Attached files

file filename
EX-32 - EX-32 - GOLD RESOURCE CORPgoro-20150930xex32.htm
EX-31.2 - EX-31.2 - GOLD RESOURCE CORPgoro-20150930ex312809811.htm
EX-31.1 - EX-31.1 - GOLD RESOURCE CORPgoro-20150930ex3113cf31b.htm

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549


 

FORM 10-Q

 

(Mark One)

 

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended September 30, 2015

 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from              to              

 

Commission File Number: 001-34857

 


 

GOLD RESOURCE CORPORATION

(Exact Name of Registrant as Specified in its charter)

 


 

 

 

Colorado

84-1473173

(State or other jurisdiction of

incorporation or organization)

(I.R.S. Employer

Identification No.)

 

2886 Carriage Manor Point, Colorado Springs, Colorado 80906

(Address of Principal Executive Offices) (Zip Code)

 

(303) 320-7708

(Registrant’s telephone number including area code) 


 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    Yes      No    

 

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to post such files). Yes  No  

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See definition of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

 

 

 

 

Larger accelerated filer

Accelerated filer

 

 

 

 

Non-accelerated filer

(Do not check if a smaller reporting company)

Smaller reporting company

 

Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    Yes      No   

 

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date: 54,179,369 shares of common stock outstanding as of November 2, 2015.

 

 

 


 

GOLD RESOURCE CORPORATION

 

FORM 10-Q

 

Index

 

 

 

 

 

Page

 

Part I - FINANCIAL INFORMATION 

 

 

 

Item 1 

 

Financial Statements

 

 

 

 

 

Condensed Consolidated Balance Sheets at September 30, 2015 (unaudited) and December 31, 2014

 

 

 

 

Condensed Consolidated Statements of Operations for the three and nine months ended September 30, 2015 and 2014 (unaudited)

 

 

 

 

Condensed Consolidated Statements of Cash Flows for the nine months ended September 30, 2015 and 2014 (unaudited)

 

 

 

 

Notes to Condensed Consolidated Financial Statements (unaudited)

 

 

Item 2 

 

Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

13 

 

Item 3 

 

Quantitative and Qualitative Disclosures About Market Risk

 

22 

 

Item 4 

 

Controls and Procedures

 

23 

 

 

 

 

 

 

 

Part II - OTHER INFORMATION 

 

 

 

Item 2. 

 

Unregistered Sales of Equity Securities and Use of Proceeds

 

25 

 

Item 6. 

 

Exhibits

 

25 

 

Signatures 

 

26 

 

 

References in this report to agreements to which Gold Resource Corporation is a party and the definition of certain terms from those agreements are not necessarily complete and are qualified by reference to the agreements. Readers should refer to the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2014 and the exhibits listed therein.

 

 

 


 

PART I - FINANCIAL INFORMATION

ITEM 1. Financial Statements

 

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED BALANCE SHEETS

(U.S. dollars in thousands, except share and per share amounts)

 

 

 

 

 

 

 

 

 

 

 

 

September 30, 

 

December 31, 

 

 

 

2015

 

2014

 

 

    

(Unaudited)

 

 

 

ASSETS

 

 

 

 

 

 

 

Current assets:

 

 

 

 

 

 

 

Cash and cash equivalents

 

$

14,105

 

$

27,541

 

Gold and silver bullion

 

 

3,160

 

 

3,447

 

Accounts receivable

 

 

1,851

 

 

1,416

 

Inventories

 

 

9,347

 

 

7,295

 

IVA taxes receivable

 

 

1,870

 

 

575

 

Deferred tax assets

 

 

3,891

 

 

3,891

 

Prepaid expenses and other current assets

 

 

1,932

 

 

2,935

 

Total current assets

 

 

36,156

 

 

47,100

 

Property, plant and mine development, net

 

 

47,808

 

 

32,348

 

Deferred tax assets

 

 

27,040

 

 

25,519

 

Investments in equity securities

 

 

894

 

 

2,620

 

Other non-current assets

 

 

2,964

 

 

4,078

 

Total assets

 

$

114,862

 

$

111,665

 

LIABILITIES AND SHAREHOLDERS' EQUITY

 

 

 

 

 

 

 

Current liabilities:

 

 

 

 

 

 

 

Accounts payable

 

$

8,201

 

$

3,892

 

Accrued expenses and other current liabilities

 

 

5,124

 

 

3,923

 

Capital lease obligations

 

 

1,220

 

 

1,498

 

Income taxes payable

 

 

3,348

 

 

7,907

 

Dividends payable

 

 

542

 

 

542

 

Total current liabilities

 

 

18,435

 

 

17,762

 

Capital lease obligations

 

 

 -

 

 

834

 

Reclamation and remediation liabilities

 

 

2,537

 

 

2,993

 

Total liabilities

 

 

20,972

 

 

21,589

 

Shareholders' equity:

 

 

 

 

 

 

 

Preferred stock - $0.001 par value, 5,000,000 shares authorized:

 

 

 

 

 

 

 

no shares issued and outstanding

 

 

 -

 

 

 -

 

Common stock - $0.001 par value, 100,000,000 shares authorized:

 

 

 

 

 

 

 

54,515,767 shares issued and outstanding

 

 

55

 

 

55

 

Additional paid-in capital

 

 

96,387

 

 

93,094

 

Retained earnings

 

 

4,503

 

 

3,982

 

Treasury stock at cost, 336,398 shares

 

 

(5,884)

 

 

(5,884)

 

Accumulated other comprehensive loss

 

 

(1,171)

 

 

(1,171)

 

Total shareholders' equity

 

 

93,890

 

 

90,076

 

Total liabilities and shareholders' equity

 

$

114,862

 

$

111,665

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

1


 

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

for the three and nine months ended September 30, 2015 and 2014

(U.S. dollars in thousands, except share and per share amounts)

(Unaudited)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

    

2015

    

2014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sales, net

 

$

19,437

 

$

21,052

 

$

71,082

 

$

85,873

 

Mine cost of sales:

 

 

 

 

 

 

 

 

 

 

 

 

 

Production costs

 

 

