Valaris plc
Fleet Status Report
April 22, 2020
 
New Contracts & Extensions Since February 13, 2020 Fleet Status Report
Floaters
VALARIS MS-1 awarded a three-well contract with Santos offshore Australia that is expected to commence in first quarter 2021, with an estimated duration of 155 days
VALARIS 8505 awarded a one-well contract with Lukoil Upstream Mexico that is expected to commence in mid-November, with an estimated duration of 80 days


Jackups
VALARIS JU-118 (Joe Douglas) awarded a three-well contract with Fieldwood offshore Mexico that commenced in mid-March, with an estimated duration of 425 days
VALARIS JU-144 (EXL II) awarded a two-well contract with Fieldwood offshore Mexico that is expected to commence in May, with an estimated duration of 200 days; contract previously announced with ENI offshore Mexico expected to commence in September 2020 transferred to VALARIS JU-102
VALARIS JU-87 awarded a one-well contract with Cox in the U.S. Gulf of Mexico, with an estimated duration of 30 days from March 2020 to April 2020, and then extended to May 2020 for another well with an estimated duration of 30 days

 

Other
VALARIS DS-8 contract, which was scheduled to be completed in November 2020, was early terminated and ended in late March 2020
VALARIS JU-109 contract, which was scheduled to be completed in July 2021, was early terminated and ended in mid April 2020
VALARIS DS-7 contract for operations offshore Ghana from April 2020 to mid-May 2020 has been terminated
VALARIS 5004 operated on a reduced day rate from mid March 2020 to mid April 2020, at which point the contract was terminated
VALARIS JU-249 (Gorilla VII) ended its contract with Chrysaor in early April 2020
VALARIS DS-16 (Resolute) expected to end its contract with Fieldwood in late June 2020
VALARIS 8503 expected to end its contract with Kosmos in late April 2020
VALARIS JU-100 expected to end its contract with DNO in late April 2020
VALARIS DS-10 expected to operate on a reduced day rate from late April 2020 to mid July 2020
VALARIS JU-120 expected to operate on a reduced day rate from late April 2020 to late September 2020
VALARIS JU-92 expected to operate on a reduced day rate from mid May 2020 to late September 2020
VALARIS JU-72 expected to operate on a reduced day rate from April 2020 to July 2020
VALARIS DS-4, VALARIS DS-11, VALARIS DS-17 & VALARIS 8504 are in the process of being preservation stacked




 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
New Disclosure: bolded text signifies contracts or extensions that have not been previously disclosed.

Page 1 of 12


    

vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 

Contract Backlog(1)
($ millions)
Q2 - Q4 2020
2021
2022
2023 and Beyond
Total
 
Contract Days(1)
Q2 - Q4 2020
2021
2022
Drillships
$
233.9

$
77.5

$

$

$
311.4

 
Drillships
1,271

349


Semisubmersibles
137.0

93.3



230.3

 
Semisubmersibles
709

417


Floaters
$
370.9

$
170.8

$

$

$
541.7

 
Floaters
1,980

766


 
 
 
 
 
 
 
 
 
 
 
HD - Ultra-Harsh & Harsh
$
234.5

$
200.2

$
59.9

$

$
494.6

 
HD - Ultra-Harsh & Harsh
2,049

1,835

629

HD & SD - Modern
172.8

112.5

57.5

0.3

343.1

 
HD & SD - Modern
2,341

1,594

730

SD - Legacy
68.8

96.8

70.9

4.3

240.8

 
SD - Legacy
1,055

1,339

979

Jackups
$
476.1

$
409.5

$
188.3

$
4.6

$
1,078.5

 
Jackups
5,445

4,768

2,338

 
 
 
 
 
 
 
 
 
 
 
Leased Rigs
$
68.3

$
67.5

$
6.7

$

$
142.5

 
Leased Rigs
2,475

2,554

560

Managed Rigs
49.5

64.7

3.4


117.6

 
Managed Rigs
550

730

27

Other
$
117.8

$
132.2

$
10.1

$

$
260.1

 
Other
3,025

3,284

587

 
 
 
 
 
 
 
 
 
 
 
Total
$
964.8

$
712.5

$
198.4

$
4.6

$
1,880.3

 
Total
10,450

8,818

2,925

 
 
 
 
 
 
 
 
 
 
 
HD = Heavy Duty; SD = Standard Duty

(1) Contract backlog, contract days and average day rates as of March 31, 2020 exclusive of performance bonus, adjusted for drilling contracts signed or terminated after March 31, 2020 but prior to furnishing the Fleet Status Report as an exhibit to the Form 8-K filed on April 22, 2020.

