UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

 

FORM 10-K

 

 

 

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the fiscal year ended December 31, 2019

 

 

 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from                            to                          

 

Commission file number:  001-32986

 

GENERAL MOLY, INC.

(Exact Name of Registrant as Specified in Its Charter)

 

 

 

 

Delaware

 

91-0232000

(State or Other Jurisdiction of Incorporation or
Organization)

 

(I.R.S. Employer Identification No.)

 

 

 

 

 

 

1726 Cole Blvd.,

Suite 115

Lakewood, CO

 

80401

(Address of principal executive offices)

 

(Zip Code)

 

Registrant’s telephone number, including area code: (303) 928-8599

 

Securities registered pursuant to Section 12(b) of the Act:

 

 

 

 

Common Stock, par value $0.001 per share

 

NYSE American and Toronto Stock Exchange

(Title of Each Class)

 

(Name of each Exchange on Which Registered)

 

Securities registered pursuant to Section 12(g) of the Act:  None

 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☐    No ☒

 

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ☐    No ☒

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

 

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§ 229.405) is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. ☒

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company.  See definitions of “large accelerated filer”, “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

 

 

 

 

Large accelerated filer ☐

 

Accelerated filer ☐

 

 

 

Non-accelerated filer ☒

 

Smaller reporting company ☒

 

 

 

                                                       Emerging growth company ☐

 

 

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒

 

As of June 30, 2019, the aggregate market value of the registrant’s common stock held by non-affiliates of the registrant was $29,054,389 based on the closing price as reported on the NYSE American.

 

As of April 30, 2020, 152,685,255 shares of the registrant’s common stock, par value of $0.001 per share, were outstanding.

 

 

 

DOCUMENTS INCORPORATED BY REFERENCE

 

Certain portions of the registrant’s definitive proxy statement to be used in connection with its Annual Meeting of Stockholders and to be filed within 120 days of December 31, 2019 are incorporated by reference into Part III, Items 10-14, of this report on Form 10-K.

 

TABLE OF CONTENTS

 

 

 

 

 

 

Page

 

 

 

 

Part I

 

 

 

 

ITEMS 1. & 2. 

BUSINESS AND PROPERTIES

2

 

 

 

ITEM 1A. 

RISK FACTORS

26

 

 

 

ITEM 1B. 

UNRESOLVED STAFF COMMENTS

37

 

 

 

ITEM 3. 

LEGAL PROCEEDINGS

37

 

 

 

ITEM 4. 

MINE SAFETY DISCLOSURES

40

 

 

 

 

Part II

 

 

 

 

ITEM 5. 

MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

41

 

 

 

ITEM 6. 

SELECTED FINANCIAL DATA

41

 

 

 

ITEM 7. 

MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

42

 

 

 

ITEM 7A. 

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

57

 

 

 

ITEM 8. 

FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

59

 

 

 

ITEM 9. 

CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

100

 

 

 

ITEM 9A. 

CONTROLS AND PROCEDURES

100

 

 

 

ITEM 9B. 

OTHER INFORMATION

101

 

 

 

 

Part III

 

 

 

 

ITEM 10. 

DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

102

 

 

 

ITEM 11. 

EXECUTIVE COMPENSATION

102

 

 

 

ITEM 12. 

SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

102

 

 

 

ITEM 13. 

CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

102

 

 

 

ITEM 14. 

PRINCIPAL ACCOUNTING FEES AND SERVICES

102

 

 

 

 

Part IV

 

 

 

 

ITEM 15. 

EXHIBITS, FINANCIAL STATEMENT SCHEDULES

103

 

 

 

ITEM 16. 

FORM 10-K SUMMARY

108

 

 

 

SIGNATURES 

109

 

 

 

PART I

 

ITEMS 1. & 2.BUSINESS AND PROPERTIES

 

The Company

 

References made in this Annual Report on Form 10-K to “we,” “our,” “us,” and the “Company” refer to General Moly, Inc. and its consolidated Mt. Hope Project joint-venture subsidiary Eureka Moly, LLC, referred to as the “LLC.”

 

We are in the business of the exploration, development and mining of properties primarily containing molybdenum.  Our main asset is an 80% interest in the Mt. Hope Project (“Mt. Hope Project”), a primary molybdenum property, located in Eureka County, Nevada.  In 2006, we acquired a second significant molybdenum and copper project, the Liberty Project (“Liberty Project”), located in Nye County, Nevada, which we wholly own.  The Liberty Project is anticipated to become our second molybdenum and copper operation, after commencement of commercial production at the Mt. Hope Project, with initial production dependent on market conditions.

 

Corporate Information

 

The Company was initially incorporated in Idaho under the name “General Mines Corporation” in 1925.  We have gone through several name changes and on October 5, 2007, we reincorporated the Company in the State of Delaware (“Reincorporation”) through a merger of Idaho General Mines, Inc. with and into General Moly, Inc., a Delaware corporation that was a wholly-owned subsidiary of Idaho General Mines, Inc. with General Moly, Inc. being the surviving entity.  In connection with the Reincorporation, all of the outstanding securities of Idaho General Mines, Inc. were converted into securities of General Moly, Inc. on a one-for-one basis.  For purposes of the Company’s reporting status with the U.S. Securities and Exchange Commission (“SEC”), General Moly, Inc. is deemed a successor to Idaho General Mines, Inc. Our common stock is traded on the NYSE American market under the symbol “GMO” and, in February 2008, the Company began trading on the Toronto Stock Exchange (“TSX”) under the same symbol.  Our registered and principal executive office is located at 1726 Cole Blvd., Suite 115, Lakewood, Colorado 80401 and the phone number for that office is (303) 928-8599.

 

We maintain a website at www.generalmoly.com, on which we post free of charge our annual reports on Form 10-K, quarterly reports on Form 10-Q, Extensible Business Reporting Language (“XBRL”) documents, and any amendments to these reports under the heading “Investors” as soon as reasonably practicable after we electronically file such material with, or furnish it to, the SEC.  We also routinely post important information about the Company on our website under the heading “Investors.”  We do not incorporate the information on our website into this document and you should not consider any information on, or that can be accessed through, our website as part of this document.  The SEC also maintains a website that contains our reports and other information at www.sec.gov.

 

Corporate Strategy and Objective

 

Our corporate strategy has been to acquire and develop highly profitable advanced stage mineral deposits.  Our corporate objective is to profitably develop and operate the Mt. Hope Project and to complete our evaluation and commence development of the Liberty Project.  Presently, we are focused on obtaining financing required to maintain the continuing operations of the Company and to work toward financing to jointly develop the Mt. Hope Project with our LLC joint-venture partner, while at the same time conserving our cash resources until such financing is received.

 

We believe we have the following business strengths that will enable us to achieve our objectives:

 

·

We have retained a strong, proven management team with experience in mine development, project financing, and operations.

 

·

The Mt. Hope Project is anticipated to be one of the largest and lowest cost primary molybdenum projects in the world, driven, in part, by high ore grades that will be processed early in the mine life.

 

·

Our Liberty Project has the potential to become a second, significant, molybdenum and copper operation and is wholly-owned by the Company and royalty-free.

2

 

·

The Mt. Hope Project and the Liberty Project are located in Nevada, which has a long and ongoing history of large-scale, open pit mining operations.

 

·

Both the Mt. Hope Project and the Liberty Project have near-by infrastructure for labor, power, access roads, and water and have an environmentally sound design.

 

·

We have strong international support from the steel industry as evidenced by the strategic partnerships and off-take agreements we have in place with several of the world’s largest steel companies.

 

·

We are observing tightening molybdenum supply and anticipate improving long-term market fundamentals for molybdenum based on anticipated renewed global industrial growth and steel demand upon the subsidence of the ongoing global health crisis, and we believe that the molybdenum price will then resume appreciation.

 

Products

 

We do not currently produce any products.  When the Mt. Hope Project is developed, the LLC expects production of 40 million pounds of molybdenum (“Mo”) per year over the first five years on average, and approximately 1.2 billion pounds of molybdenum over the expected 41-year life of the project (based on a $12/lb Mo reserve).  Using the $8/lb Mo reserve referenced later in this report, life of mine production declines to approximately 0.5 billion pounds of molybdenum.  The Mt. Hope Project will primarily focus on producing Technical Grade Molybdenum Oxide (“TMO”), which is widely utilized by the steel industry.  In the future, we may also consider producing ferromolybdenum (“FeMo”), which is also used by the steel industry and would make the Company an integrated supplier to the steel industry and have left space in the process plant design for the Mt. Hope Project to accommodate this process.

 

Molybdenum is a refractory metal with unique properties.  Approximately 70% to 80% of molybdenum applications are in steel making.  Molybdenum, when added to plain carbon and low alloy steels, increases strength, corrosion resistance and high temperature properties of the alloy.  The major applications of molybdenum containing plain and low alloy steels are automotive body panels, construction steel and oil and gas pipelines.  When added to stainless steels, molybdenum imparts specialized corrosion resistance in severe corrosive environments while improving strength.  The major applications of stainless steels are in industrial chemical process plants, desalinization plants, nuclear reactor cooling systems and environmental pollution abatement.  When added to super alloy steels, such as those used in jet turbine blades and other advanced aerospace engine components, molybdenum dramatically improves high temperature strength, thermal expansion and contraction resistance and resistance to oxidation.  The effects of molybdenum additions to steels are not readily duplicated by other elements and as such are not significantly impacted by substitution of other materials.

 

Other significant molybdenum applications include lubrication, catalytic sulfur reduction in petrochemicals, lighting, LCD activation screens, x-ray generation, high temperature heat dissipation and high temperature conductivity.  These areas represent the highest technical and value-added applications of molybdenum.

 

Competitive Conditions

 

Molybdenum exploration, development and production is a competitive business.  We anticipate competing worldwide with numerous molybdenum suppliers once the Mt. Hope Project achieves production.

 

The supply of molybdenum comes from both primary molybdenum mines, such as our proposed Mt. Hope Project, and as a byproduct of porphyry copper production.  Annual molybdenum supply is estimated by the CPM Group to be approximately 600 million pounds. Although many companies produce molybdenum, some of which also mine other minerals, approximately two-thirds of global production is concentrated among the leading ten companies, and the largest producing country, China, accounting for over 40% of total production.

 

When and if we develop either or both our Mt. Hope Project and/or Liberty Project and commence production, our competitive position will be based on the quality and grade of our ore bodies and our ability to manage costs compared with other producers. 

3

 

Employees

 

The Company had a total of 12 employees, including 10 exempt and 2 hourly employees, as of December 31, 2019.

 

Description of the Mt. Hope Project

 

Overview

 

The discussion in this section is based on the entire Mt. Hope Project, of which we own an 80% interest. The LLC is responsible for the development of the Mt. Hope Project.  The Mt. Hope Project will include the development of an open pit mine, construction of a concentrator and a roaster, and construction of all related infrastructure to produce TMO, the most widely used molybdenum product.

 

From November 2004 through August 2007 we conducted numerous exploration, drilling and evaluation studies, culminating in the completion of a Bankable Feasibility Study (“BFS”) for the Mt. Hope Project.  The BFS provides data on the viability, expected economics, and production and cost estimates of the project.  Since publication of the BFS, we have revised several estimates, based primarily on engineering progress, which remains approximately 65% complete at December 31, 2019.  Our current estimates for the Mt. Hope Project capital cost requirements are referred to as the “Project Capital Estimate” and our current estimates for the Mt. Hope Project operating costs are referred to as the “Project Operating Cost Estimate”.

 

In 2005, we initiated the baseline studies necessary for development of an Environmental Impact Statement (“EIS”).  We completed an initial Plan of Operations (“PoO”), which the BLM accepted in September 2006.  In December 2006, the BLM selected an environmental firm to complete the EIS for the Mt. Hope Project.  The Company worked diligently with the environmental firm to complete the EIS, which culminated in the issuance of a Record of Decision (“ROD”) in November 2012, approving the EIS.  The original ROD was challenged in the federal courts and vacated by the Ninth Circuit in 2016.  A supplement to the EIS (“SEIS”) was published on September 27, 2019 and announced that the BLM had re-issued the ROD, marking completion of the NEPA process, approval of the SEIS, and reauthorization of the PoO.  The ROD was challenged a second time on October 31, 2019, as discussed below.

 

On January 16, 2014, we filed an updated technical report (the “January 2014 Technical Report”) prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administration (“NI 43-101”) for the Mt. Hope Project, estimating molybdenum reserves and resources, production, capital and operating cost parameters and project economics.  The NI 43-101 is a codified set of rules and guidelines for reporting and displaying information related to mineral properties owned by, or explored by, companies which report these results on stock exchanges within Canada. The completed report estimates molybdenum reserves and resources, production, capital and operating cost parameters, along with project economics.

 

The January 2014 Technical Report stated a proven and probable mineral reserve containing 984.6 million tons averaging 0.070% sulfide molybdenum, resulting in 1.4 billion pounds (1.1 billion pounds owned by us), of which 1.2 billion pounds (1.0 billion pounds owned by us) are estimated to be recoverable (molybdenum pounds contained in Technical Grade Molybdenum Oxide (“TMO”).  The proven and probable mineral reserves (eight-phase base plan) stated in the January 2014 Technical Report were developed at a price of $12.00/lb of molybdenum (“Mo”).  Since the filing of the January 2014 Technical Report the molybdenum price has declined and the proven and probable mineral reserve has been updated and is shown in the section “Reserves and Mineralized Material” found later in this filing. 

 

The Mt. Hope Project — the Mt. Hope Lease

 

The Mt. Hope molybdenum project is owned/leased and, when developed, will be operated by the LLC under the LLC Agreement, described below under “—Mt. Hope Project Ownership”.  The LLC currently has a lease (“Mt. Hope Lease”) with Mount Hope Mines, Inc. (“MHMI”) for the Mt. Hope Project for a period of 30 years from October 19, 2005 and for so long thereafter as operations are being conducted on the property.  The lease may be terminated earlier at the election of the LLC, or upon a material breach of the lease and failure to cure such breach.  If the LLC terminates the lease, termination is effective 30 days after receipt by MHMI of written notice to terminate the Mt. Hope Lease and no further payments would be due to MHMI.  If MHMI terminates the lease, termination is effective

4

upon receipt of a notice of termination of a material breach, representation, warranty, covenant or term contained in the Mt. Hope Lease and followed by failure to cure such breach within 90 days of receipt of a notice of default.  MHMI may also elect to terminate the Mt. Hope Lease if the LLC has not cured the non-payment of obligations under the lease within 10 days of receipt of a notice of default.

 

Located in Eureka County, Nevada, the Mt. Hope Project consists of 13 patented lode claims and one millsite claim, which are owned by MHMI and leased to the LLC, and 1,521 unpatented lode claims, including 109 unpatented lode claims owned by MHMI and leased to the LLC and 1,412 unpatented lode claims owned by the LLC.  Patented claims are owned real property and unpatented claims are held subject to the paramount title of the United States of America (“U.S.”) and remain valid for as long as the claim contains a discovery of valuable minerals as defined by law and the holder pays the applicable fees.

 

The Mt. Hope Lease is subject to the payment of certain royalties.  See  “—Royalties, Agreements and Encumbrances” below.  In addition to the royalty payments, the LLC is obligated to maintain the property and the Mt. Hope Project’s associated water rights, including the payment of all property taxes and claim maintenance fees.  The LLC must also indemnify MHMI against any and all losses incurred as a result of any breach or failure to satisfy any of the terms of the Mt. Hope Lease or any activities or operations on the Mt. Hope property.

 

The LLC is not permitted to assign or otherwise convey its obligations under the Mt. Hope Lease to a third party without the prior written consent of MHMI, which consent may be withheld at its sole discretion.  If, however, the assignment takes the form of a pledge of our interest in the Mt. Hope Project for the purpose of obtaining project financing, MHMI’s consent may not be unreasonably withheld.  The Mt. Hope Lease further requires the LLC to keep the property free and clear of all liens, encumbrances, claims, charges and burdens on production except as allowed for project financing.

 

The Mt. Hope Lease requires that the terms of any project financing must provide that: (i) any principal amount of debt can only be repaid after payment of the periodic payments as set out in the Mt. Hope Lease; (ii) the lenders may not prohibit or interfere with any advance royalty payments due to MHMI under the Mt. Hope Lease; and (iii) no cash sweeps or payments of excess cash flow may be made to the lenders in priority of such advance royalty payments, as discussed in “ — Royalties, Agreements and Encumbrances” below.

 

The Mt. Hope Lease also contains an after acquired property clause, which requires that any property acquired by the LLC within two miles of the boundary of the Mt. Hope Project be conveyed to MHMI if requested within a certain time period following notification of such acquisition.  MHMI has requested that we maintain ownership of all new claims filed by the LLC, which now includes 1,412 unpatented lode claims.

 

Property Description and Location

 

The Mt. Hope molybdenum project is located on the eastern flank of Mt. Hope approximately 21 miles north of Eureka, Nevada.  The Mt. Hope Project is located at the southern end of the northwest-trending Battle Mountain-Eureka

5

mineral belt.  Mt. Hope is approximately 2.6 miles due west of Nevada State Route 278 (“Route 278”), and the Mt. Hope Project centers in sections 1 and 12, T22N-R51E and sections 12 and 13, T22N-R51½E.

 

Picture 1

 

Royalties, Agreements and Encumbrances

 

Advance Royalty

 

For the production of molybdenum, the Mt. Hope Lease requires a royalty advance (“Construction Royalty Advance”) of 3% of certain construction capital costs, as defined in the Mt. Hope Lease.  The LLC is obligated to pay a portion of the Construction Royalty Advance each time capital is raised for the Mt. Hope Project based on 3% of the expected capital to be used for those certain construction capital costs defined in the Mt. Hope Lease.  Through December 31, 2019, we have paid $26.1 million of the total Construction Royalty Advance.  Based on our Mt. Hope Project capital budget we estimate that a final reconciliation payment on the Capital Construction Cost Estimate (the “Estimate”) will be due following the commencement of commercial production, after as-built costs are definitively determined.  The Company estimates that, based on the revised capital estimate discussed above and the current timeline for the commencement of commercial production, an additional $5.4 million will be due approximately 24 months after the commencement of construction.  This amount was accrued as of December 31, 2019.  The capital estimates will be subject to escalation as the Company experiences continued delays associated with current market conditions, the permitting process and its ability to seek and obtain full financing for the Mt. Hope Project.

 

The LLC is also obligated to make a minimum annual advance royalty payment (“Annual Advance Royalty”) of $0.5 million each year for any year wherein commercial production has not been achieved or the MHMI Production Royalty (as hereinafter defined) is less than $0.5 million.  As commercial production is not anticipated to commence before late-2022, the Company has also accrued $1.5 million in Annual Advance Royalty payments which will be due in three $0.5 million installments in October 2020, 2021 and 2022, respectively.  The 2019 payment was made on October 19, 2019.  The Estimate and the Annual Advance Royalty are collectively referred to as the “Advance Royalties.”  All Advance Royalties are credited against the MHMI Production Royalties once the molybdenum mine has achieved commercial production.  After the mine begins production, the LLC estimates that the MHMI Production Royalties will be in excess of the Annual Advance Royalties for the life of the Mt. Hope Project.  Until the advance royalties are fully credited, the LLC will pay one half of the calculated Production Royalty annually.  Assuming a $12 molybdenum price, the Annual Advance Royalties will be consumed within the first five years of commercial production.

 

On February 28, 2018, EMLLC and MHMI entered into an amendment to the Mt. Hope Lease. The amendment

6

primarily concerns non-molybdenum royalty arrangements that are applicable to the copper-silver target and zinc mineralization, discussed below. The amendment provides for net returns production royalties of 4% for all non-molybdenum minerals.  With respect to zinc production only, there is the potential to increase the 4% royalty to 5% dependent on increasing zinc prices. These royalties are consistent with other royalty mining practices in Nevada. 

Production Royalty

 

Following commencement of commercial production, the LLC will be required to pay a molybdenum production royalty to MHMI and Exxon Corporation (“Exxon”) as follows:

 

(a) MHMI Production Royalty

 

After commencement of commercial production at the Mt. Hope Project, the LLC will be required to pay to MHMI a production royalty equal to the greater of: (i) $0.25 per pound of molybdenum metal (or the equivalent of some other product) sold or deemed to be sold from the Mt. Hope Project; or (ii) 3.5% of net returns (“Base Percentage”), if the average gross value of products sold is equal or lower than $12.00 per pound, or the Base Percentage plus 1% of net returns if the average gross value of products sold is higher than $12.00 per pound but equal or lower than $15.00 per pound, or the Base Percentage plus 1.5% of net returns if the average gross value of products sold is higher than $15.00 per pound (“MHMI Production Royalties”).  As used in this paragraph, the term “products” refers to ores, concentrates, minerals or other material removed and sold (or deemed to be sold) from the Mt. Hope Project; the term “gross value” refers generally to proceeds received by us or our affiliates for the products sold (or deemed to be sold); and the term “net returns” refers to the gross value of all products, less certain direct out of pocket costs, charges and expenses actually paid or incurred by us in producing the products.

 

(b) Exxon Production Royalty

 

Exxon will receive a perpetual 1% royalty interest in and to all ores, metals, minerals and metallic substances mineable or recoverable from the Mt. Hope Project in kind at the mine or may elect to receive cash payment equal to 1% of the total amount of gross payments received from the purchaser of ores mined/removed/sold from property net of certain deductions.

 

Mt. Hope Project Ownership

 

From October 2005 to January 2008, we owned the rights to 100% of the Mt. Hope Project.  Effective as of January 1, 2008, we contributed all of our interest in the assets related to the Mt. Hope Project, the Mt. Hope Lease, discussed above, into the LLC, and in February 2008 entered into a joint venture agreement (“LLC Agreement”) for the development and operation of the Mt. Hope Project with POS-Minerals Corporation (“POS-Minerals”).  Under the LLC Agreement, POS-Minerals owns a 20% interest in the LLC and General Moly, through Nevada Moly, LLC (“Nevada Moly”), a wholly-owned subsidiary, owns an 80% interest.  The ownership interests and/or required capital contributions under the LLC Agreement can change as discussed below.

 

Under the terms of the LLC Agreement, since commercial production at the Mt. Hope Project was not achieved by December 31, 2011, the LLC will be required to return to POS-Minerals $36.0 million, since reduced to $33.6 million as discussed below, of its capital contributions (“Return of Contributions”), with no corresponding reduction in POS-Minerals’ ownership percentage.  Effective January 1, 2015, as part of a comprehensive agreement concerning the release of the reserve account described below, Nevada Moly and POS-Minerals agreed that the Return of Contributions will be payable to POS-Minerals on December 31, 2020; provided that, at any time on or before November 30, 2020, Nevada Moly and POS-Minerals may agree in writing to extend the due date to December 31, 2021; and if the due date has been so extended, at any time on or before November 30, 2021, Nevada Moly and POS-Minerals may agree in writing to extend the due date to December 31, 2022.  If the repayment date is extended, the unpaid amount will bear interest at a rate per annum of LIBOR plus 5%, which interest shall compound quarterly, commencing on December 31, 2020 through the date of payment in full.  Payments of accrued but unpaid interest, if any, shall be made on the repayment date.  Nevada Moly may elect, on behalf of the Company, to cause the Company to prepay, in whole or in part, the Return of Contributions at any time, without premium or penalty, along with accrued and unpaid interest, if any.

 

7

The original Return of Contributions amount due to POS-Minerals is reduced, dollar for dollar, by the amount of capital contributions for equipment payments required from POS-Minerals under approved budgets of the LLC, as discussed further below.  As of December 31, 2019, this amount has been reduced by $2.4 million, consisting of POS-Minerals 20% share of equipment purchases, such that the remaining amount due to POS-Minerals is $33.6 million.  If Nevada Moly does not fund its additional capital contribution in order for the LLC to make the required Return of Contributions to POS-Minerals set forth above, POS-Minerals has an election to either make a secured loan to the LLC to fund the Return of Contributions or receive an additional interest in the LLC estimated to be 5%.  In the latter case, Nevada Moly’s interest in the LLC is subject to dilution by a percentage equal to the ratio of 1.5 times the amount of the unpaid Return of Contributions over the aggregate amount of deemed capital contributions (as determined under the LLC Agreement) of both parties to the LLC (“Dilution Formula”).  At December 31, 2019, the aggregate amount of deemed capital contributions of both parties was $1,090.8 million.

 

Furthermore, the LLC Agreement permits POS-Minerals to put/sell its interest in the LLC to Nevada Moly after a change of control of Nevada Moly or the Company, as defined in the LLC Agreement, followed by a failure by us or our successor company to use standard mining industry practice in connection with the development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve (12) consecutive months.  If these circumstances should occur, POS-Minerals may exercise its option to put or sell its interest, and thereafter, Nevada Moly or its transferee or surviving entity would be required to purchase the interest for 120% of POS-Minerals’ total contributions to the LLC, which, if not paid timely, would be subject to 10% interest per annum.

 

The LLC Agreement requires the Company and POS-Minerals to make monthly pro rata capital contributions to the LLC to fund costs incurred.  The interest of a party in the LLC that does not make its monthly pro rata capital contributions to fund costs incurred is subject to dilution based on the Dilution Formula.  All required monthly contributions have been made by both parties in accordance with the terms of the agreements between the parties.

 

The Reserve Account

 

Effective January 1, 2015, Nevada Moly and POS-Minerals signed an amendment to the LLC Agreement under which a separate $36.0 million belonging to Nevada Moly, held by the LLC in a reserve account established in December 2012, is being released for the mutual benefit of both members related to annual jointly approved Mt. Hope Project expenses into 2021.  In January 2015, the reserve account funded a reimbursement of contributions made by the members during the fourth quarter of 2014, inclusive of $0.7 million to POS-Minerals and $2.7 million to Nevada Moly.  The remaining reserve account funds are now being used to pay ongoing jointly approved expenses of the LLC until the Company obtains full financing for its portion of the Mt. Hope Project construction cost, or until the reserve account is exhausted.  Any remaining funds after financing is obtained will be returned to the Company.  The balance of the reserve account was $3.4 million and $6.2 million at December 31, 2019 and December 31, 2018, respectively. 

 

Agreement with AMER International Group

 

Private Placement

 

As announced in April 2015, the Company and AMER International Group Co., Ltd (“AMER”) entered into a private placement for 40.0 million shares of the Company’s common stock and warrants to purchase 80.0 million shares of the Company’s common stock, priced using the trailing 90-day volume weighted average price (“VWAP”) of $0.50 on April 17, 2015, the date the Investment and Securities Purchase Agreement (“AMER Investment Agreement”) was signed. General Moly received stockholder approval of the transaction at its 2015 Annual Meeting, and of material amendments to the transaction at a special meeting held in December 2017.

 

On November 2, 2015, the Company and AMER entered into an amendment to the AMER Investment Agreement, utilizing a three-tranche investment.  The first tranche of the amended AMER Investment Agreement closed on November 24, 2015 for a $4.0 million private placement representing 13.3 million shares, priced at $0.30 per share, and warrants (“the AMER Warrants”) to purchase 80.0 million shares of common stock at $0.50 per share, which would become exercisable upon availability of an approximately $700.0 million senior secured loan (“Bank Loan”). The funds received from the $4.0 million first tranche private placement were divided evenly between general corporate purposes and an expense reimbursement account available to both AMER and the Company to cover anticipated Mt. Hope financing costs and other jointly sourced business development opportunities. In addition, AMER and General Moly entered into a Stockholder Agreement allowing AMER to nominate a director to the General Moly Board of Directors

8

and additional directors following the close of the third tranche, discussed below, and drawdown of the Bank Loan.  The Stockholder Agreement also governed amer’s acquisition and transfer of General Moly shares.  Prior to closing the first tranche the parties agreed to eliminate certain conditions to closing.  Following the closing, AMER nominated Tong Zhang to serve as a director of the Company, and he was appointed by the Board of Directors on December 3, 2015.  Mr. Zhang was nominated by the Board of Directors to stand for election at the 2018 General Meeting of Stockholders and was elected by the stockholders to serve as a Class II director for a three (3) year term expiring in 2021, subject to re-election.  On July 29, 2019, Mr. Zhang resigned from the Board of Directors.

 

On October 16, 2017, the Company and AMER announced the closure of the second tranche of the parties’ three-tranche financing agreement.  At the close of the second tranche, General Moly issued 14.6 million shares to AMER, priced at the volume weighted average price (“VWAP”) for the 30-day period ending August 7, 2017 (the date of the parties’ Amendment No. 2 to the AMER Investment Agreement) of $0.41 per share for a private placement of $6.0 million by AMER.  $5.5 million of the equity sale proceeds were available for general corporate purposes, while $0.5 million was held in the expense reimbursement account established at the close of the first tranche to cover costs related to the Mt. Hope Project financing and other jointly sourced business development opportunities.

 

The third tranche of the amended Amer Investment Agreement was to include a $10.0 million private placement representing 20.0 million shares, priced at $0.50 per share (“Tranche 3”).  Closing of Tranche 3 was conditioned upon the earlier of the reissuance of water permits for the Mt. Hope Project or completion of a joint business opportunity involving use of 10.0 million shares of General Moly stock.

 

The issuance of shares in connection with Tranche 3 was approved by General Moly stockholders in December 2017 at a Special Meeting of Stockholders.

 

The Company and AMER have jointly evaluated other potential opportunities, ranging from outright acquisitions and privatizations, or significant minority interest investments with a focus on base metal and ferro-alloy prospects, where the Company would benefit from management fees, minority equity interests, or the acquisition of both core and non-core assets.  The Company and AMER have considered but not completed any such transactions to date and we are not currently evaluating potential opportunities with AMER.  From commencement of the AMER Investment Agreement in 2015 to December 31, 2019, the Company and AMER spent approximately $2.5 million from the expense reimbursement account described above in connection with such evaluations.

 

Amer Disputes Obligation to Close Tranche 3 Private Placement Obligation

The last closing conditions for Tranche 3 under the AMER Investment Agreement included issuance of water permits for the Mt. Hope Project.  The water permits were issued by the Nevada State Engineer on July 24, 2019.  On July 26, 2019, the Company provided formal notice to AMER that the conditions to closing of Tranche 3 had been satisfied, and that AMER had two business days (until the close of business on Tuesday, July 30, 2019) to close the transaction.  On July 31, 2019, the Company sent a Notice of Default to AMER, as AMER failed to fund and close Tranche 3 by the July 30, 2019 deadline.

On August 1, 2019, the Company received a letter from AMER dated July 30, 2019, purporting to terminate the AMER Investment Agreement, referencing its earlier letter received by the Company on July 18, 2019, in which AMER alleged uncured material adverse effects and alleged breaches of the AMER Investment Agreement by the Company (which include concerns related to US/China relations, concerns regarding the delay in obtaining environmental permits and solvency concerns).  The Company believed that such assertions were inaccurate and wholly without merit under the terms of the AMER Investment Agreement.  Additionally, as AMER disputed its obligation to fund the close of Tranche 3, the Company believed that AMER’s attempted termination of the AMER Investment Agreement was ineffective.  With AMER’s failure to fund Tranche 3, the Company had inadequate cash to continue operations and was forced to evaluate its options, including pursuing asset sales, short-term financing options and, if such efforts were unsuccessful in obtaining sufficient financing, the possibility of seeking bankruptcy protection. 

 

On August 28, 2019, the Company engaged King & Spalding, an international arbitration and litigation firm, to represent the Company in its Tranche 3 dispute with AMER.  The Company also formally notified AMER that a Dispute, as defined by the AMER Investment Agreement, existed between the parties as a result of AMER’s failure to close Tranche 3.  The notification required that one representative of each of the executive management of the parties be designated and authorized to attempt to settle the Dispute and the representatives were to meet in good faith to resolve

9

the Dispute.  If the designated representatives did not resolve the Dispute within 10 business days after delivery of the Notice, the Dispute was subject to resolution by binding arbitration, pursuant to the AMER Investment Agreement in Hong Kong SAR under the rules of the International Chamber of Commerce.

 

On October 14, 2019, the Company announced that it had entered into an agreement with AMER to extend the dispute negotiation period (“Extension Agreement”).  Under the terms of the Extension Agreement, the Company received $300,000 from AMER in exchange for an extension of the negotiation period to November 15, 2019, on which date the Company’s CEO Bruce Hansen and AMER Chairman Wang Wen  Yin met to discuss settlement options.  With the payment, AMER had the right, at its option, to apply the Extension Fee among the following: (1) credit against a final negotiated settlement; (2) credit against any AMER payment obligation to the Company, pursuant to an arbitration award; or (3) as consideration for the purchase of the Company’s common stock, priced at the 30-day volume weighted average price, as of the date immediately prior to the date that AMER demands delivery of such shares. 

 

On December 9, 2019, the Company and an affiliate of AMER announced the closure of a $4.0 million private placement at a price of $0.40 per common share of General Moly common stock under a new Securities Purchase Agreement (“SPA”) and amended and restated warrant agreement (“New AMER Warrant”), resolving the Dispute.  Additionally, the parties agreed to a mutual release, terminating the previous AMER Investment Agreement, the prior Warrant, and the Dispute Negotiation Extension Agreement (“Extension Agreement”).  The parties’ previous Stockholder Agreement expired by its terms on November 24, 2019.  In addition to the 10.0 million shares issued by General Moly to AMER in the private placement, AMER also received 1.1 million General Moly common shares priced at $0.27/share, the 30-day volume weighted average price of the Company’s shares on December 6, 2019 utilizing the previously $300,000 extension fee, pursuant to the terms of the Extension Agreement. 

 

Additionally, AMER nominated Mr. Siong Tek (“Terry”) Lee to serve the remaining term of AMER’s previous director nominee (Tong Zhang) expiring at the Company’s annual meeting in 2021.  AMER may nominate a second director to the Board so long as its shareholding exceeds 20% of the Company’s shares outstanding.

 

Bank Loan

 

Under the new SPA, AMER has agreed to use its reasonable best efforts to assist the Company in obtaining a loan from one or more prime Chinese banks (“Bank Loan”), for the Company’s share of construction and development costs at the Mt. Hope Project.  As discussed above, for every $100 million of sourced Chinese bank lending that AMER has assisted in contributing to a completed $700 million project debt financing, AMER may exercise 12 million warrants issued under the New AMER Warrant at an exercise price of $0.50 per share, up to 80 million warrants. 

 

Supply Agreement

 

Furthermore, upon closing of a minimum of $100 million from AMER’s efforts toward the completion of a Chinese bank $700 million project financing, AMER has the option to enter into a moly supply agreement with General Moly to purchase Mt. Hope Project sourced moly at a small discount to spot pricing when the Mt. Hope Project achieves full commercial production.  The saleable amount of moly to AMER escalates from an aggregate 3 million pounds per year to 20 million pounds per year over the first five years of mine production based on the level of project financing assisted by AMER towards the $700 million project financing.

 

Permitting

 

Permitting Process Overview

 

The development, operation, closure and reclamation of mining projects in the U.S. require numerous notifications, permits, authorizations, and public agency decisions.  This section does not attempt to exhaustively identify all of the permits and authorizations that need to be granted, but instead focuses on those that are considered to be critical for Mt. Hope Project and/or Liberty Project start-up.

 

Environmental Evaluations

 

There are certain environmental evaluations that routinely must be completed in order to provide the information against which project impacts are measured.  Both the BLM and Nevada Department of Environmental

10

Protection (“NDEP”) have requirements to profile existing conditions and to evaluate what effects will result from developing the Mt. Hope Project.

 

Reports summarizing background information on geology, air quality, soils, biology, water resources, wildlife, vegetation, noise, visual resources, social and economic conditions, and cultural resources have been assembled and have been submitted to the appropriate regulatory agencies.  These reports have been approved during the permitting process.

 

Mt. Hope Permitting Requirements

 

The Mt. Hope Project requires both federal and state of Nevada permits before construction and operations can commence.  Major permits required for the Mt. Hope Project include the ROD, a BLM issued permit, water appropriation permits from the Nevada Division of Water Resources, the Water Pollution Control (“WPC”) permit and Reclamation Permit from the NDEP—BMRR, received in November 2012, and an Air Quality Permit (“AQP”) from the NDEP—Bureau of Air Pollution Control (“BAPC”), received in May 2012.  We continue to comply with the conditions of these permits and update or renew them as appropriate.

 

History of Record of Decision (ROD)

 

On November 16, 2012, the BLM issued its initial ROD authorizing development of the Mt. Hope Project.  The ROD was subsequently vacated by the U.S. Court of Appeals for the Ninth Circuit in December 2016, discussed below.  Also, on April 23, 2015, the BLM issued a Finding of No Significant Impact (“FONSI”) supporting their Decision to approve an amendment to the PoO.  The initial ROD and FONSI/Decision approved the PoO and amended PoO, respectively, for construction and operation of the mining and processing facilities and also granted the Right-of-Way, and amended Right-of-Way, respectively, for a 230kV power transmission line, discussed below.  Monitoring and mitigation measures identified in the initial ROD and FONSI, developed in collaboration with the regulatory agencies involved throughout the permitting process, will avoid, minimize, and mitigate environmental impacts, and reflect the Company’s commitment to be good stewards of the environment.  Ongoing changes to permits and the PoO during the life of mining operations are typical as design evolves and operations are optimized.

 

On February 15, 2013, Great Basin Resource Watch and the Western Shoshone Defense Project (“Plaintiffs”) filed a Complaint against the U.S. Department of the Interior and the BLM (“Defendants”) in the U.S. District Court, District of Nevada (“District Court”), seeking relief under the National Environmental Policy Act (“NEPA”) and other federal laws, challenging the BLM’s issuance of the initial ROD for the Mt. Hope Project, and on February 20, 2013 filed a Motion for Preliminary Injunction.  The District Court allowed the LLC to intervene in the matter.

 

On August 22, 2013, the District Court denied, without prejudice, Plaintiffs’ Motion for Preliminary Injunction based on a Joint Stipulation to Continue Preliminary Injunction Oral Argument, which advised the District Court that as a result of economic conditions, including the Company’s ongoing financing efforts, all major ground disturbing activities had ceased at the Mt. Hope Project.

 

On July 23, 2014, the District Court denied Plaintiffs’ motion for summary judgment in its entirety and on August 1, 2014 the Court entered judgment in favor of the Defendants and the LLC, and against Plaintiffs regarding all claims raised in the Complaint. 

 

Thereafter, on September 22, 2014, the Plaintiffs filed their notice of appeal to the U.S. Court of Appeals for the Ninth Circuit (“Ninth Circuit”) of the District Court’s dismissal.  Oral argument of the parties before the Ninth Circuit was completed on October 18, 2016.  On December 28, 2016, the Ninth Circuit issued its Opinion rejecting many of the arguments raised by the Plaintiffs, but issued a narrow reversal of the BLM's findings related to air quality analysis and information related to potential public water resources. Because of this technical deficiency, the Court vacated the initial ROD.

 

Re-Issuance of Record of Decision Approving Supplemental Environmental Impact Statement (“SEIS”)

 

On remand from the Ninth Circuit to the BLM, the agency conducted additional evaluation of air quality impacts and resulting cumulative impact analysis under NEPA in preparation of a Supplemental Environmental Impact Statement (“SEIS”).  The SEIS disclosed additional information to the public related to the selection of appropriate background concentrations to use for dispersion modeling of air pollutants and information related to potential public

11

water reserves.  Because the SEIS must be prepared in accordance with NEPA guidelines, the SEIS process included three publications in the Federal Register:    the first was the Notice of Intent (“NOI”) which was published on July 19, 2017; the second, the Notice of Availability (“NOA”) of the Draft SEIS (“DSEIS”) was published on March 6, 2019, and on September 27, 2019; the third, an NOA of the Final SEIS, was published announcing that the BLM had re-issued the ROD marking completion of the NEPA process, approval of the SEIS, and reauthorization of the PoO.  On October 31, 2019, a Complaint was filed against the U.S. Department of Interior and the BLM in the U.S. District Court in Nevada, challenging the re-issuance of the ROD.

 

On March 11, 2020, the LLC filed its unopposed Motion to Intervene in the U.S. District Court on behalf of the Mt. Hope Project.  The District Court approved the LLC’s intervention on March 19, 2020 and the LLC’s Answer to the Complaint was filed on March 20, 2020.  The LLC will work closely with the BLM and DOI to defend the claims filed by Great Basin Resource Watch and Western Shoshone Defense Project.

 

Reclamation Considerations

 

Environmental regulations related to reclamation require that the cost for a third party contractor to perform reclamation activities on the minesite be estimated.  In October 2015, we submitted a request to the BLM to reduce our reclamation liability to current surface disturbance.  Simultaneously, we submitted an application to NDEP-BMRR to modify the Reclamation Permit to reflect this reduced reclamation liability. On October 26, 2015, NDEP-BMRR approved the proposed permit modification, including the reduced reclamation liability amount.   On December 21, 2015, BLM approved the updated reclamation liability estimate, reducing the reclamation liability to approximately $2.8 million.  In early 2019, the Company submitted, and BLM approved a required 3-year update to the reclamation liability estimate, resulting in an increased liability of approximately $3.1 million.  We worked with the LLC’s reclamation surety underwriters to satisfy the $2.8 million financial guarantee requirements under the approved amended PoO for the Mt. Hope Project and funded the $0.3 million increase in cash directly with the BLM in April 2019.  As of December 31, 2019, the surety bond program was funded with a cash collateral payment of $0.3 million.

 

Utilities Environmental Protection Permit

 

On January 2, 2013, the Public Utilities Commission of Nevada (“PUCN”) issued the LLC a permit to construct a 230kV power line that will interconnect with Nevada Energy’s transmission system at the existing Machacek Substation located near the town of Eureka, Nevada and extend it approximately 25 miles to the planned Mt. Hope Substation.  This permit was obtained pursuant to the Utilities Environmental Protection Act, intended to balance the potential environmental impact of a proposed utility with the public interest served by such facility.  The PUCN permit allows the LLC to build the transmission infrastructure in a timely manner and provide the necessary capacity to power construction activities and Mt. Hope Project operations. Construction of the transmission line will also include upgrades to the existing Machacek Substation near Eureka that will improve the reliability of electrical power to the community.  At full production, the Mt. Hope Project will have a total electrical demand load of approximately 75 megawatts. Transmission capacity will be secured using a network services agreement and the LLC will negotiate for generating capacity prior to the Mt. Hope Project commissioning activities, which will be available once the power line is constructed and energized.

 

Water Pollution Control Permit—Nevada Division of Environmental Protection—Bureau of Mining Regulation and Reclamation

 

The BMRR administers the program for the WPC Permit, which is required for the Mt. Hope Project.  The WPC Permit program specifies design criteria for containment of process fluids and mandates development of monitoring, operational, and closure plans.  The WPC Permit requires renewal every five years.  We received the WPC Permit in November 2012, and have recently received approval for the renewed WPC permit.

 

Reclamation Permit —Nevada Division of Environmental Protection—Bureau of Mining Regulation and Reclamation and Bureau of Land Management

 

The BMRR administers the program for the Reclamation Permit, which is required for the Mt. Hope Project.  The Reclamation Permit approves the proposed reclamation methods, specifies reclamation objectives, and requires bonding based on the reclamation cost estimate.  Environmental regulations require that the reclamation cost estimate be based on the cost for a third-party contractor to perform the approved reclamation activities.  We received the

12

Reclamation Permit in November 2012.   Regulations also require that the reclamation cost estimate be updated every three years.   BMRR and BLM are jointly responsible for review and approval of the reclamation cost estimate.   

 

Air Quality Permit—Nevada Division of Environmental Protection—Bureau of Air Pollution Control

 

The Nevada BAPC regulations categorize permit types as Class 1 or Class 2, based on the estimated emissions amounts.  The Mt. Hope Project is subject to a Class 2 permit (smaller emissions) based on emissions estimates.  The permit application included an emissions inventory and dispersion modeling to demonstrate that emissions from the project will not exceed established air quality standards.  Emissions are primarily associated with the crush/grind circuit (particulate matter) and the roaster (sulfur oxides).  Roaster emissions will be controlled with a 99.7% estimated removal efficiency for sulfur oxides. We received the Air Quality Permit (“AQP”) in May 2012.

 

Minor process changes identified through continued engineering and the preliminary phase of construction, were compiled into an application to amend the AQP, and submitted to Nevada BAPC on December 23, 2013.  A revised AQP was issued on July 30, 2014.  The air permit requires renewal every five years.  A renewal application was timely submitted to BAPC, and is being processed.

 

Water Rights Considerations

 

History of Mt. Hope Water Permits

 

In July 2011, the Nevada State Engineer (“State Engineer”) initially approved our applications for new appropriation of water for mining and milling use, and applications to change existing water from agricultural use to mining and milling use for the Mt. Hope Project.  Subsequently, the State Engineer granted water permits associated with the approved applications and approved a Monitoring, Management and Mitigation Plan (“3M Plan”) for the Mt. Hope Project.  Eureka County, Nevada and two other parties comprised of water rights holders in Diamond Valley and Kobeh Valley appealed the State Engineer’s decision approving the applications and granting the water permits to the Nevada State District Court (“District Court”) and then filed a further appeal to the Nevada Supreme Court challenging the District Court’s decision affirming the State Engineer’s decision to approve the applications and grant the water permits.  In June 2013, the appeal was consolidated by the Nevada Supreme Court with an appeal of the State Engineer’s approval of the 3M Plan filed by two water rights holders.  The District Court previously upheld the State Engineer’s approval of the 3M Plan and the two parties subsequently appealed the District Court’s decision to the Nevada Supreme Court. 