13,411

 

 

13,025

 

 

40,462

 

 

43,107

 

Depreciation and amortization

 

 

1,579

 

 

1,180

 

 

5,195

 

 

2,969

 

Reclamation and remediation

 

 

6

 

 

 -

 

 

36

 

 

 -

 

Total mine cost of sales

 

 

14,996

 

 

14,205

 

 

45,693

 

 

46,076

 

Mine gross profit

 

 

4,441

 

 

6,847

 

 

25,389

 

 

39,797

 

Costs and expenses:

 

 

 

 

 

 

 

 

 

 

 

 

 

General and administrative expenses

 

 

2,913

 

 

4,361

 

 

8,032

 

 

9,623

 

Exploration expenses

 

 

1,810

 

 

2,901

 

 

6,416

 

 

5,786

 

Total costs and expenses

 

 

4,723

 

 

7,262

 

 

14,448

 

 

15,409

 

Operating (loss) income

 

 

(282)

 

 

(415)

 

 

10,941

 

 

24,388

 

Other (expense) income, net

 

 

(1,033)

 

 

69

 

 

(2,080)

 

 

766

 

(Loss) income before income taxes

 

 

(1,315)

 

 

(346)

 

 

8,861

 

 

25,154

 

Provision for income taxes

 

 

(846)

 

 

1,109

 

 

3,465

 

 

12,264

 

Net (loss) income

 

$

(469)

 

$

(1,455)

 

$

5,396

 

$

12,890

 

Net (loss) income per common share:

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

$

(0.01)

 

$

(0.03)

 

$

0.10

 

$

0.24

 

Diluted

 

$

(0.01)

 

$

(0.03)

 

$

0.10

 

$

0.24

 

Weighted average shares outstanding:

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

 

54,179,369

 

 

54,179,369

 

 

54,179,369

 

 

54,098,783

 

Diluted

 

 

54,179,369

 

 

54,179,369

 

 

54,201,274

 

 

54,698,748

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

2


 

 

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

for the nine months ended September 30, 2015 and 2014

(U.S. dollars in thousands)

(Unaudited)

 

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

 

 

 

 

 

 

Cash flows from operating activities:

    

 

 

 

 

 

 

Net income

 

$

5,396

 

$

12,890

 

Adjustments to reconcile net income to net cash from operating activities:

 

 

 

 

 

 

 

Depreciation, depletion and amortization

 

 

6,331

 

 

3,107

 

Stock-based compensation

 

 

3,293

 

 

3,847

 

Deferred income taxes

 

 

(1,522)

 

 

 -

 

Currency exchange (gain) loss

 

 

(326)

 

 

545

 

Unrealized loss (gain) on investments

 

 

1,726

 

 

(1,504)

 

Other operating adjustments

 

 

1,072

 

 

162

 

Changes in operating assets and liabilities:

 

 

 

 

 

 

 

Accounts receivable

 

 

(435)

 

 

(3,699)

 

Inventories

 

 

(1,149)

 

 

(1,582)

 

Prepaid expenses and other current assets

 

 

(897)

 

 

1,354

 

Accounts payable and other accrued liabilities

 

 

5,069

 

 

(731)

 

Income taxes payable/receivable

 

 

(4,528)

 

 

11,907

 

Other noncurrent assets

 

 

466

 

 

 -

 

Net cash provided by operating activities

 

 

14,496

 

 

26,296

 

Cash flows from investing activities:

 

 

 

 

 

 

 

Capital expenditures

 

 

(21,837)

 

 

(10,524)

 

Investments

 

 

 -

 

 

(1,805)

 

Proceeds from sale of building

 

 

 -

 

 

1,737

 

Other investing activities

 

 

40

 

 

23

 

Net cash used in investing activities

 

 

(21,797)

 

 

(10,569)

 

Cash flows from financing activities:

 

 

 

 

 

 

 

Proceeds from exercise of stock options

 

 

 -

 

 

100

 

Dividends paid

 

 

(4,876)

 

 

(4,868)

 

Repayment of capital leases

 

 

(1,123)

 

 

(1,099)

 

Net cash used in financing activities

 

 

(5,999)

 

 

(5,867)

 

Effect of exchange rate changes on cash and cash equivalents

 

 

(136)

 

 

(33)

 

Net (decrease) increase in cash and cash equivalents

 

 

(13,436)

 

 

9,827

 

Cash and cash equivalents at beginning of period

 

 

27,541

 

 

14,973

 

Cash and cash equivalents at end of period

 

$

14,105

 

$

24,800

 

Supplemental Cash Flow Information

 

 

 

 

 

 

 

Interest expense paid

 

$

65

 

$

139

 

Income and mining taxes paid

 

$

8,464

 

$

 -

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

3


 

GOLD RESOURCE CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

September 30, 2015

(Unaudited)

 

1. Basis of Preparation of Financial Statements

 

Basis of Presentation: The unaudited interim condensed consolidated financial statements included herein are expressed in United States dollars and are prepared in conformance with United States generally accepted accounting principles (“U.S. GAAP”) and applicable rules of the U.S. Securities and Exchange Commission (“SEC”) regarding interim financial reporting. The unaudited interim condensed consolidated financial statements include the accounts of Gold Resource Corporation (the Company”) and its U.S. subsidiary GRC Nevada Inc. (“GRC Nevada”) and its Mexican subsidiary Don David Gold Mexico S.A. de C.V. (“Don David Gold Mexico”). Significant intercompany accounts and transactions have been eliminated. Certain information and note disclosures normally included in financial statements prepared in accordance with U.S. GAAP have been omitted pursuant to SEC rules and regulations, although the Company believes that the disclosures included herein are adequate to make the information presented not misleading. These unaudited interim condensed consolidated financial statements should be read in conjunction with the Company’s consolidated financial statements and notes thereto contained in the Company’s Form 10-K for the year ended December 31, 2014. Unless otherwise noted, there have been no material changes to the footnotes from those accompanying the audited financial statements contained in the Company’s annual report on Form 10-K.