(2) Leased rigs represents contract backlog and contract days related to bareboat charter agreements.
 
Average Day Rates(1)
Q2 - Q4 2020
2021
2022
 
Drillships
$
184,000

$
222,000

$

 
Semisubmersibles
193,000

224,000


 
Floaters
$
187,000

$
223,000

$

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
HD - Ultra-Harsh & Harsh
$
114,000

$
109,000

$
95,000

 
 
 
 
 
 
 
HD & SD - Modern
74,000

71,000

79,000

 
 
 
 
 
 
 
SD - Legacy
65,000

72,000

72,000

 
 
 
 
 
 
 
Jackups
$
87,000

$
86,000

$
81,000


Page 2 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Asset Type / Status / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Drillships
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Marketed
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VALARIS DS-18
(Relentless)
 
GustoMSC P10000
 
2015
 
EnVen
Chevron
 
U.S. GOM
U.S. GOM
 
Feb. 20
Sep. 20
 
Apr. 20
Mar. 21
 
Contracted for two wells. Plus one 1-well priced option
Contracted for two wells. Plus five 1-well priced options

VALARIS DS-16
(Resolute)
 
GustoMSC P10000
 
2014
 
Fieldwood
 
U.S. GOM
 
Mar. 19

 
Jun. 20

 
 
VALARIS DS-15
(Renaissance)
 
GustoMSC P10000
 
2014
 
Murphy
CNOOC
 
U.S. GOM
Mexico
 
Jan. 20
May 20

 
May 20
Oct. 20
 
Contracted for two wells
Contracted for two wells. Plus two 1-well priced options
VALARIS DS-12

 
DSME 12000
 
2014
 
BP
BP
 
Egypt
Angola
 
Feb. 20
Jul. 20
 
Jun. 20
Jan. 21
 
Contracted for one well
Contracted for four wells. Plus four 1-well options

VALARIS DS-10

 
Samsung GF12000
 
2017
 
Shell
 
Nigeria
 
Mar. 18

 
Mar. 21
 
Operating on a reduced day rate from late April 2020 to mid-July 2020, then expected to return to full day rate until end of contract in March 2021. Plus three 1-year priced options
VALARIS DS-9

 
Samsung GF12000
 
2015
 
Total
Premier
 
Brazil
Brazil

 
Jun. 19
Jul. 20

 
May 20
Aug. 20

 
Contracted for four wells
Contracted for one well
VALARIS DS-8

 
Samsung GF12000
 
2015
 
Total
Available
 
Angola
 
Nov. 15
 
Mar. 20
 
 
VALARIS DS-7

 
Samsung 96K
 
2013
 
Burullus
-----

BP
 
Egypt
-----

Senegal/Mauritania
 
Apr. 19
-----

Sep. 20
 
Mar. 20
-----

Aug. 21
 

Contract for operations offshore Ghana from April 2020 to mid May 2020 has been terminated
Contracted for five wells. Plus one 1-well priced option and two 1-well unpriced options
Under Construction
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VALARIS DS-14

 
DSME 12000
 
 
 
Under Construction
 
South Korea
 
 
 
 
 
Scheduled delivery date 2Q22
VALARIS DS-13

 
DSME 12000
 
 
 
Under Construction
 
South Korea
 
 
 
 
 
Scheduled delivery date 3Q21
Changes: bolded rig names and underlined text signify changes in rig status from previous report




Page 3 of 12


Asset Type / Status / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Preservation Stacked
 
 
VALARIS DS-3

 
Samsung 96K
 
2010
 
Preservation Stacked(2)
 
Spain
 
 
 
 
 
 
VALARIS DS-4
 
Samsung 96K
 
2010
 
Preservation Stacking(2)
 
Spain
 


 
 
 
 
VALARIS DS-5

 
Samsung 96K
 
2011
 
Preservation Stacked(2)
 
Spain
 
 
 
 
 
 
VALARIS DS-6

 
Samsung 96K
 
2012
 
Preservation
Stacked(2)
 
Spain
 
 
 
 
 