 

On September 18, 2015, the Nevada Supreme Court issued an Order that reversed and remanded the cases to the District Court for further proceedings consistent with the Order.  On October 29, 2015, the Nevada Supreme Court issued the Order as a published Opinion.  The Nevada Supreme Court ruled that the State Engineer did not have sufficient evidence in the record at the time he approved the applications and granted the water permits to demonstrate that successful mitigation may be undertaken so as to dispel the threat to existing water rights holders.

 

On September 27, 2017, the Nevada Supreme Court affirmed a March 4, 2016 District Court Order vacating the 3M Plan, denying the water applications and vacating the permits issued by the State Engineer in July 2011 and June 2012.  This decision of the Nevada Supreme Court was final, and not subject to further appeal.

 

New Change Applications for Water Use at Mt. Hope Project

 

After the Company received the September 2017 decision from the Nevada Supreme Court, it proceeded with new applications to change existing agricultural irrigation and mining/milling water rights owned by the Company to use at the Mt. Hope Project.  These new change applications had been filed with the State Engineer in 2015 and 2016 while the above described appeals were pending before the Nevada Supreme Court.  Originally, these applications and other new appropriation applications were to be addressed at a pre-hearing conference scheduled on August 25, 2016 before the State Engineer.  These applications were the subject of a Writ of Prohibition or Mandamus (“Writ”) filed by Eureka County on August 23, 2016 to the Nevada Supreme Court seeking the Supreme Court’s intervention to stop further action by the State Engineer while the appeals discussed above were pending.  On December 22, 2017 the Nevada Supreme Court denied Eureka County’s Writ Petition.  As a result, the State Engineer allowed a pre-hearing conference held on January 24, 2018.  At the pre-hearing conference the State Engineer and his hearing officer scheduled review of the new change applications for a September 11, 2018 hearing in Carson City, Nevada. 

13

 

On January 2, 2018, Eureka County, and later joined by the other two protestants representing a rancher in Kobeh Valley and a ranching group in Diamond Valley, filed a motion to dismiss with the State Engineer asserting that our applications were precluded from review and approval asserting that they were repetitive of the applications denied previously by the Nevada Supreme Court in its September 2017 decision.  On March 26, 2018, the State Engineer issued a non-final order denying the motion to dismiss finding that the applications to be reviewed at the upcoming hearing were not identical issues and that further consideration of the motion could be taken at the hearing.  On May 14, 2018, Eureka County, joined by the other protestants filed a Writ to the Nevada Supreme Court and later a Motion to Stay the September hearing date, asserting that the denial of the Motion to Dismiss was erroneous and that the Nevada Supreme Court should order that the applications be denied and/or the September 2018 hearing should be delayed until the Nevada Supreme Court can consider the Writ and underlying motion to dismiss.  The Company filed its objection on June 27, 2018, and on August 30, 2018, the Nevada Supreme Court denied the Writ, permitting the September 2018 hearing before the Nevada State Engineer to proceed. 

 

On the second day of the September hearing, all protest issues raised by Eureka County and the Diamond Natural Resources Protections & Conservation Association (“DNR”) concerning the Mt. Hope water rights applications were resolved through a Stipulation, Settlement Agreement and Withdrawal of Protest (“Settlement”).  After Eureka County and DNR were excused, the hearing continued with evidence addressing concerns raised by another protestant representing a Kobeh Valley ranching family and cattle company that refused to participate in the Settlement. At the public hearing, the Company presented expert testimony in support of its augmentation and monitoring plan to the Nevada State Engineer, which will protect senior water rights in the Kobeh Valley basin when the Company commences construction and operation of its proposed Mt. Hope molybdenum project near the town of Eureka, Nevada.  The hearing concluded on September 21, 2018. 

 

Effective April 30, 2019, the Company, through its wholly owned subsidiary Kobeh Valley Ranch LLC (“KVR”) entered into a settlement agreement with a Kobeh Valley, Nevada ranching family (“Ranchers”), resolving the last set of protests pending before the Nevada State Engineer pertaining to the Mt. Hope Project’s water rights applications.

 

On June 6, 2019, the Nevada State Engineer issued Ruling 6464 granting the Company’s water rights applications for mining purposes.  The water right permits for the Mt. Hope Project were issued on July 24, 2019.  With receipt of and in compliance with the terms of the water permits, the water is available for consumptive use at the Mt. Hope Project.  Neither the issuance of Ruling 6464 nor the issuance of the water permits were challenged, and the deadline for filing any appeal has expired.

 

Key Terms of Settlements

Eureka County and the DNR

 

Under the terms of the Settlement with Eureka County and the DNR, the Company and the LLC agreed to convey all related water rights for Mt. Hope Project at the future cessation of all mining activity to assist Eureka County and the DNR’s efforts to mitigate the pre-existing effects of agricultural groundwater pumping in Diamond Valley. Furthermore, upon construction of certain power infrastructure and grants of right of way by the LLC at the Mt. Hope Project, the Company and the LLC will work cooperatively with Eureka County to allow use of and access to such infrastructure to lessen the pre-existing effects of Diamond Valley groundwater pumping. Eureka County, and the Company and the LLC, also agreed to work cooperatively to seek opportunities to improve and implement groundwater monitoring efforts.

In addition, the Company withdrew its protests to Eureka County’s pending applications with the Nevada State Engineer to appropriate water from the Kobeh Valley basin, and at the request of DNR, the Company also agreed to publicly support the proposed Diamond Valley Ground Water Management Plan currently pending before the Nevada State Engineer.

 

With receipt of the water permits, the LLC increased its financial contributions to the existing Agricultural Sustainability Trust Agreement, discussed above, with the Eureka Producers’ Cooperative (“EPC”) in Diamond Valley with an additional $50,000 to EPC.  Initially, upon execution of the Settlement, the LLC made a payment of $50,000. 

 

14

The LLC will make additional contributions of $750,000 each after the commencement of molybdenum production at the Mt. Hope Project and on the one-year anniversary of production, for a total contribution obligation to the Sustainability Trust of $5.6 million, an increase of $1.6 million related to the terms of the Settlement. The amount has been accrued under mining properties, land, and water rights in the Company’s financial statements in addition to the previously accrued $4.0 million resulting in a total accrual of $5.6 million.  The LLC has contributed $0.1 million into the Trust as of December 31, 2019.

 

The Sustainability Trust is tasked with developing and implementing programs that will serve to slow groundwater drawdown and thereby improve the sustainability of the agricultural economy in the Diamond Valley Hydrographic Basin.  

 

Kobeh Valley Ranching Family

 

At the execution of the settlement agreement, the LLC funded an initial payment of $1 million into a trust account; distribution to the Ranchers occurred when the water permits were issued on July 24, 2019.  Upon receipt of the initial $1,000,000 into the trust account, the Ranchers withdrew their protests and forfeited any judicial review of Ruling 6464 and the water applications and issuance of the water permits issued on July 24, 2019 by the Nevada State Engineer.

When conditions exist for the LLC to secure project financing, additional consideration of $14,000,000 will be payable to the Ranchers.  If the LLC has not secured Mt. Hope Project financing within 12 months of the executed settlement agreement or April 2020, the LLC will begin to make monthly payments of $10,000 to the Ranchers until financing is achieved and the remaining consideration will be paid to the Ranchers.

Pursuant to an April 29, 2019 Consent Agreement, the members of the LLC agreed that funding for the $1 million was advanced to the LLC by the Company, to preserve the joint venture’s existing reserve account.  General Moly sourced $500,000 from its available cash, and received the remaining $500,000 from closing a sale of Series A Convertible Preferred Shares in a private placement with Mount Hope Mines Inc. (“MHMI”), the Mt. Hope Project’s claim/land lessor, discussed in Items 1 and 2 above and later in Note 7 to the consolidated financial statements contained elsewhere in this report.

In exchange for General Moly advancing the $1,000,000 initial settlement funding, the LLC members have agreed to repay the $1 million advance from the proceeds of ongoing sales of non-critical LLC assets and lands.  On September 27, 2019, the Company and POS-Minerals entered into a further Consent Agreement for a reimbursement schedule concerning the approximately $700,000 owed to the Company by the LLC in return for the Company’s advance of funding to settle protests related to the water right applications for the Mt. Hope Project.  Under the September Consent Agreement, $200,000 was reimbursed from the Reserve Account to the Company on September 30, 2019 and an additional $200,000 was reimbursed in early November.  The remaining approximately $300,000 was reimbursed in March 2020 upon the sale by the LLC of more than $400,000 in non-critical Mt. Hope Project related equipment. 

 

Equipment and Supply Procurement

 

Through December 31, 2019, the LLC has made deposits and/or final payments of $88.0 million on equipment orders and has spent approximately $208.9 million for the development of the Mt. Hope Project, for a total Mt. Hope Project inception-to-date spend of $298.7 million.

 

In 2012, the LLC issued a firm purchase order for eighteen haul trucks.  The order provides for delivery of those haul trucks required to perform initial mine development, which will begin several months prior to commercial production.  Non-refundable down-payments of $1.2 million were made in 2012, with pricing subject to escalation as the trucks were not delivered prior to December 31, 2013.  Since that time, the LLC has renegotiated the timelines for truck delivery and delayed deliveries into December 2020.  The contract is cancellable with no further liability to the LLC.

 

Also in 2012, the LLC issued a firm purchase order for four mine production drills with a non-refundable down-payment of $0.4 million, and pricing was subject to escalation if the drills were not delivered by the end of 2013.  Since that time, the LLC accepted a change order which delayed delivery into December 2020.  The contract remains cancellable with no further liability to the LLC.

 

15

On June 30, 2012, the LLC’s contract to purchase two electric shovels expired.  On July 11, 2012, we signed a letter of intent with the same vendor providing for the opportunity to purchase the electric shovels at prices consistent with the expired contract, less a special discount in the amount of $3.4 million to provide credit to the LLC for amounts paid as deposits under the expired contract.  The letter of intent provides that equipment pricing will remain subject to inflation indexes and guarantees production slots to ensure that the equipment is available when required by the LLC.  Since that time, the parties agreed to extend the letter of intent through December 31, 2020.

 

Accessibility, Climate, Local Resources, Infrastructure, and Physiography

 

Access

 

The Mt. Hope Project has year-round access from Route 278.  The land package includes the land between the project site and Route 278 making the project accessible from existing roads.

 

Climate

 

Climate in the area is moderate, with average highs in July of about 85 degrees Fahrenheit and lows in January of about 17 degrees Fahrenheit.  Precipitation in the area is relatively low with annual precipitation averages of about 12 inches.  Operations at the site are planned to continue year-round.

 

Local Resources and Infrastructure

 

The town of Eureka, Nevada is approximately 21 miles to the south of the Mt. Hope Project, via Route 278.  The infrastructure requirements to support the mine and mill concentrator consist of bringing power and water to the property, commensurate with the operational requirements, including developing a water wellfield within the Kobeh Valley water basin, constructing site access roads, constructing maintenance shops for the mine and plant administrative offices, constructing a potable water supply system, constructing septic drain field systems, installing emergency power generators and propane gas tanks, and installing facilities for project communications.  A 230kV power line is expected to be developed from the Machacek substation near Eureka to the mine site.

 

Water Rights and Surface Rights

 

Planned water wells, located approximately 6 miles to the southwest of the planned operating facilities, are anticipated to supply approximately 7,000 gallons per minute to the Mt. Hope Project.  Exploration for water is sufficiently advanced to identify the source of water that will be used for all project water needs, with final fresh water development to occur during the construction of the project.  (See “—Permitting — Mt. Hope Permitting Requirements — Water Appropriation Permits—Nevada Division of Water Resources” above for a discussion of the current status of our applications for water rights for use in the Mt. Hope Project).

 

Surface rights on the Mt. Hope Project include BLM open range grazing rights; water rights are located in the vicinity of the Project.  Two power line easements cross within the property boundaries.  An existing easement for a 345kV transmission line runs north-south on the western edge of the property and the other existing easement is a medium-voltage power line that runs east along the existing main access road that connects to Route 278 to the eastern property boundary.  The LLC also has a right-of-way from the BLM for a microwave relay that provides network communications and voice radio capability for the mine site and will provide improved cellular service to the surrounding community. 

 

Physiography

 

The Mt. Hope area lies within an area of north-south trending mountains separated by alluvial valleys.  The primary mountain ranges in the Mt. Hope area include the Roberts Mountains, Sulphur Spring Range, Diamond Mountains, Simpson Park Range, and the Cortez Mountains.  Elevations of the mountains range from approximately 6,800 feet for the crests of the Sulphur Spring range to over 10,000 feet for the Roberts Mountains.

 

The major valleys in the Mt. Hope region are Diamond Valley to the east, Pine Valley to the north, and Kobeh Valley to the west and southwest of the Mt. Hope Project.  Diamond and Pine Valleys are elongated in a north-south direction.

16

 

Valleys are typically underlain by up to several thousand feet of unconsolidated to poorly consolidated alluvium.  Mountains are characterized by extensive bedrock exposures.  Soils are typically thin and poorly developed.

 

Generally, groundwater in the mountains is hosted in fracture-controlled aquifers, while groundwater in the valleys is in porosity-controlled aquifers.

 

The upper portions of the valleys are similar in nature and are characterized by slightly incised stream channels with no significant associated floodplain.  The uplands and mountains have slopes ranging from moderate to steep (over 30 percent) with shallow to deep, moderately alkaline to medium acidic soils.  Bedrock is often within 0.5 meters of the surface, particularly on the steep upland slopes.

 

Lake sediments make up the largest areas in the valleys.  The slopes range from smooth to rolling (0 to 15 percent) and the soils vary from shallow to deep and mildly to strongly alkaline.  The surface textures range from silty clay loams to gravelly sandy loams and local sand.  The permeability of these soils ranges from slow to rapid.

 

The natural vegetation of the region consists of pinion juniper and sagebrush with grass.  The pinion juniper occupies the higher elevations of the mountain slopes, with the lower areas in the valley covered predominantly with sagebrush, shrubs, and perennial bunchgrasses.

 

Mt. Hope, located in the lower foothills of the southeast flank of the Roberts Mountains, stands approximately 8,400 feet in elevation.  Areas to the east and southeast of the Mt. Hope Project slope gently to elevations from 6,400 to 7,900 feet.  Diamond Valley, situated to the south and east, is approximately 6,000 feet in elevation.

 

These physiographic attributes are typical of other major mines in Nevada.

 

History

 

Mt. Hope Prior Ownership and Results of Exploration Work

 

Lead-zinc ores were discovered at Mt. Hope in 1870, and small-scale mining was carried out sporadically until the 1970s.  Zinc and adjacent copper mineralization were the focus of drilling activities by Phillips Petroleum in the early 1970s and by ASARCO and Gulf (“ASARCO”) in the mid-1970s, which outlined further zinc mineralization.  The last drill hole of this series encountered significant molybdenum mineralization at depth west of the zinc deposits.  The significance of this mineralization was first recognized by ASARCO in 1976, but ASARCO did not reach an agreement with MHMI to test this potential.

 

Exxon recognized molybdenum potential at Mt. Hope in 1978 and acquired an option on the property from MHMI.  By 1982, Exxon had completed 69 drill holes, which partially defined a major molybdenum deposit underlying the east flank of the Mt. Hope property.  Exxon conducted a +/-25% feasibility study of the Mt. Hope project in 1982.  A draft EIS was completed on the project and public hearings were held in early 1985.  Exxon drilled an additional 60 holes on the property between 1983 and 1988 but did not update their deposit block model with data from the post-1982 holes.  Cyprus drilled four holes on the property in 1989-90 under an agreement with Exxon but did not pursue the project.  Exxon retains a perpetual 1% royalty interest, as discussed above in “—Description of the Mt. Hope Project—Royalties, Agreements and Encumbrances—Production Royalty.”

 

We established an agreement with MHMI in 2004 pursuant to which we obtained access to the work completed by previous companies that had evaluated the property, including drill core and drill data.  We used this data as the basis for developing an evaluation of the Mt. Hope deposit.  The evaluation provided the basic engineering, plant design and other aspects of analysis of the Mt. Hope Project and outlined a positive operating process, waste disposal, mine design and plan, preliminary Environmental Assessment (“EA”), permitting plan, operating and capital cost estimates, and the corresponding estimates of mineralized material. 

 

17

Geology

 

Mt. Hope is located in north-central Nevada on the eastern edge of a mineral belt linking ore deposits of diverse ages. The Battle Mountain-Eureka mineral belt, a northwest-southeast trending corridor about 250 miles long, has localized major deposits of gold, silver, copper, and molybdenum.

 

The Mt. Hope molybdenum ore deposit occurs in an area of about two square miles of elevated igneous rocks.  The mineralized complex includes a variety of igneous rocks derived from a common volcanic source.  Quartz porphyry, the primary molybdenum host rock, is commonly veined with molybdenite.  Subordinate molybdenum mineralization also occurs in hornfels. The known orebody occurs in two zones of the quartz porphyry stock and hornfels wallrocks.

 

The ore deposit is a molybdenum porphyry, which is classified as a “Climax-type” deposit.  This type of deposit has well zoned molybdenum mineralization.  The molybdenum mineral content, termed grade zoning, surrounds the central area of the deposit and forms geometries that are circular in plan and arch shaped in section. Mt. Hope has two of these mineralized systems adjacent to each other.  The mineral zones or “shells” consist of quartz porphyry and hornfels cross-cut by quartz stockwork veining containing molybdenite.

 

Mineralization

 

The main form of molybdenum mineralization that occurs within the orebody is molybdenite (MoS2 - molybdenum disulfide).  Much of the known molybdenite is distributed around two lobes and offshoots of the main quartz porphyry stock and within two separate mineralized zones.  A concentration of higher-grade mineralization is present between the eastern and western mineral zones.  This overlap mineralization lies beneath the Mt. Hope Fault, and the upper, eastern edge is truncated by the fault surface.  The overlap zone is interpreted as a rock volume that was mineralized by both mineral systems in sequence, contributing to a greater intensity of stock work veining and additive molybdenum grades.  Referred to as the Mt. Hope Fault Zone, this area is approximately 1,300 feet in diameter and varies from 325 to 985 feet deep.  This zone will be the target of open pit mining in the first 7 years of the project. 

 

Exploration

 

The majority of the exploration activities were completed prior to our leasing the property from MHMI.  However, since acquiring access to the Mt. Hope Project, we have completed additional exploration drilling for molybdenum for the purposes of supporting our BFS and subsequent January 2014 Technical Report and obtaining engineering information for items such as geotechnical design, hydrology, and condemnation for waste dumps and tailing ponds as well as infill drilling for ore calculation purposes.

 

All core and assay results from the extensive drilling campaigns are available to the Company.  Accordingly, this data has been incorporated into a high quality database and has been used to analyze and quantify the mineral resource.  The drilling at the Mt. Hope Project has been predominately performed by utilizing diamond core methods, and some reverse circulation (“RC”) in areas of condemnation and water well drilling.  The drill hole database used in the current mineral resource estimate includes 267 holes drilled for a total of 324,634 feet of drilling; 247,893 feet of which are core and RC collar/core finish, the remaining 76,741 feet are RC.

 

Ore to Be Mined

 

The table below summarizes the ore grades we would expect to mill under an $8.00/lb Mo open pit design:

 

Mill Feed Ore Statistics

 

 

 

 

 

 

 

 

 

 

    

    

    

Average

    

    

 

 

 

 

 

Grade

 

Mo

 

Category

 

Ktons

 

Sulfide Mo%

 

Recovery %

 

Ore in Years 1-5

 

120,736

 

0.094

 

89.8

 

Ore in Years 1-10

 

242,441

 

0.086

 

89.5

 

Ore Life of Mine

 

367,385

 

0.079

 

89.3

 

 

18

Based on these estimates, from the inception of production through year 16, the mill will process 367 million tons of ore at an average ore grade of 0.079% sulfide molybdenum (“sulfide Mo”).  Waste material totaling 818 million tons will also be mined and stockpiled on site.

   

If the molybdenum price is above $12.00/lb, the Mt. Hope Project will operate under a $12.00/lb Mo open pit design.  Based on this design, from the inception of production through year 34, the mill would process 820 million tons of ore at an average ore grade of 0.076% sulfide Mo.  During the active mining period, low-grade ore totaling 165 million tons with an average ore grade of 0.039% sulfide Mo will be stockpiled for later feed into the mill from years 34 through 41.  Waste material totaling 1.7 billion tons will also be mined and stored on site. 

 

During the first thirteen years of production, there would be no meaningful change in ore tonnage and grades between the $8.00 and $12.00 designs.  The divergence would come in later years resulting in the economic processing of lower grade ores at higher molybdenum prices.

 

Mining

 

The Mt. Hope Project is planned for production by conventional large-scale, hardrock, open-pit mining methods.  The mine plan provides for primary loading with a fleet of two electric cable shovels, one hydraulic shovel, and one front-end loader.  The mine fleet is expected to include 24 240-ton trucks by the end of the first full year of production.  Once construction commences, the LLC anticipates engaging a contractor to perform approximately 10 months of pre-production stripping concurrent with the initial phases of construction of the Mt. Hope Project.

 

Ore will be hauled directly to the crusher at the southeast side of the pit.  Waste will be delivered to one of four waste sites located around the mine.  One low grade stockpile will be located to the east of the pit.  The low-grade material will be re-handled and processed through the plant following the initial mining of higher grade ore.

 

Process Overview

 

The process circuit will include:

 

·

Primary Crusher & Coarse Ore Stockpile—The primary crusher will be located adjacent to the pit and crushed ore will be fed to a 70,000 ton live capacity stockpile.

 

·

Semi-Autogenous Grinding (“SAG”) & Ball Mill Circuit—Ore will be reclaimed from the stockpile from up to four feeders and fed by conveyor to the SAG mill.  The design will allow for the addition of a pebble crusher.  Following the SAG mill, the ore will be ground to 80% passing 150 micrometers in the two ball mills at an average daily processing rate of 66,688 tons.

 

·

Flotation Circuit—Following the grinding circuit, the ore will be processed in a conventional flotation plant.  The molybdenum ore will be treated through two banks of rougher/scavenger flotation, one stage of first cleaners followed by regrind, and six additional stages of cleaner flotation.  Some molybdenum concentrates with higher levels of included metals will be treated through a concentrate leach facility to produce the cleaned, final molybdenum concentrate.  Metallurgical results have indicated that an estimated mill recovery of approximately 89% is achievable across grades ranging from 0.04% through 0.10% molybdenum (“Mo”) with final concentrate grades of approximately 54% to 56% Mo.

 

·

Roaster Circuit—Molybdenum concentrate will be further processed in two multi-hearth roasters to produce technical grade molybdenum trioxide product.  The roasting facility will provide a fully integrated process.

 

Tailing Facility

 

The proposed mining and processing operation is expected to produce approximately 24 million tons of tailing (including gypsum generated by the scrubber) per year.  The tailing storage facility layout provides for the construction of one tailing impoundment that could contain approximately 30 years of operations.  The tailing impoundment will be constructed with plastic liners to provide for groundwater protection.

 

19

Reserves and Mineralized Material

 

Based on the $8.00/lb Mo pit design, the current statement of proven reserves totals 177.5 million tons of ore at an average grade of 0.094% molybdenum and probable reserves totaling 189.8 million tons of ore at an average grade of 0.066% molybdenum, as summarized below:

 

Statement of Reserves and Mineralized Material

Units = Short Tons

 

Reserves

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cutoff Grade

 

Proven Reserves

 

Probable Reserves

 

Proven+Probable Reserves

 

 

    

 

    

Grade

    

 

    

Grade

    

 

    

Grade

 

Sulfide Mo

 

Ktons

 

Sulfide Mo

 

Ktons

 

Sulfide Mo

 

Ktons

 

Sulfide Mo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0.039

%  

177,537

 

0.094

%  

189,848

 

0.066

%  

367,385

 

0.080

%

 

Additional Mineralized Material

 

 

 

 

 

 

 

Cutoff Grade

 

Mineralized Material

 

 

    

 

    

Grade

 

Sulfide Mo

 

Ktons

 

Sulfide Mo

 

 

 

 

 

 

 

0.025

 

682,460

 

0.061

%

 

Footnotes to Statements of Reserves and Mineralized Material

 

The Company tabulated reserves at a cutoff grade of 0.039% sulfide Mo and a pit design based on a price of $8.00/lb of contained molybdenum as saleable molybdenum tri-oxide (“TMO”).  As of December 31, 2019, the 4 year backward average price (2016-2019) for molybdenum was $9.80/lb, as reported by Platts.  As of March 25, 2020, the spot price was $8.48/lb.  The 4 year forward looking nominal average price (2020-2023) forecast by the CPM Group (a leading commodities research and consulting firm) is $12.67/lb.  The average of the past 4 years and the future 4 years yields $11.24/lb.  At this average price, the estimated mineral sales from the $8.00/lb molybdenum pit mine plan generates a positive non-discounted, forward-looking cash flow.  Consequently, the $8.00/lb reserve pit design is very conservative and is maintained for this reporting period.

 

The reserve at the Mt. Hope Project is based on a revised, non-optimized mine plan and production schedule, which was supervised by John M. Marek, P.E., President, Independent Mining Consultants, as a Qualified Person.  Mr. Marek also served as the Qualified Person for the January 2014 Technical Report entitled “Mount Hope Project, Form 43-101F1 Technical Report Feasibility Study, January 15, 2014” and, among other, was specifically responsible for Chapter 14 Mineral Resource Estimates and Chapter 15 Mineral Reserves.

 

The reserve at the Mt. Hope Project is based on a block model that utilized the statistical process of Indicator and Ordinary Linear Kriging constrained by appropriate rock type and grade boundaries.  Floating cone pit design algorithms were used to establish the guidelines to design the reserve pit.  Mine planning utilized conventional mine equipment to prepare mine cost estimates.

 

Mineralized material is tabulated within the $12.00/lb pit outline that defined the previous reserves in January of 2014.  The additional mineralized material is proven and probable category above a 0.025% Sulfide Mo cutoff that is inside of the historic $12.00/lb Mo pit but does not include the reserve material contained in the $8.00/lb Mo pit.

 

The metallurgical recovery applied to the financial models used in the determination of reserves was variable by grade, with 89.8% for the first five years of mining, 89.5% for the first ten years, and 89.3% for the life of mine.  The molybdenum roaster recovery was held constant at 99.2%.

 

20

Capital & Operating Cost Estimates

 

Presently, the development of the Mt. Hope Project has a Project Capital Estimate of $1,312 million, which includes development costs of approximately $1,245 million and $67 million in cash financial guaranty/bonding requirements, advance royalty payments, and power pre-payment estimates.  These capital costs were updated in the third quarter of 2012 and were then escalated by approximately 3% in the third quarter of 2013, for those items not yet procured or committed to by contract.  The Mt. Hope Project has not materially changed in scope and remains currently designed at approximately 65% engineering completion, with solid scope definition.  The pricing associated with this estimate remains subject to escalation associated with equipment, construction labor and commodity price increases, and project delays, which will continue to be reviewed periodically.  The Project Capital Estimate does not include financing costs or amounts necessary to fund operating working capital and potential capital overruns, is subject to additional holding costs as financing activities for construction of the Mt. Hope Project are delayed and may be subject to other escalation and de-escalation as contracts and purchase arrangements are finalized at then current pricing.  From October 2007 through the year ended December 31, 2019, the LLC spent approximately $298.7  million of the estimated $1,312 million on development of the Mt. Hope Project.

 

The LLC’s Project Operating Cost Estimate (for the $8.00/lb mineral reserve) forecasts molybdenum production of 41 million pounds per year for the first five years of operations at estimated average direct operating costs of $6.16 per pound based on $90 per barrel oil equivalent energy prices.  The Costs Applicable to Sales (“CAS”) per pound, including anticipated royalties calculated at a market price of $15 per pound molybdenum, are anticipated to average $6.84 per pound for the first 5 years.  For a reconciliation of direct operating costs, a non-GAAP measure, to CAS, see “—Production and Operating Cost Estimates” below.  These cost estimates are based on 2013 constant dollars and are subject to cost inflation or deflation. 

 

The anticipated capital requirements of the Mt. Hope Project are divided into cost categories in the following table:

 

 

 

 

 

 

 

 

 

 

 

Millions $US

 

 

    

 

 

    

2013

 

 

 

2012

 

Revised

 

Category

 

Estimate

 

Estimate

 

Mining equipment

 

$

150

 

$

149

 

Construction, materials & plant facilities

 

 

583

 

 

595

 

Owners cost, pre-stripping, camp

 

 

245

 

 

265

 

Taxes, freight, commissioning, spares

 

 

73

 

 

74

 

Equipment suspension costs

 

 

11

 

 

11

 

Engineering, Procurement, & Construction Mgmt

 

 

70

 

 

70

 

Contingency

 

 

70

 

 

59

 

Escalation

 

 

 

 

22

 

Total Capital

 

$

1,202

 

 

1,245

 

Bonding and pre-paid items

 

 

67

 

 

67

 

Total Capital Requirement

 

$

1,269

 

 

1,312

 

 

Furthermore, ongoing replacement and sustaining mine equipment and process plant capital over a $12.00/lb Mo pit 41-year operating life is currently estimated to be approximately $786 million (in 2013 dollars).  For a shorter mine life of 16 years ($8.00 pit), the sustaining capital would be $222 million.  These amounts exclude financing costs, amounts necessary to fund operating working capital, or reclamation.  We expect that these cost estimates will increase once we complete an engineered re-estimate of capital costs.

 

Pricing

 

In the first half of 2019, molybdenum prices were range bound between $10.70 and $12.70, averaging $11.98/lb compared with $11.88/lb at the end of 2018 and $10.25/lb at the end of 2017, according to Platts’ data.  Molybdenum prices remained range bound until late October 2019 when the prices weakened into the single digits to the 52-week low of $8.28/lb in early November 2019 and ended 2019 at $9.20/lb.

 

Beginning in the new year 2020 through mid-February, molybdenum prices were resilient and rose to $10+/lb  outperforming the vast majority of metal and energy commodities against the face of the coronavirus (“COVID-19”)

21

outbreak in China.  Thereafter, molybdenum prices have declined as demand has been impacted by the global economic retreat due to the COVID-19 pandemic.    

 

 Further details are described in “Molybdenum Market Update” below.

 

In its March 2020 Molybdenum Quarterly publication, CPM forecasts average nominal prices (base of 2019) for molybdenum to increase from $9.53/lb in 2020 to $15.00/lb in 2023.

 

Production and Operating Cost Estimates

 

Production over the life of the Mt. Hope Project is estimated to be 517 million pounds of saleable molybdenum on a 100% basis ($8.00/lb reserve).  Average yearly production over the first full five years is estimated at 41 million pounds of molybdenum.  Direct operating costs for the Mt. Hope Project over the first full five years of operation are anticipated to average $6.16 per pound, using $90 per barrel oil equivalent energy costs, and Costs Applicable to Sales (“CAS”) per pound over the first full five years of operation, including anticipated royalties calculated at $15 per pound molybdenum, are anticipated to average $6.84 per pound.  Life of mine CAS are estimated to be approximately $7.61 per pound of molybdenum at $90 per barrel oil, inclusive of anticipated royalty payments calculated at $15 per pound molybdenum.  These cost estimates are based on 2013 constant dollars and are subject to cost inflation or deflation.  The Company will update the operating cost projections with new commodity pricing adjustments at the time of project construction restart.

 

Reconciliation between CAS, a measure based on accounting principles generally accepted in the United States of America (“GAAP”), and direct operating costs, a non-GAAP measure, is provided in the table below.

 

 

 

 

 

 

 

 

 

Description

    

First Five Years

    

Life of Mine

 

Direct operating costs

 

$

6.16

 

$

6.84

 

Royalty payments (1)

 

 

0.68

 

 

0.77

 

Total CAS

 

$

6.84

 

$

7.61

 


(1)

Royalty payments are a function of assumed molybdenum prices realized.  The above calculation assumes a molybdenum price of $15.00 per pound.

 

Description of the Liberty Project

 

On March 17, 2006, we purchased the Liberty Project, an approximately ten square mile property in Nye County, Nevada, including water rights, mineral and surface rights, buildings and certain equipment from High Desert Winds LLC (“High Desert”).  The property includes the former Hall molybdenum and copper deposit that was mined for molybdenum by open pit methods between 1982 and 1985 by Anaconda and between 1988 and 1991 by Cyprus.  Equatorial Tonopah, Inc. mined copper from 1999 to 2000 on this property, although their operations were in a separate open pit also located on the property.  Much of the molybdenum deposit was drilled but not developed or mined by these previous owners.  At closing, we paid High Desert a cash payment of $4.5 million for a portion of the property, and in November 2006, made an additional payment of $1.0 million for the remainder of the property.

 

On January 30, 2007, we purchased Equatorial Mining North America, Inc. and its two subsidiaries, which owned a 12% net smelter returns royalty on the Liberty Project, from Equatorial Mining Pty. Limited, effectively eliminating all third-party royalties on the property.  The consideration paid for the Equatorial acquisition was $4.8 million with an additional deferred payment of $6.0 million, which will be due upon commencement of commercial production at the property.  In connection with the transaction, we acquired $1.2 million in cash accounts and assumed all environmental liabilities on the reclaimed site.  We later purchased all outstanding mineral claims associated with this property that were not previously owned by us thus giving the Company 100% control over all mineral rights within the boundary of the property, as well as claims on BLM property adjacent to the patented grounds.

 

Since purchasing the Liberty Project, we completed two drilling programs that, combined with previous evaluation work performed by former owners, identified additional mineralization.  In April 2008, we completed a pre-feasibility study on the Liberty Project that detailed initial capital and operating costs, anticipated mining and milling rates and permitting requirements.  In 2011 the Company released an updated NI 43-101 compliant resource estimate and later the same year a pre-feasibility study detailing updated resource estimates and project economics was released. 

22

Metallurgical and environmental work were advanced in 2013 with $0.2 million in external costs and use of dedicated internal resources.  In 2014, the Company more closely examined the use of existing infrastructure and copper potential of the property.  This work resulted in an updated NI 43-101 compliant pre-feasibility study released in July 2014 which developed a statement of mineral reserves under Canadian definitions.  Those definitions are not consistent with U.S. definitions.  Under Industry Guide 7, the Liberty deposit contains 309.2 million tons of mineralized material with a total molybdenum grade of 0.078% and a total copper grade of 0.098% using a $12.00/lb Mo pit. The Liberty Project is viewed by the Company as a follow-on project to the Mt. Hope Project that we intend to actively pursue following development of the Mt. Hope Project, dependent on market conditions.

 

The Liberty Project includes a previously mined open pit and a small heap leach facility, both developed by previous operators.  The Company continues to perform maintenance and reclamation activities on these facilities under a permit administered by NDEP.

 

History

 

In 1955, Anaconda leased and optioned the Liberty molybdenum prospect and mine in order to evaluate extensive molybdenum and copper occurrences.  From 1956 through 1966, Anaconda explored or delineated molybdenum mineralization over an approximate one square mile area.  Drilling indicated extensive mineralization from the surface to a depth of approximately 2,000 feet.  Drilling delineated approximately 200 million tons of mineralization grading 0.091 percent sulfide molybdenum, which was included in a long-term mining plan.  (Historic references to tonnage and grade are based on available historic records.  They may not reflect the current definitions of mineral reserves and mineral resources as defined by the SEC or by Canadian NI 43-101.)  Mine construction began in 1979 with production from the Hall Mine starting in 1981.  Anaconda ceased operations in 1985 due to low metal prices.  Between 1982 and 1991, Anaconda and successor operator Cyprus mined a total of 50 million tons of ore grading 0.11 percent molybdenum.  No further molybdenum mining took place after 1991, leaving an estimated 150 million tons of un-mined material at a grade of 0.09 percent molybdenum.

 

Between 1995 and 2002 a copper zone independent of the existing molybdenum pit was the subject of a copper leach operation by Equatorial.  Approximately 10 million tons were mined before operations ceased in 2002.

 

The molybdenum mine open pit remains easily accessible for mining.  Various facilities and improvements continue to exist on the property that may be of future use for molybdenum and/or copper operations including a power supply, water rights, water and well system, offices, truck and vehicle shops, thickening tanks, water and fuel tanks, roads and other structures.  All of the mobile equipment was removed from the property.  Much of the plant area was reclaimed after the 2002 closure with most of the crushing, conveying, grinding, concentrator equipment and other milling equipment being removed from the property.

 

Geology

 

The Liberty molybdenum deposit appears to conform to a class of deposit that is generally termed in ore deposit literature as a “Climax-Urad” type, where better-grade molybdenum mineralization in the form of molybdenite (MoS2) is concentrated in and along the margins of an irregularly-shaped “sleeve” or “shell” around a central lower-grade to nearly barren core of silicic-alkalic intrusive rocks.  In some cases, an outer shell of copper-dominant mineralization surrounds the interior molybdenum-dominant shell(s).

 

The Hall stock (Cretaceous intrusive rocks) intruded the metasedimentary sequence of rocks in the Late Cretaceous Period. It hosts most of the molybdenum mineralization.   The 2,500 ft-diameter stock complex consists of two spatially and temporally-distinct bodies — the earlier North stock and the younger South stock, which truncated the molybdenum mineralization hosted by the North stock.

 

Base metal mineralization in the Liberty deposit consists of molybdenite (MoS2), chalcopyrite (CuFeS2), chalcocite (Cu2S), galena (PbS), sphalerite (ZnS), tetrahedrite (Cu8Sb2S7), and pyrite (FeS2).  Molybdenite occurs mainly in 0.1” to 1.2”-wide quartz veins and veinlets in amounts that range from 0.1% to more than 40% by volume, typically as a selvage on vein walls.  Molybdenite is also found in wider (+1.2”) quartz veins, but these are much less common in occurrence.  Chalcopyrite and pyrite also are common but lesser vein/veinlet constituents.

 

23

Although chalcopyrite can occur with molybdenite in minor amounts in veins and veinlets within the main body of molybdenum mineralization in the Hall stock, it is much more prevalent in quartz veins in the metasediments on the northeast and east sides of the stock. Here it occurs in the remnant of the copper-dominant shell that originally surrounded the Hall stock before it was tilted and disrupted by faulting.  In addition to chalcopyrite, chalcocite occurs as disseminations and as secondary coatings on pyrite within a roughly horizontal blanket of secondary supergene copper enrichment just below the bottom of oxidation.

 

The Liberty deposit has been subjected to much folding and faulting.  A major anticline located 3,000’ to the south of the Hall stock has an axis that trends N20˚W and plunges 50˚ to 70˚ to the northwest.  Post-Cretaceous tilting of the northern San Antonio Mountains and other structural disruptions have resulted in the rotation of the Liberty deposit so that it now plunges to the east.  This rotation has caused erosion of the deposit along its flank, exposing both the shallow and deep-emplaced portions of the mineralization.  The Liberty deposit was segmented by faulting.  The Basement Fault bounds the bottom of the deposit while the Liberty Fault truncates the deposit on the west side.  In addition to these major structures, a number of N40˚E- to N30˚W-trending normal faults and several east-west-trending normal faults transect the Liberty deposit.

 

Liberty Project Permitting Requirements

 

The majority of the Liberty Project area is located on fee lands and patented claims owned by the Company.  Unpatented claims administered by the BLM are on public ground and largely surround the open pit and waste stockpile areas.  BLM approval will be required prior to commencement of operations, including construction, which would likely include an EIS under NEPA.  A shorter EIS and state permitting process are anticipated for the Liberty Project as compared to the Mt. Hope Project, as the Liberty Project is located largely on privately held property with existing water rights, is located in a previously mined area in a mining friendly jurisdiction, and is sparsely vegetated due to the arid climate.

 

In addition to land ownership, two other factors distinguish the Liberty Project from the Mt. Hope Project with respect to environmental permitting.  First, water consumption is not as significant an issue at Liberty.  Unlike the Mt. Hope Project, the areas surrounding Liberty are not extensively irrigated.  In addition, we own significant water rights at the Liberty site and have water wells in place.  Second, the area has been mined previously which has resulted in significant surface disturbance.  By conducting exploration drilling on pre-existing disturbance, to the extent possible, the amount of additional disturbance is greatly reduced, and permitting requirements to support further exploration is likewise reduced.  Furthermore, there is extensive environmental information developed to support permitting of the previous mine operation.  We anticipate that this information can be used to streamline the permitting process by reducing the amount of baseline studies and other technical information that must be developed by the Company.

 

The Nevada Division of Environmental Protection (“NDEP”) has identified environmental concerns with some Liberty Project facilities acquired with the property.  NDEP’s concerns are related to aspects of previously approved closure plans required by Nevada regulation.  We have proposed options to NDEP to address these concerns.  In July, 2018, we addressed one of those concerns by successfully completing a program, as approved by NDEP, to neutralize the acidic Liberty pit lake by adding hydrated lime to raise the pH.  Our 2019 costs are consistent with budgeted spend.  Since October of 2018, we have been actively managing process solutions draining from the pre-existing leach pad to resolve the second concern.  We will continue to work with NDEP to evaluate ongoing options to address any future concerns, and additional costs may be required beyond 2020 to meet NDEP’s closure requirements.  However, a reasonable estimate cannot be determined at this time as it is not possible to reasonably predict the outcome of a resolution with NDEP.

 

Applicable Mining Laws

 

Mining in the State of Nevada is subject to federal and state law.  Three types of laws are of particular importance to the Mt. Hope Project: those affecting land ownership and mining rights; those regulating mining operations; and those relating to the environment.

 

The Mt. Hope Project is situated on lands owned by the U.S. (“federal lands”).  The LLC, as the owner or leaseholder of the unpatented mining claims, has the right to conduct mining operations on the lands subject to the required operating permits and approvals, compliance with the terms and conditions of the Mt. Hope Lease, and compliance with applicable federal, state, and local laws, regulations and ordinances.  On federal lands, mining rights are

24

governed by the General Mining Law of 1872, as amended, 30 U.S.C. UU 21-161 (various sections), which allows for the location of mining claims on certain federal lands upon the discovery of a valuable mineral deposit and on proper compliance with claim location requirements.

 

The operation of mines is governed by both federal and state regulatory programs.  The predominant non-environmental federal regulatory program that will affect future mining operations at the Mt. Hope Project is the mine safety regulations administered by the Mine Safety and Health Administration.  Additional federal laws, such as those governing the purchase, transport, storage or usage of explosives, and those governing communications systems, labor and taxes also apply.  State non-environmental regulatory programs affecting operations include the permitting programs for drinking water systems, sewage and septic systems, water rights appropriations, Department of Transportation, and dam safety (engineering design and monitoring).

 

Environmental regulations require various permits or approvals before any mining operations on the Mt. Hope Project can begin.  Federal environmental regulations are administered primarily by the BLM.  The Environmental Protection Agency (“EPA”) has delegated authority for the Clean Water Act and Clean Air Act to the State of Nevada.  The NDEP, therefore, has primacy for these programs and is responsible for administering the associated permits for the Mt. Hope Project.  The Bureau of Mining Regulations and Reclamation (“BMRR”) within NDEP administers the WPC and Reclamation permits.  The Bureau of Air Pollution Control (“BAPC”) within NDEP administers the Air Quality Permit.  The NDEP also administers the permit program for onsite landfills.  The Nevada Division of Wildlife administers the artificial industrial pond permit program.  Local laws and ordinances may also apply to such activities as waste disposal, road use and noise levels.  Both our Mt. Hope Project and Liberty Project will be subject to these various environmental laws and regulations.

 

Other Mining Properties

 

We also have had other mining claims and land purchased prior to 2006 which consisted in part of (a) six patented mining claims known as the Chicago-London group, located near the town of Murray in Shoshone County, Idaho, (b) 34 unpatented mining claims in Marion County, Oregon, known as the Detroit property, and (c) 83 unpatented claims in Sanders and Madison County, Montana.  Historically, our efforts at these properties were minimal and consumed no significant financial resources.  The total book value of these properties was approximately $0.1 million and the Company has retained production royalties of 1.5% of all net smelter returns on future production from two undeveloped properties in Skamania County, Washington and Josephine County, Oregon, which were sold in 2012 and 2013, respectively.  The Chicago-London property ((a) above) was sold in January 2020.  As a result of ongoing cash conservation efforts, we allowed the annual claim payments for the 83 unpatented claims in Sanders and Madison County, Montana ((c) above) to lapse and no longer hold rights to these claims.

 

Other United States Regulatory Matters

 

The Resource Conservation and Recovery Act (“RCRA”) and related state laws regulate generation, transportation, treatment, storage, or disposal of hazardous or solid wastes associated with certain mining-related activities.  RCRA also includes corrective action provisions and enforcement mechanisms, including inspections and fines for non-compliance.

 

Mining operations may produce air emissions, including dust and other air pollutants, from stationary equipment, such as crushers and storage facilities, and from mobile sources such as trucks and heavy construction equipment.  All of these sources are subject to review, monitoring, permitting, and/or control requirements under the federal Clean Air Act and related state air quality laws.  Air quality permitting rules may impose limitations on our production levels or create additional capital expenditures in order to comply with the permitting conditions.