 

In management’s opinion, the unaudited condensed consolidated financial statements contained herein reflect all material normal and recurring adjustments that are necessary for the fair presentation of the Company’s financial position, results of operations, and cash flows on a basis consistent with that of its audited consolidated financial statements for the year ended December 31, 2014. However, the results of operations for the interim period ended September 30, 2015 may not be indicative of results of operations to be expected for the full fiscal year.

 

Recently Issued Accounting Pronouncements: Accounting Standards Update No. 2015-11 Inventory (Topic 330). Topic 330 Inventory, currently requires an entity to measure inventory at the lower of cost or market. Market could be replacement cost, net realizable value, or net realizable value less an approximately normal profit margin. The amendments in this Update require an entity to measure inventory within the scope of this Update at the lower of cost and net realizable value. For public business entities, the amendments in this Update are effective for fiscal years beginning after December 15, 2016, including interim periods within those fiscal years. The Company does not anticipate any significant changes due to the implementation of this update.

 

2. Fair Value Measurement

 

Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below: 

 

Level 1Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities; 

 

Level 2Quoted prices in markets that are not active, or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability; and 

 

Level 3Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity). 

 

4


 

The following tables set forth certain of the Company’s assets measured at fair value by level within the fair value hierarchy. As required by accounting guidance, assets are classified in their entirety based on the lowest level of input that is significant to the fair value measurement.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fair Value as of September 30, 2015

 

 

 

 

    

Level 1

    

Level 2

    

Level 3

    

Total

    

Balance Sheet Classification

 

 

 

(in thousands)

 

 

 

Receivables related to unsettled invoices

 

$

 -

 

$

1,851

 

$

 -

 

$

1,851

 

Accounts receivable

 

Investments in equity securities

 

$

663

 

$

 -

 

$

 -

 

$

663

 

Investments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fair Value as of December 31, 2014

 

 

 

 

    

Level 1

    

Level 2

    

Level 3

    

Total

    

Balance Sheet Classification

 

 

 

(in thousands)

 

 

 

Receivables related to unsettled invoices

 

$

 -

 

$

1,416

 

$

 -

 

$

1,416

 

Accounts receivable

 

Investments in equity securities

 

$

2,389

 

$

 -

 

$

 -

 

$

2,389

 

Investments

 

 

 

Cash and cash equivalents consist primarily of money market funds and are valued at cost, which approximates fair value.

 

Trade accounts receivable include amounts due to the Company for shipments of concentrates and doré sold to customers.  Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain an embedded derivative related to the provisional pricing mechanism which is bifurcated and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices. Because these provisionally priced sales have not yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts receivable as of each reporting date.

 

The Company’s non-current investments consist of marketable equity securities which are valued using quoted market prices for each security when available.

 

Gains and losses related to changes in the fair value of these financial instruments were included in the Company’s condensed consolidated statements of operations as shown in the following table:

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

 

 

    

2015

    

2014

    

Statement of Operations Classification

 

    

(in thousands)

 

 

Derivative loss 

 

$

(89)

 

$

(2,303)

 

Sales, net

Investment (loss) gain

 

$

(227)

 

$

577

 

Other (expense) income, net

 

 

 

 

 

 

 

 

 

 

 

 

 

Nine months ended September 30, 

 

 

 

    

2015

    

2014

    

Statement of Operations Classification

 

    

(in thousands)

 

 

Derivative loss

 

$

(704)

 

$

(845)

 

Sales, net

Investment (loss) gain

 

$

(1,726)

 

$

1,482

 

Other (expense) income, net

 

 

 

3. Gold and Silver Bullion

 

The Company periodically purchases gold and silver bullion on the open market for investment purposes and to use in its dividend exchange program under which shareholders may exchange their cash dividends for gold and silver bullion. The Company’s investment in gold and silver bullion is carried at the lower of cost or market. 

 

5


 

During the nine months ended September 30, 2015, the Company made no purchases of gold or silver bullion. The Company recorded write-downs on its gold and silver bullion totaling $0.3 million and $0.2 million for the nine months ended September 30, 2015 and 2014, respectively. At September 30, 2015 and December 31, 2014, the Company’s holdings of bullion consisted of the following:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2015

 

2014

 

 

    

Gold

    

Silver

    

Gold

    

Silver

 

 

 

(in thousands, except ounces and per ounce )

 

Ounces

 

 

1,636

 

 

91,284

 

 

1,646

 

 

92,237

 

Carrying value per ounce

 

$

1,114.00

 

$

14.65

 

$

1,199.25

 

$

15.97

 

Total carrying value

 

$

1,823

 

$

1,337

 

$

1,974

 

$

1,473

 

 

 

 

4. Current Inventories 

 

At September 30, 2015 and December 31, 2014, inventories consisted of the following:  

 

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

(in thousands)

 

Stockpiles - underground mine

 

$

596

 

$

116

 

Stockpiles - open pit mine (1)

 

 

903

 

 

 -

 

Concentrates

 

 

1,201

 

 

1,481

 

Materials and supplies (2)

 

 

6,647

 

 

5,698

 

Total

 

$

9,347

 

$

7,295

 


(1)Reclassified from non-current inventory.

(2)Net of reserve for obsolescence of $217 in each period.

 

 

5. Income Taxes 

 

The Company recorded income tax benefit of $0.8 million and expense of $3.5 million for the three and nine months ended September 30, 2015, respectively. During the three and nine months ended September 30, 2014, the Company recorded income tax expense of $1.1 million and $12.3 million, respectively

 

During the nine months ended September 30, 2015, the Company received $3.0 million in intercompany dividends from its Mexican operations. The Company has asserted permanent reinvestment of all Mexico undistributed earnings as of December 31, 2014. The impact of the planned intercompany dividends for 2015, net of foreign tax credits, is reflected in the estimated annual effective tax rate.

 

During the nine months ended September 30, 2015, the Company experienced a decrease in its annualized effective tax rate principally due to the decrease in intercompany dividends anticipated to be paid in 2015 and the related foreign tax credit.

