells)
$222,295
A fee of $36.5 million will be paid to mobilize the rig to Australia which will be amortized over the contract term.
Operations are expected to commence January 2018 for an estimated duration of 550 days.
ATWOOD OSPREY
8,200'
Australia
CONOCOPHILLIPS AUSTRALIA EXPLORATION PTY
June 2017
(1 well)
$185,000

The client exercised a one well option at the contracted rate.
Day rate subject to change due to various performance metrics.







 
 
 
 
 
 
 
 
 
Australia
WOODSIDE ENERGY LTD.
September 2017
(1 well)
$185,000
Operations are expected to commence in June 2017 for an estimated duration of 100 days.
 
 
Australia
---
AVAILABLE
N/A

Being actively marketed September 2017 to March 2018.

 
 
Australia
WOODSIDE ENERGY LTD.
June 2018
(1 well)
$190,000
Operations are expected to commence in March 2018 for an estimated duration of 100 days. The contract provides a one well option at the contracted rate.
DEEPWATER SEMISUBMERSIBLE
ATWOOD EAGLE
5,000'
Singapore
---
IDLE
N/A

We have entered into an agreement to scrap/recycle the rig.

JACKUPS
ATWOOD MAKO
400'
Philippines
---
AVAILABLE
N/A
Idled and being actively marketed.
ATWOOD MANTA
400'
Philippines
---
AVAILABLE
N/A
Idled and being actively marketed.
ATWOOD ORCA
400'
Thailand
MUBADALA PETROLEUM
April 2018
(Fixed term)
Not Disclosed
Operations commenced on April 27, 2017.
ATWOOD BEACON
400'
Malta
---
AVAILABLE
N/A
Idled and being actively marketed.
ATWOOD AURORA
350'
Malta
---
AVAILABLE
N/A
Idled and being actively marketed.







FORWARD-LOOKING STATEMENTS

As used herein, “we”, “us”, and “our” refers to Atwood Oceanics, Inc. and its subsidiaries, except where the context indicates otherwise. Statements contained in this Fleet Status Report, including, but not limited to, information regarding our estimated rig availability, estimated delivery dates, estimated contract duration, day rates, future contract commencement dates and locations and planned out of service time are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. These statements reflect management's reasonable judgment with respect to future events. Forward-looking statements are subject to numerous risks, uncertainties and assumptions and actual results could differ materially from those anticipated as a result of various factors including: uncertainties related to the level of activity in offshore oil and gas exploration and development; oil and gas prices; competition and market conditions in the contract drilling industry; shipyard delays and the risks inherent in the construction of a rig; delays in the commencement of operations of a rig following delivery; our ability to enter into and the terms of future contacts; possible cancellation or suspension of drilling contracts; the availability of qualified personnel; labor relations; operating hazards and risks; terrorism and political and other uncertainties inherent in foreign operations (including risk of war, civil disturbances, seizure or damage to equipment and exchange and currency fluctuations); the impact of governmental and industry laws and regulations; and environmental matters. These factors and others are described and discussed in our most recently filed annual report on Form 10-K, in our Forms 10-Q for subsequent periods and in our other filings with the Securities and Exchange Commission which are available on the SEC's website at www.sec.gov. All information in this Fleet Status Report is as of the date indicated above and is subject to change without notice. You should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the particular statement, and we undertake no duty to update the content of this Fleet Status Report or any forward-looking statement contained herein to conform the statement to actual results or to reflect changes in our expectations.