 

Under the federal Clean Water Act and delegated state water-quality programs, point-source discharges into “Waters of the State” are regulated by the National Pollution Discharge Elimination System program, while Section 404 of the Clean Water Act regulates the discharge of dredge and fill material into “Waters of the United States,” including wetlands.  Stormwater discharges also are regulated and permitted under that statute.  All of those programs may impose permitting and other requirements on our operations.

 

The Endangered Species Act (“ESA”) is administered by the U.S. Department of Interior’s U.S. Fish and Wildlife Service (“USFWS”).  The purpose of the ESA is to conserve and recover listed endangered and threatened

25

species and their habitat.  Under the ESA, “endangered” means that a species is in danger of extinction throughout all or a significant portion of its range.  “Threatened” means that a species is likely to become endangered within the foreseeable future.  Under the ESA, it is unlawful to “take” a listed species, which can include harassing or harming members of such species or significantly modifying their habitat.  We conduct wildlife and plant inventories required by regulatory agencies prior to initiating exploration or mining project permitting.  We currently are unaware of any endangered species issues at any of our projects.  A threatened species occurs in limited segments of two creeks approximately 10 miles to the north of the proposed wellfield for the Mt. Hope Project.  Although hydrologic modeling predicts no impacts to these stream segments, consultation with the USFWS was required.  Future identification of endangered species or habitat in our project areas may delay or adversely affect our operations.

 

We are committed to fulfilling or exceeding our obligations under applicable environmental laws and regulations.  These laws and regulations are continually changing and, as a general matter, are becoming more restrictive.  Our policy is to conduct our business in a manner that strives to safeguard public health and mitigates the environmental effects of our business activities.  To comply with these laws and regulations, we have made, and in the future may be required to make, capital and operating expenditures.

 

ITEM 1A. RISK FACTORS

 

You should carefully consider the risks described below and elsewhere in this report, which could materially and adversely affect our business, results of operations or financial condition.  If any of the following risks actually occurs, the market price of our common stock would likely decline.  The risks and uncertainties we have described below include all of the material risks presently known to us, however, additional risks and uncertainties not presently known to us or that we currently deem immaterial may also affect our operations.

 

Our investors may lose their entire investment in our securities

 

An investment in our securities is speculative and the price of our securities has been and will likely continue to be volatile.  Only investors who are experienced in high risk investments and who can afford to lose their entire investment should consider an investment in our securities.

 

Substantial risk that COVID-19 is and will continue to effect financing efforts to improve liquidity

Beginning in early 2020, there has been an outbreak of coronavirus (COVID-19), initially in China and which has spread to other jurisdictions, including locations where the Company does business. The full extent of the outbreak, related business and travel restrictions and changes to behavior intended to reduce its spread are uncertain as of the date of the Report as this continues to evolve globally. COVID – 19 has had a direct impact on the Company’s financing efforts and potential solutions to its liquidity position.  Currently, the Company believes that it will be able to sustain its corporate and Liberty Project operations only into the quarter ending September 30, 2020.  Management continues to seek financing opportunities notwithstanding the impacts associated with the COVID-19 pandemic, however the Company anticipates that its financing efforts and liquidity may continue to be materially impacted by the coronavirus outbreak.

 

Substantial doubt exists as to our ability to continue as a going concern

 

Our consolidated financial statements have been prepared assuming we will continue as a going concern. We have experienced substantial and recurring losses from operations, which losses have caused an accumulated deficit of $199.4 million at December 31, 2019.  At December 31, 2019, we had approximately $4.6 million in unrestricted cash and $3.4 million in restricted cash on hand, held by the LLC. Based on the Company’s cash balances as of December 31, 2019, the Company believes that it will be able to sustain its corporate and Liberty Project operations only into the quarter ending September 30, 2020.  The Mt. Hope Project remains funded into 2021 by the reserve account held by the LLC for the payment of ongoing jointly approved (by POS-Minerals and the Company) expenses until the Company obtains full financing for its portion of the Mt. Hope Project construction cost.  However, the Company does not currently have liquidity and capital resources to finance its portion of Mt. Hope Project operations after the reserve account is depleted.

 

 We have been funding our business principally through sales of our securities, most recently with the closure of the private placement with AMER for $4.3 million, the sale of Series A and Series B convertible preferred shares, the issuance of $1.3 million in supplemental notes, our at-the-market offering facility and our October 2018 underwritten

26

public offering.  In conjunction with the public offering, the Company agreed to suspend the ATM facility for a period of 2 years.  We expect to continue to fund our Corporate and Liberty Project costs through additional equity investments in the Company and are also attempting to sell some of our non-critical equipment to raise additional funds.  These factors, among others, raise substantial doubt about our ability to continue as a going concern for the next 12 months. Our consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.  We may choose to reduce our Corporate or Liberty Project operating expenses through reductions in our operating costs during fiscal year 2020 if we are not successful in our efforts to raise additional capital. We may not be able to increase our cash flow to a level which would support our Corporate or Liberty Project operations and provide sufficient funds to pay our obligations past the third quarter 2020 or thereafter, for the foreseeable future.

 

As discussed later in Item 7, the Company has retained financial advisors to assist the Company with strategic alternatives, including securing incremental financing and evaluating other strategic alternatives, including the potential addition of new Mt. Hope Project partners, additional corporate strategic investors, merger opportunities, and/or the possible sale or privatization of the Company.  We may not be successful independently or with our financial advisors in securing strategic alternatives, and may not be able to raise additional capital or, if we are successful in our efforts to raise additional capital, the terms and conditions upon which any such capital would be extended. If we are unable to meet our obligations past third quarter 2020, we would be forced to cease all operations and pursue restructuring or liquidation alternatives, including the potential to seek a bankruptcy filing, in which event investors may lose their entire investment in our Company.

 

We may not be able to obtain, maintain or renew licenses, rights and permits required to develop or operate our mining projects, or we may encounter environmental conditions or requirements that would adversely affect our business

 

In the ordinary course of business, mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations. We may not be successful in defending legal challenges to the new ROD, which may affect our ability to maintain the permits.

 

In addition to requiring permits for the development of the Mt. Hope Project, we will need to obtain and modify various mining and environmental permits during the life of the project.  Obtaining, modifying, and renewing the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often requiring public hearings and substantial expenditures.  The duration and success of our efforts to obtain, modify or renew permits will be contingent upon many variables, some of which are not within our control.  Increased costs or delays could occur, depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority.  All necessary permits may not be obtained and, if obtained, may not be maintained or renewed, or the costs involved in each case may exceed those that we previously estimated.  It is possible that the costs and delays associated with compliance with such standards and regulations could become such that we would not proceed with the financing, development or operation of the Mt. Hope Project.

 

The development of the Mt. Hope Project may continue to be delayed, which could result in increased costs or an inability to complete its development

 

The LLC may experience continued delays in developing the Mt. Hope Project.  These could increase its development costs, affect its economic viability, or prevent us from completing its development.  The timing of development of the Mt. Hope Project depends on many factors, some of which are beyond our and the LLC’s control, including:

 

·

Sustained low prices for molybdenum;

 

·

Timely availability of project financing to construct the Mt. Hope Project;

 

·

Timely availability of equipment;

 

·

Inability to successfully defend appeals of the new ROD;

 

·

Continued appeals or unfavorable orders concerning the defense of the new ROD, and other related state of Nevada and federal permits

27

 

·

Completion of advanced engineering;

 

·

Timely availability of labor and resources from construction contractors throughout construction of the project; and

 

·

Volatility in foreign exchange and/or interest rates.

 

Any delays caused by our inability to raise capital when needed may lead to the cancellation or extension of, or defaults under, agreements with equipment manufacturers or a need to sell equipment and other project related assets already purchased, any of which may adversely impact the Mt. Hope Project timeline.  Additionally, delays to the Mt. Hope Project schedule have consequences with regard to our sales agreements, the LLC Agreement with POS-Minerals, including potential claims by POS-Minerals, which may serve to increase our capital obligations and further enhance these risks.

 

Our profitability depends largely on the success of the Mt. Hope Project, the failure of which would have a material adverse effect on our financial condition

 

We are focused primarily on the ability to develop the Mt. Hope Project and to seek and obtain construction financing upon reobtaining necessary permits, and sustained improvement in current molybdenum market conditions.  Accordingly, our profitability depends largely upon the successful financing to continue the development and operation of this project.  We are currently incurring losses and we expect to continue to incur losses until sometime after molybdenum production begins at the Mt. Hope Project.  The LLC may never achieve production at the Mt. Hope Project and may never be profitable even if production is achieved.  The failure to see improvements in the molybdenum market such that we may seek and obtain financing for the construction of the Mt. Hope Project would have a material adverse effect on our financial condition, results of operations and cash flows.  Even if the LLC is successful in construction and eventually achieving production, an interruption in operations at the Mt. Hope Project that prevents the LLC from extracting ore from the Mt. Hope Project for any reason would have a material adverse impact on our business.

 

If certain conditions are not met under attempts to secure project financing, including AMER’s reasonable best efforts to assist the Company under the new SPA, our ability to begin construction of the Mt. Hope Project could be delayed further

 

Any proposed financing with a Chinese bank, as well as the current molybdenum supply agreements are subject to a number of conditions precedent, including negotiation of acceptable loan terms with a Chinese bank or other lending source.  These conditions may not be met, in which case our ability to begin construction of the Mt. Hope Project could be delayed further. 

 

Past strong demand for molybdenum in China and throughout the world could be affected by future developments in that country

 

The Company is highly exposed to the Chinese market.  China’s demand for molybdenum could be substantially affected by an economic slowdown in China, financial or banking market conditions impacting investment (including tariffs and trade restrictions imposed by the U.S. and/or China and the status of trade negotiations between the two countries), or an accelerated shift from infrastructure-led to service-oriented growth.  Increased federal regulatory oversight concerning our relationships with investors in China, as well as access of Chinese consumers to our products may become more burdensome.  In addition, the current coronavirus (“COVID-19”) outbreak, or similar events in the future, could have an adverse impact on demand.  Any or all of these may adversely affect the Company’s ability to obtain financing for construction of the Mt. Hope Project.

 

We require and may not be able to obtain substantial financing in order to fund the development and eventual operations of the Company and the LLC and if we are successful in raising additional capital, it may have dilutive and other adverse effects on our stockholders

 

If the actual costs to obtain financing and complete the development of the Mt. Hope Project are significantly higher than we expect, we may not have enough funds to cover these costs and we may not be able to obtain other

28

sources of financing.  The failure to obtain all necessary financing would prevent the LLC from developing and eventually achieving production at the Mt. Hope Project and impede our ability to become profitable.  Our financing plan assumes that POS-Minerals will continue to make their required on-going capital contributions after we obtain financing or exhaust the reserve account as outlined in the LLC Agreement.  We may not be able to obtain financing necessary for developing and eventually achieving production at the Mt. Hope Project if these contributions are not made.

 

We continue to review the technical merits of the Liberty Project, which would also require significant additional capital to permit and/or commence mining activities.  We may not be able to obtain the financing necessary to develop the Liberty Project should we decide to do so.

 

If additional financing is not available, or available only on terms that are not acceptable to us, we may be unable to fund the development and expansion of our business, attract and retain qualified personnel, take advantage of business opportunities or respond to competitive pressures.  Any of these events may harm our business.  Also, if we raise funds by issuing additional shares of our common stock, preferred stock, debt securities convertible into preferred or common stock, or a sale of additional minority interests in our assets, our existing stockholders will experience dilution, which may be significant, to their ownership interest in us or our assets.  If we raise funds by issuing shares of a different class of stock other than our common stock or by issuing debt, the holders of such different classes of stock or debt securities may have rights senior to the rights of the holders of our common stock.

 

The LLC Agreement gives POS-Minerals the right to approve certain major decisions regarding the Mt. Hope Project which could impair our ability to quickly adapt to changing market conditions

 

The LLC Agreement requires unanimous approval of the members for certain major decisions regarding the Mt. Hope Project.  This effectively provides either member with a veto right over the specified decisions.  These decisions include:

 

·

Approval of the operations to be conducted and objectives to be accomplished by the Mt. Hope Project (“Program and Budget”);

 

·

Approval of the budget for costs to be incurred by the LLC and the schedule of cash capital contributions to be made to the LLC (“Budget”);

 

·

Approval of cost overruns in excess of 10% until we obtain financing or exhaust the reserve account balance, and thereafter 15% of the approved Program and Budget;

 

·

Approval of an expansion or contraction of the average tons per day (“tpd”) planned of 20% or more from the relevant tpd throughput schedule in the BFS;

 

·

Approval of the LLC’s acquisition or disposition of significant real property, water rights or real estate assets;

 

·

Approval of the incurrence of indebtedness by the LLC that requires (1) an asset of the LLC to be pledged as security, (2) the pledge of a membership interest in the LLC, or (3) a guaranty by either the Company or POS-Minerals, other than in each instance a purchase money security interest or other security interest in the LLC to finance the acquisition or lease of equipment;

 

·

Approval of the conduct of business other than the development, construction, operations and financing of the Mt. Hope Project, including the potential Cu-Ag target and zinc mineralization, and

 

·

Approval of the issuance by the LLC of an ownership interest to any person other than Nevada Moly or POS-Minerals,

 

·

Approval of the termination of the Mt. Hope Project or the liquidation/dissolution of the Project.

 

The requirement that certain decisions be approved by POS-Minerals may make it more difficult for our stockholders to benefit from certain decisions or transactions that we would otherwise cause the LLC to make if they are opposed by POS-Minerals.

29

 

Fluctuations in the market price of molybdenum could adversely affect the value of our Company and our securities

 

The profitability of our mining operations will be influenced by the market price of the metals we mine.  The market prices of metals such as molybdenum fluctuate widely and are affected by numerous factors including several that are beyond the control of any mining company.  These factors include fluctuations with respect to the rate of inflation, the exchange rates of the U.S. dollar and other currencies, interest rates, global or regional political and economic conditions and banking crises, global and regional demand, production costs in major molybdenum producing areas, and a number of other factors.  Sustained periods of low molybdenum prices would adversely impact our ability to seek financing for the development of the Mt. Hope Project and the Liberty Project, and our ability to obtain revenues, profits, and cash flows.  In particular, a sustained low molybdenum price could:

 

·

Have a continued negative impact on the availability of financing to us;

 

·

Cause a continued delay and suspension of our development activities and, ultimately, mining operations at our Mt. Hope Project, if such operations become uneconomic at the then-prevailing molybdenum price; and

 

·

Prevent us from fulfilling our obligations under our agreements or licenses which could cause us to lose our interests in, or be forced to sell, our properties.

 

Furthermore, the need to reassess the feasibility of any of our projects if molybdenum prices were to return to historical lows could cause substantial delays.  Mineral reserve calculations and life-of-mine plans using lower molybdenum prices could result in reduced estimates of mineral reserves and in material write-downs of our investment in mining properties and increased amortization, reclamation and closure charges.

 

The volatility in metals prices is illustrated by the molybdenum price chart shown in the Molybdenum Market Update section and the historical monthly average prices ranging from a low price of $2.16/lb in January 2001 to a high of $33.84 in August 2008.  Prices fell from approximately $33.50 per pound in October 2008 to $7.70 per pound in April 2009 as a result of the global financial crisis.  Subsequent to April 2009, prices rose continuously through 2010 to finish at $16.40 per pound.  Prices then decreased, falling to approximately $9.00 per pound by the third quarter of 2013, those rose sharply, reaching $15.00 by mid-2014.  Beginning in September 2014, the molybdenum price experienced a sharp pullback reflecting softening demand and a strengthening U.S. dollar, amongst other factors, reaching a low of below $5.00 in October 2015.  A slow price recovery saw the price increase at yearend 2016 to $6.75/lb and at yearend 2017 to $10.25/lb. Molybdenum prices reached a high of $13.00/lb in March 2018, a level last seen in 2014, and closed 2018 at $11.88/lb.  During 2019, molybdenum prices were mostly range bound between $10.70 and $12.70, until the price declined to single digits in the fourth quarter, ending the year at $9.20/lb.  (Prices quoted are sourced from Platts.) Although we estimate the Mt. Hope Project’s average cost of production over the first five years to be approximately $7.00 per pound, a sustained period of lower molybdenum prices would have material negative impacts on the Company’s profitability.  Actual molybdenum prices when and if we commence commercial production cannot be estimated and are subject to numerous factors outside our control.

 

Our profitability is subject to demand for molybdenum, and any decrease in that demand, or increase in the world’s supply, could adversely affect our results of operations

 

Molybdenum is used primarily in the steel industry.  The demand for molybdenum from the steel industry and other industries was extremely robust through the third quarter of 2008, primarily fueled by growth in Asia and other developing countries.  Beginning in the fourth quarter of 2008, the global financial crisis forced steel companies to substantially reduce their production levels with a corresponding reduction in the consumption of molybdenum, which contributed to the decline in the price of molybdenum.  Starting in September 2014, molybdenum prices began to decline and remained low through 2016, but improved throughout 2017 and 2018.  In the latter half of the first quarter of 2020, molybdenum prices have declined as demand has been impacted by the global economic retreat due to the COVID-19 pandemic.

 

Continued low molybdenum prices could delay our ability to obtain other financing, and could cause a continued suspension of our development or, in the future, a suspension of our mining operations at our Mt. Hope Project.    

30

 

A sustained significant increase in molybdenum supply could also adversely affect our results.  In the event demand for molybdenum does not increase to consume the potential additional production, the price for molybdenum may be adversely affected.

 

We are exposed to counter party risk, which may adversely affect our results of operations

 

The off-take sales agreements the Company has completed contain provisions allowing for the sale of molybdenum at certain floor prices, or higher, over the life of the agreements.  During the past 18 months there have been periods where the spot molybdenum prices fell below the inflation-adjusted floor prices in the contracts.  During these time periods all off-take contracts would have provided for the Company to sell molybdenum at above-spot prices.  In addition, presently, one of our off-take agreement counterparties currently has the option to cancel its agreement, and a second off-take agreement will expire on December 31, 2020 if production at specified minimum levels has not commenced by that date.  We currently do not expect to commence commercial production before late 2022.  In the event that our contract counterparties choose not to honor their contractual obligations, attempt to terminate these agreements as a result of the continuing delay in achieving production, or discontinue operations, our profitability may be adversely impacted.  We may be unable to sell any product our contract parties fail to purchase in a timely manner, at comparable prices, or at all.

 

Our mineralization and reserve estimates are uncertain, and any material inaccuracies in those estimates could adversely affect the value of our mineral reserves

 

There are numerous uncertainties inherent in estimating mineralization and reserves, including many factors beyond our control.  The estimation of mineralization and reserves is a subjective process and the accuracy of any such estimates is a function of the quality of available data and of engineering and geological interpretation and judgment.  Results of drilling, metallurgical testing, production, and the evaluation of mine plans subsequent to the date of any estimate may justify revision of such estimates.  The volume and grade of mineralization and reserves recovered and rates of production may be less than anticipated.  Assumptions about prices are subject to greater uncertainty and metals prices have fluctuated widely in the past.  Further declines in the market price of molybdenum and copper may render mineralization and reserves containing relatively lower grades of ore uneconomic to exploit, which may materially and adversely impact our reserve and mineralization estimates at our projects.  Changes in operating and capital costs and other factors including, but not limited to, short-term operating factors such as the need for sequential development of ore bodies and the processing of new or different ore grades, may also materially and adversely affect mineralization and reserves.

 

Any material inaccuracies in our production or cost estimates could adversely affect our results of operations

 

We have prepared estimates of future molybdenum production.  We or the LLC may never achieve these production estimates or any production at all.  Our production estimates depend on, among other things:

 

·

The accuracy of our mineralization and reserves estimates;

 

·

The accuracy of assumptions regarding ore grades and recovery rates;

 

·

Ground conditions and physical characteristics of the mineralization, such as hardness and the presence or absence of particular metallurgical characteristics; and

 

·

The accuracy of estimated rates and costs of mining and processing.

 

Our actual production may vary from our estimates if any of our assumptions prove to be incorrect.  With respect to the Mt. Hope Project, we do not have the benefit of actual mining and production experience in verifying our estimates, which increases the likelihood that actual production results or costs will vary from the estimates.

 

31

Mining has inherent dangers and is subject to conditions or events beyond our control, and any operating hazards could have a material adverse effect on our business

 

Mining at the Mt. Hope Project and Liberty Project will involve the potential for various types of risks and hazards, including: environmental hazards, industrial accidents, metallurgical and other processing problems, unusual or unexpected rock formations, structure cave-in or slides, flooding, fires, and interruption due to inclement or hazardous weather conditions.

 

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties, personal injury or death, environmental damage, delays in mining, increased production costs, monetary losses, and possible legal liability.  We may not be able to obtain insurance to cover these risks at economically feasible premiums and some types of insurance may be unavailable or too expensive to maintain.  We may suffer a material adverse effect on our business and the value of our securities may decline if we incur losses related to any significant events that are not covered by our insurance policies.

 

Our operations make us susceptible to environmental liabilities that could have a material adverse effect on us

 

Mining is subject to potential risks and liabilities associated with the potential pollution of the environment and the necessary disposal of mining waste products occurring as a result of mineral exploration and production.  Insurance against environmental risk (including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production) is not generally available to us or the LLC (or to other companies in the minerals industry) at a reasonable price.  To the extent that we become subject to environmental liabilities, the satisfaction of any such liabilities would reduce funds otherwise available to us and could have a material adverse effect on us.  Laws and regulations intended to ensure the protection of the environment are constantly changing, and are generally becoming more restrictive.

 

Legal title to the properties in which we have an interest may be challenged, which could result in the loss of our rights in those properties

 

The ownership and validity, or title, of unpatented mining claims are often uncertain and may be contested.  A successful claim contesting our title or interest to a property or, in the case of the Mt. Hope Project, the landowner’s title or interest to such property could cause us and/or the LLC to lose the rights to mine that property.  In addition, the success of such a claimant could result in our not being compensated for our prior expenditures relating to the property.

 

Climate change and climate change legislation or regulations may adversely impact General Moly’s planned future operations

 

Energy is anticipated to be a significant input in General Moly’s operations.  A number of governmental bodies have introduced or are contemplating legislative and regulatory change in response to the possible impacts of climate change.  U.S. Congress and several states have initiated legislation regarding climate change that could affect energy prices and demand.  In December 2009, the EPA issued an endangerment finding under the federal Clean Air Act indicating that current and projected concentrations of certain mixed greenhouse gases in the atmosphere, including carbon dioxide, threaten the public health and welfare.  It is possible that regulation may be promulgated in the U.S. to address the concerns raised by the endangerment finding. 

 

Legislation and increased regulation regarding climate change could impose increased costs on us, our partners and our suppliers, including increased energy, capital equipment, environmental monitoring and reporting and other costs to comply with such regulations.  Until the timing, scope and extent of any future regulation becomes known, we cannot predict the effect on our financial condition, financial position, results of operations and ability to compare.

 

The possible physical impacts of climate change on the Company’s planned future operations are highly uncertain and would be particular to the geographic circumstances in the area in which we operate. These may include changes in rainfall, storm patterns and intensities, shortages of water or other natural resources, changing sea levels, and changing temperatures. These effects may adversely impact the cost, production and financial performance of the Company’s planned future operations.

 

32

Mineral exploration and mining activities require compliance with a broad range of laws and regulations, and compliance with or violation of these laws and regulations may be costly

 

Mining operations and exploration activities are subject to federal, state, and local laws and regulations governing prospecting, development, mining, production, exports, taxes, labor standards, occupational health and safety, waste disposal, toxic substances, land use, environmental protection, reclamation obligations, and mine safety.  In order to comply with applicable laws and regulations, we may be required to make capital and operating expenditures or to close an operation until a particular problem is remedied.  In addition, if our activities violate any such laws and regulations, we may be required to compensate those suffering loss or damage, and may be fined if convicted of an offense under such legislation.  We may also incur additional expenses and our projects may be delayed as a result of changes and amendments to such laws and regulations, including changes in local, state, and federal taxation.

 

Land reclamation requirements for exploration properties may be burdensome, may divert funds from our exploration programs and could have an adverse effect on our financial condition

 

Although variable, depending on location and the governing authority, land reclamation requirements are generally imposed on mineral exploration companies, as well as companies with mining operations, in order to minimize long term effects of land disturbance.  Reclamation may include requirements to control dispersion of potentially deleterious effluents and to reasonably re-establish pre-disturbance landforms and vegetation.  In order to carry out reclamation obligations imposed on us in connection with our mineral exploration, we and the LLC must allocate financial resources that might otherwise be spent on further exploration programs.  Such costs could also have an adverse effect on our financial condition.

 

Non-compliance with our Mt. Hope Mines Inc. Lease could result in loss of the LLC’s rights to develop the Mt. Hope Project and may adversely affect our business

 

The LLC leases the Mt. Hope Project from MHMI under the Mt. Hope Lease.  Failure to comply with the terms of the Mt. Hope Lease (which principally require us to make prescribed payments on or before certain prescribed dates) could result in loss of the LLC’s rights to develop the Mt. Hope Project.  Any loss of rights under the Mt. Hope Lease would have a material adverse effect on us and our ability to generate revenues.

 

Our ability to operate our Company effectively could be impaired if we lose key personnel or if we are not able to attract and retain the additional personnel we will need to develop any of our projects, including the Mt. Hope Project

 

We are a small company with a limited operating history and relatively few employees.  The development of any of our proposed projects, including the Mt. Hope Project, will place substantial demands on us.  We depend on the services of key executives and a small number of personnel, including our Chief Executive Officer/Chief Financial Officer, Chief Operating Officer, Chief Legal Officer, Principal Accounting Officer and Vice President of Environmental and Permitting. 

 

We will be required to recruit additional personnel and to train, motivate and manage these new employees as our projects mature toward eventual construction and operation.  The number of persons skilled in the development and operation of mining properties is limited and significant competition exists for these individuals.  We implemented a reduction in force in November 2014 and another in October 2015, affecting more than 40% of our employees and contractors as a result of the delay in our ability to obtain project financing.  In each of January 2015, 2016, 2017 and 2018, we implemented an annual retention program including equity stay incentives to our officer and all non-officer employees, though retention programs may not be successful in retaining our executives and key employees.  As a result of our current cash restraints, we were unable to re-implement the annual retention program for 2019, though we reinstituted the retention program in January 2020.  We may not be able to attract and retain qualified personnel in the future.  We do not maintain “key person” life insurance to cover our executive officers.  Due to the relatively small size of our company and the specific skill sets of our key employees, the loss of any of our key employees or our failure to attract and retain key personnel may delay or otherwise adversely affect the development of the Mt. Hope Project, which could have a material adverse effect on our business.

 

33

Our ability to have access to insurance programs for directors & officers; commercial general liability and automobile liability; workers compensation; property; surety bonding for reclamation liability and builders risk insurance could be impaired if our financial condition continues to be at risk for meeting our financial obligations

 

We experienced difficulty placing directors & officers’ insurance in October 2019 as result of a tightening insurance market and our financial condition.  If we are unable to continue to place directors & officer insurance or in limits of coverage sufficient to satisfy our indemnification obligations to the Company’s directors and officers, the Company may lose its officers and directors and have limited ability to attract replacements.

 

 

We rely on independent contractors and experts and technical and operational service providers over whom we may have limited control

 

Because we are a small exploration and development stage company, we rely on independent contractors to assist us with technical assistance and services, contracting and procurement and other matters, including the services of geologists, attorneys, engineers and others.  Our limited control over the activities and business practices of these service providers or any inability on our part to maintain satisfactory commercial relationships with them may adversely affect our business, results of operations, and financial condition.

 

Changes to the General Mining Law of 1872 and related federal legislation that impact unpatented mining claims could adversely impact the Mt. Hope Project

 

The Mt. Hope Project is located substantially on unpatented mining claims administered by the BLM.  Mining on unpatented mining claims is conducted pursuant to the General Mining Law of 1872 and amendments thereto.  Legislation for the amendment of the mining laws applicable to mining property has been considered by the U.S. Congress, which may include imposition of a governmental royalty and new permitting and environmental rules.  Amendments to the mining laws could cause delays, increase the costs, and have an adverse effect on the returns anticipated from the Mt. Hope Project.

 

Increased costs could affect our ability to become profitable

 

Costs at any particular mining location frequently are subject to variation due to a number of factors, such as changing ore grade, changing metallurgy, and revisions to mine plans in response to the physical shape and location of the ore body.  In addition, costs are affected by the price of commodities, such as fuel, electricity, and labor.  Commodity costs are at times subject to volatile price movements, including increases that could make production at our projects less profitable or uneconomic.

 

We anticipate significant capital expenditures in connection with the development of the Mt. Hope Project.  In the past several years, costs associated with capital expenditures have escalated on an industry-wide basis as a result of major factors beyond our control.  Increased costs for capital expenditures have an adverse effect on the returns anticipated from the Mt. Hope Project.

 

Shortages of critical parts, equipment and skilled labor may adversely affect our development projects

 

The industry has been impacted at times by increased worldwide demand for critical resources such as input commodities, drilling equipment, tires, and skilled labor.  Shortages may cause unanticipated cost increases and delays in delivery times, potentially impacting operating costs, capital expenditures, and production schedules.

 

Cost estimates and timing of new projects are uncertain

 

The capital expenditures and time required to develop new mines or other projects are considerable and changes in costs or construction schedules can affect project economics.  There are a number of factors that can affect costs and construction schedules, including, among others:

 

·

Sustained lower molybdenum pricing;

 

·

Availability of project financing;

34

 

·

Availability of water, labor, power, transportation, commodities, and infrastructure;

 

·

Increases in input commodity prices and labor costs;

 

·

Fluctuations in exchange rates;

 

·

Difficulty of estimating construction costs over a period of years; and

 

·

Delays in maintaining environmental or other state of Nevada and federal government permits, including ongoing appeals related to the new ROD.

 

Legislation, including the Sarbanes-Oxley Act of 2002 and the Dodd-Frank Wall Street Reform and Consumer Protection Act, may make it difficult for us to retain or attract officers and directors and increase the costs of doing business, which could adversely affect our financial position and results of operations

 

We may be unable to attract and retain qualified officers, directors and members of board committees required to provide for our effective management as a result of the recent changes and currently proposed changes in the rules and regulations, which govern publicly-held companies.  The Sarbanes-Oxley Act of 2002 has resulted in a series of rules and regulations by the SEC that increase responsibilities and liabilities of directors and executive officers.  The Dodd-Frank Wall Street Reform and Consumer Protection Act, adopted in July 2010, imposes significant additional obligations and disclosure requirements, as to which SEC rulemaking is ongoing.  We are a small company with a limited operating history and no revenues or profits, which may influence the decisions of potential candidates we may recruit as directors or officers.  The real and perceived increased personal risk associated with these requirements may deter qualified individuals from accepting these roles.  In addition, costs of compliance with such legislation, including several provisions specifically applicable to companies engaged in mining operations, could have a significant impact on our financial position and results of operations.

 

Provisions of Delaware law and our charter and bylaws may delay or prevent transactions that would benefit stockholders

 

Our certificate of incorporation and bylaws and the Delaware General Corporation Law contain provisions that may have the effect of delaying, deferring or preventing a change of control of the Company.  These provisions, among other things:

 

·

Provide for staggering the terms of directors by dividing the total number of directors into three groups;

 

·

Authorize our board of directors to set the terms of preferred stock;

 

·

Restrict our ability to engage in transactions with stockholders with 15% or more of outstanding voting stock;

 

·

Authorize the calling of special meetings of stockholders only by the board of directors, not by the stockholders;

 

·

Limit the business transacted at any meeting of stockholders to those purposes specifically stated in the notice of the meeting; and

 

·

Prohibit stockholder action by written consent without a meeting and provide that directors may be removed only at a meeting of stockholders.

 

Because of these provisions, persons considering unsolicited tender offers or other unilateral takeover proposals may be more likely to negotiate with our board of directors rather than pursue non-negotiated takeover attempts.  As a result, these provisions may make it more difficult for our stockholders to benefit from transactions that are opposed by an incumbent board of directors.

 

35

Forward-Looking Statements

 

Certain statements in this document may constitute forward-looking statements, which involve known and unknown risks, uncertainties and other factors, which may cause actual results, performance or achievements of our Company, the Mt. Hope Project and our other projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.  We use the words “may,” “will,” “believe,” “expect,” “anticipate,” “intend,” “future,” “plan,” “estimate,” “potential,” and other similar expressions to identify forward-looking statements.  Forward-looking statements may include, but are not limited to, statements with respect to the following:

 

·

Our ability to raise additional capital and to meet our financial obligations past third quarter 2020, which may force us to cease all operations and pursue restructuring or liquidation alternatives, including the potential to seek a bankruptcy filing, in which event investors may lose their entire investment in our Company;

 

·

Our ability to work cooperatively with POS-Minerals to extend repayment of the Return of Contribution under the LLC Agreement, currently valued at $33.6 million;

 

·

Our ability to obtain project financing for the development and construction of the Mt. Hope Project;

 

·

The ability to obtain and maintain all permits, including the new ROD, water rights, and approvals for the Mt. Hope Project and the Liberty Project, and potential development of the copper-silver target and zinc mineralization;

 

·

Our dependence on the success of the Mt. Hope Project;

 

·

Our ability to access a $700 million bank loan with or without the reasonable best efforts of AMER or meet conditions under the molybdenum supply agreements;

 

·

Issues related to the management of the Mt. Hope Project pursuant to the LLC Agreement;

 

·

Risks related to the failure of POS-Minerals to make ongoing cash contributions pursuant to the LLC Agreement;

 

·

Our ability to obtain approval from POS-Minerals to explore and develop the copper-silver target and zinc mineralization;

 

·

Fluctuations in the market price of, demand for, and supply of molybdenum and other metals;

 

·

The estimation and realization of mineral reserves and production estimates, if any;

 

·

The timing of exploration, development and production activities and estimated future production, if any;

 

·

Estimates related to costs of production, capital, operating and exploration expenditures;

 

·

Requirements for additional capital and our ability to obtain additional capital in a timely manner and on acceptable terms;

 

·

Our ability to renegotiate, restructure, suspend, cancel or extend payment terms of contracts as necessary or appropriate in order to conserve cash;

 

·

Government regulation of mining operations, environmental conditions and risks, reclamation and rehabilitation expenses;

 

·

Title disputes or claims;

 

36

·

Limitations of and access to certain insurance coverage;

 

·

The future price of molybdenum, copper or other metals; and

 

·

Ability to retain key employees and staff.

 

These forward-looking statements are based on our current expectations and are subject to a number of risks and uncertainties, including those identified under “Risk Factors” and “Management’s Discussion and Analysis of Financial Condition and Results of Operations.”  Although we believe that the expectations reflected in these forward-looking statements are reasonable, our actual results could differ materially from those expressed in these forward-looking statements, and any events anticipated in the forward-looking statements may not actually occur.

 

ITEM 1B.UNRESOLVED STAFF COMMENTS

 

None.

 

ITEM 3.  LEGAL PROCEEDINGS

 

History of Record of Decision (ROD)

 

On November 16, 2012, the BLM issued its initial ROD authorizing development of the Mt. Hope Project.  The ROD was subsequently vacated by the U.S. Court of Appeals for the Ninth Circuit in December 2016, discussed below.  Also, on April 23, 2015, the BLM issued a Finding of No Significant Impact (“FONSI”) supporting their Decision to approve an amendment to the PoO.  The initial ROD and FONSI/Decision approved the PoO and amended PoO, respectively, for construction and operation of the mining and processing facilities and also granted the Right-of-Way, and amended Right-of-Way, respectively, for a 230kV power transmission line, discussed below.  Monitoring and mitigation measures identified in the initial ROD and FONSI, developed in collaboration with the regulatory agencies involved throughout the permitting process, will avoid, minimize, and mitigate environmental impacts, and reflect the Company’s commitment to be good stewards of the environment.  Ongoing changes to permits and the PoO during the life of mining operations are typical as design evolves and operations are optimized.

 

On February 15, 2013, Great Basin Resource Watch and the Western Shoshone Defense Project (“Plaintiffs”) filed a Complaint against the U.S. Department of the Interior and the BLM (“Defendants”) in the U.S. District Court, District of Nevada (“District Court”), seeking relief under the National Environmental Policy Act (“NEPA”) and other federal laws challenging the BLM’s issuance of the initial ROD for the Mt. Hope Project, and on February 20, 2013 filed a Motion for Preliminary Injunction.  The District Court allowed the LLC to intervene in the matter.

 

On August 22, 2013, the District Court denied, without prejudice, Plaintiffs’ Motion for Preliminary Injunction based on a Joint Stipulation to Continue Preliminary Injunction Oral Argument, which advised the District Court that as a result of economic conditions, including the Company’s ongoing financing efforts, all major ground disturbing activities had ceased at the Mt. Hope Project.

 

On July 23, 2014, the District Court denied Plaintiffs’ motion for summary judgment in its entirety and on August 1, 2014 the Court entered judgment in favor of the Defendants and the LLC, and against Plaintiffs regarding all claims raised in the Complaint. 

 

Thereafter, on September 22, 2014, the Plaintiffs filed their notice of appeal to the U.S. Court of Appeals for the Ninth Circuit (“Ninth Circuit”) of the District Court’s dismissal.  Oral argument of the parties before the Ninth Circuit was completed on October 18, 2016.  On December 28, 2016, the Ninth Circuit issued its Opinion rejecting many of the arguments raised by the Plaintiffs challenging the Environmental Impact Statement ("EIS") completed for the Mt. Hope Project, but issued a narrow reversal of the BLM's findings related to air quality analysis and information related to potential public water resources. Because of this technical deficiency, the Court vacated the initial ROD.

 

Re-Issuance of Record of Decision Approving Supplemental Environmental Impact Statement (“SEIS”)

 

On remand from the Ninth Circuit to the BLM, the agency conducted additional evaluation of air quality impacts and resulting cumulative impact analysis under NEPA in preparation of a Supplemental Environmental Impact

37

Statement (“SEIS”).  The SEIS disclosed additional information to the public related to the selection of appropriate background concentrations to use for dispersion modeling of air pollutants and information related to potential public water reserves.  Because the SEIS must be prepared in accordance with NEPA guidelines, the SEIS process included three publications in the Federal Register: the first was the Notice of Intent (“NOI”) which was published on July 19, 2017; the second, the Notice of Availability (“NOA”) of the Draft SEIS (“DSEIS”) was published on March 6, 2019; and on September 27, 2019, the third, an NOA of the final SEIS, was published announcing that the BLM had re-issued the ROD marking completion of the NEPA process and approval of the SEIS.  On October 31, 2019, a Complaint was filed against the U.S. Department of Interior and the BLM in the U.S. District Court in Nevada, challenging the re-issuance of the ROD. We are reviewing the Complaint filed by Great Basin Resource Watch and the Western Shoshone Defense Project, and may seek permission from the Court for the LLC to intervene on behalf of the Mt. Hope Project.

 

History of Mt. Hope Water Permits

 

In July 2011, the Nevada State Engineer (“State Engineer”) initially approved our applications for new appropriation of water for mining and milling use, and applications to change existing water from agricultural use to mining and milling use for the Mt. Hope Project.  Subsequently, the State Engineer granted water permits associated with the approved applications and approved a Monitoring, Management and Mitigation Plan (“3M Plan”) for the Mt. Hope Project.  Eureka County, Nevada and two other parties comprised of water rights holders in Diamond Valley and Kobeh Valley appealed the State Engineer’s decision approving the applications and granting the water permits to the Nevada State District Court (“District Court”) and then filed a further appeal to the Nevada Supreme Court challenging the District Court’s decision affirming the State Engineer’s decision to approve the applications and grant the water permits.  In June 2013, the appeal was consolidated by the Nevada Supreme Court with an appeal of the State Engineer’s approval of the 3M Plan filed by two water rights holders.  The District Court previously upheld the State Engineer’s approval of the 3M Plan and the two parties subsequently appealed the District Court’s decision to the Nevada Supreme Court. 

 

On September 18, 2015, the Nevada Supreme Court issued an Order that reversed and remanded the cases to the District Court for further proceedings consistent with the Order.  On October 29, 2015, the Nevada Supreme Court issued the Order as a published Opinion.  The Nevada Supreme Court ruled that the State Engineer did not have sufficient evidence in the record at the time he approved the applications and granted the water permits to demonstrate that successful mitigation may be undertaken so as to dispel the threat to existing water rights holders.

 

On September 27, 2017, the Nevada Supreme Court affirmed a March 4, 2016 District Court Order vacating the 3M Plan, denying the water applications and vacating the permits issued by the State Engineer in July 2011 and June 2012.  This decision of the Nevada Supreme Court was final, and not subject to further appeal.

 

New Change Applications for Water Use at Mt. Hope Project

 

After the Company received the September 2017 decision from the Nevada Supreme Court, it proceeded with new applications to change existing agricultural irrigation and mining/milling water rights owned by the Company to use at the Mt. Hope Project.  These new change applications had been filed with the State Engineer in 2015 and 2016 while the above described appeals were pending before the Nevada Supreme Court.  Originally, these applications and other new appropriation applications were to be addressed at a pre-hearing conference scheduled on August 25, 2016 before the State Engineer.  These applications were the subject of a Writ of Prohibition or Mandamus (“Writ”) filed by Eureka County on August 23, 2016 to the Nevada Supreme Court seeking the Supreme Court’s intervention to stop further action by the State Engineer while the appeals discussed above were pending.  On December 22, 2017 the Nevada Supreme Court denied Eureka County’s Writ Petition.  As a result, the State Engineer allowed a pre-hearing conference held on January 24, 2018.  At the pre-hearing conference the State Engineer and his hearing officer scheduled review of the new change applications for a September 11, 2018 hearing in Carson City, Nevada. 

 

On January 2, 2018, Eureka County, and later joined by the other two protestants representing a rancher in Kobeh Valley and a ranching group in Diamond Valley, filed a motion to dismiss with the State Engineer asserting that our applications were precluded from review and approval asserting that they were repetitive of the applications denied previously by the Nevada Supreme Court in its September 2017 decision.  On March 26, 2018, the State Engineer issued a non-final order denying the motion to dismiss finding that the applications to be reviewed at the upcoming hearing were not identical issues and that further consideration of the motion could be taken at the hearing.  On May 14, 2018, Eureka County, joined by the other protestants filed a Writ to the Nevada Supreme Court and later a Motion to Stay the

38

September hearing date, asserting that the denial of the Motion to Dismiss was erroneous and that the Nevada Supreme Court should order that the applications be denied and/or the September 2018 hearing should be delayed until the Nevada Supreme Court can consider the Writ and underlying motion to dismiss.  The Company filed its objection on June 27, 2018, and on August 30, 2018, the Nevada Supreme Court denied the Writ, permitting the September 2018 hearing before the Nevada State Engineer to proceed. 

 

On the second day of the September hearing, all protest issues raised by Eureka County and the Diamond Natural Resources Protections & Conservation Association (“DNR”) concerning the Mt. Hope water rights applications were resolved through a Stipulation, Settlement Agreement and Withdrawal of Protest (“Settlement”).  After Eureka County and DNR were excused, the hearing continued with evidence addressing concerns raised by another protestant representing a Kobeh Valley ranching family and cattle company that refused to participate in the Settlement. At the public hearing, the Company presented expert testimony in support of its augmentation and monitoring plan to the Nevada State Engineer, which will protect senior water rights in the Kobeh Valley basin when the Company commences construction and operation of its proposed Mt. Hope molybdenum project near the town of Eureka, Nevada.  The hearing concluded on September 21, 2018. 

 

Effective April 30, 2019, the Company, through its wholly owned subsidiary Kobeh Valley Ranch LLC (“KVR”) and the entered into a settlement agreement with a Kobeh Valley, Nevada ranching family (“Ranchers”), resolving the last set of protests pending before the Nevada State Engineer pertaining to the Mt. Hope Project’s water rights applications.

 

On June 6, 2019, the Nevada State Engineer issued Ruling 6464 granting the Company’s water rights applications for mining purposes.  The water right permits for the Mt. Hope Project were issued on July 24, 2019.  With receipt of and in compliance with the terms of the water permits, the water is available for consumptive use at the Mt. Hope Project.  Neither the issuance of Ruling 6464 nor the issuance of the water permits were challenged, and the deadline for filing any appeal has expired.

 

Key Terms of Settlements

Eureka County and the DNR

 

Under the terms of the Settlement with Eureka County and the DNR, the Company and the LLC agreed to convey all related water rights for Mt. Hope Project at the future cessation of all mining activity to assist Eureka County and the DNR’s efforts to mitigate the pre-existing effects of agricultural groundwater pumping in Diamond Valley. Furthermore, upon construction of certain power infrastructure and grants of right of way by the LLC at the Mt. Hope Project, the Company and the LLC will work cooperatively with Eureka County to allow use of and access to such infrastructure to lessen the pre-existing effects of Diamond Valley groundwater pumping. Eureka County, and the Company and the LLC, also agreed to work cooperatively to seek opportunities to improve and implement groundwater monitoring efforts.

In addition, the Company withdrew its protests to Eureka County’s pending applications with the Nevada State Engineer to appropriate water from the Kobeh Valley basin, and at the request of DNR, the Company also agreed to publicly support the proposed Diamond Valley Ground Water Management Plan currently pending before the Nevada State Engineer.