 

In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of the deferred tax assets will not be realized. The ultimate realization of deferred tax assets is dependent upon the generation of future taxable income during the periods in which those temporary differences become deductible. Management considers the scheduled reversal of deferred tax liabilities (including the impact of available carry-back and carry-forward periods), projected future taxable income and tax-planning strategies in making this assessment. As of September 30, 2015, the Company believes it has sufficient positive evidence to conclude that its federal and foreign deferred tax assets are more likely than not to be realized. However, the Company has determined that the realization of its state deferred tax assets is not more likely than not to be realized and has a valuation allowance offsetting the state deferred tax assets.

 

As of September 30, 2015, the Company believes that it has no liability for uncertain tax positions. If the Company were to determine there was an uncertain tax position, the Company would recognize the liability and related interest and penalties within income tax expense.

6


 

Currently the Company is undergoing a normal course tax examination by the Mexican tax authorities that relates to the 2011 and 2012 tax years. The tax examinations are open and ongoing, and no further information has been communicated to the Company by the Mexican tax authorities.

 

6. Prepaid Expenses and Other Current Assets

 

At September 30, 2015 and December 31, 2014, prepaid expenses and other current assets consisted of the following:

 

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

(in thousands)

 

Other receivables

 

$

76

 

$

179

 

Advances to suppliers

 

 

132

 

 

1,193

 

Prepaid insurance

 

 

873

 

 

329

 

Vendor deposits

 

 

778

 

 

921

 

Other current assets

 

 

73

 

 

313

 

Total

 

$

1,932

 

$

2,935

 

 

 

7. Property, Plant and Mine Development – net

 

At September 30, 2015 and December 31, 2014, property, equipment and mine development consisted of the following:

 

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

(in thousands)

 

Machinery and equipment

 

$

19,988

 

$

19,398

 

Mine development

 

 

26,136

 

 

13,393

 

Furniture, computer and office equipment

 

 

2,761

 

 

2,899

 

Mill facilities and infrastructure

 

 

3,078

 

 

2,825

 

Light vehicles and other mobile equipment

 

 

1,887

 

 

1,942

 

Construction-in-progress

 

 

8,760

 

 

592

 

Asset retirement costs

 

 

354

 

 

448

 

Land and mineral rights

 

 

230

 

 

227

 

Subtotal (1)

 

 

63,194

 

 

41,724

 

Accumulated depletion, depreciation and amortization

 

 

(15,386)

 

 

(9,376)

 

Total

 

$

47,808

 

$

32,348

 


(1)

Includes accrued capital expenditures of $1.3 million and $1.6 million for the period ended September 30, 2015 and December 31, 2014, respectively. 

 

The Company recorded depletion, depreciation and amortization expense of $1.6 million and  $5.4 million for the three and nine months ended September 30, 2015, respectively. During the three and nine months ended September 30, 2014, the Company recorded depletion, depreciation and amortization expense of $1.2 million and $3.1 million, respectively.

 

The Company has equipment leases that qualify as capital leases which have been recorded at the present value of the future minimum lease payments, including transaction fees and bargain purchase options, which approximates the net carrying value of the equipment. The equipment leases bear interest at 4.5% to 5.5% per annum, with monthly principal and interest payments of $0.1 million over the three-year lease term. The Company has an option to purchase the equipment at the end of the lease term for less than $0.1 million. Depreciation on the leased assets is recorded over their estimated useful lives. Scheduled minimum capital lease repayments are $0.3 million in 2015 and $0.9 million in 2016. 

 

7


 

8. Investments in Equity Securities

 

At September 30, 2015 and December 31, 2014, the value of investments in equity securities consisted of the following:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2015

 

2014

 

 

    

Cost

    

Unrealized loss

    

Fair Value

    

Cost

    

Unrealized gain

    

Fair Value

 

 

 

(in thousands)

 

Canamex Resources Corporation - common shares

 

$

1,805

 

$

(1,142)

 

$

663

 

$

1,805

 

$

584

 

$

2,389

 

Laguna Gold Pty Ltd - common shares (1)

 

 

231

 

 

 -

 

 

231

 

 

231

 

 

 -

 

 

231

 

Total

 

$

2,036

 

$

(1,142)

 

$

894

 

$

2,036

 

$

584

 

$

2,620

 

 

 


(1)The Company determined that it is not practicable to estimate the fair value of this investment.

 

9. Other Non-Current Assets

 

At September 30, 2015 and December 31, 2014, other non-current assets consisted of the following:

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

(in thousands)

Stockpiles - open pit mine

 

$

 -

 

$

903

Deferred charge

 

 

2,911

 

 

3,175

Other non-current assets

 

 

53

 

 

 -

Total

 

$

2,964

 

$

4,078

 

 

10. Accrued Expenses and Other Current Liabilities

 

At September 30, 2015 and December 31, 2014, accrued expenses and other current liabilities consisted of the following:

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

(in thousands)

 

Accrued royalty payments

 

$

961

 

$

1,343

 

Accrued vendor payables

 

 

3,595

 

 

2,212

 

Payroll and other taxes payable

 

 

60

 

 

107

 

Accrued insurance

 

 

508

 

 

235

 

Other

 

 

 -

 

 

26

 

Total

 

$

5,124

 

$

3,923

 

 

 

 

 

 

 

 

11. Reclamation and Remediation

 

The Company’s reclamation and remediation obligations relate to the Aguila Project in Oaxaca, Mexico.  The following table presents the changes in reclamation and remediation obligations for the nine months ended September 30, 2015 and the twelve months ended December 31, 2014:

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

(in thousands)

 

Reclamation liabilities – balance at beginning of period

 

$

2,546

 

$

2,887

 

Changes in estimate

 

 

17

 

 

(17)

 

Foreign currency exchange gain

 

 

(345)

 

 

(325)

 

Reclamation liabilities – balance at end of period

 

 

2,218

 

 

2,545

 

 

 

 

 

 

 

 

 

Asset retirement obligation – balance at beginning of period

 

 

448

 

 

 -

 

Changes in estimate

 

 

(114)

 

 

 -

 

Accretion expense

 

 

36

 

 

448

 

Foreign currency exchange gain

 

 

(51)

 

 

 -

 

Asset retirement obligation – balance at end of period

 

 

319

 

 

448

 

Total period end balance

 

$

2,537

 

$

2,993

 

 

8


 

 

12. Shareholders’ Equity 

 

The Company declared and paid $4.9 million of dividends during each of the nine months ended September 30, 2015 and 2014. The Company has declared monthly cash dividends totaling $2.01 per share of common stock to shareholders of record since July 2010. On October 27, 2015, the Board of Directors declared a dividend on common stock totaling $0.5 million payable in November 2015.