 
VALARIS DS-11

 
DSME 12000
 
2013
 
Preservation
Stacked(2)
 
Spain
 
 
 
 
 
 
VALARIS DS-17
(Reliance)
 
GustoMSC P10000
 
2014
 
Preservation Stacking(2)
 
Spain
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Semisubmersibles
 
 
 
 
 
 
 
 
 
 
 
 
Marketed
 
 
 
 
 
 
 
 
 
 
VALARIS DPS-1

 
F&G ExD Millennium, DP
 
2012
 
Woodside
 
Australia
 
Feb. 20
 
Sep. 21
 
Contracted for ten wells. Plus one 2-well option
VALARIS 8505

 
ENSCO 8500 Series,
DP + Moored
 
2012
 
Eni
Lukoil

 
Mexico
Mexico

 
Jan. 19
Nov. 20

 
Nov. 20
Feb. 21

 
Contracted for six wells in the U.S. GOM and for five wells in Mexico
Contracted for one well. Plus 1-well option

VALARIS 8503

 
ENSCO 8500 Series,
DP + Moored
 
2010
 
Kosmos
Available
 
U.S. GOM
 
Sep. 19
 
Apr. 20
 
Contracted for six wells.
VALARIS MS-1

 
F&G ExD Millennium, Moored
 
2011
 
Inpex
Santos
 
Australia
Australia
 
Jul. 20
Feb. 21
 
Nov. 20
Apr. 21
 
Contracted for one well
Contracted for three wells. Plus 6-well option
VALARIS 5004

 
F&G Enhanced Pacesetter, Moored
 
1982
 
Mellitah
Available
 
Mediterranean
 
Aug. 14
 
Apr. 20
 
Operated on reduced day rate from mid-March 2020 to mid-April 2020 before contract ended
Preservation Stacked
 
 
VALARIS 8500

 
ENSCO 8500 Series, DP
 
2008
 
Preservation Stacked(2)
 
U.S. GOM
 
 
 
 
 
 
VALARIS 8501

 
ENSCO 8500 Series, DP
 
2009
 
Preservation Stacked(2)
 
U.S. GOM
 
 
 
 
 
 
VALARIS 8502

 
ENSCO 8500 Series, DP
 
2010
 
Preservation Stacked(2)
 
U.S. GOM
 
 
 
 
 
 
VALARIS 8504

 
ENSCO 8500 Series,
DP + Moored
 
2011
 
Preservation Stacking(2)
 
Malaysia

 
 
 
 
 


VALARIS 8506

 
ENSCO 8500 Series, DP
 
2012
 
Preservation Stacked(2)
 
U.S. GOM
 
 
 
 
 
 
Changes: bolded rig names and underlined text signify changes in rig status from previous report

Page 4 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Segment /
Asset Type / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Heavy Duty Ultra-Harsh Environment(3)
 
 
VALARIS JU-292
(Norway)
 
KFELS N Class
 
2011
 
ConocoPhillips
 
Norway
 
Nov. 19
 
Feb. 21
 
Plus one 13-month priced option
VALARIS JU-291
(Stavanger)
 
KFELS N Class
 
2011
 
Equinor
 
Norway
 
Oct. 19
 
Dec. 20
 
Plus three 1-well priced options and recurring 6-month priced options through Dec. 25
VALARIS JU-290
(Viking)
 
KFELS N Class
 
2010
 
Repsol
Lundin
 
Norway
Norway
 
Oct. 19
May 20
 
Apr. 20
Sep. 21
 
Contracted for accommodation services
Contracted for seven wells. Plus four 1-well priced options
VALARIS JU-250
(Bob Palmer)
 
LT Super Gorilla XL
 
2003
 
Saudi Aramco
 
Saudi Arabia
 
Jun. 18
 
Jun. 21
 
Leased to ARO Drilling(4)
VALARIS JU-249
(Gorilla VII)
 
LT Super Gorilla
 
2002
 
Chrysaor
Neptune
 
UK
UK

 
May 18
Aug. 20
 
Apr. 20
Jan. 22
 

Contract transferred from VALARIS JU-248. Contracted for four wells. Plus two 1-well options

VALARIS JU-248
(Gorilla VI)
 
LT Super Gorilla
 
2000
 
Premier

 
UK

 
May 20

 
Aug. 20

 
Contracted for three wells


VALARIS JU-247
(Gorilla V)
 