 

With receipt of the water permits, the LLC increased its financial contributions to the existing Agricultural Sustainability Trust Agreement, discussed above, with the Eureka Producers’ Cooperative (“EPC”) in Diamond Valley with an additional $50,000 to EPC.  Initially, upon execution of the Settlement, the LLC made a payment of $50,000. 

 

The LLC will make additional contributions of $750,000 each after the commencement of molybdenum production at the Mt. Hope Project and on the one-year anniversary of production, for a total contribution obligation to the Sustainability Trust of $5.6 million, an increase of $1.6 million related to the terms of the Settlement. The amount has been accrued under mining properties, land, and water rights in the Company’s financial statements in addition to the previously accrued $4.0 million resulting in a total accrual of $5.6 million.  The LLC has contributed $0.1 million into the Trust as of December 31, 2019.

 

39

The Sustainability Trust is tasked with developing and implementing programs that will serve to slow groundwater drawdown and thereby improve the sustainability of the agricultural economy in the Diamond Valley Hydrographic Basin.  

 

Kobeh Valley Ranching Family

 

At the execution of the settlement agreement, the LLC funded an initial payment of $1 million into a trust account; distribution to the Ranchers occurred when the water permits were issued on July 24, 2019.  Upon receipt of the initial $1,000,000 into the trust account, the Ranchers withdrew their protests and forfeited any judicial review of Ruling 6464 and the water applications and issuance of the water permits issued on July 24, 2019 by the Nevada State Engineer.

When conditions exist for the LLC to secure project financing additional consideration representing less than 1.5 % of the remaining project capital budget will be payable to the Ranchers.  If the LLC has not secured Mt. Hope Project financing within 12 months of the executed settlement agreement or April 2020, the LLC will begin to make monthly payments of $10,000 to the Ranchers until financing is achieved and the remaining consideration will be paid to the Ranchers.

Pursuant to an April 29, 2019 Consent Agreement, the members of the LLC agreed that funding for the $1 million was advanced to the LLC by the Company, to preserve the joint venture’s existing reserve account.  General Moly sourced $500,000 from its available cash, and received the remaining $500,000 from closing a sale of Series A Convertible Preferred Shares in a private placement with Mount Hope Mines Inc. (“MHMI”), the Mt. Hope Project’s claim/land lessor, discussed in Items 1 and 2 above and later in Note 7 to the consolidated financial statements contained elsewhere in this report.

In exchange for General Moly advancing the $1,000,000 initial settlement funding, the LLC members have agreed to repay the $1 million advance from the proceeds of ongoing sales of non-critical LLC assets and lands.  On September 27, 2019, the Company and POS-Minerals entered into a further Consent Agreement for a reimbursement schedule concerning the approximately $700,000 owed to the Company by the LLC in return for the Company’s advance of funding to settle protests related to the water right applications for the Mt. Hope Project.  Under the September Consent Agreement, $200,000 was reimbursed from the Reserve Account to the Company on September 30, 2019 and an additional $200,000 was reimbursed in early November.  The remaining approximately $300,000 was reimbursed in March 2020 after the LLC sold more than $400,000 in non-critical Mt. Hope Project related equipment. 

 

ITEM 4.MINE SAFETY DISCLOSURES

 

Not applicable.

 

40

PART II

 

ITEM 5.MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

 

Market Information

 

Our common stock trades on the NYSE American under the symbol “GMO.”  On February 14, 2008 our common stock began trading on the Toronto Stock Exchange (“TSX”), also under the symbol “GMO.”

 

Holders

 

As of April 3, 2020, there were approximately 327 holders of record of our common stock.

 

Dividends

 

We have never declared or paid dividends on our common stock or preferred stock and we do not anticipate paying any dividends on our common stock or preferred stock in the foreseeable future.  We will pay dividends on our common stock and preferred stock only if and when declared by our board of directors.  Our board’s ability to declare a dividend is subject to limits imposed by Delaware corporate law.  In determining whether to declare dividends, the board will consider these limits, our financial condition, results of operations, working capital requirements, future prospects, and other factors it considers relevant.

 

Issuer Purchases of Equity Securities

 Not applicable.

 

 

ITEM 6.SELECTED FINANCIAL DATA

 

Not applicable.

 

 

41

ITEM 7.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 

The following discussion and analysis of our financial condition and results of operations constitutes management’s review of the factors that affected our financial and operating performance for the years ended December 31, 2019 and 2018.  This discussion should be read in conjunction with the consolidated financial statements and notes thereto contained elsewhere in this report.

 

Overview

 

We began the development of the Mt. Hope Project on October 4, 2007.  During the year ended December 31, 2008 we also completed work on a pre-feasibility study of our Liberty Project, which we updated during 2014.

 

Project Ownership

 

From October 2005 to January 2008, we owned the rights to 100% of the Mt. Hope Project.  Effective as of January 1, 2008, we contributed all of our interest in the assets related to the Mt. Hope Project, the Mt. Hope Lease, discussed above, into the LLC, and in February 2008 entered into a joint venture agreement (“LLC Agreement”) for the development and operation of the Mt. Hope Project with POS-Minerals Corporation (“POS-Minerals”).  Under the LLC Agreement, POS-Minerals owns a 20% interest in the LLC and General Moly, through Nevada Moly, LLC (“Nevada Moly”), a wholly-owned subsidiary, owns an 80% interest.  The ownership interests and/or required capital contributions under the LLC Agreement can change as discussed below.

 

Under the terms of the LLC Agreement, since commercial production at the Mt. Hope Project was not achieved by December 31, 2011, the LLC will be required to return to POS-Minerals $36.0 million, since reduced to $33.6 million as discussed below, of its capital contributions (“Return of Contributions”), with no corresponding reduction in POS-Minerals’ ownership percentage.  Effective January 1, 2015, as part of a comprehensive agreement concerning the release of the reserve account described below, Nevada Moly and POS-Minerals agreed that the Return of Contributions will be payable to POS-Minerals on December 31, 2020; provided that, at any time on or before November 30, 2020, Nevada Moly and POS-Minerals may agree in writing to extend the due date to December 31, 2021; and if the due date has been so extended, at any time on or before November 30, 2021, Nevada Moly and POS-Minerals may agree in writing to extend the due date to December 31, 2022.  If the repayment date is extended, the unpaid amount will bear interest at a rate per annum of LIBOR plus 5%, which interest shall compound quarterly, commencing on December 31, 2020 through the date of payment in full.  Payments of accrued but unpaid interest, if any, shall be made on the repayment date.  Nevada Moly may elect, on behalf of the Company, to cause the Company to prepay, in whole or in part, the Return of Contributions at any time, without premium or penalty, along with accrued and unpaid interest, if any.

 

The original Return of Contributions amount due to POS-Minerals is reduced, dollar for dollar, by the amount of capital contributions for equipment payments required from POS-Minerals under approved budgets of the LLC, as discussed further below.  As of December 31, 2019, this amount has been reduced by $2.4 million, consisting of POS-Mineral’s 20% share of equipment purchases, such that the remaining amount due to POS-Minerals is $33.6 million.  If Nevada Moly does not fund its additional capital contribution in order for the LLC to make the required Return of Contributions to POS-Minerals set forth above, POS-Minerals has an election to either make a secured loan to the LLC to fund the Return of Contributions or receive an additional interest in the LLC estimated to be 5%.  In the latter case, Nevada Moly’s interest in the LLC is subject to dilution by a percentage equal to the ratio of 1.5 times the amount of the unpaid Return of Contributions over the aggregate amount of deemed capital contributions (as determined under the LLC Agreement) of both parties to the LLC (“Dilution Formula”).  At December 31, 2019, the aggregate amount of deemed capital contributions of both parties was $1,090.8 million.

 

Furthermore, the LLC Agreement permits POS-Minerals to put/sell its interest in the LLC to Nevada Moly after a change of control of Nevada Moly or the Company, as defined in the LLC Agreement, followed by a failure by us or our successor company to use standard mining industry practice in connection with the development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve (12) consecutive months.  If these circumstance should occur, POS-Minerals may exercise its option to put or sell its interest, and thereafter, Nevada Moly or its transferee or surviving entity would be required to purchase the interest for 120% of POS-Minerals’ total contributions to the LLC, which, if not paid timely, would be subject to 10% interest per annum.

 

42

The LLC Agreement requires the Company and POS-Minerals to make monthly pro rata capital contributions to the LLC to fund costs incurred.  The interest of a party in the LLC that does not make its monthly pro rata capital contributions to fund costs incurred is subject to dilution based on the Dilution Formula.  All required monthly contributions have been made by both parties in accordance with the terms of the agreements between the parties.

 

The Reserve Account

 

Effective January 1, 2015, Nevada Moly and POS-Minerals signed an amendment to the LLC Agreement under which a separate $36.0 million belonging to Nevada Moly, held by the LLC in a reserve account established in December 2012, is being released for the mutual benefit of both members related to annual jointly approved Mt. Hope Project expenses into 2021.  In January 2015, the reserve account funded a reimbursement of contributions made by the members during the fourth quarter of 2014, inclusive of $0.7 million to POS-Minerals and $2.7 million to Nevada Moly.  The remaining reserve account funds are now being used to pay ongoing jointly approved expenses of the LLC until the Company obtains full financing for its portion of the Mt. Hope Project construction cost, or until the reserve account is exhausted.  Any remaining funds after financing is obtained will be returned to the Company.  The balance of the reserve account was $3.4 million and $6.2 million at December 31, 2019 and December 31, 2018, respectively. 

 

Permitting Considerations

 

In the ordinary course of business, mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations. The LLC is required to obtain approval, in the form of a Record of Decision (“ROD”), from the BLM to implement the Mt. Hope Project Plan of Operations (“PoO”).  The LLC is also required to obtain various state and federal permits including, but not limited to, water protection, air quality, water rights and reclamation.  In addition to requiring permits for the development of the Mt. Hope Project, we will need to obtain and modify various mining and environmental permits during the life of the Mt. Hope Project.  Maintaining, modifying, and renewing the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and substantial expenditures.  The duration and success of the LLC’s efforts to obtain, modify or renew permits will be contingent upon many variables, some of which are not within the LLC’s control.  Increased costs or delays could occur, depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority.  All necessary permits may not be obtained and, if obtained, may not be renewed, or the costs involved in each case may exceed those that we previously estimated.  In addition, it is possible that compliance with such permits may result in additional costs and delays.

 

History of Record of Decision (ROD)

 

On November 16, 2012, the BLM issued its initial ROD authorizing development of the Mt. Hope Project.  The ROD was subsequently vacated by the U.S. Court of Appeals for the Ninth Circuit in December 2016, discussed below.  Also, on April 23, 2015, the BLM issued a Finding of No Significant Impact (“FONSI”) supporting their Decision to approve an amendment to the PoO.  The initial ROD and FONSI/Decision approved the PoO and amended PoO, respectively, for construction and operation of the mining and processing facilities and also granted the Right-of-Way, and amended Right-of-Way, respectively, for a 230kV power transmission line, discussed below.  Monitoring and mitigation measures identified in the initial ROD and FONSI, developed in collaboration with the regulatory agencies involved throughout the permitting process, will avoid, minimize, and mitigate environmental impacts, and reflect the Company’s commitment to be good stewards of the environment.  Ongoing changes to permits and the PoO during the life of mining operations are typical as design evolves and operations are optimized.

 

On February 15, 2013, Great Basin Resource Watch and the Western Shoshone Defense Project (“Plaintiffs”) filed a Complaint against the U.S. Department of the Interior and the BLM (“Defendants”) in the U.S. District Court, District of Nevada (“District Court”), seeking relief under the National Environmental Policy Act (“NEPA”) and other federal laws challenging the BLM’s issuance of the initial ROD for the Mt. Hope Project, and on February 20, 2013 filed a Motion for Preliminary Injunction.  The District Court allowed the LLC to intervene in the matter.

 

On August 22, 2013, the District Court denied, without prejudice, Plaintiffs’ Motion for Preliminary Injunction based on a Joint Stipulation to Continue Preliminary Injunction Oral Argument, which advised the District Court that as a result of economic conditions, including the Company’s ongoing financing efforts, all major ground disturbing activities had ceased at the Mt. Hope Project.

 

43

On July 23, 2014, the District Court denied Plaintiffs’ motion for summary judgment in its entirety and on August 1, 2014 the Court entered judgment in favor of the Defendants and the LLC, and against Plaintiffs regarding all claims raised in the Complaint. 

 

Thereafter, on September 22, 2014, the Plaintiffs filed their notice of appeal to the U.S. Court of Appeals for the Ninth Circuit (“Ninth Circuit”) of the District Court’s dismissal.  Oral argument of the parties before the Ninth Circuit was completed on October 18, 2016.  On December 28, 2016, the Ninth Circuit issued its Opinion rejecting many of the arguments raised by the Plaintiffs challenging the Environmental Impact Statement ("EIS") completed for the Mt. Hope Project, but issued a narrow reversal of the BLM's findings related to air quality analysis and information related to potential public water resources. Because of this technical deficiency, the Court vacated the initial ROD.

 

Re-Issuance of Record of Decision Approving Supplemental Environmental Impact Statement (“SEIS”)

 

On remand from the Ninth Circuit to the BLM, the agency conducted additional evaluation of air quality impacts and resulting cumulative impact analysis under NEPA in preparation of a Supplemental Environmental Impact Statement (“SEIS”).  The SEIS disclosed additional information to the public related to the selection of appropriate background concentrations to use for dispersion modeling of air pollutants and information related to potential public water reserves.  Because the SEIS must be prepared in accordance with NEPA guidelines, the SEIS process included three publications in the Federal Register: the first was the Notice of Intent (“NOI”) which was published on July 19, 2017; the second, the Notice of Availability (“NOA”) of the Draft SEIS (“DSEIS”) was published on March 6, 2019; and on September 27, 2019, the third, an NOA of the final SEIS, was published announcing that the BLM had re-issued the ROD marking completion of the NEPA process and approval of the SEIS.  On October 31, 2019, a Complaint was filed against the U.S. Department of Interior and the BLM in the U.S. District Court in Nevada, challenging the re-issuance of the ROD. We are reviewing the Complaint filed by Great Basin Resource Watch and the Western Shoshone Defense Project, and may seek permission from the Court for the LLC to intervene on behalf of the Mt. Hope Project.

 

Reclamation Considerations

 

Environmental regulations related to reclamation require that the cost for a third party contractor to perform reclamation activities on the minesite be estimated.  In October 2015, we submitted a request to the BLM to reduce our reclamation liability to current surface disturbance.  Simultaneously, we submitted an application to NDEP-BMRR to modify the Reclamation Permit to reflect this reduced reclamation liability. On October 26, 2015, NDEP-BMRR approved the proposed permit modification, including the reduced reclamation liability amount.   On December 21, 2015, BLM approved the updated reclamation liability estimate, reducing the reclamation liability to approximately $2.8 million.  In early 2019, the Company submitted, and BLM approved a required 3-year update to the reclamation liability estimate, resulting in an increased liability of approximately $3.1 million.  We worked with the LLC’s reclamation surety underwriters to satisfy the $2.8 million financial guarantee requirements under the approved amended PoO for the Mt. Hope Project and funded the $0.3 million increase in cash directly with the BLM in April 2019.  As of December 31, 2019, the surety bond program was funded with a cash collateral payment of $0.3 million.

 

Water Rights Considerations

 

History of Mt. Hope Water Permits

 

In July 2011, the Nevada State Engineer (“State Engineer”) initially approved our applications for new appropriation of water for mining and milling use, and applications to change existing water from agricultural use to mining and milling use for the Mt. Hope Project.  Subsequently, the State Engineer granted water permits associated with the approved applications and approved a Monitoring, Management and Mitigation Plan (“3M Plan”) for the Mt. Hope Project.  Eureka County, Nevada and two other parties comprised of water rights holders in Diamond Valley and Kobeh Valley appealed the State Engineer’s decision approving the applications and granting the water permits to the Nevada State District Court (“District Court”) and then filed a further appeal to the Nevada Supreme Court challenging the District Court’s decision affirming the State Engineer’s decision to approve the applications and grant the water permits.  In June 2013, the appeal was consolidated by the Nevada Supreme Court with an appeal of the State Engineer’s approval of the 3M Plan filed by two water rights holders.  The District Court previously upheld the State Engineer’s approval of the 3M Plan and the two parties subsequently appealed the District Court’s decision to the Nevada Supreme Court. 

 

44

On September 18, 2015, the Nevada Supreme Court issued an Order that reversed and remanded the cases to the District Court for further proceedings consistent with the Order.  On October 29, 2015, the Nevada Supreme Court issued the Order as a published Opinion.  The Nevada Supreme Court ruled that the State Engineer did not have sufficient evidence in the record at the time he approved the applications and granted the water permits to demonstrate that successful mitigation may be undertaken so as to dispel the threat to existing water rights holders.

 

On September 27, 2017, the Nevada Supreme Court affirmed a March 4, 2016 District Court Order vacating the 3M Plan, denying the water applications and vacating the permits issued by the State Engineer in July 2011 and June 2012.  This decision of the Nevada Supreme Court was final, and not subject to further appeal.

 

New Change Applications for Water Use at Mt. Hope Project

 

After the Company received the September 2017 decision from the Nevada Supreme Court, it proceeded with new applications to change existing agricultural irrigation and mining/milling water rights owned by the Company to use at the Mt. Hope Project.  These new change applications had been filed with the State Engineer in 2015 and 2016 while the above described appeals were pending before the Nevada Supreme Court.  Originally, these applications and other new appropriation applications were to be addressed at a pre-hearing conference scheduled on August 25, 2016 before the State Engineer.  These applications were the subject of a Writ of Prohibition or Mandamus (“Writ”) filed by Eureka County on August 23, 2016 to the Nevada Supreme Court seeking the Supreme Court’s intervention to stop further action by the State Engineer while the appeals discussed above were pending.  On December 22, 2017 the Nevada Supreme Court denied Eureka County’s Writ Petition.  As a result, the State Engineer allowed a pre-hearing conference held on January 24, 2018.  At the pre-hearing conference the State Engineer and his hearing officer scheduled review of the new change applications for a September 11, 2018 hearing in Carson City, Nevada. 

 

On January 2, 2018, Eureka County, and later joined by the other two protestants representing a rancher in Kobeh Valley and a ranching group in Diamond Valley, filed a motion to dismiss with the State Engineer asserting that our applications were precluded from review and approval asserting that they were repetitive of the applications denied previously by the Nevada Supreme Court in its September 2017 decision.  On March 26, 2018, the State Engineer issued a non-final order denying the motion to dismiss finding that the applications to be reviewed at the upcoming hearing were not identical issues and that further consideration of the motion could be taken at the hearing.  On May 14, 2018, Eureka County, joined by the other protestants filed a Writ to the Nevada Supreme Court and later a Motion to Stay the September hearing date, asserting that the denial of the Motion to Dismiss was erroneous and that the Nevada Supreme Court should order that the applications be denied and/or the September 2018 hearing should be delayed until the Nevada Supreme Court can consider the Writ and underlying motion to dismiss.  The Company filed its objection on June 27, 2018, and on August 30, 2018, the Nevada Supreme Court denied the Writ, permitting the September 2018 hearing before the Nevada State Engineer to proceed. 

 

On the second day of the September hearing, all protest issues raised by Eureka County and the Diamond Natural Resources Protections & Conservation Association (“DNR”) concerning the Mt. Hope water rights applications were resolved through a Stipulation, Settlement Agreement and Withdrawal of Protest (“Settlement”).  After Eureka County and DNR were excused, the hearing continued with evidence addressing concerns raised by another protestant representing a Kobeh Valley ranching family and cattle company that refused to participate in the Settlement. At the public hearing, the Company presented expert testimony in support of its augmentation and monitoring plan to the Nevada State Engineer, which will protect senior water rights in the Kobeh Valley basin when the Company commences construction and operation of its proposed Mt. Hope molybdenum project near the town of Eureka, Nevada.  The hearing concluded on September 21, 2018. 

 

Effective April 30, 2019, the Company, through its wholly owned subsidiary Kobeh Valley Ranch LLC (“KVR”) and the entered into a settlement agreement with a Kobeh Valley, Nevada ranching family (“Ranchers”), resolving the last set of protests pending before the Nevada State Engineer pertaining to the Mt. Hope Project’s water rights applications.

 

On June 6, 2019, the Nevada State Engineer issued Ruling 6464 granting the Company’s water rights applications for mining purposes.  The water right permits for the Mt. Hope Project were issued on July 24, 2019.  With receipt of and in compliance with the terms of the water permits, the water is available for consumptive use at the Mt. Hope Project.  Neither the issuance of Ruling 6464 nor the issuance of the water permits were challenged, and the deadline for filing any appeal has expired.

45

 

Key Terms of Settlements

Eureka County and the DNR

 

Under the terms of the Settlement with Eureka County and the DNR, the Company and the LLC agreed to convey all related water rights for Mt. Hope Project at the future cessation of all mining activity to assist Eureka County and the DNR’s efforts to mitigate the pre-existing effects of agricultural groundwater pumping in Diamond Valley. Furthermore, upon construction of certain power infrastructure and grants of right of way by the LLC at the Mt. Hope Project, the Company and the LLC will work cooperatively with Eureka County to allow use of and access to such infrastructure to lessen the pre-existing effects of Diamond Valley groundwater pumping. Eureka County, and the Company and the LLC, also agreed to work cooperatively to seek opportunities to improve and implement groundwater monitoring efforts.

In addition, the Company withdrew its protests to Eureka County’s pending applications with the Nevada State Engineer to appropriate water from the Kobeh Valley basin, and at the request of DNR, the Company also agreed to publicly support the proposed Diamond Valley Ground Water Management Plan currently pending before the Nevada State Engineer.

 

With receipt of the water permits, the LLC increased its financial contributions to the existing Agricultural Sustainability Trust Agreement, discussed above, with the Eureka Producers’ Cooperative (“EPC”) in Diamond Valley with an additional $50,000 to EPC.  Initially, upon execution of the Settlement, the LLC made a payment of $50,000. 

 

The LLC will make additional contributions of $750,000 each after the commencement of molybdenum production at the Mt. Hope Project and on the one year anniversary of production, for a total contribution obligation to the Sustainability Trust of $5.6 million, an increase of $1.6 million related to the terms of the Settlement. The amount has been accrued under mining properties, land, and water rights in the Company’s financial statements in addition to the previously accrued $4.0 million resulting in a total accrual of $5.6 million.  The LLC has contributed $0.1 million into the Trust as of December 31, 2019.

 

The Sustainability Trust is tasked with developing and implementing programs that will serve to slow groundwater drawdown and thereby improve the sustainability of the agricultural economy in the Diamond Valley Hydrographic Basin.  

 

Kobeh Valley Ranching Family

 

At the execution of the settlement agreement, the LLC funded an initial payment of $1 million into a trust account; distribution to the Ranchers occurred when the water permits were issued on July 24, 2019.  Upon receipt of the initial $1,000,000 into the trust account, the Ranchers withdrew their protests and forfeited any judicial review of Ruling 6464 and the water applications and issuance of the water permits issued on July 24, 2019 by the Nevada State Engineer.

When conditions exist for the LLC to secure project financing additional consideration representing less than 1.5 % of the remaining project capital budget will be payable to the Ranchers.  If the LLC has not secured Mt. Hope Project financing within 12 months of the executed settlement agreement or April 2020, the LLC will begin to make monthly payments of $10,000 to the Ranchers until financing is achieved and the remaining consideration will be paid to the Ranchers.

Pursuant to an April 29, 2019 Consent Agreement, the members of the LLC agreed that funding for the $1 million was advanced to the LLC by the Company, to preserve the joint venture’s existing reserve account.  General Moly sourced $500,000 from its available cash, and received the remaining $500,000 from closing a sale of Series A Convertible Preferred Shares in a private placement with Mount Hope Mines Inc. (“MHMI”), the Mt. Hope Project’s claim/land lessor, discussed in Items 1 and 2 above and later in Note 7 to the consolidated financial statements contained elsewhere in this report.

In exchange for General Moly advancing the $1,000,000 initial settlement funding, the LLC members have agreed to repay the $1 million advance from the proceeds of ongoing sales of non-critical LLC assets and lands.  On September 27, 2019, the Company and POS-Minerals entered into a further Consent Agreement for a reimbursement

46

schedule concerning the approximately $700,000 owed to the Company by the LLC in return for the Company’s advance of funding to settle protests related to the water right applications for the Mt. Hope Project.  Under the September Consent Agreement, $200,000 was reimbursed from the Reserve Account to the Company on September 30, 2019 and an additional $200,000 was reimbursed in early November.  The remaining approximately $300,000 will be reimbursed once the LLC has sold a minimum of $400,000 in non-critical Mt. Hope Project related equipment, anticipated to occur in March 2020. 

 

Capital & Operating Cost Estimates

 

Presently, the development of the Mt. Hope Project has a Project Capital Estimate of $1,312 million, which includes development costs of approximately $1,245 million and $67 million in cash financial guaranty/bonding requirements, advance royalty payments, and power pre-payment estimates.  These capital costs were updated in the third quarter of 2012, and were then escalated by approximately 3% in the third quarter of 2013, for those items not yet procured or committed to by contract.  The Mt. Hope Project has not materially changed in scope and remains currently designed at approximately 65% engineering completion, with solid scope definition.  The pricing associated with this estimate remains subject to escalation associated with equipment, construction labor and commodity price increases, and project delays, which will continue to be reviewed periodically.  The Project Capital Estimate does not include financing costs or amounts necessary to fund operating working capital and potential capital overruns, is subject to additional holding costs as financing activities for construction of the Mt. Hope Project are delayed, and may be subject to other escalation and de-escalation as contracts and purchase arrangements are finalized at then current pricing.  From October 2007 through the quarter ended December 31, 2019, the LLC spent approximately $298.7  million of the estimated $1,312 million on development of the Mt. Hope Project.

 

The LLC’s Project Operating Cost Estimate forecasts molybdenum production of approximately 41 million pounds per year for the first five years of operations at estimated average direct operating costs of $6.16 per pound based on a $8.00/lb reserve and $90 per barrel oil equivalent energy prices.  The Costs Applicable to Sales (“CAS”) per pound, including anticipated royalties calculated at a market price of $15 per pound molybdenum, are anticipated to average $6.84 per pound for the first 5 years.  These cost estimates are based on 2013 constant dollars and are subject to cost inflation or deflation.  We expect that these cost estimates will increase in the future upon completion of an engineered re-estimate of capital costs.

 

Equipment and Supply Procurement

 

Through December 31, 2019, the LLC has made deposits and/or final payments of $88.0 million on equipment orders.

 

In 2012, the LLC issued a firm purchase order for eighteen haul trucks.  The order provides for delivery of those haul trucks required to perform initial mine development, which will begin several months prior to commercial production.  Non-refundable down-payments of $1.2 million were made in 2012, with pricing subject to escalation as the trucks were not delivered prior to December 31, 2013.  Since that time, the LLC has renegotiated the timelines for truck delivery and delayed deliveries into December 2020.  The contract is cancellable with no further liability to the LLC.

 

Also in 2012, the LLC issued a firm purchase order for four mine production drills with a non-refundable down-payment of $0.4 million, and pricing was subject to escalation if the drills were not delivered by the end of 2013.  Since that time, the LLC has renegotiated the contract to further delay delivery into December 2020.  The contract remains cancellable with no further liability to the LLC.

 

On June 30, 2012, the LLC’s contract to purchase two electric shovels expired.  On July 11, 2012, we signed a letter of intent with the same vendor providing for the opportunity to purchase the electric shovels at prices consistent with the expired contract, less a special discount in the amount of $3.4 million to provide credit to the LLC for amounts paid as deposits under the expired contract.  The letter of intent provides that equipment pricing will remain subject to inflation indexes and guarantees production slots to ensure that the equipment is available when required by the LLC.  Since that time, the parties have agreed to extend the letter of intent through December 31, 2020.

 

47

Agreement with AMER International Group

 

Private Placement

 

As announced in April 2015, the Company and AMER International Group Co., Ltd (“AMER”) entered into a private placement for 40.0 million shares of the Company’s common stock and warrants to purchase 80.0 million shares of the Company’s common stock, priced using the trailing 90-day volume weighted average price (“VWAP”) of $0.50 on April 17, 2015, the date the Investment and Securities Purchase Agreement (“AMER Investment Agreement”) was signed. General Moly received stockholder approval of the transaction at its 2015 Annual Meeting, and of material amendments to the transaction at a special meeting held in December 2017.

 

On November 2, 2015, the Company and AMER entered into an amendment to the AMER Investment Agreement, utilizing a three-tranche investment.  The first tranche of the amended AMER Investment Agreement closed on November 24, 2015 for a $4.0 million private placement representing 13.3 million shares, priced at $0.30 per share, and warrants (“the AMER Warrants”) to purchase 80.0 million shares of common stock at $0.50 per share, which would become exercisable upon availability of an approximately $700.0 million senior secured loan (“Bank Loan”). The funds received from the $4.0 million first tranche private placement were divided evenly between general corporate purposes and an expense reimbursement account available to both AMER and the Company to cover anticipated Mt. Hope financing costs and other jointly sourced business development opportunities. In addition, AMER and General Moly entered into a Stockholder Agreement allowing AMER to nominate a director to the General Moly Board of Directors and additional directors following the close of the third tranche, discussed below, and drawdown of the Bank Loan.  The Stockholder Agreement also governed amer’s acquisition and transfer of General Moly shares.  Prior to closing the first tranche the parties agreed to eliminate certain conditions to closing.  Following the closing, AMER nominated Tong Zhang to serve as a director of the Company, and he was appointed by the Board of Directors on December 3, 2015.  Mr. Zhang was nominated by the Board of Directors to stand for election at the 2018 General Meeting of Stockholders and was elected by the stockholders to serve as a Class II director for a three (3) year term expiring in 2021, subject to re-election.  On July 29, 2019, Mr. Zhang resigned from the Board of Directors.

 

On October 16, 2017, the Company and AMER announced the closure of the second tranche of the parties’ three-tranche financing agreement.  At the close of the second tranche, General Moly issued 14.6 million shares to AMER, priced at the volume weighted average price (“VWAP”) for the 30-day period ending August 7, 2017 (the date of the parties’ Amendment No. 2 to the AMER Investment Agreement) of $0.41 per share for a private placement of $6.0 million by AMER.  $5.5 million of the equity sale proceeds were available for general corporate purposes, while $0.5 million was held in the expense reimbursement account established at the close of the first tranche to cover costs related to the Mt. Hope Project financing and other jointly sourced business development opportunities.

 

The third tranche of the amended AMER Investment Agreement was to include a $10.0 million private placement representing 20.0 million shares, priced at $0.50 per share (“Tranche 3”).  Closing of Tranche 3 was conditioned upon the earlier of the reissuance of water permits for the Mt. Hope Project or completion of a joint business opportunity involving use of 10.0 million shares of General Moly stock.  The issuance of shares in connection with the Tranche 3 was approved by General Moly stockholders in December 2017 at a Special Meeting of Stockholders.

 

The Company and AMER have jointly evaluated other potential opportunities, ranging from outright acquisitions and privatizations, or significant minority interest investments with a focus on base metal and ferro-alloy prospects, where the Company would benefit from management fees, minority equity interests, or the acquisition of both core and non-core assets.  The Company and AMER have considered but not completed any such transactions to date and we are not currently evaluating potential opportunities with AMER.  From commencement of the AMER Investment Agreement in 2015 to December 31, 2019, the Company and AMER spent approximately $2.5 million from the expense reimbursement account described above in connection with such evaluations.

 

AMER Disputes Obligation to Close Tranche 3 Private Placement Obligation

The last closing conditions for Tranche 3 under the AMER Investment Agreement included issuance of water permits for the Mt. Hope Project.  The water permits were issued by the Nevada State Engineer on July 24, 2019.  On July 26, 2019, the Company provided formal notice to AMER that the conditions to closing of Tranche 3 had been satisfied, and that Amer had two business days (until the close of business on Tuesday, July 30, 2019) to close the

48

transaction.  On July 31, 2019, the Company sent a Notice of Default to Amer, as Amer failed to fund and close Tranche 3 by the July 30, 2019 deadline.

On August 1, 2019, the Company received a letter from Amer dated July 30, 2019, purporting to terminate the Amer Investment Agreement, referencing its earlier letter received by the Company on July 18, 2019, in which Amer alleged uncured material adverse effects and alleged breaches of the Amer Investment Agreement by the Company (which include concerns related to US/China relations, concerns regarding the delay in obtaining environmental permits and solvency concerns).  The Company believed that such assertions were inaccurate and wholly without merit under the terms of the Amer Investment Agreement.  Additionally, as Amer disputed its obligation to fund the close of Tranche 3, the Company believed that Amer’s attempted termination of the Amer Investment Agreement was ineffective.  With Amer’s failure to fund Tranche 3, the Company had inadequate cash to continue operations and was forced to evaluate its options, including pursuing asset sales, short-term financing options and, if such efforts were unsuccessful in obtaining sufficient financing, the possibility of seeking bankruptcy protection. 

 

On August 28, 2019, the Company engaged King & Spalding, an international arbitration and litigation firm, to represent the Company in its Tranche 3 dispute with Amer.  The Company also formally notified Amer that a Dispute, as defined by the Amer Investment Agreement, existed between the parties as a result of Amer’s failure to close Tranche 3.  The notification required that one representative of each of the executive management of the parties be designated and authorized to attempt to settle the Dispute and the representatives were to meet in good faith to resolve the Dispute.  If the designated representatives did not resolve the Dispute within 10 business days after delivery of the Notice, the Dispute was subject to resolution by binding arbitration, pursuant to the Amer Investment Agreement in Hong Kong SAR under the rules of the International Chamber of Commerce.

 

On October 14, 2019, the Company announced that it had entered into an agreement with AMER to extend the dispute negotiation period (“Extension Agreement”).  Under the terms of the Extension Agreement, the Company received $300,000 from AMER in exchange for an extension of the negotiation period to November 15, 2019, on which date the Company’s CEO Bruce Hansen and AMER Chairman Wang Wen Yin met to discuss settlement options.  With the payment, AMER had the right, at its option, to apply the Extension Fee among the following: (1) credit against a final negotiated settlement; (2) credit against any AMER payment obligation to the Company, pursuant to an arbitration award; or (3) as consideration for the purchase of the Company’s common stock, priced at the 30-day volume weighted average price, as of the date immediately prior to the date that AMER demands delivery of such shares. 

 

On December 9, 2019, the Company and an affiliate of Amer announced the closure of a $4.0 million private placement at a price of $0.40 per common share of General Moly common stock under a new Securities Purchase Agreement (“SPA”) and amended and restated warrant agreement (“New Amer Warrant”), resolving the Dispute.  Additionally, the parties agreed to a mutual release, terminating the previous Amer Investment Agreement, the prior Warrant, and the Dispute Negotiation Extension Agreement (“Extension Agreement”).  The parties’ previous Stockholder Agreement expired by its terms on November 24, 2019.  In addition to the 10.0 million shares issued by General Moly to AMER in the private placement, AMER also received 1.1 million General Moly common shares priced at $0.27/share, the 30-day volume weighted average price of the Company’s shares on December 6, 2019 utilizing the previously $300,000 extension fee, pursuant to the terms of the Extension Agreement. 

 

Additionally, Amer nominated Mr. Siong Tek (“Terry”) Lee to serve the remaining term of Amer’s previous director nominee (Tong Zhang) expiring at the Company’s annual meeting in 2021.  Amer may nominate a second director to the Board so long as its shareholding exceeds 20% of the Company’s shares outstanding.

 

Bank Loan

 

Under the new SPA, Amer has agreed to use its reasonable best efforts to assist the Company in obtaining a loan from one or more prime Chinese banks (“Bank Loan”), for the Company’s share of construction and development costs at the Mt. Hope Project.  As discussed above, for every $100 million of sourced Chinese bank lending that Amer has assisted in contributing to a completed $700 million project debt financing, Amer may exercise 12 million warrants issued under the New Amer Warrant at an exercise price of $0.50 per share, up to 80 million warrants. 

 

 

49

Supply Agreement

 

Furthermore, upon closing of a minimum of $100 million from Amer’s efforts toward the completion of a Chinese bank $700 million project financing, Amer has the option to enter into a moly supply agreement with General Moly to purchase Mt. Hope Project sourced moly at a small discount to spot pricing when the Mt. Hope Project achieves full commercial production.  The saleable amount of moly to Amer escalates from an aggregate 3 million pounds per year to 20 million pounds per year over the first five years of mine production based on the level of project financing assisted by Amer towards the $700 million project financing.

 

Molybdenum Market Update

 

The molybdenum oxide daily global spot price per pound is currently at $8.48 compared with $9.20 at yearend 2019 and $11.88 at yearend 2018, according to Platts. During 2019, molybdenum prices were mostly range bound between $10.70 and $12.70 until prices declined to single digits to a year low of $8.28/lb in November 2019. The high for the year was $12.70/lb in March 2019.

During the second half of 2019, lower molybdenum prices may be attributed to the heightened U.S.-China trade tensions that led to a weakened Renminbi which further exacerbated the price fall when expressed in dollars. China is the world’s largest consumer and producer of molybdenum. In addition, increased fears about a more severe global economic slowdown may also have dampened molybdenum demand. The CPM Group noted that an evident shift in demand in China away from nickel-rich 300-series stainless steel to a cheaper and less molybdenum-intensive 200-series might have had a further impact. Nickel prices rose sharply, topping above $8/lb in early fourth quarter 2019. Nickel prices have since declined below $6/lb. Such shifts occurred in the past as well.

Beginning in 2020 through mid-February, moly prices were resilient and rose to nearly $11/lb, outperforming the vast majority of metal and energy commodities. Later in February 2020, moly prices again pulled back to the $9-range and below $9 in mid-March upon the global economic impact of the COVID-19 pandemic.

Molybdenum prices can be volatile. In consideration of China’s and the global economic retreat dampening demand, CPM estimates a small moly surplus in 2020. CPM has pushed out the supply deficit to begin in 2021 and extended the deficit to five years to 2025.

CPM also revised its price projections for an average moly real price of $9.32/lb and nominal price of $9.53/lb for 2020 and $11.64 and $12.19 for 2021, respectively (using a base of 2019). CPM further projects average moly real price of $13.29 and average nominal price of $14.59 for the five-year period 2021-2025; and an average real price of $13.65 and nominal price of $16.74 for 2026-2030.

Approximately 70% of molybdenum’s first use is for steel production as molybdenum is a premier alloy to strengthen steel and make it corrosion resistant. Most of molybdenum in steel is consumed by the specialty steels, an expanding, value-added segment accounting for approximately 10% of overall steel production. Within the specialty steels segment, stainless steel accounts for the largest use of molybdenum at 21%, and full alloy steel accounts for 20% of total molybdenum consumption.

The International Stainless Steel Forum announced that world stainless steel consumption increased 2.9% to 52.2 million metric tons in 2019 over 2018 driven by a 10.1% increase in output of 29.4 million metric tons from China, offsetting decreased output from other regions of the world. China is the world’s largest stainless steel producer and accounts for 56% of global production.

 

50

Molybdenum Spot Price (1/6/2011 – 3/202020) 

Picture 3

 

Outlook

 

We believe the molybdenum market is in a temporary pause caused by the COVID-19 pandemic.  When the global health crisis abates, we anticipate that the molybdenum market will recover and view the long-term outlook for our business positively, supported by shortfalls in long-term supplies of molybdenum, the requirements for molybdenum in the steel industry, and a recovery of the oil and gas industry.  We believe the underlying long-term fundamentals of the molybdenum business remain positive, supported by the significant role of molybdenum in the steel industry and a challenging long-term supply environment attributable to the difficulty in replacing output from both existing and high-cost mines with new production sources.  World market prices for molybdenum and other commodities have fluctuated historically and are affected by numerous factors beyond our control.  

 

Future molybdenum prices are expected to be volatile and are likely to be influenced by demand from China and emerging markets, as well as the strength or weakness of the U.S. dollar, U.S.-China trade tariffs, economic activity in the U.S. and other industrialized countries, the timing of the development of new supplies of molybdenum, production levels of mines, including primary molybdenum production from China, and the duration of the global health crisis and its drag on the global economy.

 

Liquidity, Capital Resources and Capital Requirements

 

For the period from December 31, 2018 to December 31, 2019

 

Our total consolidated cash balance at December 31, 2019 was $4.6 million compared to $2.0 million at December 31, 2018, representing an increase of $2.6 million due to a variety of cash inflows and outflows.  Outflows included $1.3 million in development costs for the Mt. Hope Project, $0.5 million at the Liberty Project, $5.7 million in general and administrative costs, offset by an inflow of funds released from the reserve account of $2.8 million, $1.8 million in funds received from the issuance of preferred shares, $1.35 million in funds received from supplemental notes issued and $4.3 million in funds received from AMER upon resolution of the dispute related to Tranche 3 of the Investment Agreement. 

 

The $36.0 million reserve account established in December of 2012, at the direction of the LLC management committee, was payable to Nevada Moly upon release, at which time the funds would have become available for use by

51

the Company.  Effective January 1, 2015, Nevada Moly and POS-Minerals signed an amendment to the LLC agreement under which $36.0 million owed to Nevada Moly and held by the LLC in the reserve account will be released for the mutual benefit of both members related to the jointly approved Mt. Hope Project expenses into 2021, as discussed above.  The balance of the reserve account at December 31, 2019 was $3.6 million, compared to $6.2 million at December 31, 2018.

 

Issuance of Series A and Series B Convertible Preferred Stock

On March 28, 2019, the Company executed a Securities Purchase Agreement (the “Series A Purchase Agreement”) with Bruce D. Hansen, the Company’s Chief Executive Officer/Chief Financial Officer, and Robert I. Pennington, the Company’s Chief Operating Officer (collectively the “Investors”), effective as of March 21, 2019.  Pursuant to the Series A Purchase Agreement, the Investors agreed to purchase up to $900,000 of convertible shares of Series A Preferred Stock, par value $0.001 per share (the “Series A Convertible Preferred Shares”), of the Company.  The Company requested three separate closings of sales of Series A Convertible Preferred Shares to the Investors between the date of the Series A Purchase Agreement and June 30, 2019.  Each closing was in the amount of $300,000 of Series A Convertible Preferred Shares. 

 

The Series A Convertible Preferred Shares were priced at $100.00/preferred share, convertible at any time at the holder’s discretion into common shares whereby one preferred share converts at a price of $0.27/common share to 370.37 common shares. The conversion price was set as the closing price of the common stock on March 12, 2019, which was the day before announcement of the private placement. The Series A Convertible Preferred Shares carry a 5% annual dividend, which may be paid, in the Company’s sole discretion, in cash, additional shares or a combination thereof.  [Upon maturity or full repayment of the Exchange Note and Supplemental Note debt (discussed below), there will be mandatory redemption of the Series A Convertible Preferred Shares into equivalent cash for the principal invested, plus any accrued and unpaid dividends.]

 

On May 2, 2019, the Company also executed a Securities Purchase Agreement (the “MHMI Series A Purchase Agreement”) with Mount Hope Mines, Inc. (“MHMI”), later assigned in part to members of MHMI individually.  Pursuant to the MHMI Series A Purchase Agreement, MHMI agreed to purchase $500,000 of Series A Convertible Preferred Shares, as described above.  These shares were fully converted in the fourth quarter of 2019.

 

On August 5, 2019, the Company executed a Securities Purchase Agreement (the “Series B Purchase Agreement”) with the Investors.  Pursuant to the Series B Purchase Agreement, the Investors agreed to purchase up to $400,000 of convertible shares of Series B Preferred Stock, par value $0.001 per share (the “Series B Convertible Preferred Shares”), of the Company.  This transaction closed on August 7, 2019. 

 

The Series B Convertible Preferred Shares were issued at a price of $100.00 per share, and each Series B Convertible Preferred Share will be convertible at any time at the holder’s discretion into 500 shares of common stock of the Company.  The Series B Convertible Preferred Shares carry a 5% annual dividend, which may be paid, in the Company’s sole discretion, in cash, additional shares of Series B Convertible Preferred Shares or a combination thereof.  [The Series B Convertible Preferred Shares, like the Series A Convertible Preferred Shares, are mandatorily redeemable upon maturity or full repayment of the Exchange Note and Supplemental Note debt (discussed below).]

Interest Forbearance Agreement and New 12% Senior Promissory Notes due December 2022

On September 26, 2019, the Company entered into a 90-day interest deferral and forbearance agreement with the primary holder of the Senior Convertible Notes, along with certain of the Company’s members of management and directors who participated in the 2014 debt offering.  As a result, the Company deferred approximately $162,000 of interest payments that were due at the end of the third quarter 2019.

Exchange Offer and New 12% Senior Promissory Notes due December 2022

On December 27, 2019, the Company closed a private offer to exchange (the “Exchange Offer”) its outstanding 10% Senior Convertible Promissory Notes and 10% Senior Promissory Notes both due December 26, 2019 (together, the “Old Notes”), for units consisting of its newly issued 12% Senior Promissory Notes due December 26, 2022 (the “Exchange Notes”) and warrants (the “New Warrants”) to purchase shares of the Company’s common stock, par value

52

$0.001 per share (“Common Stock”), upon the terms and subject to the conditions set forth in the confidential Offer to Exchange and Subscription Offer dated November 27, 2019. 