 

13. Concentrate Sale Settlements

 

The Company records adjustments to sales of metals concentrate that result from final settlement of provisional invoices in the period that the final invoice settlement occurs. The Company also compares assays taken at the mine site on its concentrate shipments, upon which the Company’s provisional invoices are based, to assays obtained from samples taken at the buyer’s warehouse prior to final settlement, upon which the final invoices are in part based, to assess whether an adjustment to sales is required prior to final invoice settlement. These adjustments resulted in a decrease to sales of $1.2 million and $1.3 million for the three and nine months ended September 30, 2015, respectively, and an increase to sales of $0.1 million and a decrease to sales of $2.4 million for the three and nine months ended September 30, 2014, respectively.

 

In addition to the final settlement adjustments on provisional invoices, the Company records a sales adjustment to mark-to-market outstanding provisional invoices at the end of each reporting period. These adjustments resulted in an increase to sales of $0.1 million and $0.7 million for the three and nine months September 30, 2015 respectively, and a decrease to sales of $1.4 million for the three and nine months ended September 30, 2014, respectively.

 

Sales of metal concentrates are recorded net of smelter refining fees, treatment charges and penalties. Total charges for these items totaled $2.9 million and  $8.8 million for the three and nine months ended September 30, 2015, and $3.5 million and $9.6 million for the three and nine months ended September 30, 2014, respectively.

 

14. Stock Options

 

The Company has a non-qualified stock option and stock grant plan under which equity awards may be granted to key employees, directors and others (the “Plan”). A summary of activity under the Plan for the nine months ended September 30, 2015 is presented below:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Shares

    

Weighted
Average Exercise
Price (per share)

    

Weighted Average
Remaining
Contractual Term
(in years)

    

Aggregate
Intrinsic
Value
(thousands)

 

Outstanding as of December 31, 2014

 

4,675,000

 

$

9.61

 

5.9

 

$

 -

 

Granted

 

1,260,000

 

 

2.30

 

 -

 

 

 -

 

Exercised

 

 -

 

 

 -

 

 -

 

 

 -

 

Forfeited

 

(385,000)

 

 

12.55

 

 -

 

 

 -

 

Outstanding as of September 30, 2015

 

5,550,000

 

$

7.74

 

5.4

 

$

 -

 

 

 

 

 

 

 

 

 

 

 

 

 

Vested and exercisable as of September 30, 2015

 

4,371,666

 

$

8.86

 

5.3

 

$

 -

 

 

A total of 1,260,000 options were granted during the nine months ended September 30, 2015 of which 225,000 options vested immediately and have an exercise term of 10 years. The remaining options vest over a three year period and have an exercise term of 10 years.

 

9


 

The following table summarizes information about stock options outstanding at September 30, 2015:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Outstanding

 

Exercisable

Range of Exercise Prices

    

Number of
Options

    

Weighted Average
Remaining
Contractual Term
(in years)

    

Weighted
Average Exercise
Price (per share)

    

Number of
Options

    

Weighted
Average Exercise
Price (per share)

$0.26 - $3.39

 

1,260,000

 

9.95

 

$

2.30

 

225,000

 

$

2.30

$3.40 - $3.95

 

1,900,000

 

2.95

 

$

3.66

 

1,900,000

 

$

3.66

$5.81 - $14.36

 

1,390,000

 

6.86

 

$

10.86

 

1,246,666

 

$

10.62

$17.10 - $20.51

 

1,000,000

 

6.88

 

$

18.02

 

1,000,000

 

$

18.02

 

 

5,550,000

 

6.23

 

$

7.74

 

4,371,666

 

$

8.86

 

The fair value of stock option grants is amortized over the respective vesting period. Total stock-based compensation expense related to stock options for the three and nine months ended September 30, 2015 was $1.4 million and $3.3 million, respectively, and for the three and nine months ended September 30, 2014 was $1.9 million and $3.9 million, respectively. 

 

Stock-based compensation expense has been allocated between production costs and general and administrative expense as follows:  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

 

2015

    

2014

 

 

 

(in thousands)

Production costs

 

$

412

 

$

759

 

$

1,019

 

$

1,723

 

General and administrative expenses

 

 

968

 

 

1,133

 

 

2,274

 

 

2,124

 

Total

 

$

1,380

 

$

1,892

 

$

3,293

 

$

3,847

 

 

The estimated unrecognized stock-based compensation expense from unvested options as of September 30, 2015 was $0.7 million, and is expected to be recognized over the remaining vesting periods of up to three years. 

 

The assumptions used to determine the value of stock-based awards under the Black-Scholes-Merton method are summarized below:

 

 

 

 

 

 

 

 

 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

 

Risk-free interest rate

 

1.03

%  

1.53

%

Dividend yield

 

5.22

%  

1.63

%

Expected volatility

 

58.79

%  

55.35

%

Expected life in years

 

5

 

5

 

 

 

 

10


 

15. Other (Expense) Income, Net

 

Other (expense) income, net consisted of the following:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

    

2015

    

2014

 

 

 

(in thousands)

 

Unrealized currency exchange (loss) gain

 

$

(497)

 

$

(488)

 

$

326

 

$

(512)

 

Realized currency exchange (loss) gain

 

 

(105)

 

 

75

 

 

(369)

 

 

(21)

 

Impairment loss on gold and silver coins and bullion

 

 

(187)

 

 

(162)

 

 

(260)

 

 

(162)

 

Unrealized (loss) gain from investments (1)

 

 

(227)

 

 

702

 

 

(1,726)

 

 

1,504

 

Interest income

 

 

(133)

 

 

41

 

 

14

 

 

123

 

Interest expense

 

 

(19)

 

 

(43)

 

 

(70)

 

 

(139)

 

Other income (expense)

 

 

135

 

 

(56)

 

 

5

 

 

(27)

 

Total

 

$

(1,033)

 

$

69

 

$

(2,080)

 

$

766

 


(1)

The unrealized (loss) gain due to changes in an equity investment include gains and losses that are non-cash in nature until such time that they are realized through cash transactions. For additional information regarding our fair value measurements and investments, please see notes 2 and 8 to these condensed consolidated financial statements.