LT Super Gorilla
 
1998
 
Total
 
UK
 
Sep. 17
 
Nov. 20
 
Plus one 3-month and one 6-month priced options
Changes: bolded rig names and underlined text signify changes in rig status from previous report

Page 5 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Segment /
Region / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Heavy Duty Harsh Environment(3)
 
 
VALARIS JU-123
 
KFELS Super A
 
2019
 
Premier
 
UK
 
Oct. 20
 
Nov. 21
 
Contracted for four wells. Plus three 1-well options
VALARIS JU-122

 
KFELS Super A
 
2014
 
Shell
 
UK
 
Jan. 20
 
Apr. 21
 
Contracted for three wells. Plus six 1-well priced options
VALARIS JU-121

 
KFELS Super A
 
2013
 
ONE
Available
 
Netherlands
 
Apr. 19
 
Apr. 20
 
Contracted for three wells
VALARIS JU-120

 
KFELS Super A
 
2013
 
Chrysaor
 
UK
 
Jul. 17
 
Dec. 22
 
Operating on a reduced day rate from late April 2020 to late September 2020, then expected to return to full day rate until end of contract in December 2022

VALARIS JU-102

 
KFELS MOD V-A
 
2002
 
Eni
 
Mexico

 
Sep. 20

 
Sep. 22

 
Contracted for twelve wells
VALARIS JU-101

 
KFELS MOD V-A
 
2000
 
Ithaca

 
UK

 
Apr. 20

 
May 20

 
Contracted for three wells
VALARIS JU-100

 
LT Gorilla
 
1987
 
DNO
 
UK
 
Nov. 19
 
Apr. 20
 
Contracted for nine P&A wells
Changes: bolded rig names and underlined text signify changes in rig status from previous report


Page 6 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Segment /
Region / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Heavy Duty - Modern(3)
 
 
VALARIS JU-118
(Joe Douglas)
 
LT 240-C
 
2011
 
Fieldwood
 
Mexico
 
Mar. 20
 
May 21
 
Contracted for three wells. Plus a 3-well option
VALARIS JU-117
(Ralph Coffman)
 
LT 240-C
 
2009
 
Undisclosed Operator


 
Trinidad

 
Jul. 19

 
May 20
 
Plus two 2-well priced options. Contract suspended from early April 2020 to early May 2020
VALARIS JU-116
(Mississippi)
 
LT 240-C
 
2008
 
Saudi Aramco
 
Saudi Arabia
 
Dec. 18
 
Dec. 21
 
Leased to ARO Drilling(4). Planned maintenance for approx. 15 days in 2Q20
VALARIS JU-115

 
BM Pacific Class 400
 
2013
 
Mubadala Petroleum
 
Thailand
 
Mar. 19
 
Jul. 20
 
 
VALARIS JU-114

 
BM Pacific Class 400
 
2012
 
Preservation
Stacked(2)

 
Philippines
 
 
 
 
 
 
VALARIS JU-113

 
BM Pacific Class 400
 
2012
 
Preservation
Stacked(2)

 
Philippines
 
 
 
 
 
 
VALARIS JU-111

 
KFELS MOD V-B
 
2003
 
Preservation
Stacked(2)

 
Malta
 
 
 
 
 
 
VALARIS JU-110

 
KFELS MOD V-B
 
2015
 
North Oil Company
 
Qatar
 
Sep. 17
 
Sep. 20
 
Plus 1-year priced option
VALARIS JU-109

 
KFELS MOD V-Super B
 
2008
 
Chevron
Available
 
Angola
 
Dec. 14
 
Apr. 20
 
 
VALARIS JU-108

 
KFELS MOD V-B
 
2007
 
Saudi Aramco
 
Saudi Arabia
 
Nov. 18
 
Nov. 21
 
 
VALARIS JU-107

 
KFELS MOD V-B
 
2006
 
Chevron
SapuraOMV
Jadestone
 
Australia
Australia
Australia
 
Sep. 19
May 20
Jun. 20
 
Mar. 20
Jun. 20
Sep. 20
 
Plus three 30-day priced options
Contracted for one well
Contracted for two wells
VALARIS JU-106