Eligible holders tendered Old Notes with an original principal amount of $6.89 million of the total outstanding of $7.25 million, representing 95% of the outstanding, in the Exchange Offer.  For each $1 principal amount of, and accrued and unpaid interest on, Old Notes tendered and accepted by the Company, one unit consisting of $1 principal amount of Exchange Notes and one New Warrant was settled.  The Exchange Notes bear interest at an initial rate of 12% per annum. Interest on the Exchange Notes will be paid on March 31, June 30, September 30 and December 31 of each year, commencing on March 31, 2020. The Exchange Notes will mature on December 26, 2022, unless otherwise earlier redeemed.  Each New Warrant is exercisable for one share of Common Stock at a price of $0.35 per share for a period of three years.  One New Warrant was issued for each dollar of original principal amount of, and accrued and unpaid interest on, Old Notes exchanged for Exchange Notes for a total of 7.2 million New Warrants issued.

The Company paid at maturity the unpaid principal and all accrued and unpaid interest in the approximate amount of $368,000 to those eligible holders that elected not to participate in the Exchange Offer.  The original principal amount of Old Notes paid at maturity represented approximately 5% of the total outstanding.  The maturity date was December 26, 2019.  The Notes Warrants issued in connection with the Old Notes expired by their terms on December 26, 2019.

New 13% Senior Promissory Notes due December 2022

The Company  also announced that certain eligible holders who tendered their Old Notes in the Exchange Offer (“Participating Holders”) elected to participate in the accompanying Subscription Agreement, to purchase (the “Subscription Offer”) 13,355 units for $100 each, consisting of its newly issued 13% Senior Promissory Notes due 2022 (the “Supplemental Notes”) and accompanying New Warrant, including participation by the largest Old Noteholder investor, as well as the Company’s CEO, Bruce Hansen.  One New Warrant was also issued for each dollar invested in the Supplemental Notes.  The New Warrants have an exercise price of $0.35 per share and have a three-year term.  The Participating Holders increased their respective note investment by approximately 20% as additional consideration for the Supplemental Notes, resulting in approximately $1.34 million of new capital to the Company.

Outlook

The cash needs for the construction and development of the Mt. Hope Project are significant and require that we arrange for financing to be combined with funds anticipated to be received from POS-Minerals in order to retain its 20% membership interest.  The Company estimates the go-forward capital required for the Mt. Hope Project, based on 65% completed engineering, to be approximately $1,023 million, of which the Company’s 80% capital requirement is $818 million.  There is no assurance that the Company will be successful in obtaining the financing required to complete the Mt. Hope Project, or in raising additional financing in the future on terms acceptable to the Company, or at all.

 

Based on our updated current operating forecast and the combination of the liquidity provided by the proceeds from AMER and the supplemental notes with our current cash on hand, the Company only expects to be able to fund its operations and meet its financial obligations into the third quarter of 2020. These conditions raise substantial doubt about the Company’s ability to continue as a going concern.

 

Total assets as of December 31, 2019 increased to $344.2 million compared to $329.5 million as of December 31, 2018 primarily due to the issuance of supplemental notes in 2019.

 

Results of Operations

 

Year Ended December 31, 2019 Compared to Year Ended December 31, 2018

 

For the year ended December 31, 2019 we had a consolidated net loss of $7.9 million compared with a net loss of $11.1 million in the same period for 2018.  The decrease is primarily related to reduced due diligence efforts, reduced costs associated with the drilling exploration program and accelerated depreciation associated with software programs no longer in use incurred in 2018. 

 

53

For the years ended December 31, 2019 and 2018, exploration and evaluation expenses were $0.5 million and $0.8 million, respectively, reflecting continuous care and maintenance expense at the Liberty Project during both periods. 

 

For the years ended December 31, 2019 and 2018, general and administrative expenses, comprised largely of salaries and benefits, legal and audit fees, insurance costs, and outside contracted services, along with due diligence efforts and accelerated depreciated associated with software programs no longer in use, were $3.6 million and $9.6 million, respectively. 

 

For the years ended December 31, 2019 and 2018, interest income was nil as a result of low deposit interest rates on consolidated cash balances in 2019 and 2018.  Interest expense for the year ended December 31, 2019 and 2018 was $0.8 million and $0.8 million, respectively, as a result of cash interest expense incurred during both years on the Senior Convertible Promissory Notes issued and non-cash interest expense incurred as a result of the amortization of debt issuance costs and the embedded derivatives associated with the Senior Convertible Promissory Notes.

 

Off-Balance Sheet Arrangements

 

None.

 

Contractual Obligations

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Payments due by period

 

 

 

Total

 

 

2020

 

 

2021-2022

 

 

2023-2024

 

 

Thereafter

 

Agricultural Sustainability Trust Contributions

 

 

5.5

 

 

 

 

 

 

2.0

 

 

 

3.5

 

 

 

 

Exchange Notes and Supplemental Notes**

 

 

8.3

 

 

 

 

 

 

8.3

 

 

 

 

 

 

 

Equipment Purchase Contracts

 

 

0.6

 

 

 

 

 

 

0.6

 

 

 

 

 

 

 

Advance Royalties

 

 

6.9

 

 

 

0.5

 

 

 

1.0

 

 

 

5.4

 

 

 

 

Return of Contributions to POS-Minerals

 

 

33.6

 

 

 

33.6

 

 

 

 

 

 

 

 

 

 

3M Plan Contributions

 

 

1.0

 

 

 

 

 

 

0.3

 

 

 

0.7

 

 

 

 

Total

 

$

55.9

 

 

$

34.1

 

 

$

12.2

 

 

$

9.6

 

 

$

 

 


 * With the exception of the 12% Senior Promissory Notes (Exchange Notes) and 13% Senior Promissory Notes (Supplemental Notes), which are the obligation of the Company, all amounts are commitments of the LLC, and as a result of the agreement between Nevada Moly and POS-Minerals are to be funded by the reserve account until such time that the Company obtains financing for its portion of construction costs at the Mt. Hope Project or until the reserve account balance is exhausted, and thereafter are to be funded 80% by Nevada Moly and 20% by POS-Minerals.  POS-Minerals remains obligated to make capital contributions for its 20% portion of equipment payments required by approved budgets of the LLC, and such amounts contributed by the reserve account on behalf of POS-Minerals will reduce, dollar for dollar, the amount of capital contributions that the LLC is required to return to POS-Minerals, as described above.

 

** The Company is obligated to pay interest on the Exchange Notes at a rate of 12% per year, payable quarterly and on the Supplemental Notes at a rate of 13% per year, payable quarterly.

 

Through December 31, 2019, the LLC has made deposits and/or final payments of $88.0 million on equipment orders.  See “—Overview—Equipment and Supply Procurement” above.  Of these deposits, $71.7 million relate to fully fabricated items, primarily milling equipment, for which the LLC has additional contractual commitments of $0.6 million.  The remaining $16.3 million reflects both partially fabricated milling equipment, and non-refundable deposits on mining equipment.  As discussed in Note 11 to the consolidated financial statements contained elsewhere in this report, the mining equipment agreements remain cancellable with no further liability to the LLC. The underlying value and recoverability of these deposits and our mining properties in our consolidated balance sheets are dependent on the LLC’s ability to fund development activities that would lead to profitable production and positive cash flow from operations or proceeds from the disposition of these assets. There can be no assurance that the LLC will be successful in obtaining project financing, in generating future profitable operations, disposing of these assets or the Company securing

54

additional funding in the future on terms acceptable to us or at all.  Our audited consolidated financial statements do not include any adjustments relating to recoverability and classification of recorded assets or liabilities.

 

If the LLC does not make the payments contractually required under these purchase contracts, it could be subject to claims for breach of contract or to cancellation of the respective purchase contract.  In addition, the LLC may proceed to selectively suspend, cancel or attempt to renegotiate additional purchase contracts if necessary, to further conserve cash.  See “—Liquidity, Capital Resources and Capital Requirements” above.  If the LLC cancels or breaches any contracts, the LLC will take all appropriate action to minimize any losses, but could be subject to liability under the contracts or applicable law.  The cancellation of certain key contracts could cause a delay in the commencement of operations, and could add to the cost to develop the Company’s interest in the Mt. Hope Project.

 

Obligations under capital and operating leases

 

We have contractual obligations under operating leases that will require a total of $0.1 million in payments over the next three years.  Operating leases consist primarily of rents on office facilities and office equipment.  Our expected payments are $0.1 million, nil, and nil for the years ended December 31, 2020, 2021 and 2022, respectively.

 

Creation of Agricultural Sustainability Trust

 

On August 19, 2010, the LLC entered into an agreement with the Eureka Producers’ Cooperative (“EPC”) whereby the LLC will fund a $4.0 million Sustainability Trust (“Trust”) in exchange for the cooperation of the EPC with respect to the LLC’s water rights and permitting of the Mt. Hope Project, since increased to $5.6 million as a result of the settlement reached with Eureka County and the DNR, first discussed in Item 2 above.  The Trust will be tasked with developing and implementing programs that will serve to enhance the sustainability and well-being of the agricultural economy in the Diamond Valley Hydrographic Basin through reduced water consumption.

 

The Trust may be funded by the LLC over several years based on the achievement of certain milestones, which are considered probable, and as such $5.6 million has been accrued in the Company’s financial statements and is included in mining properties, land, and water rights.

 

Critical Accounting Policies and Estimates

 

Estimates

 

The process of preparing financial statements in conformity with accounting principles generally accepted in the United States of America (“GAAP”) requires the use of estimates and assumptions regarding certain types of assets, liabilities, revenues, and expenses.  Such estimates primarily relate to unsettled transactions and events as of the date of the financial statements.  Accordingly, upon settlement, actual results may differ from estimated amounts.

 

Provision for Taxes

 

Income taxes are provided based upon the asset and liability method of accounting.  Under this approach, deferred income taxes are recorded to reflect the tax consequences in future years of differences between the tax basis of assets and liabilities and their financial reporting amounts at each year-end.  In accordance with authoritative guidance for Income Taxes, a valuation allowance is recorded against the deferred tax asset if management does not believe the Company has met the “more likely than not” standard to allow recognition of such an asset.  At December 31, 2019 and 2018, we had deferred tax assets principally arising from net operating loss carryforwards for income tax purposes multiplied by an expected rate of 21% and 35%, respectively.  As management of the Company has concluded that it is not more likely than not that we will realize the benefit of the deferred tax assets, a valuation allowance equal to the net deferred tax asset has been established.

 

Mining Properties, Land and Water Rights

 

The Company evaluates its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amount may not be recoverable.  If the sum of estimated future net cash flows on an undiscounted basis is less than the carrying amount of the related asset grouping, asset impairment is considered to exist.  The related impairment loss is measured by comparing estimated future net cash flows on a discounted basis to the

55

carrying amount of the asset.  Changes in significant assumptions underlying future cash flow estimates may have a material effect on the Company’s financial position and results of operations.  To date no such impairments have been identified.  Property and equipment are being depreciated over useful lives of three to twenty-seven and one-half years using straight-line depreciation.

 

Stock-Based Compensation

 

We account for stock-based compensation in accordance with authoritative guidance for Share-Based Payments.  Under the fair value recognition provisions of this statement, share-based compensation cost is measured at the grant date based on the value of the award and is recognized as expense over the vesting period.  Determining the fair value of share-based awards at the grant date requires judgment; including estimating the expected term of the award, volatility of the underlying equity and estimating the amount of share-based awards that are expected to be forfeited.  If actual results associated with share-based awards that are forfeited differ significantly from these estimates, stock-based compensation expense and our results of operations could be materially impacted.

 

Contingently Redeemable Noncontrolling Interest (“CRNCI”)

 

Under GAAP, certain noncontrolling interests in consolidated entities meet the definition of mandatorily redeemable financial instruments if the ability to redeem the interest is outside of the control of the consolidating entity.  As described in Note 1 — “Description of Business” to the consolidated financial statements contained elsewhere in this report, the LLC Agreement permits POS-Minerals the option to put its interest in the LLC to Nevada Moly upon a change of control, as defined in the LLC Agreement, followed by a failure to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of 12 consecutive months.  As such, the CRNCI has continued to be shown as a separate caption between liabilities and equity.  The carrying value of the CRNCI has historically included the Return of Contributions which will be returned to POS-Minerals in 2020, unless further extended by the members of the LLC as discussed above.  The expected Return of Contributions to POS-Minerals was carried at redemption value as we believed redemption of this amount was probable.  Effective January 1, 2015, Nevada Moly and POS-Minerals agreed that the Return of Contributions will be due to POS-Minerals on December 31, 2020, unless further extended by the members of the LLC as discussed above.  As a result, we have reclassified the Return of Contributions, originally $36.0 million, payable to POS-Minerals from CRNCI to a non-current liability at redemption value, and subsequently reduced it by $2.4 million, consisting of POS-Minerals 20% share of equipment purchases such that the remaining amount due to POS-Minerals is $33.6 million.

The remaining carrying value of the CRNCI has not been adjusted to its redemption value as the contingencies that may allow POS-Minerals to require redemption of its non-controlling interest are not probable of occurring.  Under GAAP, until such time as that contingency has been eliminated and redemption is no longer contingent upon anything other than the passage of time, no adjustment to the CRNCI balance should be made. Future changes in the redemption value will be recognized immediately as they occur and the Company will adjust the carrying amount of the CRNCI to equal the redemption value at the end of each reporting period.

 

Senior Convertible Promissory Notes and other Long-Term Debt

 

As discussed in Note 5 to the consolidated financial statements contained elsewhere in this report, in December 2014, the Company sold and issued $8.5 million in units consisting of Senior Convertible Promissory Notes (the “Convertible Notes”) and warrants to accredited investors, including several directors and  named executive officers of the Company, pursuant to Section 4(a)(2) of the Securities Act of 1933, as amended, and Rule 506 thereunder. The Convertible Notes were unsecured obligations and were senior to any of the Company’s future secured obligations to the extent of the value of the collateral securing such obligations.

 

In December 2019, the Company sold and issued $7.2 million of Exchange Notes and $1.3 million of Supplemental Notes in the Exchange Offer and Subscription Offer described above to accredited investors, including several directors and  named executive officers of the Company, pursuant to Section 4(a)(2) of the Securities Act of 1933, as amended, and Rule 506 thereunder. The Exchange Notes and Supplemental Notes are unsecured obligations and were senior to any of the Company’s future secured obligations to the extent of the value of the collateral securing such obligations. 

 

56

The Company evaluates its contracts for potential derivatives.  See Note 5 to the consolidated financial statements contained elsewhere in this report for a description of the Company’s accounting for embedded derivatives and the Convertible Notes, Exchange Notes and Supplemental Notes.

 

Debt issuance costs are costs incurred in connection with the Company’s debt financings that have been capitalized and are being amortized over the stated mandatory period or estimated life of the related debt, using the effective interest method.

 

Recent Accounting Developments

 

See recently adopted accounting developments in Note 2 – Summary of Significant Accounting Policies in Item 8 of Part II of this Annual Report on Form 10-K.

 

ITEM 7A.QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

 

Commodity Price Risk

 

We are a development stage company in the business of the exploration, development and mining of properties primarily containing molybdenum.  As a result, upon commencement of production, our financial performance could be materially affected by fluctuations in the market price of molybdenum and other metals we may mine.  The market prices of metals can fluctuate widely due to a number of factors.  These factors include fluctuations with respect to the rate of inflation, the exchange rates of the U.S. dollar and other currencies, interest rates, global or regional political and economic conditions, banking environment, global and regional demand, production costs, and investor sentiment.  See “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Molybdenum Market Update” for a discussion of molybdenum prices.

 

In order to better manage commodity price risk and to seek to reduce the negative impact of fluctuations in prices, we will seek to enter into long-term supply contracts for our portion of the Mt. Hope production.  On December 28, 2007, we entered into a molybdenum supply agreement with ArcelorMittal S.A. (“ArcelorMittal”), the world’s largest steel company, that provides for ArcelorMittal to purchase 6.5 million pounds of molybdenum per year, plus or minus 10%, once the Mt. Hope Project commences commercial operations at minimum specified levels. The supply agreement provides for a floor price along with a discount for spot prices above the floor price and expires five years after the commencement of commercial production at the Mt. Hope Project.  Both the floor and threshold levels at which the percentage discounts change are indexed to a producer price index. According to public filings, on January 25, 2011, the boards of directors of ArcelorMittal S.A. and APERAM each approved the transfer of the assets comprising ArcelorMittal’s stainless and specialty steels businesses from its carbon steel and mining businesses to APERAM, a separate entity incorporated in the Grand Duchy of Luxembourg.  This transfer did not include the supply agreement the Company had in place with ArcelorMittal.  The shares of the Company’s common stock previously owned by ArcelorMittal were transferred to APERAM. 

 

Additionally, on May 14, 2008, we entered into a molybdenum supply agreement with SeAH Besteel Corporation (“SeAH Besteel”), Korea’s largest manufacturer of specialty steels, which provides for SeAH Besteel to purchase 4.0 million pounds of molybdenum per year, plus or minus 10%, once the Mt. Hope Project commences commercial operations at minimum specified levels. Like the APERAM supply agreement, the supply agreement with SeAH Besteel provides for a floor price along with staged discounts for spot prices above the floor price and expires five years from the date of first supply under the agreement.  Both the floor and threshold levels at which the percentage discounts change are indexed to a producer price index.  On July 22, 2015, the Company and SeAH Besteel entered into a first amendment to the molybdenum supply agreement, which provides that the agreement will terminate on December 31, 2020, if commercial operations at the minimum specified levels have not commenced by that date, which is not anticipated to occur.

 

On August 8, 2008, the Company entered into a molybdenum supply agreement (“Sojitz Agreement”) with Sojitz Corporation (“Sojitz”).  The Sojitz Agreement provides for the supply of 5.0 million pounds per year of molybdenum for five years, beginning once the Mt. Hope Project reaches certain minimum commercial production levels.  One million annual pounds sold under the Sojitz Agreement will be subject to a per-pound molybdenum floor price and is offset by a flat discount to spot molybdenum prices above the floor.  The remaining 4.0 million annual pounds sold under the Sojitz Agreement will be sold with reference to spot molybdenum prices without regard to a floor price.  The Sojitz Agreement includes a provision that allows Sojitz the option to cancel in the event that supply from the

57

Mt. Hope Project had not begun by January 1, 2013.  The described option is available up to ten days following the achievement of certain production levels at the Mt. Hope Project.  As commercial production at the Mt. Hope Project has not commenced, Sojitz currently has the option to cancel its contract or participate in the molybdenum supply agreement as described above.

 

The long-term supply agreements provide for supply only after commercial production levels are achieved, and no provisions require the Company to deliver product or make any payments if commercial production is never achieved or declines in later periods and have floor prices ranging from $13.75 to $14.75 per pound and incremental discounts above the floor price.  The agreements require that monthly shortfalls be made up only if the Company’s portion of Mt. Hope production is available for delivery, after POS-Minerals has taken its 20% share.  In no event do these requirements to make up monthly shortfalls become obligations of the Company if production does not meet targeted levels.

 

Furthermore, each of the agreements remain as contractual obligations and have take-or-pay provisions that require the buyers to either take delivery of product made available by the Company, or to pay as though they had taken delivery pursuant to the term of the agreements.  In the event that our contract parties choose not to honor their contractual obligations or attempt to terminate these agreements as a result of the continuing delay in achieving production, our profitability may be adversely impacted.  We may be unable to sell any product our contract parties fail to purchase in a timely manner, at comparable prices, or at all.

 

While we have not used derivative financial instruments in the past, we may elect to enter into derivative financial instruments to manage commodity price risk.  We have not entered into any market risk sensitive instruments for trading or speculative purposes and do not expect to enter into derivative or other financial instruments for trading or speculative purposes.

 

Interest Rate Risk

 

As of December 31, 2019, we had a balance of cash and cash equivalents of $4.6 million and restricted cash of $3.4 million.  Interest rates on short term, highly liquid investments have not changed materially since December 31, 2010, and continue to be 1% or less on an annualized basis.

58

59

Report of Independent Registered Public Accounting Firm

 

To the Stockholders and Board of Directors of General Moly, Inc.

 

Opinion on the Consolidated Financial Statements

 

We have audited the accompanying consolidated balance sheet of General Moly, Inc. (the “Company”) as of December 31, 2019, the related consolidated statement of operations and comprehensive loss, consolidated statements of equity, and cash flows for the year ended December 31, 2019, and the related notes (collectively referred to as the “financial statements”). In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 2019, and the results of its operations and its cash flows for the year ended December 31, 2019 in conformity with accounting principles generally accepted in the United States of America.

 

Going Concern

 

The accompanying financial statements have been prepared assuming that the Company will continue as a going concern. As discussed in Note 1 to the financial statements, the Company has a working capital deficit and does not generate revenue from operations. These conditions along with other matters discussed in Note 1 raises substantial doubt about the Company’s ability to continue as a going concern. Management’s plan in regards to these matters is also described in Note 1. The financial statements do not include any adjustments that might result from the outcome of this uncertainty.

 

Basis for Opinion

 

The Company's management is responsible for these financial statements. Our responsibility is to express an opinion on the Company’s financial statements based on our audit. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (“PCAOB”) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

 

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audit we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.

 

Our audit included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audit also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audit provides a reasonable basis for our opinion.

 

/s/ Plante & Moran, PLLC

We have served as the Company’s auditor since 2019.

 

Denver, CO 

May 4, 2020

60

Report of Independent Registered Public Accounting Firm

 

To the Board of Directors and Shareholders of General Moly, Inc.

 

Opinion on the Financial Statements

 

We have audited the consolidated balance sheet of General Moly, Inc. and its subsidiaries (the “Company”) as of December 31, 2018, and the related consolidated statements of operations and comprehensive loss, of equity and of cash flows for the year ended December 31, 2018, including the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2018, and the results of its operations and its cash flows for the year ended December 31, 2018 in conformity with accounting principles generally accepted in the United States of America.   

 

Substantial Doubt About the Company’s Ability to Continue as a Going Concern

The accompanying consolidated financial statements have been prepared assuming that the Company will continue as a going concern. As discussed in Note 2 “Liquidity” (not presented herein) to the consolidated financial statements appearing under Item 8 of the Company’s 2018 Annual Report on Form 10-K, the Company does not generate revenues, has incurred significant recurring losses, and does not have sufficient liquidity and capital resources to fund its operations and meet its financial obligations, which raises substantial doubt about its ability to continue as a going concern. Management's plans in regard to these matters are also described in Note 2. The consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.

 

Basis for Opinion

 

These consolidated financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company’s consolidated financial statements based on our audit. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB. 

 

We conducted our audit of these consolidated financial statements in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud.

 

Our audit included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audit also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audit provides a reasonable basis for our opinion.

 

 

 

/s/ PricewaterhouseCoopers LLP

Denver, Colorado

March 21, 2019

 

We served as the Company's auditor from 2007 to 2019.

61

GENERAL MOLY, INC.

CONSOLIDATED BALANCE SHEETS

 

(In thousands, except par value amounts)

 

 

 

 

 

 

 

 

 

 

 

    

 

December 31,

    

December 31,

 

 

 

 

2019

 

2018

 

 

 

 

 

 

 

 

 

 

ASSETS:

 

 

 

 

 

 

 

 

CURRENT ASSETS

 

 

 

 

 

 

 

 

Cash and cash equivalents

 

 

$

4,614

 

$

2,016

 

Deposits, prepaid expenses and other current assets

 

 

 

272

 

 

62

 

Total Current Assets

 

 

 

4,886

 

 

2,078

 

Mining properties, land and water rights

 

 

 

244,137

 

 

229,175

 

Deposits on project property, plant and equipment

 

 

 

87,972

 

 

88,124

 

Restricted cash held at EMLLC

 

 

 

3,388

 

 

6,167

 

Restricted cash and investments held for reclamation bonds

 

 

 

708

 

 

834

 

Non-mining property and equipment, net

 

 

 

32

 

 

40

 

Other assets

 

 

 

3,104

 

 

3,076

 

TOTAL ASSETS

 

 

$

344,227

 

$

329,494

 

LIABILITIES, CRNCI, AND EQUITY:

 

 

 

 

 

 

 

 

CURRENT LIABILITIES

 

 

 

 

 

 

 

 

Accounts payable and accrued liabilities

 

 

$

1,223

 

$

574

 

Promissory Notes

 

 

 

 

 

1,340

 

Senior Convertible Promissory Notes

 

 

 

 

 

5,807

 

Return of Contributions Payable to POS-Minerals, current portion

 

 

 

33,641

 

 

 

Accrued advance royalties

 

 

 

500

 

 

500

 

Total Current Liabilities

 

 

 

35,364

 

 

8,221

 

Provision for post closure reclamation and remediation costs

 

 

 

1,953

 

 

1,769

 

Accrued advance royalties

 

 

 

6,388

 

 

5,700

 

Accrued payments to Agricultural Sustainability Trust

 

 

 

5,500

 

 

5,500

 

Accrued water rights payments

 

 

 

14,000

 

 

 

Return of Contributions Payable to POS-Minerals, less current portion

 

 

 

 

 

33,641

 

Senior Promissory Notes

 

 

 

7,883

 

 

 

Other accrued liabilities

 

 

 

3,447

 

 

2,125

 

Total Liabilities

 

 

 

74,535

 

 

56,956

 

 

 

 

 

 

 

 

 

 

COMMITMENTS AND CONTINGENCIES - NOTE 12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTINGENTLY REDEEMABLE NONCONTROLLING INTEREST ("CRNCI")

 

 

 

172,239

 

 

172,261

 

CONVERTIBLE PREFERRED SHARES

 

 

 

1,300

 

 

 

 

 

 

 

 

 

 

 

 

EQUITY

 

 

 

 

 

 

 

 

Common stock, $0.001 par value; 650,000,000 and 650,000,000 shares authorized, respectively, 152,033,515 and 137,114,804

 

 

 

152

 

 

137

 

Additional paid-in capital

 

 

 

295,005

 

 

291,266

 

Accumulated deficit during exploration and development stage

 

 

 

(199,004)

 

 

(191,126)

 

Total Equity

 

 

 

96,153

 

 

100,277

 

TOTAL LIABILITIES, CRNCI, AND EQUITY

 

 

$

344,227

 

$

329,494

 

 

The accompanying notes are an integral part of these consolidated financial statements.

62

GENERAL MOLY, INC.

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE LOSS

 

(In thousands, except per share amounts)

 

 

 

 

 

 

 

 

 

 

 

 

 

Years Ended

 

 

    

 

December 31,

    

December 31,

 

 

 

 

2019

 

2018

 

REVENUES

 

 

$

 

$

 

 

 

 

 

 

 

 

 

 

OPERATING EXPENSES:

 

 

 

 

 

 

 

 

Exploration and evaluation

 

 

 

527

 

 

789

 

General and administrative expense

 

 

 

3,643

 

 

9,553

 

Loss on Sale of non-core properties and assets

 

 

 

2,885

 

 

 

TOTAL OPERATING EXPENSES

 

 

 

7,055

 

 

10,342

 

 

 

 

 

 

 

 

 

 

(LOSS) FROM OPERATIONS

 

 

 

(7,055)

 

 

(10,342)

 

 

 

 

 

 

 

 

 

 

OTHER INCOME/(EXPENSE):

 

 

 

 

 

 

 

 

Interest expense

 

 

 

(845)

 

 

(774)

 

TOTAL OTHER (EXPENSE)/INCOME, NET

 

 

 

(845)

 

 

(774)

 

 

 

 

 

 

 

 

 

 

(LOSS) BEFORE INCOME TAXES

 

 

 

(7,900)

 

 

(11,116)

 

 

 

 

 

 

 

 

 

 

Income Taxes

 

 

 

 —

 

 

 —

 

 

 

 

 

 

 

 

 

 

CONSOLIDATED NET (LOSS)

 

 

$

(7,900)

 

$

(11,116)

 

Less: Net loss attributable to CRNCI

 

 

 

22

 

 

372

 

NET LOSS ATTRIBUTABLE TO GMI

 

 

$

(7,878)

 

$

(10,744)

 

Basic and diluted net loss attributable to GMI per share of common stock

 

 

$

(0.06)

 

$

(0.08)

 

Weighted average number of shares outstanding — basic and diluted

 

 

 

138,784

 

 

129,421

 

 

 

 

 

 

 

 

 

 

COMPREHENSIVE (LOSS)

 

 

$

(7,878)

 

$

(10,744)

 

 

The accompanying notes are an integral part of these consolidated financial statements.

63

GENERAL MOLY, INC.

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

(In thousands)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Years Ended

 

 

    

 

December 31,

    

December 31,

 

 

 

 

2019

 

2018

 

CASH FLOWS FROM OPERATING ACTIVITIES:

 

 

 

 

 

 

 

 

Consolidated net loss

 

 

$

(7,900)

 

$

(11,116)

 

Adjustments to reconcile net loss to net cash used by operating activities:

 

 

 

 

 

 

 

 

Depreciation and amortization

 

 

 

134

 

 

1,870

 

Non-cash interest expense

 

 

 

89

 

 

62

 

Income realized on lease of water rights

 

 

 

(13)

 

 

(13)

 

Stock-based compensation for employees and directors

 

 

 

84

 

 

737

 

Decrease (increase) in deposits, prepaid expenses and other

 

 

 

(210)

 

 

52

 

Decrease in accounts payable and accrued liabilities

 

 

 

1,956

 

 

(508)

 

(Decrease) increase in post closure reclamation and remediation costs

 

 

 

76

 

 

(38)

 

Net cash used by operating activities

 

 

 

(5,784)

 

 

(8,954)

 

 

 

 

 

 

 

 

 

 

CASH FLOWS FROM INVESTING ACTIVITIES:

 

 

 

 

 

 

 

 

Purchase and development of mining properties, land and water rights

 

 

 

(284)

 

 

(2,470)

 

Deposits on property, plant and equipment

 

 

 

152

 

 

(298)

 

Increase in investments for reclamation bonds

 

 

 

(308)

 

 

 

 

Net cash used by investing activities

 

 

 

(440)

 

 

(2,768)

 

 

 

64

GENERAL MOLY, INC.

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

(In thousands)

 

 

 

 

 

 

 

 

 

 

CASH FLOWS FROM FINANCING ACTIVITIES:

 

 

 

 

 

 

 

 

Stock proceeds, net of issuance costs

 

 

 

4,962

 

 

2,365

 

Repayment of Long-Term Debt

 

 

 

647

 

 

 —

 

Net cash provided/(used) by financing activities:

 

 

 

5,609

 

 

2,365

 

Net (decrease) in cash, cash equivalents and restricted cash

 

 

 

(615)

 

 

(9,357)

 

Cash, cash equivalents and restricted cash, beginning of period

 

 

 

8,617

 

 

17,974

 

Cash, cash equivalents and restricted cash, end of period

 

 

$

8,002

 

$

8,617

 

 

 

 

 

 

 

 

 

 

SUPPLEMENTAL CASH FLOW INFORMATION:

 

 

 

 

 

 

 

 

Cash paid for interest, net of capitalized

 

 

 

(600)

 

 

(735)

 

 

 

 

 

 

 

 

 

 

NON-CASH INVESTING AND FINANCING ACTIVITIES:

 

 

 

 

 

 

 

 

Equity compensation capitalized as development

 

 

$

 8

 

$

134

 

Accrued portion of advance royalties

 

 

 

 -

 

 

500

 

Change in accrued payments to Agricultural Sustainability Trust

 

 

 

 -

 

 

1,550

 

Conversion of Preferred shares to common shares

 

 

 

500

 

 

 —

 

     Accrued portion of water rights settlement

 

 

 

14,000

 

 

 —

 

Noncash change in deposits on property, plant and equipment

 

 

 

 -

 

 

153

 

 

The accompanying notes are an integral part of these consolidated financial statements

65

GENERAL MOLY, INC.

CONSOLIDATED STATEMENTS OF EQUITY

 

(In thousands, except number of shares and per share amounts)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Common

 

Preferred

 

 

 

 

Additional

 

Accumulated

 

 

 

 

 

    

Shares

    

Shares

    

Amount

    

Paid-In Capital

    

Deficit

    

Total

 

Balances, December 31, 2017

 

125,802,023

 

 —

 

$

126

 

$

288,041

 

$

(180,382)

 

$

107,785

 

Issuance of Units of Common Stock:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Issued pursuant to stock awards

 

993,481

 

 —

 

 

 1

 

 

(173)

 

 

 —

 

 

(172)

 

Stock-based compensation

 

 —

 

 —

 

 

 —

 

 

871

 

 

 —

 

 

871

 

Public Offering

 

9,151,000

 

 —

 

 

 9

 

 

2,042

 

 

 —

 

 

2,051

 

Issued under at-the-market trading mechanism

 

1,168,300

 

 —

 

 

 1

 

 

485

 

 

 —

 

 

486

 

Net loss for the period ended December 31, 2018

 

 —

 

 —

 

 

 —

 

 

 —

 

 

(10,744)

 

 

(10,744)

 

Balances, December 31, 2018

 

137,114,804

 

 —

 

$

137

 

$

291,266

 

$

(191,126)

 

$

100,277

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Common

 

Preferred

 

 

 

 

Additional

 

Accumulated

 

 

 

 

 

 

Shares

 

Shares

 

Amount

 

Paid-In Capital

 

Deficit

 

Total

 

Balances, December 31, 2018

 

137,114,804

 

 —

 

$

137

 

$

291,266

 

$

(191,126)

 

$

100,277

 

Issuance of Units of Common Stock:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Issued pursuant to stock awards

 

135,000

 

 —

 

 

 —

 

 

 3

 

 

 —

 

 

 3

 

Stock-based compensation

 

 —

 

 —

 

 

 —

 

 

88

 

 

 —

 

 

88

 

Restricted stock net share settlement

 

1,409,296

 

 —

 

 

 —

 

 

(161)

 

 

 —

 

 

(161)

 

Warrant Exercise

 

694,200

 

 —

 

 

 2

 

 

253

 

 

 —

 

 

255

 

Issuance of New Warrants

 

 —

 

 —

 

 

 —

 

 

289

 

 

 —

 

 

289

 

Series A Private Placement

 

 —

 

1,400

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

Series B Private Placement

 

 —

 

400

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

Conversion of Preferred Shares to Common

 

1,851,844

 

(500)

 

 

 2

 

 

498

 

 

 —

 

 

500

 

Private Placement

 

11,111,111

 

 —

 

 

11

 

 

2,769

 

 

 

 

 

2,780

 

Net loss for the period ended December 31, 2019

 

 —

 

 —

 

 

 —

 

 

 —

 

 

(7,878)

 

 

(7,878)

 

Balances, December 31, 2019

 

152,316,255

 

1,300

 

$

152

 

$

295,005

 

$

(199,004)

 

$

96,153

 

 

The accompanying notes are an integral part of these consolidated financial statements.

66

GENERAL MOLY, INC.

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

 

NOTE 1 — DESCRIPTION OF BUSINESS

 

General Moly, Inc. (“we,” “us,” “our,” “Company,” or “General Moly”) is a Delaware corporation originally incorporated as General Mines Corporation on November 23, 1925.  We have gone through several name changes and on October 5, 2007, we reincorporated in the State of Delaware (“Reincorporation”) through a merger involving Idaho General Mines, Inc. and General Moly, Inc., a Delaware corporation that was a wholly owned subsidiary of Idaho General Mines, Inc. The Reincorporation was effected by merging Idaho General Mines, Inc. with and into General Moly, with General Moly being the surviving entity.  For purposes of the Company’s reporting status with the United States Securities and Exchange Commission (“SEC”), General Moly is deemed a successor to Idaho General Mines, Inc.

 

The Company conducted exploration and evaluation activities from January 1, 2002 until October 4, 2007, when our Board of Directors (“Board”) approved the development of the Mt. Hope molybdenum property (“Mt. Hope Project”) in Eureka County, Nevada.  The Mt. Hope Project is leased and operated by Eureka Moly, LLC, an indirectly held 80% subsidiary of the Company (“EMLLC” or the “LLC”).  The Company is continuing its efforts to both obtain financing for and develop the Mt. Hope Project.  However, the combination of ongoing depressed molybdenum prices, challenges to our permits and current liquidity concerns have further delayed development at the Mt. Hope Project. 

 

Additionally, in late June 2018 we completed a 9-hole drill program on the Mt. Hope property, focused on the area where previously identified copper-silver-zinc-mineralized skarns have been identified, immediately adjacent to the Mt. Hope molybdenum deposit. 

 

We also continue to evaluate our Liberty molybdenum and copper property (“Liberty Project”) in Nye County, Nevada.

 

Liquidity and Management’s Plans

 

Our current working capital is negative.  Based on our current operating forecast, which takes into consideration the delays described above, and the fact that we currently do not generate any revenue, the Company does not expect to be able to fund its current operations and meet its financial obligations for a period of at least 12 months from the issuance of these financials.  These conditions raise substantial doubt about the Company’s ability to continue as a going concern.  If we are unable to meet our obligations, we would be forced to cease operations and pursue restructuring or liquidation alternatives, including the potential to seek a bankruptcy filing, in which event investors may lose their entire investment in our company.  Without additional funding, the Company has inadequate cash to continue operations past the third quarter of 2020 and will have to find funding going forward including pursuing asset sales, short term financing options and, if unsuccessful in obtaining sufficient financing, the possibility of seeking bankruptcy protection.    There can be no assurance that the Company will be successful in obtaining the financing required to complete the Mt. Hope Project, or in raising additional financing in the future on terms acceptable to the Company, or at all.

 

Based on our current operating forecast, our current cash on hand, the convertible preferred share purchase agreements implemented in March and August 2019, discussed below, reimbursement from the LLC for the proceeds advanced to fund the water rights settlement, the exchange offer for the outstanding convertible and promissory notes and supplemental subscription offering, settlement of the dispute with AMER, the Company expects to be able to fund its operations and meet its financial obligations into the third quarter of 2020. 

 

 The Company is currently pursuing a number of options to extend its liquidity beyond the third quarter of 2020 and into 2021.  On March 13, 2019, the Company announced that its Board of Directors has retained XMS Capital Partners, Headwall Partners, and Odinbrook Global Advisors (collectively, the “Advisors”), as financial advisors to assist the Board and management with evaluating and recommending strategic alternatives.

 

The range of strategic alternatives being evaluated include the potential addition of new Mt. Hope Project partners, additional Corporate Strategic investors, merger opportunities, and/or the possible sale or privatization of the Company.  The advisors assisted the Company in successfully restructuring the Convertible and Non-Convertible

67

Promissory Notes issued in a December 2014 private placement, extending maturity until December 2022 as well as providing an additional $1.3 million in interim funding.

 

Additional potential funding sources for the Company include public or private equity offerings, including sale of other assets wholly-owned by the Company or with EMLLC partner POS-Minerals at the Mt. Hope Project.  However, there is no assurance that the Company will be successful in securing additional funding in the future on terms acceptable to the Company, or at all.  This could result in further cost reductions, contract cancellations, and potential delays which ultimately may jeopardize the development of the Mt. Hope Project.

 

As the cash needs for the development of the Mt. Hope Project are significant, we and/or the LLC will be required to arrange for financing to be combined with funds anticipated to be received from POS-Minerals in order to retain its 20% LLC membership interest.  If we are unsuccessful in obtaining financing, we will not be able to proceed with the development of the Mt. Hope Project.  Additional funding for the Mt. Hope Project would allow us to restart equipment procurement and agreements that were suspended or terminated would be renegotiated under current market terms and conditions, as necessary.  In the event of an extended delay related to availability of the Company’s portion of full financing for the Mt. Hope Project, the Company will continue using its best efforts to work with its LLC joint venture partner POS-Minerals to revise procurement and construction commitments to preserve liquidity, including Mt. Hope Project equipment deposits and pricing structures.  There can be no assurance that additional funding will be obtained.

 

Currently the Company has no plans or intentions to enter into restructuring or liquidation. The Company has engaged the Advisors to assist in securing interim financing and negotiating with debt holders and other potential stakeholders. While the Advisors would have the capability to assist with a restructuring if needed, we do not intend to engage them (or other parties) for these services at this time.

 

Other Financing Actions Taken

 

On April 12, 2017, the Company filed a prospectus supplement in both Canada and the United States which enabled the Company, at its discretion from time to time, to sell up to $20 million worth of common shares by way of an “at-the-market” offering (the “ATM”).  Since the effectiveness of the prospectus supplement by the SEC on April 26, 2017 to December 31, 2019, a total of 1,168,300 common shares have been sold under the ATM, for net proceeds to the Company of $0.5 million.  In October 2018, the Company completed a public offering of 9,125,000 units consisting of one share of common stock and one warrant to purchase one share of common stock resulting in net proceeds to the Company of $1,900,000.  In conjunction with the public offering in October 2018, the Company agreed to suspend the ATM facility for a period of 2 years.

 

Additionally, on March 28, 2019, the Company executed a Securities Purchase Agreement (the “Series A Purchase Agreement”) with Bruce D. Hansen, the Company’s Chief Executive Officer/Chief Financial Officer, and Robert I. Pennington, the Company’s Chief Operating Officer (collectively the “Investors”), effective as of March 21, 2019.  Pursuant to the Series A Purchase Agreement, the Investors agreed to purchase up to $900,000 of convertible shares of Series A Preferred Stock, par value $0.001 per share (the “Series A Convertible Preferred Shares”), of the Company.  The Company requested three separate closings of sales of Series A Convertible Preferred Shares to the Investors between the date of the Series A Purchase Agreement and June 30, 2019.  Each closing was in the amount of $300,000 of Series A Convertible Preferred Shares. 

The Series A Convertible Preferred Shares were priced at $100.00/preferred share, convertible at any time at the holder’s discretion into common shares whereby one preferred share converts at a price of $0.27/common share to 370.37 common shares. The conversion price was set as the closing price of the common stock on March 12, 2019, which was the day before announcement of the private placement. The Series A Convertible Preferred Shares carry a 5% annual dividend, which may be paid, in the Company’s sole discretion, in cash, additional shares or a combination thereof.  Upon maturity or full repayment of the Exchange Note and Supplemental Note debt discussed in Note 5 below, there will be mandatory redemption of the Series A Convertible Preferred Shares into equivalent cash for the principal invested, plus any accrued and unpaid dividends.  

On May 2, 2019, the Company also executed a Securities Purchase Agreement (the “MHMI Series A Purchase Agreement”) with Mount Hope Mines, Inc. (“MHMI”), later assigned in part to members of MHMI

68

individually.  Pursuant to the MHMI Series A Purchase Agreement, MHMI agreed to purchase $500,000 of Series A Convertible Preferred Shares, as described above.  These shares were fully converted in the fourth quarter of 2019.

 

On August 5, 2019, the Company executed a Securities Purchase Agreement (the “Series B Purchase Agreement”) with the Investors.  Pursuant to the Series B Purchase Agreement, the Investors agreed to purchase up to $400,000 of convertible shares of Series B Preferred Stock, par value $0.001 per share (the “Series B Convertible Preferred Shares”), of the Company.  This transaction closed on August 7, 2019. 

The Series B Convertible Preferred Shares were issued at a price of $100.00 per share, and each Series B Convertible Preferred Share will be convertible at any time at the holder’s discretion into 500 shares of common stock of the Company.  The Series B Convertible Preferred Shares carry a 5% annual dividend, which may be paid, in the Company’s sole discretion, in cash, additional shares of Series B Convertible Preferred Shares or a combination thereof.  The Series B Convertible Preferred Shares, like the Series A Convertible Preferred Shares, are mandatorily redeemable upon maturity or full repayment of the Exchange Note and Supplemental Note debt discussed in Note 5 below.

 

On September 26, 2019, the Company entered into a 90-day interest deferral and forbearance agreement with the primary holder of the Convertible Notes, along with certain of the Company’s members of management and directors who participated in the 2014 debt offering.  As a result, the Company deferred approximately $163,000 of interest payments that were due at the end of the third quarter 2019.

 

Effective April 30, 2019, the Company, through its wholly owned subsidiary Kobeh Valley Ranch LLC (“KVR”) entered into a settlement agreement with a Kobeh Valley, Nevada ranching family (“Ranchers”), resolving the last set of protests pending before the Nevada State Engineer pertaining to the Mt. Hope Project’s water rights applications.  Under the terms of the settlement agreement, $1.0 million was required to be paid upon issuance of the water rights at the Mt. Hope Project.

 

Pursuant to an April 29, 2019 Consent Agreement, the members of the LLC agreed that funding for the $1 million was advanced to the LLC by the Company, to preserve the joint venture’s existing reserve account.  General Moly sourced $500,000 from its available cash, and received the remaining $500,000 from closing a sale of Series A Convertible Preferred Shares in a private placement with Mount Hope Mines Inc. (“MHMI”), the Mt. Hope Project’s claim/land lessor discussed in Items 1 and 2 of this Annual Report on 10-K and in Note 7 below.

In exchange for General Moly advancing the $1,000,000 initial settlement funding, the LLC members have agreed to repay the $1 million advance from the proceeds of ongoing sales of non-critical LLC assets and lands.  On September 27, 2019, the Company and POS-Minerals entered into a further Consent Agreement for a reimbursement schedule concerning the approximately $700,000 owed to the Company by the LLC in return for the Company’s advance of funding to settle protests related to the water right applications for the Mt. Hope Project.  Under the September Consent Agreement, $200,000 was reimbursed from the Reserve Account to the Company on September 30, 2019 and an additional $200,000 was reimbursed in early November.  The remaining approximately $300,000 was reimbursed in March 2020, once the LLC sold a minimum of $400,000 in non-critical Mt. Hope Project related equipment. 