 

16. Net (Loss) Income per Share

 

Basic earnings per share is calculated based on the weighted average number of common shares outstanding for the period. Diluted earnings per share is calculated based on the assumption that stock options outstanding, which have an exercise price less than the average market price of the Company’s common shares during the period, have been exercised on the later of the beginning of the period or the date granted and that the funds obtained from the exercise were used to purchase common shares at the average market price during the period.

 

The effect of potentially dilutive stock options on the weighted average number of shares outstanding is as follows:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

    

2015

    

2014

    

2015

    

2014

 

 

(in thousands, except shares and per share amounts)

Net (loss) income

 

$

(469)

 

$

(1,455)

 

$

5,396

 

$

12,890

Basic weighted average shares of common stock outstanding

 

 

54,179,369

 

 

54,179,369

 

 

54,179,369

 

 

54,098,783

Dilutive effect of stock options

 

 

 -

 

 

 -

 

 

21,905

 

 

599,965

Diluted weighted average common shares outstanding

 

 

54,179,369

 

 

54,179,369

 

 

54,201,274

 

 

54,698,748

Net (loss) income  per:

 

 

 

 

 

 

 

 

 

 

 

 

Basic share

 

$

(0.01)

 

$

(0.03)

 

$

0.10

 

$

0.24

Diluted share

 

$

(0.01)

 

$

(0.03)

 

$

0.10

 

$

0.24

 

Stock options to purchase 5,550,000 and 4,290,000 shares of common stock for the three and nine months ended September 30, 2015, respectively, were excluded from the calculation of diluted earnings per share because they were antidilutive. Stock options to purchase 4,955,000 and 3,055,000 shares of common stock for the three and nine months ended September 30, 2014, respectively, were excluded from the calculation of diluted earnings per share because they were antidilutive.

 

 

 

11


 

17. Supplementary Cash-Flow Information

 

During the nine months ended September 30, 2015 and 2014, within the net cash provided by operations on the statement of cash flows consisted the following:

 

 

 

 

 

 

 

 

 

 

    

2015

    

2014

 

 

 

(in thousands)

Impairment loss on gold and silver coins and bullion

 

$

260

 

$

162

 

Reclamation and remediation

 

 

36

 

 

 -

 

Amortization of deferred charge

 

 

265

 

 

 -

 

Other

 

 

511

 

 

 -

 

Total other operating adjustments and write-downs

 

$

1,072

 

$

162

 

 

 

 

 

12


 

.

ITEM 2.  Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

The following discussion summarizes the results of operations of Gold Resource Corporation and its subsidiaries (“we”, “our”, or “us”) for the three and nine months ended September 30, 2015 and compares those results to the three and nine months ended September 30, 2014. It also analyzes our financial condition at September 30, 2015 and compares it to our financial condition at December 31, 2014. This discussion should be read in conjunction with the management’s discussion and analysis and the audited financial statements and footnotes for the year ended December 31, 2014 contained in our annual report on Form 10-K for the year ended December 31, 2014.

 

The discussion also presents certain non-U.S. Generally Accepted Accounting Principles (“non-GAAP”) financial measures that are important to management in its evaluation of our operating results and which are used by management to compare our performance with what we perceive to be peer group mining companies, and are relied on as part of management’s decision-making process. Management believes these measures may also be important to investors in evaluating our performance. For a detailed description of each of the non-GAAP financial measures, please see the discussion below under Non-GAAP Measures.

 

See Forward-Looking Statements at the end of this Item 2 for important information regarding statements contained herein.

 

Overview

 

Business

 

We are a mining company which pursues gold and silver projects that are expected to have low operating costs and high returns on capital. We are presently focused on mineral production from the Aguila Project in Oaxaca, Mexico. Our mill located at the Aguila Project produces doré and metal concentrates from ore mined from the Arista underground mine, which contains precious metal products of gold and silver, and by-products of copper, lead and zinc.

 

The mill located at our Aguila Project produced, on a precious metal gold equivalent basis (at an actual gold/silver ratio of 77:1), 14,133 ounces for the three months ended September 30, 2015. During the same period, we sold 12,773 precious metal gold equivalent ounces produced at a total cash cost per ounce of $603. The Aguila Project mill produced, on a precious metal gold equivalent basis 48,370 ounces for the nine months ended September 30, 2015. During the same period, we sold 46,183 precious metal gold equivalent ounces produced at a total cash cost per ounce of $505. Precious metal gold equivalent is determined by taking gold ounces produced or sold, plus silver ounces produced or sold converted to precious metal gold equivalent ounces using the gold to silver average price ratio for the period. The gold and silver average prices used to determine the gold to silver average price ratio are the actual metal prices realized from sales of our gold and silver. Please see the section titled Non-GAAP Measures below for additional information concerning the cash cost per ounce measures.

 

For the three months ended September 30, 2015, we reported revenue of $19.4 million, mine gross profit of $4.4 million and a net loss of $0.5 million. For the nine months ended September 30, 2015, we reported revenue of $71.1 million, mine gross profit of $25.4 million and net income of $5.4 million.

 

Exploration Activities

 

Oaxaca Mining Unit

 

The Aguila Project: Our mine exploration activities during the third quarter of 2015 at the Aguila Project focused mainly on surface exploration drilling to target the feeder veins and extensions of manto mineralization at the Aguila open pit on the Aguila Project, where operations ceased in 2011. All of the manto drilling indicates additional high-grade gold mineralization north/northwest of the historic open pit. Drilling results are currently being evaluated for potential mining and processing in either the Aguila mill’s flotation or agitated leach circuits. We also continued to advance the exploration ramp to the Switchback vein system during the quarter with the goal to access previously delineated mineralized material at the Switchback deposit by year end. As ongoing ramp development advances towards the

13


 

Switchback, we are planning to construct a third drill station which we anticipate will provide a more advantageous distance and drill angles to continue exploration at Switchback.