 
KFELS MOD V-B
 
2005
 
BP
 
Indonesia
 
Jan. 18
 
Jan. 23
 
Plus 13 1-well priced options. Planned inspection for approx. 10 days in 1Q20 and 25 days in 3Q20
VALARIS JU-105

 
KFELS MOD V-B
 
2002
 
Preservation
Stacked(2)

 
Singapore
 
 
 
 
 
 
VALARIS JU-104

 
KFELS MOD V-B
 
2002
 
Available
 
 
 
 
 
 
 
 
Changes: bolded rig names and underlined text signify changes in rig status from previous report

Page 7 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Segment /
Region / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Standard Duty - Modern
 
 
VALARIS JU-148
(Earnest Dees)
 
LT Super 116-E
 
2013
 
Saudi Aramco
 
Saudi Arabia
 
Nov. 19
 
Nov. 22
 
Leased to ARO Drilling(4)
VALARIS JU-147
(Bess Brants)
 
LT Super 116-E
 
2013
 
Saudi Aramco
 
Saudi Arabia
 
Sep. 19
 
Sep. 22
 
Leased to ARO Drilling(4)
VALARIS JU-146
(EXL IV)
 
LT Super 116-E
 
2011
 
Saudi Aramco
 
Saudi Arabia
 
Sep. 18
 
Sep. 21
 
Leased to ARO Drilling(4)
VALARIS JU-145
(EXL III)
 
LT Super 116-E
 
2010
 
Available
 
U.S. GOM
 
 
 
 
 
 
VALARIS JU-144
(EXL II)
 
LT Super 116-E
 
2010
 
Fieldwood
 
Mexico
 
Apr. 20
 
Oct. 20
 
Contracted for two wells. Plus 1-well option
VALARIS JU-143
(EXL I)
 
LT Super 116-E
 
2010
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 18
 
Oct. 21
 
Leased to ARO Drilling(4)
VALARIS JU-142
(112)
 
LT Super 116-E
 
2008
 
Preservation
Stacked(2)

 
Malta
 
 
 
 
 
 
VALARIS JU-141

 
LT Super 116-E
 
2016
 
Saudi Aramco
 
Saudi Arabia
 
Aug. 18
 
Aug. 21
 
 
VALARIS JU-140

 
LT Super 116-E
 
2016
 
Saudi Aramco
 
Saudi Arabia
 
Jul. 18
 
Jun. 21
 
 
VALARIS JU-76

 
LT Super 116-C
 
2000
 
Saudi Aramco
 
Saudi Arabia
 
Jan. 15
 
Dec. 22
 
Planned inspection for 40 days in 1Q20 and 20 days in 2Q20
VALARIS JU-75

 
LT Super 116-C 
 
1999
 
W&T Offshore
Available
 
U.S. GOM


 
Feb. 20

 
Mar. 20
 
 
Changes: bolded rig names and underlined text signify changes in rig status from previous report

Page 8 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Segment /
Region / Rig
 
Design
 
Year Delivered
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Standard Duty - Legacy
 
 
VALARIS JU-92

 
LT 116-C
 
1982
 
Chrysaor
 
UK
 
Feb. 17
 
Dec. 22
 
Planned inspection for approx. 14 days in 3Q20. Operating on a reduced day rate from mid-May 2020 to late September 2020, then expected to return to full day rate until end of contract in December 2022
VALARIS JU-88

 
LT 82 SD-C
 
1982
 
Saudi Aramco
 
Saudi Arabia
 
Nov. 13
 
Apr. 20
 
Day rate of approx. $65,000
VALARIS JU-87

 
LT 116-C
 
1982
 
ExxonMobil
Cox
 
U.S. GOM
U.S. GOM
 
Nov. 19
Mar. 20

 
Mar. 20
May 20

 
Contracted for 21 wells
VALARIS JU-84

 
LT 82 SD-C
 
1981
 
Saudi Aramco
 
Saudi Arabia
 
Jan. 17
 
Aug. 21
 
Day rate of approx. $72,000. Planned inspection for approx. 60 days in 3Q20 and 60 days in 4Q20
VALARIS JU-72

 
Hitachi K1025N
 
1981
 
Eni

 
UK

 
Jan. 20


 
Jan. 23
 
Contracted for 40-well P&A program. Planned inspection for 14 days in 2Q20. Operating on a reduced day rate from April 2020 to July 2020, then expected to return to full day rate until end of contract in January 2023
VALARIS JU-71