 

In December 2019, the Company completed an exchange offer with the holder of $5 million of the Company’s Senior Convertible Promissory Notes and certain other holders of Senior Convertible Notes and Senior Promissory Notes (collectively, the “Old Notes”) to exchange the Old Notes for new units consisting of new senior non-convertible promissory notes having a principal amount equal to the original principal amount of the Old Notes exchanged plus accrued and unpaid interest (including deferred interest), bearing an interest rate between 12-14% and otherwise providing for similar terms (the “Exchange Notes”) and a three-year warrant to purchase Company common stock at $0.35 share (each a “Unit”).  The Exchange Notes extend the maturity date until December 2022.  A majority of the remaining holders also agreed to the terms of the Exchange Notes, with approximately $0.4 million repaid at maturity to those who chose not to participate in the exchange.

In addition to the exchange of Old Notes, the largest holder of the Old Notes, as well as the Company’s CEO/CFO, Bruce Hansen and other noteholders, purchased new 13% Senior Promissory Notes due 2022 in the principal amount of $1.3 million (representing approximately 20% of the original principal amount of the Old Notes to be exchanged) providing additional capital to the Company. 

 

69

The Company paid at maturity the unpaid principal and all accrued and unpaid interest in the approximate amount of $368,000 to those eligible holders that elected not to participate in the Exchange Offer.  The original principal amount of Old Notes paid at maturity represented approximately 5% of the total outstanding.  The maturity date was December 26, 2019. The Notes Warrants issued in connection with the Old Notes expired by their terms on December 26, 2019.

 

The Company believes these transactions will assist with very near-term liquidity necessary for the Company to operate into the third quarter of 2020.  However, this does not alleviate the substantial doubt about our ability to continue to operate as a going concern.

 

Purchase Commitments

 

We continue to work with our long-lead vendors to manage the timing of contractual payments for milling equipment.  The following table sets forth the LLC’s remaining cash commitments under these equipment contracts (collectively, “Purchase Contracts”) at December 31, 2019 (in millions):

 

 

 

 

 

 

 

    

As of

 

 

 

December 31,

 

Year

 

2019 *

 

2020

 

$

 —

 

2021

 

 

0.6

 

Total

 

$

0.6

 


*All amounts are commitments of the LLC, and as a result of the agreement between Nevada Moly and POS-Minerals are to be funded by the reserve account, now $3.4 million, until such time that the Company obtains financing for its portion of construction costs at the Mt. Hope Project or until the reserve account balance is exhausted, and thereafter are to be funded 80% by Nevada Moly and 20% by POS-Minerals.  POS-Minerals remains obligated to make capital contributions for its 20% portion of equipment payments required by approved budgets of the LLC, and such amounts contributed by the reserve account on behalf of POS-Minerals will reduce, dollar for dollar, the amount of capital contributions that the LLC is required to return to POS-Minerals, as described below.

 

If the LLC does not make the payments contractually required under these purchase contracts, it could be subject to claims for breach of contract or to cancellation of the respective purchase contract.  In addition, the LLC may proceed to selectively suspend, cancel or attempt to renegotiate additional purchase contracts, if necessary, to further conserve cash.  If the LLC cancels or breaches any contracts, the LLC will take all appropriate action to minimize any losses, but could be subject to liability under the contracts or applicable law.  The cancellation of certain key contracts could cause a delay in the commencement of operations, and could add to the cost to develop the Company’s interest in the Mt. Hope Project.

 

Through December 31, 2019, the LLC has made deposits and/or final payments of $88.0 million on equipment orders.  Of these deposits, $71.7 million relate to fully fabricated items, primarily milling equipment, for which the LLC has additional contractual commitments of $0.6 million noted in the table above.  The remaining $16.3 million reflects both partially fabricated milling equipment, and non-refundable deposits on mining equipment.  As discussed in Note 11, the mining equipment agreements remain cancellable with no further liability to the LLC.  The underlying value and recoverability of these deposits and our mining properties in our consolidated balance sheets are dependent on the LLC’s ability to fund development activities that would lead to profitable production and positive cash flow from operations, or proceeds from the sale of these assets. There can be no assurance that the LLC will be successful in generating future profitable operations, selling these assets or that the Company will secure additional funding in the future on terms acceptable to us or at all.  Our consolidated financial statements do not include any adjustments relating to recoverability and classification of recorded assets or liabilities.

 

All Mt. Hope Project related funding is payable out of the reserve account until exhausted, the balance of which was $3.4 million and $6.2 million at December 31, 2019 and 2018, respectively.  Corporate general and administrative expenses and costs associated with the maintenance of the Liberty Project are not covered by the Reserve Account.  Additional potential funding sources include public or private equity offerings or sale of other assets owned by the Company and/or the LLC, although a portion of any major asset sales may be owed to POS-Minerals. 

70

The Mt. Hope Project

 

From October 2005 to January 2008, we owned the rights to 100% of the Mt. Hope Project.  Effective as of January 1, 2008, we contributed all of our interest in the assets related to the Mt. Hope Project, including the Mt. Hope Lease, into the LLC, and in February 2008 entered into a joint venture agreement (“LLC Agreement”) for the development and operation of the Mt. Hope Project with POS-Minerals Corporation (“POS-Minerals”).  Under the LLC Agreement, POS-Minerals owns a 20% interest in the LLC and General Moly, through Nevada Moly, LLC (“Nevada Moly”), a wholly-owned subsidiary, owns an 80% interest.  The ownership interests and/or required capital contributions under the LLC Agreement can change as discussed below.

 

In addition, under the terms of the LLC Agreement, since commercial production at the Mt. Hope Project was not achieved by December 31, 2011, the LLC will be required to return to POS-Minerals $36.0 million, since reduced to $33.6 million as discussed below, of its capital contributions (“Return of Contributions”), with no corresponding reduction in POS-Minerals’ ownership percentage.  Effective January 1, 2015, as part of a comprehensive agreement concerning the release of the reserve account described below, Nevada Moly and POS-Minerals agreed that the Return of Contributions will be payable to POS-Minerals on December 31, 2020; provided that, at any time on or before November 30, 2020, Nevada Moly and POS-Minerals may agree in writing to extend the due date to December 31, 2021; and if the due date has been so extended, at any time on or before November 30, 2021, Nevada Moly and POS-Minerals may agree in writing to extend the due date to December 31, 2022.  If the repayment date is extended, the unpaid amount will bear interest at a rate per annum of LIBOR plus 5%, which interest shall compound quarterly, commencing on December 31, 2020 through the date of payment in full.  Payments of accrued but unpaid interest, if any, shall be made on the repayment date.  Nevada Moly may elect, on behalf of the Company to cause the Company to prepay, in whole or in part, the Return of Contributions at any time, without premium or penalty, along with accrued and unpaid interest, if any.

 

The original Return of Contributions amount due to POS-Minerals is reduced, dollar for dollar, by the amount of capital contributions for equipment payments required from POS-Minerals under approved budgets of the LLC, as discussed further below.  During the period January 1, 2015 to December 31, 2019, this amount has been reduced by $2.4 million, consisting of 20% of an $8.4 million principal payment made on milling equipment in March 2015, a $2.2 million principal payment made on electrical transformers in April 2015, and a $1.2 million principal payment made on milling equipment in April 2016, such that the remaining amount due to POS-Minerals is $33.6 million.  If Nevada Moly does not fund its additional capital contribution in order for the LLC to make the required return to POS-Minerals set forth above, POS-Minerals has an election to either make a secured loan to the LLC to fund the Return of Contributions, or receive an additional interest in the LLC, from Nevada Moly, estimated to be 5%.  In the latter case, Nevada Moly’s interest in the LLC is subject to dilution by a percentage equal to the ratio of 1.5 times the amount of the unpaid Return of Contributions over the aggregate amount of deemed capital contributions (as determined under the LLC Agreement) of both parties to the LLC (“Dilution Formula”).  At December 31, 2019, the aggregate amount of deemed capital contributions of both members was $1,090.8 million.

 

Furthermore, the LLC Agreement authorizes POS-Minerals to put/sell its interest in the LLC to Nevada Moly after a change of control of Nevada Moly or the Company, as defined in the LLC Agreement, followed by a failure by us or our successor company to use standard mining industry practice in connection with the development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve (12) consecutive months.  If these circumstances should occur, POS-Minerals may exercise its option to put or sell its interest, and thereafter, Nevada Moly or its transferee or surviving entity would be required to purchase the interest for 120% of POS-Minerals’ total contributions to the LLC, which, if not paid timely, would be subject to 10% interest per annum.

 

Effective January 1, 2015, Nevada Moly and POS-Minerals signed an amendment to the LLC agreement under which a separate $36.0 million belonging to Nevada Moly, held by the LLC in a reserve account established in December 2012, is being released for the mutual benefit of both members related to annual jointly approved Mt. Hope Project expenses through 2021.  In January 2015, the reserve account funded a reimbursement of contributions made by the members during the fourth quarter of 2014, inclusive of $0.7 million to POS-Minerals and $2.7 million to Nevada Moly.  The remaining reserve account funds are now being used to pay ongoing jointly approved expenses of the LLC until the Company obtains full financing for its portion of the Mt. Hope Project construction cost, or until the reserve account is exhausted.  Any remaining funds after financing is obtained will be returned to the Company.  The balance of the reserve account was $3.4 million and $6.2 million at December 31, 2019 and 2018, respectively.

 

71

Agreement with AMER International Group (“AMER”) 

 

Private Placement

 

As announced in April 2015, the Company and AMER International Group Co., Ltd (“AMER”) entered into a private placement for 40.0 million shares of the Company’s common stock and warrants to purchase 80.0 million shares of the Company’s common stock, priced using the trailing 90-day volume weighted average price (“VWAP”) of $0.50 on April 17, 2015, the date the Investment and Securities Purchase Agreement (“AMER Investment Agreement”) was signed. General Moly received stockholder approval of the transaction at its 2015 Annual Meeting, and of material amendments to the transaction at a Special Meeting held in December 2017.

 

On November 2, 2015, the Company and AMER entered into an amendment to the AMER Investment Agreement, utilizing a three-tranche investment.   The first tranche of the amended AMER Investment Agreement closed on November 24, 2015 for a $4.0 million private placement representing 13.3 million shares, priced at $0.30 per share, and warrants (the “AMER Warrants”) to purchase 80.0 million shares of common stock at $0.50 per share, which would become exercisable upon availability of an approximately $700.0 million senior secured loan (“Bank Loan”). The funds received from the $4.0 million first tranche private placement were divided evenly between general corporate purposes and an expense reimbursement account which is available to both AMER and the Company to cover anticipated Mt. Hope financing costs and other jointly sourced business development opportunities. In addition, amer and General Moly entered into a Stockholder Agreement allowing AMER to nominate a director to the General Moly Board of Directors and additional directors following the close of the third tranche, discussed below, and drawdown of the Bank Loan.  The Stockholder Agreement also governed amer’s acquisition and transfer of General Moly shares.  Prior to closing the first tranche, the parties agreed to eliminate certain conditions to closing.  Following the closing, AMER nominated Tong Zhang to serve as a director of the Company, and he was appointed by the Board of Directors on December 3, 2015.    Mr. Zhang was nominated by the Board of Directors to stand for election at the 2018 General Meeting of Stockholders and was elected by the stockholders to serve as a Class II director for a three (3) year term expiring in 2021, subject to re-election.  On July 29, 2019, Mr. Zhang resigned from the Board of Directors.

 

On October 16, 2017, the Company and AMER announced the closure of the second tranche of the parties’ three-tranche financing agreement.  At the close of the second tranche, General Moly issued 14.6 million shares to AMER, priced at the VWAP for the 30-day period ending August 7, 2017 (the date of the parties’ Amendment No. 2 to the Investment and Securities Purchase Agreement) of $0.41 per share for a private placement of $6.0 million by AMER.  $5.5 million of the equity sale proceeds were available for general corporate purposes, while $0.5 million was held in the expense reimbursement account established at the first tranche close to cover costs related to the Mt. Hope Project financing and other jointly sourced business development opportunities. 

The third tranche of the amended AMER Investment Agreement was to include a $10.0 million private placement representing 20.0 million shares, priced at $0.50 per share. Closing of the third tranche was conditioned upon the earlier of the reissuance of water permits for the Mt. Hope Project or completion of a joint business opportunity involving use of 10.0 million shares of General Moly stock. 

 

The issuance of shares in connection with Tranche 3 of the AMER Investment Agreement was approved by General Moly stockholder in December 2017 at a Special Meeting of Stockholders.

 

The Company and AMER have jointly evaluated other potential opportunities, ranging from outright acquisitions and privatizations, or significant minority interest investments with a focus on base metal and ferro-alloy prospects, where the Company would benefit from management fees, minority equity interests, or the acquisition of both core and non-core assets.  The Company and AMER have considered but not completed any such transactions to date and we are not currently evaluating potential opportunities with AMER.  From commencement of the AMER Investment Agreement in 2015 to December 31, 2019, the Company and AMER have spent approximately $2.5 million from the expense reimbursement account described above in connection with such evaluations.

 

AMER Disputes Obligation to Close Tranche 3 Private Placement Obligation

The last closing conditions for Tranche 3 under the AMER Investment Agreement included issuance of water permits for the Mt. Hope Project.  The water permits were issued by the Nevada State Engineer on July 24, 2019.  On July 26, 2019, the Company provided formal notice to AMER that the conditions to closing of Tranche 3 had been satisfied, and that AMER had two business days (until the close of business on Tuesday, July 30, 2019) to close the

72

transaction.  On July 31, 2019, the Company sent a Notice of Default to AMER, as AMER failed to fund and close Tranche 3 by the July 30, 2019 deadline.

On August 1, 2019, the Company received a letter from AMER dated July 30, 2019, purporting to terminate the AMER Investment Agreement, referencing its earlier letter received by the Company on July 18, 2019, in which AMER alleged uncured material adverse effects and alleged breaches of the AMER Investment Agreement by the Company (which include concerns related to US/China relations, concerns regarding the delay in obtaining environmental permits and solvency concerns).  The Company believed that such assertions were inaccurate and wholly without merit under the terms of the AMER Investment Agreement.  Additionally, as AMER has disputed its obligation to fund the close of Tranche 3, the Company believed that AMER’s attempted termination of the AMER Investment Agreement was ineffective.  With AMER’s failure to fund Tranche 3, the Company had inadequate cash to continue operations and was forced to evaluate its options, including pursuing asset sales, short-term financing options and, if such efforts were unsuccessful in obtaining sufficient financing, the possibility of seeking bankruptcy protection. 

 

On August 28, 2019, the Company engaged King & Spalding, an international arbitration and litigation firm, to represent the Company in its Tranche 3 dispute against AMER for AMER’s default.  The Company also formally notified AMER that a Dispute, as defined by the AMER Investment Agreement existed between the parties as a result of AMER’s failure to close Tranche 3.  The notification required that one representative of each of the executive management of the parties be designated and authorized to attempt to settle the Dispute and the representatives were to meet in good faith to resolve the Dispute.  If the designated representatives did not resolve the Dispute within 10 business days after delivery of the Notice, the Dispute was subject to resolution by binding arbitration, pursuant to the AMER Investment Agreement in Hong Kong SAR under the rules of the International Chamber of Commerce.

 

On October 14, 2019, the Company announced that it had entered into an agreement with AMER to extend the dispute negotiation period (“Extension Agreement”).  Under the terms of the Extension Agreement, the Company received $300,000 from AMER in exchange for an extension of the negotiation period to November 15, 2019, on which date the Company’s CEO Bruce Hansen and AMER Chairman Wang Wen Yin met to discuss settlement options.  With the Extension Agreement payment, AMER had the right, at its option, to apply the Extension Fee among the following: (1) credit against a final negotiated settlement; (2) credit against any AMER payment obligation to the Company, pursuant to an arbitration award; or (3) as consideration for the purchase of the Company’s common stock, priced at the 30-day volume weighted average price, as of the date immediately prior to the date that AMER demanded delivery of such shares.

 

On December 9, 2019, the Company and an affiliate of AMER announced the closure of a $4 million private placement at a price of $0.40 per common share of General Moly under a new Securities Purchase Agreement (“SPA”) and amended and restated warrant agreement (“New AMER Warrant”), resolving the Dispute.  Additionally, the parties agreed to a mutual release, terminating the previous AMER Investment Agreement, the prior Warrant, and the Dispute Negotiation Extension Agreement (“Extension Agreement”).  The parties’ previous Stockholder Agreement expired by its terms on November 24, 2019.  In addition to the 10.0 million shares issued by General Moly to AMER in the private placement, AMER also received 1.1 million General Moly common shares priced at $0.27/share, the 30-day volume weighted average price of the Company’s NYSE American-traded shares on December 6, 2019 utilizing the Extension Fee, pursuant to the terms of the Extension Agreement.

 

Additionally, AMER nominated Mr. Siong Tek (“Terry”) Lee to serve the remaining term of AMER’s previous director nominee (Tong Zhang) expiring at the Company’s annual meeting in 2021.  AMER may nominate a second director to the Board so long as its shareholding exceeds 20% of the Company’s shares outstanding. 

 

Supply Agreement

 

Furthermore, upon closing of a minimum of $100 million from AMER’s efforts toward the completion of a Chinese bank $700 million project financing, AMER has the option to enter into a moly supply agreement with General Moly to purchase Mt. Hope Project sourced moly at a small discount to spot pricing when the Mt. Hope Project achieves full commercial production.  The saleable amount of moly to AMER escalates from an aggregate 3 million pounds per year to 20 million pounds per year over the first five years of mine production based on the level of project financing assisted by AMER towards the $700 million project financing.

 

73

NOTE 2 — SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

 

This summary of significant accounting policies is presented to assist in understanding the financial statements.  The financial statements and notes are representations of the Company’s management, which is responsible for their integrity and objectivity.  These accounting policies conform to accounting principles generally accepted in the United States of America (“GAAP”) and have been consistently applied in the preparation of the financial statements.

 

Accounting Method

 

Our financial statements are prepared using the accrual basis of accounting in accordance with GAAP.  With the exception of the LLC, all of our subsidiaries are wholly owned.  In February 2008, we entered into the LLC Agreement, which established our ownership interest in the LLC at 80%.  The consolidated financial statements include all of our wholly owned subsidiaries and the LLC.  The POS-Minerals contributions attributable to their 20% interest are shown as Contingently Redeemable Noncontrolling Interest on the Consolidated Balance Sheets.  The net loss attributable to contingently redeemable noncontrolling interest is reflected separately on the Consolidated Statement of Operations and reduces the Contingently Redeemable Noncontrolling Interest on the Consolidated Balance Sheets. Net losses of the LLC are attributable to the members of the LLC based on their respective ownership percentages in the LLC. During 2019, the LLC had a $0.1 million loss primarily associated with accretion of its reclamation obligations, of which $22,000 was attributed to the Contingently Redeemable Noncontrolling Interest.

 

Contingently Redeemable Noncontrolling Interest (“CRNCI”)

 

Under GAAP, certain noncontrolling interests in consolidated entities meet the definition of mandatorily redeemable financial instruments if the ability to redeem the interest is outside of the control of the consolidating entity.  As described in Note 1 — “Description of Business”, the LLC Agreement permits POS-Minerals the option to put its interest in the LLC to Nevada Moly upon a change of control, as defined in the LLC Agreement, followed by a failure by us to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of 12 consecutive months.  As such, the CRNCI has continued to be shown as a separate caption between liabilities and equity based on accounting standards which require equity instruments with redemption features that are not solely within the control of the issuer to be classified outside of permanent equity (referred to as mezzanine equity).  The carrying value of the CRNCI has historically included the Return of Contributions, now $33.6 million, that will be returned to POS-Minerals in December 2020, unless further extended by the members of the LLC as discussed above.  The expected Return of Contributions to POS-Minerals was carried at redemption value as we believed redemption of this amount was probable.  Effective January 1, 2015, Nevada Moly and POS-Minerals agreed that the Return of Contributions will be due to POS-Minerals on December 31, 2020, unless further extended by the members of the LLC as discussed above.  As a result, we have reclassified the Return of Contributions payable to POS-Minerals from CRNCI to a current liability at redemption value, and subsequently reduced it by $2.4 million, consisting of 20% of an $8.4 million principal payment made on milling equipment in March 2015, a $2.2 million principal payment made on electrical transformers in April 2015, and a $1.2 million principal payment made on milling equipment in April 2016, such that the remaining amount due to POS-Minerals is $33.6 million.

 

The remaining carrying value of the CRNCI has not been adjusted to its redemption value as the contingencies that may allow POS-Minerals to require redemption of its noncontrolling interest are not probable of occurring.  Under GAAP, until such time as that contingency has been eliminated and redemption is no longer contingent upon anything other than the passage of time, no adjustment to the CRNCI balance should be made. Future changes in the redemption value will be recognized immediately as they occur and the Company will consider adjusting the carrying amount of the CRNCI to equal the redemption value at the end of each reporting period as necessary.

 

Estimates

 

The process of preparing consolidated financial statements requires the use of estimates and assumptions regarding certain types of assets, liabilities, revenues, and expenses.  Such estimates primarily relate to unsettled transactions and events as of the date of the financial statements.  Accordingly, upon settlement, actual results may differ from estimated amounts.

 

74

Asset Impairments

 

We evaluate the carrying value of long-lived assets to be held and used, using a fair-value based approach when events and circumstances indicate that the related carrying amount of our assets may not be recoverable.  Significant declines in the overall economic environment, molybdenum and copper prices may be considered as impairment indicators for the purposes of these impairment assessments.  Additionally, failure to secure our mining permits, including our water rights, or revocation of our permits may be considered as impairment indicators for the purposes of these impairment assessments.  In accordance with U.S. GAAP, the carrying value of a long-lived asset is considered impaired when the anticipated undiscounted cash flows from such asset is less than its carrying value.  In that event, an impairment charge will be recorded in our Consolidated Statement of Operations and Comprehensive Loss based on the difference between book value and the estimated fair value of the asset computed using discounted future cash flows, or the application of an expected fair value technique in the absence of an observable market price.  Future cash flows include estimates of recoverable quantities to be produced from estimated proven and probable mineral reserves, commodity prices (considering current and historical prices, price trends and related factors), production quantities and capital expenditures, all based on life-of-mine plans and projections.  In estimating future cash flows, assets are grouped at the lowest level for which identifiable cash flows exist that are largely independent of cash flows from other asset groups.  Generally, in estimating future cash flows, all assets are grouped at a particular mine for which there are identifiable cash flows.  Management evaluated the circumstances of the July 30, 2019 failure of AMER to fund Tranche 3 and concluded the dispute with AMER was a triggering event in the third quarter which continued to exist at December 31, 2019.  We evaluated and determined the carrying value of the asset groups were recoverable as the probability-weighted undiscounted flows exceeded the carrying values for each of our asset groups.  While at December 31, 2019, we have not identified any impairment of our long-lived assets, there can be no assurance that there will not be asset impairments if commodity prices experience a sustained decline and/or if there are significant downward adjustments to estimates of recoverable quantities to be produced from proven and probable mineral reserves or production quantities, changes to the weighting of our scenarios utilized in probability-weighted cash flow analysis and/or upward adjustments to estimated operating costs and capital expenditures, all based on life-of-mine plans and projections. 

 

Cash and Cash Equivalents and Restricted Cash

 

We consider all highly liquid investments with original maturities of three months or less to be cash equivalents. The Company’s cash equivalent instruments are classified within Level 1 of the fair value hierarchy established by FASB guidance for Fair Value Measurements because they are valued based on quoted market prices in active markets.

 

We consider all restricted cash, inclusive of the reserve account discussed above, the loan procurement account and reclamation surety bonds, to be long-term. 

 

 

 

 

 

 

 

 

 

    

December 31, 2019

    

December 31, 2018

 

 

(in thousands)

Cash and cash equivalents

 

$

4,614

 

$

2,016

Restricted cash held at EMLLC

 

 

3,388

 

 

6,167

Restricted cash held for loan procurement

 

 

 —

 

 

 —

Restricted cash and investments held for reclamation bonds

 

 

 

 

434

Total cash, cash equivalents and restricted cash shown in the statement of cash flows

 

$

8,002

 

$

8,617

 

As of December 31, 2019, the LLC had $0.6 million in cash deposits associated with reclamation bonds, which are accounted for as restricted cash.  Another $0.1 million in cash collateral is associated with surety bonds at the Liberty Project. These amounts are considered investments and are not included in cash and cash equivalents for purposes of the Statement of Cash Flows.  As of December 31, 2018, the LLC had an additional $0.4 million in a long-term funding mechanism, which was accounted for as restricted cash.  The $0.4 million held in a long-term funding mechanism was redeemed and is included in cash and cash equivalents as of December 31, 2019.

 

75

Basic and Diluted Net Loss Per Share

 

Net loss per share was computed by dividing the net loss attributable to the Company by the weighted average number of shares outstanding during the period.  The weighted average number of shares was calculated by taking the number of shares outstanding and weighting them by the amount of time that they were outstanding.  Outstanding awards as of December 31, 2019 and 2018, respectively, were as follows:

 

 

 

 

 

 

 

 

 

    

 

December 31, 2019

    

December 31, 2018

 

Warrants

 

 

98,013,256

 

98,686,000

 

Shares Issued upon conversion of Senior Notes

 

 

0

 

5,910,000

 

Unvested Stock Awards

 

 

421,268

 

2,401,268

 

Stock Appreciation Rights

 

 

909,837

 

938,667

 

 

These awards were not included in the computation of diluted loss per share for the twelve months ended December 31, 2019 and 2018, respectively, because to do so would have been anti-dilutive.  Therefore, basic loss per share is the same as diluted loss per share.

 

Mineral Exploration and Development Costs

 

All exploration expenditures are expensed as incurred.  If no economic ore body is discovered, previously capitalized costs are expensed in the period the property is abandoned.  Expenditures to develop new mines, to define further mineralization in existing ore bodies, and to expand the capacity of operating mines, are capitalized and amortized on a units-of-production basis over proven and probable reserves.

 

Should a property be abandoned, its capitalized costs are charged to operations.  The Company charges to the consolidated statement of operations the allocable portion of capitalized costs attributable to properties sold.  Capitalized costs are allocated to properties sold based on the proportion of claims sold to the claims remaining within the project area.

 

Mining Properties, Land and Water Rights

 

Costs of acquiring and developing mining properties, land and water rights are capitalized as appropriate by project area.  Exploration and related costs and costs to maintain mining properties, land and water rights are expensed as incurred while the property is in the exploration and evaluation stage.  Development and related costs and costs to maintain mining properties, land and water rights are capitalized as incurred while the property is in the development stage.  When a property reaches the production stage, the related capitalized costs are amortized using the units-of-production basis over proven and probable reserves.  Mining properties, land and water rights are periodically assessed for impairment of value, and any subsequent losses are charged to operations at the time of impairment.  If a property is abandoned or sold, a gain or loss is recognized and included in the consolidated statement of operations.

 

The Company has capitalized royalty payments made to Mt. Hope Mines, Inc. (“MHMI”) (discussed in Note 11 below) during the development stage.  The amounts will be applied to production royalties owed upon the commencement of production.

 

Depreciation and Amortization

 

Property and equipment are recorded at cost and depreciated using the straight-line method over the estimated useful lives of the assets.  Property and equipment are depreciated using the following estimated useful lives:

 

 

 

 

 

Field equipment

    

Four to ten years

 

Office furniture, fixtures, and equipment

 

Five to seven years

 

Vehicles

 

Three to five years

 

Leasehold improvements

 

Three years or the term of the lease, whichever is shorter

 

Residential trailers

 

Ten to twenty years

 

Buildings and improvements

 

Ten to twenty seven and one-half years

 

 

 

76

Provision for Taxes

 

Income taxes are provided based upon the asset and liability method of accounting.  Under this approach, deferred income taxes are recorded to reflect the tax consequences in future years of differences between the tax basis of assets and liabilities and their financial reporting amounts at each year-end.  In accordance with authoritative guidance under Accounting Standards Codification (“ASC”) 740, Income Taxes, a valuation allowance is recorded against the deferred tax asset if management does not believe the Company has met the “more likely than not” standard to allow recognition of such an asset.

 

Reclamation and Remediation

 

Expenditures for ongoing compliance with environmental regulations that relate to current operations are expensed or capitalized as appropriate.  Future obligations to retire an asset, including reclamation, site closure, dismantling, remediation and ongoing treatment and monitoring, are recorded as a liability at fair value at the time of construction or development.  The fair value determination is based on estimated future cash flows, the current credit-adjusted risk-free discount rate and an estimated inflation factor.  The value of asset retirement obligations is evaluated on a quarterly basis or as new information becomes available on the expected amounts and timing of cash flows required to discharge the liability.  The fair value of the liability is added to the carrying amount of the associated asset and this additional carrying amount will be depreciated or amortized over the estimated life of the asset upon the commencement of commercial production.  An accretion cost, representing the increase over time in the present value of the liability, will also be recorded each period as accretion expense.  As reclamation work is performed or liabilities are otherwise settled, the recorded amount of the liability is reduced.  Certain collateral amounts associated with our reclamation obligations are held in investment accounts, for which the fair value is estimated based on Level 1 inputs.

 

Stock-based Compensation

 

Stock-based compensation represents the fair value related to stock-based awards granted to members of the Board, officers and employees.  The Company uses the Black-Scholes model to determine the fair value of stock-based awards under authoritative guidance for Stock-Based Compensation.  For stock-based compensation that is earned upon the satisfaction of a service condition, the cost is recognized on a straight-line basis (net of estimated forfeitures) over the requisite vesting period (up to three years).  Awards expire five years from the date of vesting.

 

Further information regarding stock-based compensation can be found in Note 8 — “Equity Incentives.”

 

Warrants

 

The Company has issued warrants in connection with several financing transactions and uses the Black-Scholes model or a lattice to determine the fair value of these transactions based on the features included in each.

 

Leases

 

The Company adopted Accounting Standards Codification (“ASC”) 842, Leases, on January 1, 2019. Changes to the Company’s accounting policy as a result of adoption are discussed below.

The Company determines if a contractual arrangement represents or contains a lease at inception. Operating leases are included in Deposits, prepaids and other Current Assets and Other accrued liabilities in the Consolidated Balance Sheets. No finance leases have been identified to date.

77

Operating and finance lease right-of-use ("ROU") assets and lease liabilities are recognized at the commencement date based on the present value of the future lease payments over the lease term. When the rate implicit to the lease cannot be readily determined, the Company utilizes its incremental borrowing rate in determining the present value of the future lease payments. The incremental borrowing rate is derived from information available at the lease commencement date and represents the rate of interest that the Company would have to pay to borrow on a collateralized basis over a similar term and amount equal to the lease payments in a similar economic environment. The ROU asset includes any lease payments made and lease incentives received prior to the commencement date. Operating lease ROU assets also include any cumulative prepaid or accrued rent when the lease payments are uneven throughout the lease term. The ROU assets and lease liabilities may include options to extend or terminate the lease when it is reasonably certain that the Company will exercise that option. 

 

Recent Accounting Pronouncements

 

Leases (Topic 842)

 

In February 2016, the FASB issued Accounting Standards Update (“ASU”) 2016-02, Leases (Topic 842).  The update provides a comprehensive update to the lease accounting topic in the Codification intended to increase transparency and comparability among organizations by recognizing lease assets and lease liabilities on the balance sheet and disclosing key information about leasing arrangements.  The amendments in ASU 2016-02 include a revised definition of a lease as well as certain scope exceptions.  The changes primarily impact lessee accounting, while lessor accounting is largely unchanged from previous GAAP.  The amendments in ASU 2016-02 are effective for public entities for annual reporting periods beginning after December 15, 2018, and for interim periods within that reporting period.   

 

The Company adopted this standard as of January 1, 2019 using the modified retrospective approach with a cumulative effect adjustment on January 1, 2019.  The adoption had no effect on the opening balance of retained earnings at January 1, 2019.  The comparative information has not been adjusted and continues to be reported under the accounting standard in effect for those periods.

The new standard offers a number of optional practical expedients of which the Company elected the following:

Transition elections:  The Company elected a package of practical expedients, applied consistently to all leases that commenced prior to January 1, 2019, that allowed the Company (i) to not reassess whether a contract is or contains a lease, (ii) to not reassess the lease classification of the lease, and (iii) to not reassess initial direct costs for the lease.  The Company elected the land easements practical expedient whereby existing land easements were not reassessed under the new standard.

Ongoing accounting policy elections: The Company elected the short-term lease recognition exemption whereby ROU assets and lease liabilities will not be recognized for leasing arrangements with terms less than one year. The Company elected the practical expedient to not separate lease and non-lease components for all of its underlying asset classes.

Based on leases outstanding at January 1, 2019 and December 31, 2019, the adoption of the new standard resulted in the recognition of operating lease ROU assets and lease liabilities of $0.2 million and $0.2 million, respectively.  Certain of our leases include payments that vary based on the Company’s level of usage and operations.  These variable payments are not included within ROU assets and lease liabilities and are recognized as expense when incurred.  For the year ended December 31, 2019, operating lease costs were $20K and variable lease costs were $1K.  Cash paid for amounts in the measurement of lease liabilities which are reflected in operating cash flows relating to operating leases for the year ended December 31, 2019 were $65K. The weighted average life remaining for the operating leases is 1.8 years and the weighted average discount rate is 10%.  Adoption of this standard did not have a material impact to the Consolidated Statements of Operations or the Consolidated Statements of Cash Flows.

 

 

NOTE 3 — MINING PROPERTIES, LAND AND WATER RIGHTS

 

We currently have interests in two mining properties that are the primary focus of our operations, the Mt. Hope Project and the Liberty Project.  We also have certain other, non-core, mining properties that are being evaluated for future development or sale.

 

78

The Mt. Hope Project.  We are currently in the process of developing the Mt. Hope Project, and have recently obtained all permits required for construction.  In January 2014, the Company published an updated Technical Report on the Mt. Hope Project using Canadian Instrument NI 43-101 guidelines, which provided data on the viability and expected economics of the project.  In early 2017, we re-examined the Mt. Hope proven and probable mineral reserves and updated the reserve and resource estimates using an $8.40/lb molybdenum (“Mo”) three-year backward average price.  No further adjustments were required during 2018 and 2019.

 

The Company has identified a potential high-grade, copper-silver exploration target along with a significant zinc mineralized area at the Mt. Hope Project site, southeast of the Mt. Hope’s molybdenum deposit in central Nevada (the “Cu-Ag Target”).

A high-intensity, ground-based Induced Polarization (“IP”) survey completed in February 2018 by Quantec Geoscience indicates a fairly continuous group of high chargeability anomalies that appear aligned with the recently identified Cu-Ag Target. These anomalies lie between 100 feet and 1,000-plus feet from the surface and trend northeast for over 1,000 feet. The IP survey indicates that the anomalies could continue further to the north-northeast and to the south where they appear to dip to the east.

The preliminary Cu-Ag Target exploration work was undertaken solely at the expense of General Moly. The Company has presented the promising findings to its 20% EMLLC joint venture partner at the Mt. Hope Project, POS-Minerals, and the parties are discussing value-sharing investment options. Any mining operation to exploit economic mineralization at the Mt. Hope Project site will require the approval of POS-Minerals.

Geological review of historic logs and core was completed by Mine Mappers, LLC of Tucson, Arizona to update the geologic interpretation of the skarn area.  Mine Mappers reviewed the geologic interpretations in conjunction with the IP results and recommended a 10-hole, 9,400 foot drilling confirmation and exploration program. 

 

In September 2018, the Company commenced a 10-hole drill program on the patented claims at the Mt. Hope Project.  The drilling program is focused on copper-silver-zinc mineralized skarns and designed to confirm and extend the target defined by historical drilling as well as test for extensions of zinc mineralization horizons which were historically mined.  The drill program was completed in late 2018 and the Company concluded that this mineralization may have economic potential but requires further drilling and analysis and may be best explored in conjunction with or after the moly project.

 

Liberty Project.  We continue to evaluate opportunities at the Liberty Project as they arise.  The Liberty Project remains in care and maintenance at this time.  In July 2014, the Company published an updated NI 43-101 compliant pre-feasibility study, which more closely examined the use of existing infrastructure and the copper potential of the property. 

 

In February 2017, Liberty Moly, LLC (“Liberty Moly”) entered into a lease agreement with WK Mining Ltd. (“WK”) for the lease of water rights for the purpose of mining and milling.  The term of the lease is six years which WK can extend for an additional four years.  As compensation for the leased water rights, WK has issued $124,000 in common shares to Liberty Moly, consisting of $100,000 at signing of the agreement and shares equal to $12,000 in both its first and second annual installments, and is required to pay an annual fee on the anniversary date of the lease in either cash or WK common shares.

 

In December, 2019, Liberty Moly, LLC (“Liberty Moly”) entered into a lease agreement with SR Minerals, Inc. (SRM) for the lease of water rights for the purpose of mining and milling.  The term of the lease is five years, after which SRM can extend annually for an additional five years.  As compensation for the leased water rights, SRM has paid $16,000 in cash to Liberty Moly, and is required to pay an annual fee on the anniversary date of the lease in cash.

 

The Nevada Division of Environmental Protection (NDEP) has identified environmental concerns with some Liberty Project facilities acquired with the property.  NDEP’s concerns are related to aspects of previously approved closure plans required by Nevada regulation.  We have proposed options to NDEP to address these concerns.  In July 2018, we addressed one of those concerns by successfully completing a program, as approved by NDEP, to neutralize the acidic Liberty pit lake by adding hydrated lime to raise the pH.  Since October of 2018, we have been actively managing process solutions draining from the pre-existing leach pad to resolve the second concern.  We will continue to work with NDEP to evaluate ongoing options to address these issues, and additional costs may be required to meet

79

NDEP’s closure requirements.  However, a reasonable estimate cannot be determined at this time as it is not possible to reasonably predict the outcome of resolution with NDEP.

 

Other Mining Properties.  We also have had other mining claims and land purchased prior to 2006 which consisted in part of (a) six patented mining claims known as the Chicago-London group, located near the town of Murray in Shoshone County, Idaho, (b) 34 unpatented mining claims in Marion County, Oregon, known as the Detroit property, and (c) 83 unpatented claims in Sanders and Madison County, Montana.  Historically, our efforts at these properties were minimal and consumed no significant financial resources.  The total book value of these properties was approximately $0.1 million and the Company has retained production royalties of 1.5% of all net smelter returns on future production from two undeveloped properties in Skamania County, Washington and Josephine County, Oregon, which were sold in 2012 and 2013, respectively.  The Chicago-London property ((a) above) was sold in January 2020.  As a result of ongoing cash conservation efforts, we allowed the annual claim payments for the 83 unpatented claims in Sanders and Madison County, Montana ((c) above) to lapse and no longer hold rights to these claims.

Summary.  The following is a summary of mining properties, land and water rights at December 31, 2019 and 2018 (in thousands):

 

 

 

 

 

 

 

 

 

 

 

    

 

At

    

At

 

 

 

 

December 31,

 

December 31,

 

 

 

 

2019

 

2018

 

Mt. Hope Project:

 

 

 

 

 

 

 

 

Development costs

 

 

$

179,356

 

$

176,292

 

Mineral, land and water rights

 

 

 

23,423

 

 

11,324

 

Advance royalties

 

 

 

32,988

 

 

31,800

 

Total Mt. Hope Project

 

 

 

235,767

 

 

219,416

 

Total Liberty Project

 

 

 

8,370

 

 

9,678

 

Other Properties

 

 

 

0

 

 

81

 

Total

 

 

$

244,137

 

$

229,175

 

 

Development costs and Deposits on project property, plant and equipment

 

Development costs of $179.4 million as of December 31, 2019 include hydrology and drilling costs, expenditures to further the permitting process, capitalized salaries, project engineering costs, and other expenditures required to fully develop the Mt. Hope Project.  Deposits on project property, plant and equipment of $88.0 million as of December 31, 2019 represent ongoing progress payments on equipment orders for the custom-built grinding and milling equipment, related electric mill drives, and other processing equipment that require the longest lead times.

 

NOTE 4 — ASSET RETIREMENT OBLIGATIONS

 

Asset retirement obligations arise from the acquisition, development, construction and normal operation of mining property, plant and equipment due to government controls and regulations that protect the environment, and are primarily related to closure and reclamation of mining properties.  The exact nature of environmental issues and costs, if any, which the Company or the LLC may encounter in the future are subject to change, primarily because of the changing character of environmental requirements that may be enacted by governmental authorities.

 

The following table shows asset retirement obligations for future mine closure and reclamation costs in connection with the Mt. Hope Project and within the boundaries of the Plan of Operations (“PoO”):

 

 

 

 

 

 

 

 

 

 

(in thousands)

 

At January 1, 2018

 

 

$

1,568

 

Accretion Expense

 

 

 

103

 

Adjustments*

 

 

 

(38)

 

At December 31, 2018

 

 

$

1,633

 

Accretion Expense

 

 

 

108

 

Adjustments*

 

 

 

62

 

At December 31, 2019

 

 

$

1,803

 


* Includes additions, annual changes to the escalation rate, the market-risk premium rate, or reclamation time periods

80

 

The estimated future reclamation costs for the Mt. Hope Project have been discounted using a rate of 8%, which is the rate that existed at the time the liability was originally measured.  The total inflated and undiscounted estimated reclamation costs associated with current disturbance under the PoO at the Mt. Hope Project were $5.8 million at December 31, 2019, inclusive of $2.6 million for mitigation of sage grouse habitat that would be affected by development of the Mt. Hope Project. Increases in ARO liabilities resulting from the passage of time are recognized as accretion expense.

 

As of December 31, 2019, the LLC had provided the appropriate regulatory authorities with $2.8 million in reclamation financial guarantees through the posting of surety bonds for reclamation of the Mt. Hope Project as approved in the ROD.  As of December 31, 2019, we had $0.3 million in cash deposits associated with these bonds which are specific to the PoO disturbance and recorded in Restricted cash and investments held for reclamation bonds and are unrelated to the inflated and undiscounted liability referenced above.  The LLC posted an additional $0.3 million as a cash bond with the BLM in April 2019 as a result of a required three-year update to the reclamation bond calculation.

   

The LLC has a smaller liability at the Mt. Hope Project for disturbance associated with exploration drilling which occurred outside the PoO boundaries.  The LLC has not discounted this reclamation liability as the total amount is approximately $0.02 million. 

 

Total restricted cash for surety bond collateral requirements and other long-term reclamation obligations at the Mt. Hope Project equal $0.6 million.  Another $0.1 million in cash collateral is associated with surety bonds at the Liberty Project. 

 

The Company’s Liberty Project is currently in the exploration stage.  As the Company is not currently performing any exploration activity at the Liberty Project, the reclamation liability incurred for historical disturbance from previous operations and more recent exploration conducted by the Company of approximately $0.1 million has not been discounted and is shown in the table below.

 

 

 

 

 

 

 

 

 

 

    

Mt. Hope Project

    

 

 

 

 

 

outside PoO

 

 

 

 

 

 

boundary

 

Liberty

 

 

 

(in thousands)

 

At January 1, 2018

 

$

15

 

$

121

 

Adjustments *

 

 

 —

 

 

 —

 

At December 31, 2018

 

$

15

 

$

121

 

Adjustments *

 

 

 2

 

 

13

 

At December 31, 2019

 

$

17

 

$

134

 


* Includes reduced / reclaimed disturbance

 

NOTE 5 —SENIOR NOTES

 

In December 2014, the Company sold and issued 85,350 Units of Convertible Notes (the “Notes”) with warrants (the “Notes Warrants”) to qualified buyers pursuant to Section 4(a)(2) of the Securities Act of 1933, as amended, of which 23,750 Units were sold and issued to related parties, including several directors and each of our named executive officers.  The Convertible Notes are unsecured obligations and are senior to any of the Company's future secured obligations to the extent of the value of the collateral securing such obligations.

 

The transaction value of $8.5 million was allocated between debt for the Convertible Notes and equity for the Notes Warrants based on the relative fair value of the two instruments.   This resulted in recording $0.8 million in Additional Paid In Capital for the relative fair value of the Notes Warrants and $7.7 million as Convertible Notes.  The Company received net proceeds from the sale of the Convertible Notes of approximately $8.0 million, after deducting offering expenses of approximately $0.5 million, which was allocated between debt and equity, As a result, the Company recognized $0.4 million as Debt Issuance Costs to be amortized over the expected redemption period, and $0.1 million recognized as a reduction to Additional Paid in Capital. Net proceeds from the sale were used to fund ongoing operations.

 

81

The Convertible Notes bore interest at a rate of 10.0% per annum, payable in cash quarterly in arrears on each March 31, June 30, September 30, and December 31.  The Convertible Notes mature on December 26, 2019 unless earlier redeemed, repurchased or converted. The Convertible Notes for were redeemable by the Company for cash, either in whole or in part, at any time, in exchange for the sum of (i) a cash payment equal to the unpaid principal plus all accrued but unpaid interest through the date of redemption and (ii) the present value of the remaining scheduled interest payments discounted to the maturity date at the annual percentage yield on U.S. Treasury securities with maturity similar to the notes plus 25 basis points (the “Optional Redemption”).  The Convertible Notes were mandatorily redeemable at par plus the present value of remaining coupons upon (i) the availability of cash from a financing for Mt. Hope and (ii) any other debt financing by the Company. In addition, 50% of any proceeds from the sale of assets cumulatively exceeding $250,000 were to be used to prepay the Convertible Notes at par plus the present value of remaining coupons (the “Mandatory Redemption”).