 

At the end of the third quarter of 2015, surface drilling resumed on the Salina Blanca prospect, located southwest of the Arista mine. This program is following up mineralized drill intercepts identified during previous drilling campaigns at Salina Blanca. Twelve diamond drill holes totaling 3,485 meters were completed at the Aguila Project during the third quarter of 2015.

 

Las Margaritas property: Surface diamond drilling continued at Las Margaritas in the third quarter of 2015 to test numerous targets delineated by geochemical and geophysical data. Multiple high-grade intercepts were returned for the Tapada and other veins at Las Margaritas. Twelve surface diamond drill holes totaling 4,482 meters were completed during the quarter at Las Margaritas.

 

Alta Gracia property: Mining agreements with the local Alta Gracia community were being finalized and mine permitting was on-going during the third quarter.

 

Nevada Mining Unit

Radar property:  Evaluation of recent drill results and previously collected rock and soil geochemical data was completed during the third quarter of 2015.  A program to test additional drilling targets at Radar is being planned for 2016.

 

Goose property: Field investigations to identify drill targets were completed on the Goose property during the third quarter of 2015. Exploration targets identified at Goose will be included in the drilling program planned for Radar in 2016.

 

Results of Operations

 

The following table summarizes our results of operations:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating Data

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

    

2015

    

2014

 

 

 

(in thousands)

 

Sales, net

 

$

19,437

 

$

21,052

 

$

71,082

 

$

85,873

 

Mine gross profit

 

 

4,441

 

 

6,847

 

 

25,389

 

 

39,797

 

Operating (loss) income

 

 

(282)

 

 

(415)

 

 

10,941

 

 

24,388

 

Other (expense) income

 

 

(1,033)

 

 

69

 

 

(2,080)

 

 

766

 

(Loss) income before income taxes

 

 

(1,315)

 

 

(346)

 

 

8,861

 

 

25,154

 

Provision for income taxes

 

 

(846)

 

 

1,109

 

 

3,465

 

 

12,264

 

Net (loss) income

 

$

(469)

 

$

(1,455)

 

$

5,396

 

$

12,890

 

 

Sales, net

 

Metal sales of $19.4 million for the three months ended September 30, 2015 decreased by $1.6 million, or 8% when compared to the same period in 2014. This decrease was primarily due to lower realized gold and silver prices and lower silver production when compared to the same period in 2014. The lower silver sales were partially offset by an increase in sales of gold and base metals. For the three months ended September 30, 2015, realized prices for metals decreased from the third quarter of 2014 as follows: gold by 14% to $1,115 per ounce, silver by 28% to $14.50 per ounce, copper by 31% to $4,883 per tonne, lead by 28% to $1,619 per tonne, and zinc by 29% to $1,701.

 

Metal sales of $71.1 million for the nine months ended September 30, 2015 decreased by $14.8 million, or 17% when compared to the same period in 2014. This decrease was primarily due to the lower silver production and lower realized gold and silver prices. For the nine months ended September 30, 2015, realized prices for metals decreased from the same period of 2014 as follows: gold by 9% to $1,177 per ounce, silver by 19% to $16.09 per ounce, copper by 21%

14


 

to $5,436 per tonne, lead by 19% to $1,746 per tonne, and zinc by 10% to $1,981. Please see the Production and Sales Statistics-Arista Underground Mine table below for additional information regarding our mineral production statistics for the three and nine months ended September 30, 2015 and 2014.

 

Revenue generated from the sale of base metals in our concentrates is considered a by-product of our gold and silver production for the purpose of our total cash cost after by-product credits measure noted in our non-GAAP measures disclosure. We currently report the sale of base metals as part of our revenue.

 

We periodically review our revenues to ensure that our reporting of primary products and by-products is appropriate. We consider copper, lead and zinc to be by-products of our precious metal gold equivalent production; consequently the value of these metals is applied as a reduction to total cash costs in our calculation of total cash cost, after by-product credits, per precious metal gold equivalent ounce sold, including royalties. Please see Non-GAAP Measures below for additional information.

 

Production

 

For the three months ended September 30, 2015, mill production totaled 6,825 ounces of gold, an increase of 5% over the same period in 2014, while silver production totaled 561,985 ounces, a decrease of 18% over the same period in 2014. On a precious metal gold equivalent basis, our mill production totaled 14,133 ounces for the three months ended September 30, 2015, compared to 17,262 precious metal gold equivalent ounces for the same period in 2014, or an 18% decrease. Lower base metal head grades were offset by a 32% increase in tonnes milled compared to the same period in 2014. We processed lower grade ore due to excessive mining dilution primarily in the month of August, while the tonnages and grades for July and September were more in line with expectations for the quarter. While gold and silver ore grades were expected to be lower than in the prior year, actual grades were further affected by the excessive mining dilution. Please see Production and Sales Statistics-Arista Underground Mine table below for additional information regarding our mineral production statistics.

 

For the nine months ended September 30, 2015, mill production totaled 21,960 ounces of gold, a decrease of 18% over the same period in 2014, while silver production totaled 1,932,611 ounces, a decrease of 23% over the same period in 2014. On a precious metal gold equivalent basis, our mill production totaled 48,370 ounces compared to 65,182 precious metal gold equivalent ounces for the same period in 2014, a decrease of 26%.

 

We continue to focus on mining and development activities at the Arista underground mine. Our production rate and estimated average grades at Arista are a direct result of our mine development and the establishment of sufficient stopes and working faces while maintaining development consistent with the mine plan. We improved water inflow management by increasing capacity of the primary pump station on mine level 11.5. The Aguila mill’s flotation circuit processing capacity is a nominal 1,500 tonnes per day. Achieving this processing rate in the future is dependent upon our ability to develop the Arista underground mine to a point where ore extraction can consistently achieve an average rate of 1,500 tonnes per day assuming grade and dilution parameters are met. During the three and nine months ended September 30, 2015, we processed 1,143 and 1,104 ore tonnes per calendar day compared to 865 and 1,040 ore tonnes per calendar day for the same periods in 2014, representing an increase of 34% and 6%, respectively.