 
Hitachi K1032N
 
1982
 
Preservation
Stacked(2)
 
UK
 
 
 
 
 
 
VALARIS JU-67

 
LT 84-CE
 
1976
 
Pertamina
 
Indonesia
 
Jan. 19
 
May 20
 
 
VALARIS JU-54

 
F&G L-780 Mod II-C
 
1982
 
Saudi Aramco
 
Saudi Arabia
 
Sep. 14
 
Sep. 22
 
Day rate of approx. $72,000, plus approx. $5,000 per day for upgrade costs and mobilization amortized through Sep. 22
VALARIS JU-37
(Arch Rowan)
 
LT 116-C
 
1981
 
Saudi Aramco
 
Saudi Arabia
 
Sep. 18
 
Sep. 21
 
Leased to ARO Drilling(4)
VALARIS JU-36
(Charles Rowan)
 
LT 116-C
 
1981
 
Saudi Aramco
 
Saudi Arabia
 
Sep. 18
 
Sep. 21
 
Leased to ARO Drilling(4)
VALARIS JU-22
(Middletown)
 
LT 116-C
 
1980
 
Saudi Aramco
 
Saudi Arabia
 
Sep. 18
 
Sep. 21
 
Leased to ARO Drilling(4)
Changes: bolded rig names and underlined text signify changes in rig status from previous report

Page 9 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
Segment / Rig
 
Design
 
Customer/
Status
 
Location
 
Contract Start Date
 
Contract End Date(1)
 
Comments
Other
 
 
 
 
 
 
 
 
 
 
 
 
Drilling Management
 
 
Thunder Horse
 
Deepwater Semisubmersible
 
BP
 
U.S. GOM
 
Jan. 17
 
Jan. 22
 
Day rate of approx. $127,000. Plus five 1-year options
Mad Dog
 
Deepwater Spar Drilling Rig
 
BP
 
U.S. GOM
 
Jan. 17
 
Jan. 22
 
Day rate of approx. $86,000 until April 2020, then reduced day rate through end of contract. Plus five 1-year options
 
 
 
 
 
 
 
 
 
 
 
 
 
ARO Drilling
 
 
 
 
 
 
 
 
 
 
 
 
Jackup Rigs Owned by ARO Drilling
 
 
Gilbert Rowe
 
LT 116-C
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 17
 
Oct. 20
 
Day rate of approx. $69,000
Bob Keller
 
LT Tarzan 225-C
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 17
 
Oct. 20
 
Day rate of approx. $130,000. Planned maintenance for approx. 5 days in 2Q20 and 15 days in 3Q20
J.P. Bussell
 
LT Tarzan 225-C
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 17
 
Oct. 20
 
Day rate of approx. $130,000. Planned maintenance for approx. 10 days in 2Q20
Hank Boswell
 
LT Tarzan 225-C
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 18
 
Oct. 21
 
Undisclosed day rate. Planned maintenance for approx. 15 days in 3Q20
Scooter Yeargain
 
LT Tarzan 225-C
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 18
 
Oct. 21
 
Undisclosed day rate. Inspection for approx. 45 days in 1Q20
SAR 201
 
BM 200-H
 
Saudi Aramco
 
Saudi Arabia
 
Feb. 18
 
Feb. 21
 
Day rate of approx. $79,000. Inspection for approx. 30 days in 1Q20
SAR 202
 
KFELS Super B
 
Saudi Aramco
 
Saudi Arabia
 
Oct. 17
 
Oct. 20
 
Day rate of approx. $195,000. Planned maintenance for approx. 10 days in 2Q20
 
 
 
 
 
 
 
 
 
 
 
 
 
Held for Sale
 
 
 
 
 
 
 
 
 
 
 
 
VALARIS JU-70

 
Hitachi K1032N
 
Preservation
Stacked(2)
 
UK
 
 
 
 
 
 
Changes: bolded rig names and underlined text signify changes in rig status from previous report
(1) Contract duration does not include any unexercised optional extensions. Contract end dates can vary based on how long it takes to complete the wells subject to the contract.
(2) Prior to stacking, upfront steps are taken to preserve the rig. This may include a quayside power source to dehumidify key equipment and/or provide electrical current to the hull to prevent corrosion. Also, certain equipment may be removed from the rig for storage in a temperature-controlled environment. While stacked, large equipment that remains on the rig is periodically inspected and maintained by Valaris personnel. These steps are designed to reduce the time and lower cost to reactivate the rig when market conditions improve.
(3) Heavy duty jackups are well-suited for operations in tropical revolving storm areas.
(4) Rigs leased to ARO Drilling via bareboat charter agreements to fulfill contracts between ARO Drilling and Saudi Aramco.