 

The Convertible Notes were convertible at any time in an amount equal to 80% of the greater of (i) the average VWAP for the 30 Business Day period ending on the Business Day prior to the date of the conversion, or (ii) the average VWAP for the 30 Business Day period ending on the original issuance date of this note.  Each Convertible Note will convert into a maximum of 100 shares per note, resulting in the issuance of 8,535,000 shares, or 9.3% of shares outstanding (the “Conversion Option”).  General Moly’s executive management team and board of directors who participated in the offering were restricted from converting at a price less than $0.32, the most recent closing price at the time that the Convertible Notes were issued.

 

If the Company underwent a “fundamental change”, the Convertible Notes were to be redeemed for cash at a repurchase price equal to 100% of the principal amount of the Convertible Notes to be repurchased plus accrued and unpaid interest, including contingent interest and additional amounts, if any. Examples of a “fundamental change” include the reclassification of the common stock, consolidation or merger of the Company with another entity or sale of all or substantially all of the Company’s assets.

 

During the year ended December 31, 2015, certain holders of the Convertible Notes, including both directors and named executive officers of the Company, elected to convert notes totaling $2.6 million, reducing the principal balance of the Convertible Notes to $5.9 million. Upon conversion, the Convertible Notes holders received 2,625,000 shares of common stock, at conversion prices ranging from $0.3462 to $0.5485, and were issued non-convertible Senior Promissory Notes (“Promissory Notes”) of $1.3 million, pursuant to the terms of the share maximum provision of the Conversion Option.  The Promissory Notes have identical terms to the Convertible Notes, with the exception that the holder no longer has a Conversion Option. Accordingly, the Promissory Notes bore interest equal to 10.0% per annum, payable in cash quarterly in arrears on each March 31, June 30, September 30, and December 31 and mature on December 26, 2019.  The conversions resulted in a $0.2 million annual reduction in interest payments made by the Company in the servicing of the Convertible Notes. 

 

On December 27, 2019, the Company closed the Exchange Offer, upon the terms and subject to the conditions set forth in the confidential Offer to Exchange and Subscription Offer dated November 27, 2019. 

Eligible holders tendered Old Notes with an original principal amount of $6.89 million of the total outstanding of $7.25 million, representing 95% of the outstanding, in the Exchange Offer.  For each $1 principal amount of, and accrued and unpaid interest on, Old Notes tendered and accepted by the Company, one unit consisting of $1 principal amount of Exchange Notes and one New Warrant was settled.  The Exchange Notes bear interest at an initial rate of 12% per annum. Interest on the Exchange Notes will be paid on March 31, June 30, September 30 and December 31 of each year, commencing on March 31, 2020. The Exchange Notes will mature on December 26, 2022, unless otherwise earlier redeemed.  Each New Warrant is exercisable for one share of Common Stock at a price of $0.35 per share for a period of three years.  One New Warrant was issued for each dollar of original principal amount of, and accrued and unpaid interest on, Old Notes exchanged for Exchange Notes for a total of 7.2 million New Warrants issued.

The Company paid at maturity the unpaid principal and all accrued and unpaid interest in the approximate amount of $368,000 to those eligible holders that elected not to participate in the Exchange Offer.  The original principal amount of Old Notes paid at maturity represented approximately 5% of the total outstanding.  The maturity date was December 26, 2019.    The Notes Warrants issued in connection with the Old Notes expired by their terms on December 26, 2019. 

82

The Company may redeem the Exchange Notes for cash, either in whole or in part, at any time, in exchange for the sum of (i) 101% of the amount of unpaid principal and (ii) all accrued but unpaid interest through the date of redemption.   The Exchange Notes are mandatorily redeemable (i) upon obtaining debt or equity financing sufficient to cover the construction of Mt. Hope and (ii) upon a “fundamental change” such as a reclassification of the common stock, consolidation or merger of the Company with another entity or sale of all or substantially all of the Company’s assets.  In addition, 50% of the proceeds exceeding a specified threshold amount of approximately $6.3 million from a financing in which the Company issues debt securities senior to the Exchange Notes will be used to redeem Exchange Notes.  In all cases of mandatory redemption, the redemption amount is equal to the sum of (i) the unpaid principal plus all accrued but unpaid interest through the date of redemption and (ii) the present value of the remaining scheduled interest payments discounted to maturity date at the annual percentage yield on U.S. Treasury securities with maturity similar to the Exchange Notes plus 25 basis points. 

The Company accounted for the Exchange Offer as an extinguishment of the Old Notes and recorded a gain on extinguishment of $0.1 million.  The Exchange Notes and the Exchange Warrants were recorded at fair value at December 27, 2019 of $6.8 million and $0.3 million, respectively.   The Company incurred $0.2 million of offering expenses related to the Exchange Offer which was allocated between debt and equity.  As a result, the Company recognized $0.2 million as Debt Issuance Costs to be amortized over the term of the Exchange Notes and recognized $8,000 as a reduction of Additional Paid In Capital.

 

New 13% Senior Promissory Notes due December 2022

In addition to the Exchange Offer, certain Participating Holders also elected to participate in the accompanying Subscription Offer to purchase 13,355 units for $100 each, consisting of its newly issued Supplemental Notes and accompanying Warrant, including participation by the largest Old Noteholder investor, as well as the Company’s CEO, Bruce Hansen.  One Warrant was also issued for each dollar invested in the Supplemental Notes.  The New Warrants have an exercise price of $0.35 per share and have a three-year term.  The Participating Holders increased their respective note investment by approximately 20% as additional consideration for the Supplemental Notes, resulting in approximately $1.34 million of new capital to the Company.  The supplemental notes are redeemable at any time at the Company’s option, and must be redeemed by the Company under certain circumstances.  The Company has agreed not to issue, assume or guarantee any indebtedness that is senior to or pari passu with the Supplemental Notes, provided, however, that the Company may issue no more than $15 million of additional debt securities that rank pari passu with the Supplemental Notes. 

The transaction value of $1.3 million was allocated between debt for the Supplemental Notes and equity for the accompanying Warrants based on their relative fair value.   This resulted in recording $47,000 in Additional Paid in Capital for the Warrants and the remainder as Supplemental Notes.    The Company incurred $40,000 of offering expenses related to the Subscription Offer which was allocated between debt and equity.  As a result, the Company recognized $38,000 as Debt Issuance Costs to be amortized over the term of the Supplemental Notes and recognized $2,000 as a reduction to Additional Paid in Capital.   

The Supplemental Notes bear interest at a rate of 13.0% per annum, payable in cash quarterly in arrears on each March 31, June 30, September 30, and December 31.  The Supplemental Notes mature December 26, 2022 unless earlier redeemed.  The Company may redeem the Supplemental Notes for cash, either in whole or in part, at any time, in exchange for the sum of (i) 101% of the amount of unpaid principal and (ii) all accrued but unpaid interest through the date of redemption.   The Supplemental Notes are mandatorily redeemable (i) upon obtaining debt or equity financing sufficient to cover the construction of Mt. Hope and (ii) upon a “fundamental change” such as a reclassification of the common stock, consolidation or merger of the Company with another entity or sale of all or substantially all of the Company’s assets.   In either case, the mandatory redemption amount is equal to the sum of (i) the unpaid principal plus all accrued but unpaid interest through the date of redemption and (ii) the present value of the remaining scheduled interest payments discounted to maturity date at the annual percentage yield on U.S. Treasury securities with maturity similar to the Supplemental Notes plus 25 basis points.

Embedded Derivatives 

 

Based on the redemption and conversion features discussed above, the Company determined that there were embedded derivatives that require bifurcation from the debt instrument and accounted for under ASC 815. Embedded

83

derivatives are separated from the host contract, the Convertible Notes, and carried at fair value when: (a) the embedded derivative possesses economic characteristics that are not clearly and closely related to the economic characteristics of the host contract; and (b) a separate, stand-alone instrument with the same terms would qualify as a derivative instrument. The Company concluded that the Mandatory Redemption and Conversion Option features embedded within the Convertible Notes as well as the Mandatory Redemption feature embedded within the Exchange Notes and the Supplemental Notes meet these criteria and, as such, must be valued separate and apart from the respective notes as one embedded derivative and recorded at fair value each reporting period (the “Embedded Derivatives”).

 

A probability-weighted calculation was utilized to estimate the fair value of the Mandatory Redemption.

 

The Company used a binomial lattice model in order to estimate the fair value of the Conversion Option in the Convertible Notes. A binomial lattice model generates two probable outcomes, arising at each point in time, starting from the date of valuation until the maturity date. A lattice was initially used to determine if the Convertible Notes would be converted or held at each decision point. Within the lattice model, the Company assumes that the Convertible Notes will be converted early if the conversion value is greater than the holding value.

 

As of December 31, 2018, the carrying value of the Convertible Notes, absent the embedded derivatives, was $5.8 million inclusive of an unamortized debt discount $0.1 million, all of which is considered current debt. The fair value of the Convertible Notes was $4.0 million at December 31, 2018.  As of December 31, 2018, the carrying value of the Promissory Notes was $1.3 million. The fair value of the Promissory Notes was $0.9 million at December 31, 2018.  As of December 31, 2019, the carrying value of the Exchange Notes, absent the embedded derivative, was $6.2 million inclusive of an unamortized debt discount of $1.1 million.  The fair value of the Exchange Notes was $6.2 million at December 31, 2019.  As of December 31, 2019, the carrying value of the Supplemental Notes, absent the embedded derivative, was $1.2 million inclusive of an unamortized debt discount of $0.2 million.  The fair value of the Supplemental Notes was $1.2 million at December 31, 2019. 

 

The embedded derivatives recorded in Convertible Notes at fair value were $(14,150) at December 31, 2018. The changes in the estimated fair value of the embedded derivatives during the year ended December 31, 2019 resulted in a loss of $14,150.  The embedded derivatives in the Exchange Notes and the Supplemental Notes had a fair value of $0.6 million and $0.1 million, respectively, at December 31, 2019.  Gain or loss on embedded derivatives is recognized as Interest Expense in the Statement of Operations.

 

The Company has estimated the fair value of the Convertible Notes, Promissory Notes, Exchange Notes, Supplement Notes, and embedded derivatives based on Level 3 inputs. Changes in certain inputs into the valuation models can have a significant impact on changes in the estimated fair value. For example, the estimated fair value of the embedded derivatives will generally decrease with: (1) a decline in the stock price; (2) increases in the estimated stock volatility; and (3) an increase in the estimated credit spread.

 

The following inputs were utilized to measure the fair value of the Convertible Notes and embedded derivatives: (i) price of the Company’s common stock; (ii) Conversion Rate (as defined in the Convertible Note); (iii) Conversion Price (as defined in the Convertible Note); (iv) maturity date; (v) risk-free interest rate; (vi) estimated stock volatility; (vii) estimated credit spread for the Company; (viii) default intensity; and (ix) recovery rate.

 

The following tables set forth the inputs to the models that were used to value the embedded derivatives for the Convertible Notes at December 31, 2018:

 

 

 

 

 

 

 

 

    

 

December 31, 2018

 

Stock Price

 

 

$

0.22

 

Maturity Date

 

 

 

December 31, 2019

 

Risk-Free Interest Rate

 

 

 

2.63%

 

Estimated Stock Volatility

 

 

 

40.00%

 

Default Intensity

 

 

 

2.00%

 

Recovery Rate

 

 

 

30.00%

 

 

 

84

 

 

 

 

 

 

Type of Event

    

Expected Date

    

Probability of Event

 

Mandatory Redemption

 

October 17, 2019

 

10%

 

Conversion Option

 

March 31, 2019

 

0%

 

Note Reaches Maturity

 

December 31, 2019

 

90%

 

 

 

The following assumptions were utilized to measure the fair value of the Exchange Notes, the Supplemental Notes, and the embedded derivatives at December 31, 2019: (i) estimated market yield; and (ii) estimated probabilities of mandatory redemption

 

 

NOTE 6 —COMMON STOCK AND COMMON STOCK WARRANTS

 

During the year ended December 31, 2019, we issued 1,544,296 shares of common stock pursuant to stock awards under the 2006 Equity Incentive Plan. 

 

During the year ended December 31, 2018, 993,481 shares of common stock were issued pursuant to stock awards under the 2006 Equity Incentive Plan and 1,168,300 shares under the Company’s at-the-market offering facility.

 

The following is a summary of common stock warrant activity for each of the two years ended December 31, 2019:

 

 

 

 

 

 

 

 

 

 

    

Number of Shares

 

 

 

 

 

 

Under

 

 

 

 

 

 

Warrants

    

Exercise Price

 

Balance at December 31, 2018

 

 

98,686,000

 

$

0.50 to 5.00

 

Issuance of new warrants

 

 

88,556,456

 

 

0.35 to 0.50

 

Warrant exercises

 

 

(694,200)

 

 

0.35

 

Expiration of warrants

 

 

(88,535,000)

 

 

0.50 to 1.00

 

Balance at December 31, 2019

 

 

98,013,256

 

$

0.35 to 5.00

 

Weighted average exercise price

 

$

0.44

 

 

 

 

 

On April 12, 2017, the Company filed a prospectus supplement in both Canada and the United States to its U.S. base shelf prospectus and U.S. registration statement on Form S-3 which enabled the Company, at its discretion from time to time, to sell up to $20 million worth of common shares by way of an at-the-market offering.  Since the effectiveness of the prospectus supplement by the SEC on April 26, 2017 to December 31, 2019, a total of 1,168,300 common shares have been sold under the ATM, for net proceeds to the Company of $0.5 million.  In conjunction with the public offering discussed below, the Company has agreed to suspend the ATM facility for a period of 2 years. 

 

On October 17, 2018, the Company announced an underwritten public offering of 9,151,000 units at a price of $0.25 per share, with each unit consisting of one share of common stock accompanied by one warrant exercisable for one share of common stock immediately upon closing at a price of $0.35 per share.  The offering provided net proceeds of approximately $2.0 million after underwriting commissions and expenses.  Mr. Bruce Hansen, Chief Executive Officer of the Company and a related party, participated in the offering for a total of $0.5 million.  The Company intends to use the proceeds for general corporate purposes, including the ongoing preliminary drilling program for the exploration of zinc, copper and silver mineralization at the southeast area of the Mt. Hope Project.

 

                On December 9, 2019, the Company and an affiliate of AMER announced the closure of a $4 million private placement at a price of $0.40 per common share of General Moly under a new Securities Purchase Agreement (“SPA”) and amended and restated warrant agreement for the purchase of up to 80 million shares of common stock at $0.50 per share (“New AMER Warrant”), resolving the Dispute.  Additionally, the parties agreed to a mutual release, terminating the previous AMER Investment Agreement, the prior Warrant, and the Dispute Negotiation Extension Agreement (“Extension Agreement”).  These warrants are not indexed to the Company’s own stock.  Therefore, these warrants are classified as a liability and subsequently measured at fair value with changes in fair value recorded as interest expense in the Statements of Operations.   The Company uses a Monte Carlo Simulation to determine the fair value of the warrants at the end of each reporting period based on the number of warrants expected to vest.  At December 9, 2019 and December 31, 2019, the warrants had a fair value of $1.3 million and $1.1 million, respectively.  The following inputs to the model were used at December 31, 2019:

 

85

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

December 31, 2019

 

Stock Price

 

 

$

0.24

 

Exercise Price

 

 

$

0.50

 

Expected Term

 

 

 

7.8 years

 

Stock Volatility

 

 

 

40.0%

 

Risk-Free Interest Rate

 

 

 

1.8%

 

 

On December 27, 2019, the Company issued warrants to purchase 8,556,456 shares of common stock in connection with the exchange of its senior notes as discussed above at an exercise price of $0.35 with a three-year term.  These warrants are equity-classified.  The Company used a Black-Scholes model to determine the fair value of the warrants at the date of issuance using the following inputs to the model:

   

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

December 27, 2019

 

Stock Price

 

 

$

0.23

 

Exercise Price

 

 

$

0.35

 

Expected Term

 

 

 

3.0 years

 

Stock Volatility

 

 

 

40.0%

 

Risk-Free Interest Rate

 

 

 

1.6%

 

 

 

 

 

 

 

 

Of the warrants outstanding at December 31, 2019, 8.6 million are exercisable at $0.35 per share at any time from December 27, 2019 through their expiration on December 26, 2022, 1.0 million are exercisable at $5.00 per share once General Moly has received financing necessary for the commencement of commercial production at the Mt. Hope Project and will expire one year thereafter, and the 80.0 million shares of the AMER Warrant will become exercisable in increments of 12 million shares for each $100 million in Bank Loan financing AMER assists in arranging.

 

Pursuant to our amended Certificate of Incorporation, approved by the stockholders at the general meeting of June 30, 2015, we are authorized to issue 650.0 million shares of $0.001 par value common stock.  All shares have equal voting rights, are non-assessable and have one vote per share.  Voting rights are not cumulative and therefore, the holders of more than 50% of the common stock could, if they choose to do so, elect all of the directors of the Company.

 

NOTE 7 — REDEEMABLE PREFERRED STOCK

 

Pursuant to our Certificate of Incorporation we are authorized to issue 10,000,000 shares of $0.001 per share par value preferred stock.  The authorized but unissued shares of preferred stock may be issued in designated series from time to time by one or more resolutions adopted by the Board.  The Board has the authority to determine the preferences, limitations and relative rights of each series of preferred stock. 

 

During the year ended December 31, 2019, the Company issued 14,000 shares of Series A Preferred in a series of private placement agreements.  The Series A Preferred Shares were priced at $100.00/ share and are convertible at any time at the holder’s discretion into common shares whereby one preferred share converts at a price of $0.27/common share to 370.37 common shares. The conversion price was set at the closing price of the Company’s common stock on March 12, 2019, which was the day before announcement of the private placement. Upon maturity or full repayment of the Senior Convertible Notes and Promissory Notes currently outstanding, there will be mandatory redemption of the preferred shares in exchange for equivalent cash for the principal invested, plus any accrued and unpaid dividends.  The holders of the Series A Preferred Shares are entitled to receive, when and if declared by the Board of Directors and in preference to the common stock, cumulative cash or in-kind dividends at a rate per annum of 5% of the original issue price.   In the event of a liquidation, dissolution, or winding up of the Company, the proceeds would be distributed first to the holders of Series A Preferred Shares prior to any distributions to holders of other stock in an amount per share equal to the original issue price plus any declared but unpaid dividends.  The holders of Series A Preferred Shares are entitled to vote, together with the holders of common stock, as if the Series A Preferred Shares had been converted to common stock on all matters submitted to stockholders for vote.  In addition, the Series A Preferred Shares contains certain protective rights that require the vote or consent of the holders of at least a majority of the shares of Series A Preferred Shares. 

 

Of the 14,000 shares issued during the year ended December 31, 2019, 5,000 shares were issued to MHMI.  On May 29, 2019, MHMI assigned their interest in 4,500 of the shares to various investors in their entity.  MHMI retained

86

500 shares.  In addition to the Series A Convertible Preferred Shares terms described in Note 1 above, MHMI and their investors have a one-time right to require the Company to redeem all or a portion of the Series A Convertible Preferred Shares upon the receipt of a minimum of $5,000,000 from the close of Tranche 3 of the amended AMER Investment Agreement.  MHMI and their investors converted all of their preferred shares to 1,851,844 common shares during the fourth quarter of 2019.

 

As the Series A Preferred Shares are redeemable upon maturity or full repayment of the Senior Convertible Notes and Promissory Notes, it has been classified as mezzanine equity in our Consolidated Balance Sheets.  The Company recognizes change in the redemption value as they occur by adjusting the carrying amount of the mezzanine equity at each reporting date.  The change in the redemption value of the Series A due to accrued and unpaid dividends since its issuance is insignificant.

 

On August 2, 2019, the Company filed a Certificate of Designation of Series B Preferred Stock with the Delaware Secretary of State, designating 5,000 shares of preferred stock the Series B Convertible Preferred Shares.  On August 5, 2019, the Company executed the Series B Purchase Agreement with the Investors.  Pursuant to the Series B Purchase Agreement, the Investors agreed to purchase up to $400,000 of Series B Convertible Preferred Shares.  This transaction closed on August 7, 2019. 

The Series B Convertible Preferred Shares were issued at a price of $100.00 per share, and each Series B Convertible Preferred Share will be convertible at any time at the holder’s discretion into 500 shares of common stock of the Company.  The Series B Convertible Preferred Shares carry a 5% annual dividend, which may be paid, in the Company’s sole discretion, in cash, additional shares of Series B Convertible Preferred Shares or a combination thereof.  The Series B Convertible Preferred Shares, like the Series A Convertible Preferred Shares, are mandatorily redeemable at such time that the Company’s $7.2 million Convertible Note debt currently outstanding become due and payable in accordance with their terms, as such terms may be modified from time to time.

On March 27, 2020, the Company filed Certificates of Amendment to the Certificates of Designation for the Series A and B Convertible Preferred Stock clarifying that the private exchange offer completed by the Company in December 2019, constituted a modification of the Old Notes for purposes of the mandatory redemption provisions of the Series A and B Preferred Shares.  Accordingly, the Series A and B Preferred Shares are mandatorily redeemable on such date as a majority of the then-outstanding principal amount of the Exchange Notes become due and payable in accordance with their terms (as may be altered by modification, amendment, exchange or otherwise, from time to time).

NOTE 8 — EQUITY INCENTIVES

 

In 2006, the Board and shareholders of the Company first approved the 2006 Equity Incentive Plan (“2006 Plan”), and in May 2010, our shareholders approved an amendment and restatement of the 2006 Plan to increase to the number of shares that may be issued under the plan by 4,500,000 shares to 9,600,000 shares and extend the expiration date of the 2006 Plan to May 2020, as well as making other technical changes related to tax law and accounting rule changes, and to make administrative clarifying changes.  In June 2016, our shareholders approved an additional amendment to the 2006 Plan increasing the number of shares that may be issued under the plan by 5,000,000 shares to 14,600,000 shares.  In June 2019, our shareholders approved an amendment and restatement of the 2006 Plan increasing the number of shares that may be issued under the plan by 6,500,000 shares to 21,100,000 shares.  The 2006 Plan authorizes the Board, or a committee of the Board, to issue up to an aggregate of 21,100,000 shares of common stock, of which 3,924,920 remain available for issuance as of December 31, 2019.  Awards under the 2006 Plan may include incentive stock options, non-statutory stock options, restricted stock units, restricted stock awards, and stock appreciation rights (“SARs”).  At the option of the Board, SARs may be settled with cash, shares, or a combination of cash and shares.  The Company settles the exercise of other stock-based compensation with newly issued common shares.

 

Stock-based compensation cost is estimated at the grant date based on the award’s fair value as calculated by the Black-Scholes option pricing model and is recognized as compensation ratably on a straight-line basis over the requisite vesting/service period.  As of December 31, 2019, there was $0.3 million of total unrecognized compensation cost related to share-based compensation arrangements, which is expected to be recognized over a weighted-average period of 2.2 years.

 

87

Stock Options and Stock Appreciation Rights

 

All stock options and SARs are approved by the Board of Directors prior to or on the date of grant.  Stock options and SARs are granted at an exercise price equal to or greater than the Company’s closing stock price on the date of grant.  Both award types vest over a period of zero to three years with a contractual term of five years after vesting.  The Company estimates the fair value of stock options and SARs using the Black-Scholes valuation model.  Key inputs and assumptions used to estimate the fair value of stock options and SARs include the grant price of the award, expected option term, volatility of the Company’s stock, the risk-free rate and the Company’s dividend yield.  The following table presents the weighted-average assumptions used in the valuation and the resulting weighted-average fair value per option or SAR granted:

 

 

 

 

 

 

 

 

 

For the Year Ended December 31:

    

 

2019

    

 

Expected Life *

 

 

3.5 to 6.0 years

 

 

3.5 to 6.0 years

 

Interest Rate+

 

 

0.36% to 1.37%

 

 

0.36% to 2.58%

 

Volatility **+

 

 

62.04% to 92.76%

 

 

62.04% to 94.60%

 

Dividend Yields

 

 

 —

 

 

 —

 

Weighted Average Fair Value of Stock Appreciation Rights Granted During the Year

 

$

 —

 

$

 —

 


*   The expected life is the number of years that the Company estimates, based upon history, that options or SARs will be outstanding prior to exercise or forfeiture.

** The Company’s estimates of expected volatility are principally based on the historic volatility of the Company’s common stock over the most recent period commensurate with the estimated expected life of the Company’s stock options and other relevant factors.

+   The interest rate and volatility used by the Company in calculating stock compensation expense represent the values in effect at the date of grant for all awards.

 

At December 31, 2019, the outstanding and exercisable (fully vested) options and SARs had an aggregate intrinsic value of nil and had a weighted-average remaining contractual term of 1.9 years.  No options or SARs were exercised during the years ended December 31, 2019 and 2018.    

 

Restricted Stock Units and Stock Awards

 

Grants of restricted stock units and stock awards (“Stock Awards”) have been granted as performance based awards, earned over a required service period, or to Board members and the Company Secretary without any service requirement. Performance based grants are recognized as compensation based on the probable outcome of achieving the performance condition.  Stock Awards issued to members of the Board and the Company Secretary that are fully vested at the time of issue are recognized as compensation upon grant of the award.

 

The compensation expense recognized by the Company for Stock Awards is based on the closing market price of the Company’s common stock on the date of grant.  For the years ended December 31, 2019 and 2018 the weighted-average grant date fair value for Stock Awards was $0.24 and $0.39, respectively.  The total fair value of stock awards vested during 2019 and 2018 is $0.6 million and $0.2 million, respectively.

 

88

Summary of Equity Incentive Awards

 

The following table summarizes activity under the Plans during the years ended December 31, 2019 and 2018, respectively:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SARs

 

Stock Awards

 

 

    

Weighted

    

Number

    

Weighted

    

 

 

 

 

Average

 

of Shares

 

Average

 

 

 

 

 

Strike

 

Under

 

Grant

 

Number of

 

 

 

Price

 

Option

 

Price

 

Shares

 

Balance at January 1, 2018

 

$

3.22

 

995,983

 

$

1.44

 

1,735,553

 

Awards Granted

 

 

 —

 

 —

 

 

0.39

 

2,145,000

 

Awards Exercised or Earned

 

 

 —

 

 —

 

 

0.30

 

(1,435,000)

 

Awards Forfeited

 

 

1.15

 

(10,752)

 

 

1.46

 

(44,285)

 

Awards Expired

 

 

2.52

 

(46,564)

 

 

 —

 

 —

 

Balance at December 31, 2018

 

$

3.19

 

938,667

 

$

1.18

 

2,401,268

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercisable at December 31, 2018

 

$

2.14

 

56,523

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SARs

 

Stock Awards

 

 

    

Weighted

    

Number

    

Weighted

    

 

 

 

 

Average

 

of Shares

 

Average

 

 

 

 

 

Strike

 

Under

 

Grant

 

Number of

 

 

 

Price

 

Option

 

Price

 

Shares

 

Balance at January 1, 2019

 

$

3.19

 

938,667

 

$

1.18

 

2,401,268

 

Awards Granted

 

 

 —

 

 —

 

 

0.24

 

135,000

 

Awards Exercised or Earned

 

 

 —

 

 —

 

 

0.38

 

(2,115,000)

 

Awards Forfeited

 

 

 —

 

 —

 

 

 —

 

 —

 

Awards Expired

 

 

2.56

 

(28,830)

 

 

 —

 

 —

 

Balance at December 31, 2019

 

$

3.21

 

909,837

 

$

4.90

 

421,268

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercisable at December 31, 2019

 

$

1.69

 

27,693

 

 

 

 

 

 

 

A summary of the status of the non-vested awards as of December 31, 2019 and 2018 and changes during the years ended December 31, 2019 and 2018, respectively, is presented below.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SARs

 

Stock Awards

 

 

    

Weighted

    

Number

    

Weighted

    

 

 

 

 

Average

 

of Shares

 

Average

 

 

 

 

 

Fair

 

Under

 

Fair

 

Number of

 

 

 

Value

 

Option

 

Value

 

Shares

 

Balance at January 1, 2018

 

$

3.25

 

892,896

 

$

1.44

 

1,735,553

 

Awards Granted

 

 

 —

 

 —

 

 

0.39

 

2,145,000

 

Awards Vested or Earned

 

 

 —

 

 —

 

 

0.30

 

(1,435,000)

 

Awards Forfeited

 

 

1.15

 

(10,752)

 

 

1.46

 

(44,285)

 

Balance at December 31, 2018

 

$

3.26

 

882,144

 

$

1.18

 

2,401,268

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Weighted

    

Number

    

Weighted

    

 

 

 

 

Average

 

of Shares

 

Average

 

 

 

 

 

Fair

 

Under

 

Fair

 

Number of

 

 

 

Value

 

Option

 

Value

 

Shares

 

Balance at January 1, 2019

 

$

3.26

 

882,144

 

$

1.18

 

2,401,268

 

Awards Granted

 

 

 —

 

 —

 

 

0.24

 

135,000

 

Awards Vested or Earned

 

 

 —

 

 —

 

 

0.38

 

(2,115,000)

 

Awards Forfeited

 

 

 —

 

 —

 

 

 —

 

 —

 

Balance at December 31, 2019

 

$

3.26

 

882,144

 

$

4.90

 

421,268

 

Balance at December 31, 2019

 

 

 

 

 

 

 

 

 

 

 

 

89

Compensation Cost Recognized and Capitalized Related to Equity Incentives

 

The following table summarizes the compensation cost recognized and capitalized related to equity incentives:

 

 

 

 

 

 

 

 

 

Summary of Compensation Cost Recognized and

    

 

 

    

 

 

 

Capitalized related to Equity Incentives for the

 

 

 

 

 

 

 

Year Ended December 31 (in thousands):

 

2019

 

2018

 

Stock Options*

 

$

 

$

 

SARs

 

 

 

 

 

 

 

Performance based

 

 

66

 

 

67

 

Vesting over time

 

 

 

 

 

Stock Awards:

 

 

 

 

 

 

 

Performance based*

 

 

(6)

 

 

760

 

Vesting over time

 

 

 

 

 

Board of Directors and Secretary

 

 

32

 

 

45

 

Total

 

$

92

 

$

871

 

Included in:

 

 

 

 

 

 

 

Capitalized as Development

 

 

8

 

 

134

 

      Expensed

 

 

84

 

 

737

 

 

 

$

92

 

$

871

 

 

 

 

NOTE 9 — CHANGES IN CONTINGENTLY REDEEMABLE NONCONTROLLING INTEREST (CRNCI)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Activity for Year Ended

 

 

    

 

December 31,

    

December 31,

 

Changes CRNCI (Dollars in thousands)

 

 

2019

 

2018

 

Total CRNCI December 31, 2018 and 2017, respectively

 

 

$

172,261

 

$

172,633

 

Net Loss Attributable to CRNCI

 

 

 

(22)

 

 

(372)

 

Total CRNCI December 31, 2019 and 2018, respectively

 

 

$

172,239

 

$

172,261

 

 

 

NOTE 10 — INCOME TAXES

 

A reconciliation of the combined income taxes at the statutory rates and the Company’s effective income tax (benefit)/expense for 2019 is as follows:

90

 

 

 

 

 

 

 

 

 

    

December 31,

 

 

2019

Tax provision (benefits) computed at the statutory rate

 

$

(1,659)

Minority interest

 

 

4

State taxes

 

 

(26)

Rate change

 

 

456

Book expenses not deductible for tax purposes

 

 

19

Provision to return true-ups

 

$

State NOL true-up

 

$

(3,132)

Other true-ups

 

$

112

Change in valuation allowance

 

$

(4,226)

Income tax expense

 

 

 

During 2018, the change in valuation allowance was $2.2 million.  There were no significant reconciling items between the Company’s tax provision (benefits) computed at the statutory rate and the change in valuation allowance for the year ended December 31, 2018.

 

Deferred income taxes reflect the net effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes. The significant components of our deferred tax assets and liabilities as at December 31 are as follows (in thousands):

 

 

 

 

 

 

 

 

    

December 31,

 

 

2019

Deferred tax assets:

 

 

 

Operating loss carry forward

 

$

62,480

Mineral properties

 

 

857

Share based compensation

 

 

823

Embedded derivatives

 

 

168

Other

 

 

15

Total deferred tax assets

 

$

64,343

Valuation allowance

 

 

(35,429)

Net Deferred tax assets

 

 

28,914

 

 

 

 

Deferred tax liabilities:

 

 

 

Investment in EMLLC

 

$

(28,654)

Senior convertible notes debt discount

 

$

(260)

Total deferred tax liabilities

 

$

(28,914)

Net deferred tax asset

 

$

 

At December 31, 2018, we had deferred tax assets principally arising from the net operating loss carry forwards for income tax purposes multiplied by an expected rate of 21%.  The significant components of the deferred tax asset at December 31, 2018 was as follows (in thousands):

 

91

 

 

 

 

 

 

 

 

 

    

    

December 31,

 

 

 

 

2018

 

Operating loss carry forward

 

 

$

275,722

 

Unamortized exploration expense

 

 

 

4,489

 

Deductible stock based compensation

 

 

 

4,557

 

Other

 

 

 

93

 

Deductible temporary difference

 

 

$

284,861

 

Taxable temporary difference — Investment in EMLLC

 

 

$

(133,547)

 

Senior convertible notes debt discount

 

 

 

(2,424)

 

Net deductible temporary difference

 

 

$

148,890

 

Deferred tax asset

 

 

$

31,367

 

Deferred tax asset valuation allowance

 

 

$

(31,367)

 

Net deferred tax asset

 

 

$

 —

 

 

 

We establish a valuation allowance against the deferred tax assets if, based on available information, it is more likely than not that all of the assets will not be realized. The valuation allowance of $35,429 and $31,267 at December 31, 2019 and 2018, respectively, relates mainly to net operating loss carryforwards where the utilization of such attributes is not more likely than not. The Company continually assesses both positive and negative evidence to determine whether it is more likely than not that deferred tax assets can be realized prior to their expiration.

 

As of December 31, 2019, the Company had federal net operating losses of $280 million. $261 million of the losses were generated before 2018 and expire in varying amounts in 2021-2037. Losses generated after 2017 of $19 million have an indefinite carryover period.

 

As of December 31, 2019 and 2018, the Company had no unrecognized tax benefits.  There was no change in the amount of unrecognized tax benefits as a result of tax positions taken during the year or in prior periods or due to settlements with taxing authorities or lapses of applicable statues of limitations. 

 

The Company and/or its subsidiaries file income tax returns in the U.S. federal jurisdiction, and various state jurisdictions.  Without exception, the Company is no longer subject to U.S. Federal, state and local income tax examinations by tax authorities for years before 2014.  The Company is open to federal and state tax audits until the applicable statutes of limitations expire.

 

NOTE 11 — COMMITMENTS AND CONTINGENCIES

 

Mt. Hope Project

 

The Mt. Hope Project is owned/leased and will be operated by the LLC under the LLC Agreement.  The LLC currently has a lease (“Mt. Hope Lease”) with MHMI for a period of 30 years from October 19, 2005 and for so long thereafter as operations are being conducted on the property.  The lease may be terminated earlier at the election of the LLC, or upon a material breach of the agreement and failure to cure such breach.  If the LLC terminates the lease, termination is effective 30 days after receipt by MHMI of written notice to terminate the Mt. Hope Lease and no further payments would be due to MHMI.  If MHMI terminates the lease, termination is effective upon receipt of a notice of termination due to a material breach, representation, warranty, covenant or term contained in the Mt. Hope Lease and followed by failure to cure such breach within 90 days of receipt of a notice of default.  MHMI may also elect to terminate the Mt. Hope Lease if the LLC has not cured the non-payment of obligations under the lease within 10 days of receipt of a notice of default.  In order to maintain the Lease Agreement, the LLC must pay certain minimum advance royalties as discussed below.

 

The Mt. Hope Lease requires a royalty advance (“Construction Royalty Advance”) of 3% of certain construction capital costs, as defined in the Mt. Hope Lease. The LLC is obligated to pay a portion of the Construction Royalty Advance each time capital is raised for the Mt. Hope Project based on 3% of the expected capital to be used for those certain construction capital costs defined in the Mt. Hope Lease.  Through December 31, 2019, we have paid $26.1 million of the total royalty advance.  Based on our Mt. Hope Project capital budget we estimate that a final reconciliation payment on the Capital Construction Cost Estimate (the “Estimate”) will be due following the commencement of

92

commercial production, after as-built costs are definitively determined.  The Company estimates, based on the revised capital estimate discussed above and the current timeline for the commencement of commercial production, that an additional $5.4 million will be due approximately 24 months after the commencement of construction.  This amount was accrued as of December 31, 2019.  The capital estimates may be subject to escalation in the event the Company experiences continued delays in achieving full financing for the Mt. Hope Project.

 

The LLC is also obligated to make a minimum annual advance royalty payment (“Annual Advance Royalty”) of $0.5 million each October 19 for any year wherein commercial production has not been achieved or the MHMI Production Royalty (as hereinafter defined) is less than $0.5 million.  As commercial production is not anticipated to commence before early 2022, the Company has accrued $1.5 million in Annual Advance Royalty payments which will be due in three $0.5 million installments in October 2020, 2021 and 2022, respectively.  An additional installment of $0.5 million was paid in October 2019.  The Estimate and the Annual Advance Royalty are collectively referred to as the “Advance Royalties.”  All Advance Royalties are credited against the MHMI Production Royalties once the mine has achieved commercial production.  After the mine begins production, the LLC estimates that the MHMI Production Royalties will be in excess of the Annual Advance Royalties for the life of the Mt. Hope Project 50%.  Until the advance royalties are fully credited, the LLC will pay one half of the calculated Production Royalty annually.  Assuming a $12 molybdenum price, the Annual Advance Royalties are consumed within the first five years of commercial production.

 

On February 28, 2018, the LLC and MHMI entered into a Second Amendment dated effective January 15, 2018 (the “Lease Amendment”), to the Mt. Hope Lease.  The Lease Amendment provides that following commencement of commercial production of any non- molybdenum minerals at the Mt. Hope Project, the LLC will pay a production royalty to MHMI as follows:

 

·

For zinc, the production royalty shall be equal to (i) 4.0% of net returns when the average gross value for the calendar quarter is less than or equal to $2.00 per pound; (ii) 4.5% of net returns when the average gross value is between $2.01 and $2.49 per pound; and (iii) 5.0% of net returns when the average gross value is $2.50 per pound or greater; and

 

·

For all other non-moly minerals, the production royalty shall be equal to 4.0% of net returns.

 

If commercial production of non-moly minerals commences before commercial production of molybdenum, the Lease Amendment provides that the LLC’s obligation to pay the annual advance royalty under the Mt. Hope Lease will continue until the LLC has paid MHMI an aggregate of $3 million in non-moly production royalties in a three-year period.  After this threshold is met, then payment of the advance royalty may be deferred in whole or in part if the non-moly production royalty exceeds specified levels.  After non-moly production royalties have exceeded $10,000,000, future payments may be credited against future production royalties under certain circumstances.

 

Additionally, Exxon Corporation will receive a perpetual 1% royalty interest in and to all ores, metals, minerals and metallic substances mineable or recoverable from the Mt. Hope Project in kind at the mine or may elect to receive cash payment equal to 1% of the total amount of gross payments received from the purchaser of ores mined/removed/sold from property net of certain deductions.

 

The Liberty Project

 

The Nevada Division of Environmental Protection (“NDEP”) has identified environmental concerns with some Liberty Project facilities acquired with the property.  NDEP’s concerns are related to aspects of previously approved closure plans required by Nevada regulation.  We have proposed options to NDEP to address these concerns.  In July 2018, we addressed one of those concerns by successfully completing a program, as approved by NDEP, to neutralize the acidic Liberty pit lake by adding hydrated lime to raise the pH.  Our 2018 costs were consistent with budgeted spend.  Since October of 2018, we have been actively managing process solutions draining from the pre-existing leach pad to resolve the second concern.  We will continue to work with NDEP to evaluate ongoing options to address any these issues, and additional costs may be required to meet NDEP’s closure requirements.  However, a reasonable estimate cannot be determined at this time as it is not possible to reasonably predict the outcome of a resolution with NDEP.

 

93

Deposits on project property, plant and equipment

 

As discussed in Note 2, the LLC has active orders with varying stages of fabrication on milling process equipment comprised of two 230kV primary transformers and substation, a primary crusher, a semi-autogenous mill, two ball mills, and various motors for the mills with remaining cash commitments of $0.6 million due on these orders. 

 

Equipment and Supply Procurement

 

Through December 31, 2019, the LLC has made deposits and/or final payments of $88.0 million on equipment orders, has spent approximately $210.7  million for the development of the Mt. Hope Project, for a total Mt. Hope Project inception-to-date spend of $298.7 million.

 

In 2012, the LLC issued a firm purchase order for eighteen haul trucks.  The order provides for delivery of those haul trucks required to perform initial mine development, which will begin several months prior to commercial production.  Non-refundable down-payments of $1.2 million were made in 2012, with pricing subject to escalation as the trucks were not delivered prior to December 31, 2013.  Since that time, the LLC has renegotiated the timelines for truck delivery and delayed deliveries into December 2020.  The contract is cancellable with no further liability to the LLC.

 

Also in 2012, the LLC issued a firm purchase order for four mine production drills with a non-refundable down-payment of $0.4 million, and pricing was subject to escalation if the drills were not delivered by the end of 2013.  Since that time, the LLC has accepted a change order which delayed delivery into December 2020.  The contract remains cancellable with no further liability to the LLC.

 

On September 30, 2012, the LLC’s contract to purchase two electric shovels expired.  On July 11, 2012, we signed a letter of intent with the same vendor providing for the opportunity to purchase the electric shovels at prices consistent with the expired contract, less a special discount in the amount of $3.4 million to provide credit to the LLC for amounts paid as deposits under the expired contract.  The letter of intent provides that equipment pricing will remain subject to inflation indexes and guarantees production slots to ensure that the equipment is available when required by the LLC.  Since that time, the parties have agreed to extend the letter of intent through December 31, 2020.

 

Obligations under capital and operating leases

 

We have contractual operating leases that will require a total of $0.1 million in payments over the next three years.  Operating leases consist primarily of rents on office facilities and office equipment.  Our expected payments are $0.1 million, nil, and nil for the years ended December 31, 2020, 2021, and 2022, respectively.

 

Creation of Agricultural Sustainability Trust

 

On August 19, 2010, the LLC entered into an agreement with the Eureka Producers’ Cooperative (“EPC”) whereby the LLC will fund a $4.0 million Sustainability Trust (“Trust”) in exchange for the cooperation of the EPC with respect to the LLC’s water rights and permitting of the Mt. Hope Project, since increased to $5.6 million as a result of the settlement reached with Eureka County and the DNR, discussed in Item 2 above.  The Trust will be tasked with developing and implementing programs that will serve to enhance the sustainability and well-being of the agricultural economy in the Diamond Valley Hydrographic Basin through reduced water consumption.

 

The LLC has contributed $0.1 million into the Trust as of December 31, 2019.  The remaining contributions to the Trust may be funded by the LLC over several years based on the achievement of certain milestones, which are considered probable, and as such $5.6 million has been accrued in the Company’s December 31, 2019, financial statements and is included in mining properties, land, and water rights.

 

Permitting Considerations

 

In the ordinary course of business, mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations. The LLC is required to obtain approval, in the form of a Record of Decision (“ROD”), from the BLM to implement the Mt. Hope Project Plan of Operations (“PoO”).  The LLC is also required to obtain various state and federal permits including, but not limited to, water protection, air quality, water rights and reclamation.  In addition to requiring permits for the development of the Mt. Hope Project, we will need

94

to obtain and modify various mining and environmental permits during the life of the Mt. Hope Project.  Maintaining, modifying, and renewing the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and substantial expenditures.  The duration and success of the LLC’s efforts to obtain, modify or renew permits will be contingent upon many variables, some of which are not within the LLC’s control.  Increased costs or delays could occur, depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority.  All necessary permits may not be obtained and, if obtained, may not be renewed, or the costs involved in each case may exceed those that we previously estimated.  In addition, it is possible that compliance with such permits may result in additional costs and delays.

 

History of Record of Decision (ROD)

 

On November 16, 2012, the BLM issued its initial ROD authorizing development of the Mt. Hope Project.  The ROD was subsequently vacated by the U.S. Court of Appeals for the Ninth Circuit in December 2016, discussed below.  Also, on April 23, 2015, the BLM issued a Finding of No Significant Impact (“FONSI”) supporting their Decision to approve an amendment to the PoO.  The initial ROD and FONSI/Decision approved the PoO and amended PoO, respectively, for construction and operation of the mining and processing facilities and also granted the Right-of-Way, and amended Right-of-Way, respectively, for a 230kV power transmission line, discussed below.  Monitoring and mitigation measures identified in the initial ROD and FONSI, developed in collaboration with the regulatory agencies involved throughout the permitting process, will avoid, minimize, and mitigate environmental impacts, and reflect the Company’s commitment to be good stewards of the environment.  Ongoing changes to permits and the PoO during the life of mining operations are typical as design evolves and operations are optimized.