Page 10 of 12


globalfleetmap04222020.jpg

Page 11 of 12


vlrhposclrclrspcrgb190701a18.jpg
 
 
Valaris plc
Fleet Status Report
April 22, 2020
 
 
Additional Information Regarding this Fleet Status Report
 
Day Rate and Terms. The day rates reflected in this Fleet Status Report are stated in U.S. dollars and are the operating day rates charged to customers, which may include estimated contractual adjustments for changes in operating costs and/or reimbursable cost adjustments for ongoing expenses such as crew, catering, insurance and taxes. The day rates, however, do not include certain types of non-recurring revenues such as lump sum mobilization payments, revenues earned during mobilizations, revenues associated with contract preparation and other non-recurring reimbursable items such as mobilizations and capital enhancements, and the impact of the fair market value adjustments to previously acquired drilling contracts. Routine and non-routine downtime may reduce the actual revenues recognized during the contract term. Additionally, we sometimes negotiate special rates and/or day rate adjustments with customers that may reduce revenues recognized.
 
Forward Looking Statements. Statements contained in this Fleet Status Report that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements include words or phrases such as “anticipate,” “believe,” “estimate,” “expect,” “intend,” “plan,” “project,” “could,” “may,” “might,” “should,” “will” and similar words and specifically include statements involving future rig day rates including adjustments with the customer; future levels of offshore drilling activity; discussions with the customer; backlog; cost adjustments; utilization; estimated rig availability; expected work commitments and contracts; contract duration, status, terms and other contract commitments; letters of intent, letters of award or other correspondence indicating an award; rig enhancement projects; new rig commitments; the expected period of time and number of rigs that will be in a shipyard for repairs, maintenance, enhancement or construction; sale leaseback transactions; scheduled delivery dates for new rigs; and the timing of delivery, mobilization, contract commencement, relocation or other movement of rigs. Such statements are subject to numerous risks, uncertainties and assumptions that may cause actual results to vary materially from those indicated, including commodity price fluctuations, customer demand, new rig supply, downtime and other risks associated with offshore rig operations; relocations; costs and difficulties related to the integration of Ensco plc and Rowan Companies plc; our ability to repay debt and the timing thereof; risks related to our joint venture with Saudi Aramco, including the timing and amount of future distributions from the joint venture or contributions to the joint venture; severe weather or hurricanes; changes in worldwide rig supply and demand, competition and technology; future levels of offshore drilling activity; governmental action, civil unrest and political and economic uncertainties; the coronavirus global pandemic and the related health measures implemented by governments worldwide; terrorism, piracy and military action; risks inherent to shipyard rig construction, repair, maintenance or enhancement; possible cancellation, suspension, repudiation, or termination of drilling contracts, including termination for convenience (without cause), as a result of mechanical difficulties, performance, customer liquidity and finances, the decline or the perceived risk of a further decline in oil and/or natural gas prices, or other reasons; our ability to enter into, and the terms of, future drilling contracts; the cancellation of letters of intent or any failure to execute definitive contracts following announcements of letters of intent, letters of award or other expected work commitments or awards; the outcome of litigation, legal proceedings, investigations or other claims or contract disputes; actions by regulatory authorities or by our security holders; governmental regulatory, legislative and permitting requirements affecting drilling operations; our ability to attract and retain skilled personnel on commercially reasonable terms; environmental or other liabilities, risks or losses; debt restrictions that may limit our liquidity and flexibility; and cybersecurity risks and threats. In addition to the numerous factors described above, you should also carefully read and consider “Item 1A. Risk Factors” in Part I and “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II of our most recent annual report on Form 10-K, as updated in our subsequent quarterly reports on Form 10-Q, which are available on the SEC’s website at www.sec.gov or on the Investor Relations section of our website at www.valaris.com.  Each forward-looking statement contained herein speaks only as of the date of this Fleet Status Report, and we undertake no obligation to publicly update or revise any forward looking statements, except as required by law.

Page 12 of 12