 

On February 15, 2013, Great Basin Resource Watch and the Western Shoshone Defense Project (“Plaintiffs”) filed a Complaint against the U.S. Department of the Interior and the BLM (“Defendants”) in the U.S. District Court, District of Nevada (“District Court”), seeking relief under the National Environmental Policy Act (“NEPA”) and other federal laws, challenging the BLM’s issuance of the initial ROD for the Mt. Hope Project, and on February 20, 2013 filed a Motion for Preliminary Injunction.  The District Court allowed the LLC to intervene in the matter.

 

On August 22, 2013, the District Court denied, without prejudice, Plaintiffs’ Motion for Preliminary Injunction based on a Joint Stipulation to Continue Preliminary Injunction Oral Argument, which advised the District Court that as a result of economic conditions, including the Company’s ongoing financing efforts, all major ground disturbing activities had ceased at the Mt. Hope Project.

 

On July 23, 2014, the District Court denied Plaintiffs’ motion for summary judgment in its entirety and on August 1, 2014 the Court entered judgment in favor of the Defendants and the LLC, and against Plaintiffs regarding all claims raised in the Complaint. 

 

Thereafter, on September 22, 2014, the Plaintiffs filed their notice of appeal to the U.S. Court of Appeals for the Ninth Circuit (“Ninth Circuit”) of the District Court’s dismissal.  Oral argument of the parties before the Ninth Circuit was completed on October 18, 2016.  On December 28, 2016, the Ninth Circuit issued its Opinion rejecting many of the arguments raised by the Plaintiffs challenging the Environmental Impact Statement ("EIS") completed for the Mt. Hope Project, but issued a narrow reversal of the BLM's findings related to air quality analysis and information related to potential public water resources. Because of this technical deficiency, the Court vacated the initial ROD.

 

Re-Issuance of Record of Decision Approving Supplemental Environmental Impact Statement (“SEIS”)

 

On remand from the Ninth Circuit to the BLM, the agency conducted additional evaluation of air quality impacts and resulting cumulative impact analysis under NEPA in preparation of a Supplemental Environmental Impact Statement (“SEIS”).  The SEIS disclosed additional information to the public related to the selection of appropriate background concentrations to use for dispersion modeling of air pollutants and information related to potential public water reserves.  Because the SEIS must be prepared in accordance with NEPA guidelines, the SEIS process included three publications in the Federal Register: the first was the Notice of Intent (“NOI”) which was published on July 19, 2017; the second, the Notice of Availability (“NOA”) of the Draft SEIS (“DSEIS”) was published on March 6, 2019; and on September 27, 2019, the third, an NOA of the final SEIS was published announcing that the BLM had re-issued the ROD marking completion of the NEPA process and approval of the SEIS.  On October 31, 2019, a Complaint was filed against the U.S. Department of Interior and the BLM in the U.S. District Court in Nevada, challenging the re-issuance of the ROD. On March 11, 2020, the LLC filed its unopposed Motion to Intervene in the U.S. District Court on

95

behalf of the Mt. Hope Project.  The District Court approved the LLC’s intervention on March 19, 2020 and the LLC’s Answer to the Complaint was filed on March 20, 2020.  The LLC will work closely with the BLM and DOI to defend the claims filed by Great Basin Resource Watch and Western Shoshone Defense Project.

 

Reclamation Considerations

 

Environmental regulations related to reclamation require that the cost for a third-party contractor to perform reclamation activities on the minesite be estimated.  In October 2015, we submitted a request to the BLM to reduce our reclamation liability to current surface disturbance.  Simultaneously, we submitted an application to NDEP-BMRR to modify the Reclamation Permit to reflect this reduced reclamation liability. On October 26, 2015, NDEP-BMRR approved the proposed permit modification, including the reduced reclamation liability amount.   On December 21, 2015, BLM approved the updated reclamation liability estimate, reducing the reclamation liability to approximately $2.8 million.  In early 2019, the Company submitted, and BLM approved a required 3-year update to the reclamation liability estimate, resulting in an increased liability of approximately $3.1 million.  We worked with the LLC’s reclamation surety underwriters to satisfy the $2.8 million financial guarantee requirements under the approved amended PoO for the Mt. Hope Project and funded the $0.3 million increase in cash directly with the BLM in April 2019.  As of December 31, 2019, the surety bond program was funded with a cash collateral payment of $0.3 million.

 

Water Rights Considerations

 

History of Mt. Hope Water Permits

 

In July 2011, the Nevada State Engineer (“State Engineer”) initially approved our applications for new appropriation of water for mining and milling use, and applications to change existing water from agricultural use to mining and milling use for the Mt. Hope Project.  Subsequently, the State Engineer granted water permits associated with the approved applications and approved a Monitoring, Management and Mitigation Plan (“3M Plan”) for the Mt. Hope Project.  Eureka County, Nevada and two other parties comprised of water rights holders in Diamond Valley and Kobeh Valley appealed the State Engineer’s decision approving the applications and granting the water permits to the Nevada State District Court (“District Court”) and then filed a further appeal to the Nevada Supreme Court challenging the District Court’s decision affirming the State Engineer’s decision to approve the applications and grant the water permits.  In June 2013, the appeal was consolidated by the Nevada Supreme Court with an appeal of the State Engineer’s approval of the 3M Plan filed by two water rights holders.  The District Court previously upheld the State Engineer’s approval of the 3M Plan and the two parties subsequently appealed the District Court’s decision to the Nevada Supreme Court. 

 

On September 18, 2015, the Nevada Supreme Court issued an Order that reversed and remanded the cases to the District Court for further proceedings consistent with the Order.  On October 29, 2015, the Nevada Supreme Court issued the Order as a published Opinion.  The Nevada Supreme Court ruled that the State Engineer did not have sufficient evidence in the record at the time he approved the applications and granted the water permits to demonstrate that successful mitigation may be undertaken so as to dispel the threat to existing water rights holders.

 

On September 27, 2017, the Nevada Supreme Court affirmed a March 4, 2016 District Court Order vacating the 3M Plan, denying the water applications and vacating the permits issued by the State Engineer in July 2011 and June 2012.  This decision of the Nevada Supreme Court was final, and not subject to further appeal.

 

New Change Applications for Water Use at Mt. Hope Project

 

After the Company received the September 2017 decision from the Nevada Supreme Court, it proceeded with new applications to change existing agricultural irrigation and mining/milling water rights owned by the Company to use at the Mt. Hope Project.  These new change applications had been filed with the State Engineer in 2015 and 2016 while the above described appeals were pending before the Nevada Supreme Court.  Originally, these applications and other new appropriation applications were to be addressed at a pre-hearing conference scheduled on August 25, 2016 before the State Engineer.  These applications were the subject of a Writ of Prohibition or Mandamus (“Writ”) filed by Eureka County on August 23, 2016 to the Nevada Supreme Court seeking the Supreme Court’s intervention to stop further action by the State Engineer while the appeals discussed above were pending.  On December 22, 2017 the Nevada Supreme Court denied Eureka County’s Writ Petition.  As a result, the State Engineer allowed a pre-hearing conference

96

held on January 24, 2018.  At the pre-hearing conference the State Engineer and his hearing officer scheduled review of the new change applications for a September 11, 2018 hearing in Carson City, Nevada. 

 

On January 2, 2018, Eureka County, and later joined by the other two protestants representing a rancher in Kobeh Valley and a ranching group in Diamond Valley, filed a motion to dismiss with the State Engineer asserting that our applications were precluded from review and approval asserting that they were repetitive of the applications denied previously by the Nevada Supreme Court in its September 2017 decision.  On March 26, 2018, the State Engineer issued a non-final order denying the motion to dismiss finding that the applications to be reviewed at the upcoming hearing were not identical issues and that further consideration of the motion could be taken at the hearing.  On May 14, 2018, Eureka County, joined by the other protestants filed a Writ to the Nevada Supreme Court and later a Motion to Stay the September hearing date, asserting that the denial of the Motion to Dismiss was erroneous and that the Nevada Supreme Court should order that the applications be denied and/or the September 2018 hearing should be delayed until the Nevada Supreme Court can consider the Writ and underlying motion to dismiss.  The Company filed its objection on June 27, 2018, and on August 30, 2018, the Nevada Supreme Court denied the Writ, permitting the September 2018 hearing before the Nevada State Engineer to proceed. 

 

On the second day of the September hearing, all protest issues raised by Eureka County and the Diamond Natural Resources Protections & Conservation Association (“DNR”) concerning the Mt. Hope water rights applications were resolved through a Stipulation, Settlement Agreement and Withdrawal of Protest (“Settlement”).  After Eureka County and DNR were excused, the hearing continued with evidence addressing concerns raised by another protestant representing a Kobeh Valley ranching family and cattle company that refused to participate in the Settlement. At the public hearing, the Company presented expert testimony in support of its augmentation and monitoring plan to the Nevada State Engineer, which will protect senior water rights in the Kobeh Valley basin when the Company commences construction and operation of its proposed Mt. Hope molybdenum project near the town of Eureka, Nevada.  The hearing concluded on September 21, 2018. 

 

Effective April 30, 2019, the Company, through its wholly owned subsidiary Kobeh Valley Ranch LLC (“KVR”) entered into a settlement agreement with a Kobeh Valley, Nevada ranching family (“Ranchers”), resolving the last set of protests pending before the Nevada State Engineer pertaining to the Mt. Hope Project’s water rights applications.

 

On June 6, 2019, the Nevada State Engineer issued Ruling 6464 granting the Company’s water rights applications for mining purposes.  The water right permits for the Mt. Hope Project were issued on July 24, 2019.  With receipt of and in compliance with the terms of the water permits, the water is available for consumptive use at the Mt. Hope Project.  Neither the issuance of Ruling 6464 nor the issuance of the water permits were challenged, and the deadline for filing any appeal has expired.

 

Key Terms of Settlements

Eureka County and the DNR

 

Under the terms of the Settlement with Eureka County and the DNR, the Company and the LLC agreed to convey all related water rights for Mt. Hope Project at the future cessation of all mining activity to assist Eureka County and the DNR’s efforts to mitigate the pre-existing effects of agricultural groundwater pumping in Diamond Valley. Furthermore, upon construction of certain power infrastructure and grants of right of way by the LLC at the Mt. Hope Project, the Company and the LLC will work cooperatively with Eureka County to allow use of and access to such infrastructure to lessen the pre-existing effects of Diamond Valley groundwater pumping. Eureka County, and the Company and the LLC, also agreed to work cooperatively to seek opportunities to improve and implement groundwater monitoring efforts.

In addition, the Company withdrew its protests to Eureka County’s pending applications with the Nevada State Engineer to appropriate water from the Kobeh Valley basin, and at the request of DNR, the Company also agreed to publicly support the proposed Diamond Valley Ground Water Management Plan currently pending before the Nevada State Engineer.

 

With receipt of the water permits, the LLC increased its financial contributions to the existing Agricultural Sustainability Trust Agreement, discussed above, with the Eureka Producers’ Cooperative (“EPC”) in Diamond Valley

97

with an additional $50,000 to EPC.  Initially, upon execution of the Settlement, the LLC made a payment of $50,000 to the EPC. 

 

The LLC will make additional contributions of $750,000 each after the commencement of molybdenum production at the Mt. Hope Project and on the one year anniversary of production, for a total contribution obligation to the Sustainability Trust of $5.6 million, an increase of $1.6 million related to the terms of the Settlement. The amount has been accrued under mining properties, land, and water rights in the Company’s financial statements in addition to the previously accrued $4.0 million resulting in a total accrual of $5.6 million.  The LLC has contributed $0.1 million into the Trust as of December 31, 2019.

 

The Sustainability Trust is tasked with developing and implementing programs that will serve to slow groundwater drawdown and thereby improve the sustainability of the agricultural economy in the Diamond Valley Hydrographic Basin.  

 

Kobeh Valley Ranching Family

 

At the execution of the settlement agreement, the LLC funded an initial payment of $1 million into a trust account; distribution to the Ranchers occurred when the water permits were issued on July 24, 2019.  Upon receipt of the initial $1,000,000 into the trust account, the Ranchers withdrew their protests and forfeited any judicial review of Ruling 6464 and the water applications and issuance of the water permits issued on July 24, 2019 by the Nevada State Engineer.

When conditions exist for the LLC to secure project financing additional consideration of $14,000,000 will be payable to the Ranchers.  If the LLC has not secured Mt. Hope Project financing within 12 months of the executed settlement agreement or April 2020, the LLC will begin to make monthly payments of $10,000 to the Ranchers until financing is achieved and the remaining consideration will be paid to the Ranchers.  The $14,000,000 has been accrued on the Consolidated Balance Sheet as of December 31, 2019.

Pursuant to an April 29, 2019 Consent Agreement, the members of the LLC agreed that funding for the $1 million was advanced to the LLC by the Company, to preserve the joint venture’s existing reserve account.  General Moly sourced $500,000 from its available cash, and received the remaining $500,000 from closing a sale of Series A Convertible Preferred Shares in a private placement with Mount Hope Mines Inc. (“MHMI”), the Mt. Hope Project’s claim/land lessor, discussed in Items 1 and 2 of this Annual Report on Form 10-K and in Note 7 above.

In exchange for General Moly advancing the $1,000,000 initial settlement funding, the LLC members have agreed to repay the $1 million advance from the proceeds of ongoing sales of non-critical LLC assets and lands.  On September 27, 2019, the Company and POS-Minerals entered into a further Consent Agreement for a reimbursement schedule concerning the approximately $700,000 owed to the Company by the LLC in return for the Company’s advance of funding to settle protests related to the water right applications for the Mt. Hope Project.  Under the September Consent Agreement, $200,000 was reimbursed from the Reserve Account to the Company on September 30, 2019 and an additional $200,000 was reimbursed in early November.  The remaining approximately $300,000 was reimbursed in March 2020, after the LLC sold a minimum of $400,000 in non-critical Mt. Hope Project related equipment. 

 

Environmental Considerations

 

Our mineral property holdings in Shoshone County, Idaho include lands contained in mining districts that have been designated as “Superfund” sites pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act.  This “Superfund Site” was established to investigate and remediate primarily the Bunker Hill properties of Smelterville, Idaho, a small portion of Shoshone County where a large smelter was located.  However, because of the extent of environmental impact caused by the historical mining in the mining district, the Superfund Site covers the majority of Shoshone County including the Chicago-London and Little Pine Creek properties we previously owned, as well as many small towns located in Northern Idaho.  We have conducted a property environmental investigation of these properties, which revealed no evidence of material adverse environmental effects at either property.  We are unaware of any pending action or proceeding relating to any regulatory matters that would affect our financial position due to these inactive mining claims in Shoshone County.  Our Chicago-London property was sold in January 2020 and Little Pine Creek in 2019.

 

98

NOTE 12 — UNAUDITED SUPPLEMENTARY DATA

 

The following is a summary of selected unaudited quarterly financial information (in thousands except per share amounts):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Year Ended December 31, 2019

 

Q1

 

Q2

 

Q3

 

Q4

 

Loss from operations

 

$

(1,402)

 

$

(2,064)

 

$

(2,785)

 

$

(804)

 

Interest expense

 

 

(55)

 

 

(387)

 

 

(196)

 

 

(207)

 

Consolidated net loss

 

 

(1,457)

 

 

(2,451)

 

 

(2,981)

 

 

(1,011)

 

Net loss attributable to GMI

 

 

(1,421)

 

 

(2,476)

 

 

(2,976)

 

 

(1,005)

 

Basic net income/(loss) per share

 

 

(0.01)

 

 

(0.02)

 

 

(0.02)

 

 

(0.01)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Year Ended December 31, 2018

 

 

 

 

 

 

 

 

 

 

 

 

 

Loss from operations

 

$

(2,631)

 

$

(2,880)

 

$

(2,927)

 

$

(1,904)

 

Interest expense

 

 

(162)

 

 

(225)

 

 

(186)

 

 

(201)

 

Consolidated net loss

 

 

(2,793)

 

 

(3,105)

 

 

(3,113)

 

 

(2,105)

 

Net loss attributable to GMI

 

 

(2,609)

 

 

(2,931)

 

 

(3,033)

 

 

(2,171)

 

Basic net income/( loss) per share

 

 

(0.02)

 

 

(0.02)

 

 

(0.02)

 

 

(0.02)

 

 

 

NOTE 13 – SUBSEQUENT EVENTS

Beginning in early 2020, there has been an outbreak of coronavirus (COVID-19), initially in China and which has spread to other jurisdictions, including locations where the Company does business. The full extent of the outbreak, related business and travel restrictions and changes to behavior intended to reduce its spread are uncertain as of the date of the Report as this continues to evolve globally. Therefore, the full extent to which coronavirus may impact the Company’s results of operations, liquidity or financial position is uncertain.  Management continues to monitor the impact that the COVID-19 pandemic is having on the Company and the economies in which the Company operates.  The Company anticipates that its liquidity may be materially impacted by the coronavirus outbreak.

On March 27, 2020, President Trump signed into U.S. federal law the CARES Act, which is aimed at providing emergency assistance and health care for individuals, families, and businesses affected by the COVID-19 pandemic and generally supporting the U.S. economy. The CARES Act, among other things, includes provisions relating to refundable payroll tax credits, deferment of employer side social security payments, net operating loss carryback periods, alternative minimum tax credit (“AMT”) refunds, modifications to the net interest deduction limitations and technical corrections to tax depreciation methods for qualified improvement property. In particular, the CARES Act, (i) eliminates the 80% of taxable income limitation by allowing corporate entities to fully utilize NOLs to offset taxable income in 2018, 2019 or 2020, (ii) allows for NOLs generated in 2018, 2019, or 2020 to be carried back 5 years, (iii) increases the net interest expense deduction limit to 50% of adjusted taxable income from 30% for tax years beginning January 1, 2019 and 2020, and (iv) allows taxpayers with AMT credits to claim a refund in 2019 for the entire amount of the credit instead of recovering the credit through refunds over a period of years, as originally enacted by the Tax Cuts and Jobs Act in 2017.  The Company is in the process of analyzing the different aspects of the CARES Act to quantify the impact of these provisions

 

 

 

99

ITEM 9.CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

 

None.

 

ITEM 9A.CONTROLS AND PROCEDURES

 

Our management, with the participation of our Chief Executive Officer/Chief Financial Officer and our Principal Accounting Officer, has evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (the Exchange Act)) as of December 31, 2019. Based on that evaluation management concluded that, as of December 31, 2019, due to the material weakness in our internal control over financial reporting described below, our disclosure controls and procedures were not effective to provide reasonable assurance that the information we are required to disclose in the reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Accounting Officer, as appropriate, to allow timely decisions regarding required disclosure.

 

REPORT OF MANAGEMENT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

 

Our management is responsible for establishing and maintaining adequate internal control over financial reporting (ICFR), as such term is defined in the Securities Exchange Act of 1934 Rule 13a-15(f) and 15d-15f. The Company’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP. Because of inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

 

Management performed an assessment of the effectiveness of our ICFR as of December 31, 2019. In making this assessment, management used the criteria established in Internal Control - Integrated Framework (2013), issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Management concluded that our ICFR was not effective as of December 31, 2019.

 

A material weakness is a deficiency or a combination of deficiencies in internal control over financial reporting such that there is a reasonable possibility that a material misstatement of our annual or interim financial statements will not be prevented or detected in a timely basis.

 

As a result of our assessment, management identified the following control deficiencies that represent material weaknesses as of December 31, 2019:

 

·

In connection with the audit of the Company’s consolidated financial statements as of and for the year ended December 31, 2019, management identified material weaknesses in internal control over financial reporting. As of December 31, 2019, the limited level of staffing, combined with the lack of formalized processes and technical resources available to handle the increased volume of the complex non-routine transactions occurring during 2019 resulted in several significant adjustments being recorded. As a direct result of these complex transactions and limitation on current accounting resources we determined that our controls over the financial statement close process related to the timely account reconciliation, analysis and assessment of key accounting assessments and financial reporting and disclosure were not operating effectively.  

 

Because of this material weakness, management concluded that we did not maintain effective internal control over financial reporting as of December 31, 2019.

 

As of December 31, 2019, the Company was not an “accelerated filer” as defined in Rule 12b-2 under the Exchange Act. Accordingly, pursuant to SEC rules and regulations, the Company is not required to include, and this Annual Report on Form 10-K does not include, an attestation report of our independent registered public accounting firm

100

regarding internal control over financial reporting. We are required to annually reassess our status as a “smaller reporting company” as of the end of our fiscal year to determine whether we will be required to provide Management’s Annual Report on Internal Control Over Financial Reporting and the associated report of our independent registered public accounting firm in our Annual Report.

 

REMEDIATION OF THE MATERIAL WEAKNESS

 

We are committed to improving our ICFR.  As part of this control improvement, we plan to enhance our capacity and capabilities to review and evaluate ongoing and technically complex transactions through selective increased use of external resources and potential realignment of internal staff.  We will continue to monitor and evaluate the effectiveness of our internal controls and procedures and our ICFR on an ongoing basis, and are committed to taking further action and implementing additional enhancements or improvements, as necessary and as funds allow.

 

While we believe that the above actions will ultimately remediate the material weakness, we intend to continue to refine those controls ad monitor their effectiveness for a sufficient period of time prior to reaching any determination as to whether the material weakness has been remediated.

 

Notwithstanding the assessment that our ICFR was not effective and that there were material weaknesses as identified in this report, we believe that our consolidated financial statements contained in this Annual Report on Form 10-K for the fiscal year ended December 31, 2019, fairly present our financial position, results of our operations and cash flows for the years covered thereby in all material respects.

 

CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING

 

Other than as described in the two preceding paragraphs and in the Remediation of Material Weakness section above, there have been no changes in our internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) during the quarter ended December 31, 2019 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

 

ITEM 9B.OTHER INFORMATION

 

None.

101

PART III

 

ITEM 10.DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

 

Information regarding directors and executive officers of registrant is presented under the heading “Directors and Executive Officers” in our definitive proxy statement for use in connection with the 2019 Annual Meeting of Stockholders (“2019 Proxy Statement”) to be filed within 120 days after our fiscal year ended December 31, 2019, and is incorporated herein by this reference thereto.

 

Information regarding Section 16(a) beneficial ownership reporting compliance report is presented under the heading “Delinquent Section 16(a) Reports” in our 2019 Proxy Statement, and is incorporated herein by this reference thereto.  Information regarding our code of ethics is presented under the heading “Code of Business Conduct and Ethics” in our 2020 Proxy Statement, and is incorporated herein by reference thereto.  Information regarding our Audit Committee, Compensation Committee, Finance Committee, Technical Committee and our Nominating Committee is presented under the heading “The Board of Directors, Board Committees and Director Independence” in our 2020 Proxy Statement, and is incorporated herein by reference thereto.

 

ITEM 11.EXECUTIVE COMPENSATION

 

Information regarding executive compensation is presented under the heading “Executive Compensation” in our 2020 Proxy Statement, and is incorporated herein by this reference thereto.

 

ITEM 12.SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

 

Information regarding certain information with respect to our equity compensation plans as of December 31, 2019 is set forth under the heading “Equity Compensation Plan Information” in our 2020 Proxy Statement, and is incorporated herein by this reference thereto.

 

Information regarding security ownership of certain beneficial owners and management is set forth under the heading “Voting Securities and Principal Holders” in our 2020 Proxy Statement, and is incorporated herein by this reference thereto.

 

ITEM 13.CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

 

Information regarding certain relationships and related transactions is presented under the heading “Certain Relationships and Related Transactions” in our 2020 Proxy Statement, and is incorporated herein by this reference thereto.  Information regarding director independence is presented under the heading “The Board of Directors, Board Committees and Director Independence” in our 2020 Proxy Statement, and is incorporated herein by reference thereto.

 

ITEM 14.PRINCIPAL ACCOUNTING FEES AND SERVICES

 

Information regarding principal accounting fees and services is presented under the headings “Audit Fees,” “Audit-Related Fees,” “Tax Fees,” and “All Other Fees” in our 2020 Proxy Statement, and is incorporated herein by this reference thereto.

102

PART IV

 

ITEM 15.  EXHIBITS, FINANCIAL STATEMENT SCHEDULES

 

(1)Financial Statements

 

See the Index to Consolidated Financial Statements included on page 50 for a list of the financial statements included in this Form 10-K.

 

(2)Financial Statement Schedules

 

Financial statement schedules are omitted because they are not required or are not applicable.

 

(3)Exhibits

 

 

 

 

Exhibit
Number

    

Description

 

 

 

3.1†

 

Certificate of Incorporation, as amended (Filed as Exhibit 3.1 to our Quarterly Report on Form 10-Q filed on November 4, 2015.)

 

 

 

3.2†

 

Certificate of Designation of Series A Junior Participating Preferred Stock (Filed as Exhibit 3.1 to our Current Report on Form 8-K filed on March 5, 2010.)

 

 

 

3.3†

 

Amended and Restated Bylaws (Filed as Exhibit 3.2 to our Current Report on Form 8-K filed on February 10, 2015.)

3.4†

 

Certificate of Designations of Series A Preferred Stock. (Filed as Exhibit 3.1 to our Current Report on Form 8-K filed on March 28, 2019.)

 

 

 

3.5†

 

Certificate of Designation of Series B Preferred Stock (Filed as Exhibit 3.1 to our Current Report on Form 8-K filed on August 7, 2019.)

 

 

 

4.1†

 

Form of Common Stock Purchase Warrant (Filed as Exhibit 4.1 to our Current Report on Form 8-K filed on October 19, 2018.)

4.2†

 

Amended and Restated Common Stock Purchase Warrant by and between General Moly, Inc. and AMER International Group Co. North America, Ltd. dated December 9, 2019 (Filed as Exhibit 10.2 to our Current Report on Form 8-K filed on December 11, 2019.)

 

 

 

4.3†

 

Form of Senior Promissory Note (Exchange Note) (Filed as Exhibit 4.1 to our Current Report on Form 8-K filed on January 3, 2020.)

 

 

 

4.4†

 

Form of Senior Supplemental Promissory Note (Filed as Exhibit 4.2 to our Current Report on Form 8-K filed on January 3, 2020.)

 

 

 

4.5†

 

Form of Common Stock Purchase Warrant  (Filed as Exhibit 4.3 to our Current Report on Form 8-K filed on January 3, 2020.)

 

 

 

4.6†

 

Registration Rights Agreement dated as of December 27, 2019, by and among General Moly, Inc. and the several investors signatory thereto (Filed as Exhibit 4.4 to our Current Report on Form 8-K filed on January 3, 2020.)

 

 

 

4.7

 

Description of Registrant's securities registered pursuant to Section 12 of the Securities Exchange Act of 1934 (Filed herewith).

 

 

 

10.1†

 

Lease Agreement, dated October 17, 2005, between the Company and Mount Hope Mines, Inc. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on January 23, 2006.)

 

 

 

103

 

 

 

Exhibit
Number

    

Description

 

 

 

10.2†

 

Modification to Mount Hope Mines Lease Agreement, dated January 26, 2006 (Filed as Exhibit 10.11 to our Annual Report on Form 10-KSB filed on March 31, 2006.)

 

 

 

10.3†

 

Amendment to Lease Agreement, made effective as of November 20, 2007, between the Company and Mount Hope Mines, Inc. (Filed as Exhibit 10.3 to our Annual Report on Form 10-KSB filed on March 21, 2008.)

 

 

 

10.4†

 

Second Amendment to Lease Agreement, dated effective January 15, 2018, between Eureka Moly, LLC and Mount Hope Mines, Inc. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on February 28, 2018.)

 

10.5†

 

Option to Lease, dated November 12, 2004, between the Company and Mount Hope Mines, Inc. (Filed as Exhibit 10.1 to our Annual Report on Form 10-KSB filed on April 6, 2005.)

 

 

 

10.6†

 

Stock Purchase Agreement, dated December 11, 2006, between the Company and Equatorial Mining Limited (Filed as Exhibit 10.17 to our Annual Report on Form 10-KSB filed on April 3, 2007.)

 

 

 

10.7†

 

Securities Purchase Agreement, dated as of November 9, 2007, between the Company and ArcelorMittal S.A. (Filed as Exhibit 10.6 to our Annual Report on Form 10-KSB filed on March 21, 2008.)

 

 

 

10.8†

 

Consent and Waiver Agreement, dated April 16, 2010, by and between the Company and ArcelorMittal S.A. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on April 19, 2010.)

 

 

 

10.9†+

 

Amended and Restated Employment Agreement, dated January 1, 2012, between the Company and Bruce D. Hansen (Filed as Exhibit 10.8 to our Annual Report on Form 10-K filed on March 1, 2012.)

 

 

 

10.10†+

 

First Amendment to Amended and Restated Employment Agreement, dated as of September 6, 2013, between the Company and Bruce D. Hansen (Filed as Exhibit 10.01 to our Quarterly Report on Form 10-Q filed on November 4, 2013.)

 

 

 

10.11†+

 

Second Amendment to Amended and Restated Employment Agreement dated effective January 1, 2016, by and between General Moly, Inc. and Bruce D. Hansen (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.12†+

 

Third Amendment to Amended and Restated Employment Agreement dated effective January 16, 2016, by and between General Moly, Inc. and Bruce D. Hansen (Filed as Exhibit 10.2 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.13†+

 

Fourth Amendment to Amended and Restated Employment Agreement dated effective December 1, 2018, by and between General Moly, Inc. and Bruce D. Hansen. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on December 4, 2018.)

 

 

 

10.14†+

 

Salary Reduction and Stay Incentive Agreement, dated as of September 6, 2013, between the Company and Bruce D. Hansen (Filed as Exhibit 10.21 to our Quarterly Report on Form 10-Q filed on November 4, 2013.)

 

 

 

10.15†+

 

First Amendment to Salary Reduction and Stay Incentive Agreement dated as of January 14, 2015, by and between General Moly, Inc. and Bruce D. Hansen (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on January 21, 2015.)

 

 

 

10.16†+

 

Stay Incentive Agreement dated as of January 16, 2016, by and between General Moly, Inc. and Bruce D. Hansen (Filed as Exhibit 10.9 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

104

 

 

 

Exhibit
Number

    

Description

 

 

 

10.17†+

 

Stay Incentive Agreement dated as of January 16, 2017, by and between General Moly, Inc. and Bruce D. Hansen (Filed as Exhibit 10.1 to our Quarterly Report on Form 10-Q filed on May 1, 2017.)

 

 

 

10.18†+

 

Stay Incentive Agreement dated as of January 16, 2018, by and between General Moly, Inc. and Bruce D. Hansen (Filed as Exhibit 10.1 to our Quarterly Report on Form 10-Q filed on May 8, 2018.)

 

 

 

10.19†+

 

Form of Indemnification Agreement (Filed as Exhibit 10.18 to our Current Report on Form 8-K filed on October 5, 2007.)

 

 

 

10.20†+

 

General Moly, Inc. 2006 Equity Incentive Plan, as Amended and Restated (Filed as Exhibit 10.1 to our Registration Statement on Form S-8 filed on May 21, 2010.)

 

 

 

10.21†+

 

Form of Stock Option Grant Notice and Agreement under 2006 Equity Incentive Plan of the Company (Filed as Exhibit 10.13 to our Annual Report on Form 10-KSB filed on April 3, 2007.)

 

 

 

10.22†+

 

Form of Restricted Stock Agreement under 2006 Equity Incentive Plan of the Company (Filed as Exhibit 10.14 to our Annual Report on Form 10-KSB filed on April 3, 2007.)

 

 

 

10.23†+

 

Form of Non-Employee Option Award Agreement (Filed as Exhibit 99.1 to our Registration Statement on Form S-8 filed on January 12, 2007.)

 

 

 

10.24†+

 

Form of Employee Stock Option Agreement (Filed as Exhibit 99.2 to our Registration Statement on Form S-8 filed on January 12, 2007.)

 

 

 

10.25†+

 

Form of Stock Appreciation Right Grant Notice and Agreement under the Company’s 2006 Equity Incentive Plan (Filed as Exhibit 10.3 to our Current Report on Form 8-K filed on March 5, 2009.)

 

 

 

10.26†+

 

Form of Restricted Stock Unit Agreement under 2006 Equity Incentive Plan of the Company (Filed as Exhibit 10.4 to our Quarterly Report on Form 10-Q Filed on October 29, 2010.)

 

 

 

10.27†+

 

Amendment to General Moly, Inc. 2006 Equity Incentive Plan, as Amended (Filed as Annex A to our Definitive Proxy Statement on Schedule 14A filed on April 18, 2016.)

 

 

 

10.28†*

 

Molybdenum Supply Agreement between General Moly and ArcelorMittal Purchasing SAS, dated as of December 28, 2007 (Filed as Exhibit 10.19 to our Annual Report on Form 10-KSB filed on March 31, 2008.)

 

 

 

10.29†*

 

Extension Molybdenum Supply Agreement, dated as of April 16, 2010, by and between the Company and ArcelorMittal S.A. (Filed as Exhibit 10.2 to our Quarterly Report on Form 10-Q filed on July 30, 2010.)

 

 

 

10.30†

 

Contribution Agreement between Nevada Moly, LLC, a wholly-owned subsidiary of the Company, Eureka Moly, LLC, and POS-Minerals Corporation (Filed as Exhibit 10.20 to our Quarterly Report on Form 10-Q filed on May 7, 2008.)

 

 

 

10.31†

 

Amended and Restated Limited Liability Company Agreement of Eureka Moly, LLC (Filed as Exhibit 10.20 to our Quarterly Report on Form 10-Q filed on May 7, 2008.)

 

 

 

10.32†

 

Amendment No. 1 to Limited Liability Company Agreement of Eureka Moly, LLC, dated as of October 28, 2008, between Nevada Moly, LLC and POS-Minerals Corporation (Filed as Exhibit 10.27 to our Annual Report on Form 10-K filed on February 27, 2009.)

 

 

 

105

 

 

 

Exhibit
Number

    

Description

 

 

 

10.33†

 

Amendment No. 2 to Limited Liability Company Agreement of Eureka Moly, LLC, dated as of January 20, 2010, between Nevada Moly, LLC and POS-Minerals Corporation (Filed as Exhibit 10.3 to our Current Report on Form 8-K filed on January 25, 2010.)

 

 

 

10.34†

 

Amendment No. 4 to Limited Liability Company Agreement of Eureka Moly, LLC dated as of January 1, 2015, by and between Nevada Moly, LLC and POS-Minerals Corporation (Filed as Exhibit 10.4 to our Current Report on Form 8-K filed on January 22, 2015).

 

 

 

10.35†

 

Third Installment Election, dated as of March 3, 2010, between Nevada Moly, LLC and POS-Minerals Corporation (filed as Exhibit 10.4 to our Current Report on Form 8-K filed on March 5, 2010.) 

 

 

 

10.36†

 

Guarantee and Indemnity Agreement, dated February 26, 2008, by POSCO Canada Ltd., in favor of Nevada Moly, LLC and the Company (Filed as Exhibit 10.20 to our Quarterly Report on Form 10-Q filed on May 7, 2008.)

 

 

 

10.37†*

 

Molybdenum Supply Agreement between the Company and SeAH Besteel Corporation, dated as of May 14, 2008 (Filed as Exhibit 10.25 to our Quarterly Report on Form 10-Q filed on August 4, 2008.)

 

 

 

10.38†*

 

First Amendment to Molybdenum Supply Agreement dated July 22, 2015, by and between the Company and SeAH Besteel Corporation (Filed as Exhibit 10.2 to our Current Report on Form 8-K filed on July 24, 2015.)

 

 

 

10.39†*

 

Molybdenum Supply Agreement between the Company and Sojitz Corporation, dated as of August 8, 2008 (Filed as Exhibit 10.26 to our Quarterly Report on Form 10-Q filed on November 3, 2008.)

 

 

 

10.40†+

 

Employment Agreement, dated as of December 27, 2012, between the Company and Robert I. Pennington (Filed as Exhibit 10.28 to our Annual Report on Form 10-K filed on March 8, 2013.)

 

 

 

10.41†+

 

First Amendment to Amended and Restated Employment Agreement, dated as of September 6, 2013, between the Company and Robert I. Pennington (Filed as Exhibit 10.05 to our Quarterly Report on Form 10-Q filed on November 4, 2013.)

 

 

 

10.42†+

 

Second Amendment to Employment Agreement dated effective January 1, 2016, by and between General Moly, Inc. and Robert I. Pennington (Filed as Exhibit 10.3 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.43†+

 

Third Amendment to Employment Agreement dated effective January 16, 2016, by and between General Moly, Inc. and Robert I. Pennington (Filed as Exhibit 10.4 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.44†+

 

Fourth Amendment to Amended and Restated Employment Agreement dated effective December 1, 2018, by and between General Moly, Inc. and Robert I. Pennington. (Filed as Exhibit 10.2 to our Current Report on Form 8-K filed on December 4, 2018.)

 

10.45†+

 

Stay Incentive Agreement, dated effective January 16, 2015, between General Moly, Inc. and Robert I. Pennington (Filed as Exhibit 10.5 to our Quarterly Report on Form 10-Q filed on May 4, 2015.)

 

 

 

10.46†+

 

Stay Incentive Agreement dated as of January 16, 2016, by and between General Moly, Inc. and Robert I. Pennington (Filed as Exhibit 10.10 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.47†+

 

Stay Incentive Agreement dated as of January 16, 2017, by and between General Moly, Inc. and Robert I. Pennington (Filed as Exhibit 10.2 to our Quarterly Report on Form 10-Q filed on May 1, 2017.)

 

 

 

106

 

 

 

Exhibit
Number

    

Description

 

 

 

10.48†+

 

Stay Incentive Agreement dated as of January 16, 2018, by and between General Moly, Inc. and Robert I. Pennington (Filed as Exhibit 10.2 to our Quarterly Report on Form 10-Q filed on May 8, 2018.)

 

 

 

10.49†

 

Cooperation Agreement dated August 10, 2010, between Eureka Moly, LLC and the Eureka Producers Cooperative (Filed as Exhibit 10.1 to our Current Report on Form 8-K/A filed on August 26, 2010.)

 

 

 

10.50†

 

Employment Agreement dated as of January 16, 2016, by and between General Moly, Inc. and R. Scott Roswell (Filed as Exhibit 10.7 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.51†+

 

First Amendment to Employment Agreement dated effective January 16, 2016, by and between General Moly, Inc. and R. Scott Roswell (Filed as Exhibit 10.8 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.52†+

 

Second Amendment to Amended and Restated Employment Agreement dated effective December 1, 2018, by and between General Moly, Inc. and R. Scott Roswell. (Filed as Exhibit 10.3 to our Current Report on Form 8-K filed on December 4, 2018.)

 

 

 

10.53†+

 

Stay Incentive Agreement, dated effective January 16, 2015, between General Moly, Inc. and R. Scott Roswell (Filed as Exhibit 10.5 to our Quarterly Report on Form 10-Q filed on May 4, 2015.)

 

 

 

10.54†+

 

Stay Incentive Agreement dated as of January 16, 2016, by and between General Moly, Inc. and R. Scott Roswell (Filed as Exhibit 10.12 to our Current Report on Form 8-K filed on January 21, 2016.)

 

 

 

10.55†+

 

Stay Incentive Agreement dated as of January 16, 2017, by and between General Moly, Inc. and R. Scott Roswell (Filed as Exhibit 10.3 to our Quarterly Report on Form 10-Q filed on May 1, 2017.)

 

 

 

10.56†+

 

Stay Incentive Agreement dated as of January 16, 2018, by and between General Moly, Inc. and R. Scott Roswell (Filed as Exhibit 10.3 to our Quarterly Report on Form 10-Q filed on May 8, 2018.)

 

 

 

10.57†+

 

Form of Restricted Stock Unit Agreement for the Company’s 2006 Equity Incentive Plan (performance-based vesting) (Filed as Exhibit 10.6 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

 

 

 

10.58†+

 

Form of Restricted Stock Unit Agreement for the Company’s 2006 Equity Incentive Plan (time-based vesting) (Filed as Exhibit 10.7 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

 

 

 

10.59†+

 

Form of Amendment to Restricted Stock Unit Agreement Issued Under the General Moly, Inc. 2006 Equity Incentive Plan, dated effective December 1, 2018 (Filed as Exhibit 10.4 to our Current Report on Form 8-K filed on December 4, 2018.)

 

 

 

10.60†+

 

Form of Stock Appreciation Rights Grant Notice for the Company’s 2006 Equity Incentive Plan (Filed as Exhibit 10.8 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

10.61†

 

At the Market Offering Agreement, dated April 12, 2017, by and between the Company and Rodman & Renshaw, a unit of H.C. Wainwright & Co., LLC (Filed as Exhibit 1.2 to our Registration Statement on Form S-3 filed on April 12, 2017.)

 

 

 

10.62†+

 

Employment Agreement, dated as of May 12, 2017, between the Company and Amanda J. Corrion (Filed as Exhibit 10.4 to our Quarterly Report on Form 10-Q filed on August 14, 2017.)

 

 

 

10.63†+

 

Stay Incentive Agreement dated as of January 16, 2018, by and between General Moly, Inc. and Amanda Corrion (Filed as Exhibit 10.4 to our Quarterly Report on Form 10-Q filed on May 8, 2018.)

10.64†

 

Securities Purchase Agreement dated effective March 21, 2019, by and among General Moly, Inc. and each of the persons whose names are set forth on the Schedule of Investors attached thereto as Exhibit A (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on March 28, 2019.)

 

 

 

107

 

 

 

Exhibit
Number

    

Description

 

 

 

10.65†

 

Securities Purchase Agreement dated effective May 17, 2019, by and among General Moly, Inc. and each of the persons whose names are set forth on the Schedule of Investors attached thereto as Exhibit A (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on May 23, 2019.)

 

 

 

10.66†

 

Securities Purchase Agreement dated effective August 7, 2019, by and among General Moly, Inc. and each of the persons whose names are set forth on the Schedule of Investors attached thereto as Exhibit A (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on August 7, 2019.)

 

 

 

10.67†

 

Securities Purchase Agreement dated effective August 7, 2019, by and among General Moly, Inc. and each of the persons whose names are set forth on the Schedule of Investors attached thereto as Exhibit A (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on August 7, 2019.)

 

 

 

10.68†

 

Interest Deferral and Forbearance Agreement dated September 25, 2019, by and between General Moly, Inc. and the Holders of Notes party thereto (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on September 30, 2019.)

 

 

 

10.69†

 

Securities Purchase Agreement dated December 9, 2019, between General Moly, Inc. and AMER International Group Co. North America, Ltd. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on December 11, 2019.)

 

 

 

10.70†

 

Exchange and Subscription Agreement dated as of December 27, 2019, by and among General Moly, Inc. and the several investors signatory thereto  (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on January 3, 2020.)

 

 

 

21.1

 

Subsidiaries of General Moly, Inc. (Filed herewith)

 

 

 

23.1

 

Consent of PricewaterhouseCoopers LLP (Filed herewith)

 

 

 

23.2

 

Consent of John M. Marek, P.E. (Filed herewith)

 

 

 

23.3

 

Consent of Plante & Moran PLLC

 

 

 

31.1

 

Certification of CEO pursuant to Rule 13a-14(a)/15d-14(a) (Filed herewith)

 

 

 

32.1

 

Certification of CEO pursuant to Section 1350 (Furnished herewith)

 

 

 

101

 

The following XBRL (Extensible Business Reporting Language) materials are filed herewith: (i) XBRL Instance; (ii) XBRL Taxonomy Extension Schema; (iii) XBRL Taxonomy Extension Calculation; (iv) Taxonomy Extension Labels, (v) XBRL Taxonomy Extension Presentation, and (vi) XBRL Taxonomy Extension Definition.


Previously filed as indicated and incorporated herein by reference.

+Management contract.

*Confidential treatment has been granted for certain portions of this exhibit, and such confidential portions have been separately filed with the Securities Exchange Commission.

 

 

ITEM 16.  FORM 10-K SUMMARY

 

Not applicable.

 

108

SIGNATURES

 

Pursuant to the requirements of the Section 13 or 15(d) of the Exchange Act, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized in Lakewood, Colorado on May 4, 2020.

 

 

 

 

 

 

 

GENERAL MOLY, INC.

 

 

 

 

 

 

 

 

By:

/s/ Bruce D. Hansen

 

 

Name:

Bruce D. Hansen

 

 

Title:

Chief Executive Officer

 

 

 

(Principal Executive Officer)

 

Pursuant to the requirements of the Exchange Act, this report has been signed below on May 4, 2020 by the following persons, on behalf of the Registrant, and in the capacities indicated.

 

 

 

 

/s/ Bruce D. Hansen

 

Chief Executive Officer, Chief Financial Officer and Director

Bruce D. Hansen

 

(Principal Executive Officer & Principal Financial Officer)

 

 

 

/s/ Amanda J. Corrion

 

Controller

Amanda J. Corrion

 

(Principal Accounting Officer)

 

 

 

/s/ Ricardo M. Campoy

 

Chairman of the Board

Ricardo M. Campoy

 

 

 

 

 

/s/ Mark A. Lettes

 

Director

Mark A. Lettes

 

 

 

 

 

/s/ Gary A. Loving

 

Director

Gary A. Loving

 

 

 

 

 

/s/ Gregory P. Raih

 

Director

Gregory P. Raih

 

 

 

 

 

/s/ Terry Lee

 

Director

Terry Lee

 

 

 

109