 

During the first three quarters of 2015, our production delivered 93% of gold and 87% of silver, against the low end of the range for our 2015 Outlook, which was originally set at 31,500 gold ounces and 2,970,000 silver ounces at the beginning of the year. We have revised our 2015 Outlook to 29,600 gold ounces and 2,500,000 silver ounces. The revised annual production target represents a reduction to the low end of the original 2015 Outlook of 6% for gold ounces produced and 16% for silver ounces produced.

 

The following table summarizes certain information about our mining operations:

15


 

Production and Sales Statistics-Arista Underground Mine

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

    

2015

    

2014

 

2015

 

2014

Milled

 

 

 

 

 

 

 

 

 

 

 

 

Tonnes Milled

 

 

105,309

 

 

79,568

 

 

300,190

 

 

283,793

Tonnes Milled per Day

 

 

1,143

 

 

865

 

 

1,104

 

 

1,040

Grade

 

 

 

 

 

 

 

 

 

 

 

 

Average Gold Grade (g/t)

 

 

2.25

 

 

2.78

 

 

2.52

 

 

3.18

Average Silver Grade (g/t)

 

 

180

 

 

291

 

 

216

 

 

297

Average Copper Grade (%)

 

 

0.41

 

 

0.47

 

 

0.39

 

 

0.40

Average Lead Grade (%)

 

 

1.41

 

 

2.12

 

 

1.37

 

 

1.52

Average Zinc Grade (%)

 

 

4.02

 

 

5.67

 

 

3.78

 

 

3.97

Recoveries

 

 

 

 

 

 

 

 

 

 

 

 

Average Gold Recovery (%)

 

 

90

 

 

92

 

 

90

 

 

92

Average Silver Recovery (%)

 

 

92

 

 

92

 

 

93

 

 

92

Average Copper Recovery (%)

 

 

80

 

 

76

 

 

79

 

 

78

Average Lead Recovery (%)

 

 

75

 

 

80

 

 

75

 

 

76

Average Zinc Recovery (%)

 

 

83

 

 

85

 

 

82

 

 

83

 

 

 

 

 

 

 

 

 

 

 

 

 

Mill production (before payable metal deductions)(1)

 

 

 

 

 

 

 

 

 

 

 

 

Gold (ozs.)

 

 

6,825

 

 

6,523

 

 

21,960

 

 

26,687

Silver (ozs.)

 

 

561,985

 

 

687,240

 

 

1,932,611

 

 

2,506,466

Copper (tonnes)

 

 

343

 

 

284

 

 

929

 

 

891

Lead (tonnes)

 

 

1,114

 

 

1,350

 

 

3,071

 

 

3,273

Zinc (tonnes)

 

 

3,499

 

 

3,816

 

 

9,299

 

 

9,340

Payable metal sold

 

 

 

 

 

 

 

 

 

 

 

 

Gold (ozs.)

 

 

6,220

 

 

2,932

 

 

21,994

 

 

19,846

Silver (ozs.)

 

 

503,929

 

 

575,413

 

 

1,770,093

 

 

2,171,298

Copper (tonnes)

 

 

332

 

 

228

 

 

877

 

 

751

Lead (tonnes)

 

 

1,049

 

 

1,204

 

 

2,875

 

 

2,938

Zinc (tonnes)

 

 

2,905

 

 

2,976

 

 

7,668

 

 

7,383

Average metal prices realized (2)

 

 

 

 

 

 

 

 

 

 

 

 

Gold ($ per oz.)

 

 

1,115

 

 

1,295

 

 

1,177

 

 

1,287

Silver ($ per oz.)

 

 

14.50

 

 

20.24

 

 

16.09

 

 

19.77

Copper ($ per tonne)

 

 

4,883

 

 

7,103

 

 

5,436

 

 

6,920

Lead ($ per tonne)

 

 

1,619

 

 

2,238

 

 

1,746

 

 

2,157

Zinc ($ per tonne)

 

 

1,701

 

 

2,394

 

 

1,981

 

 

2,209

Precious metal gold equivalent ounces produced (mill production) (1)(3)(4)

 

 

 

 

 

 

 

 

 

 

 

 

Gold Ounces

 

 

6,825

 

 

6,523

 

 

21,960

 

 

26,687

Gold Equivalent Ounces from Silver

 

 

7,308

 

 

10,739

 

 

26,410

 

 

38,495

Total Precious Metal Gold Equivalent Ounces

 

 

14,133

 

 

17,262

 

 

48,370

 

 

65,182

Precious metal gold equivalent ounces sold (3)(4)

 

 

 

 

 

 

 

 

 

 

 

 

Gold Ounces

 

 

6,220

 

 

2,932

 

 

21,994

 

 

19,846

Gold Equivalent Ounces from Silver

 

 

6,553

 

 

8,991

 

 

24,189

 

 

33,348

Total Precious Metal Gold Equivalent Ounces

 

 

12,773

 

 

11,923

 

 

46,183

 

 

53,194

Total cash cost (before by-product credits) per precious metal gold equivalent ounce sold (including royalties) (5)

 

$

1,250

 

$

1,324

 

$

1,046

 

$

958

Total cash costs, after by-product credits, per precious metal gold equivalent ounce sold (including royalties) (5)

 

$

603

 

$

364

 

$

505

 

$

434

(1)

Mill production represents metal contained in concentrates produced at the mill, which is before payable metal deductions are levied by the buyer of our concentrates. Payable metal deduction quantities are defined in our contracts with the buyer of our concentrates and represent an estimate of metal contained in the concentrates produced at our mill which the buyer cannot recover through the smelting process. There are inherent limitations and differences in the sampling method and assaying of estimated metal contained in concentrates that are shipped, and those contained metal estimates are derived from sampling methods and assaying throughout the mill production process. The Company monitors these differences to ensure that precious metal mill production quantities are materially correct.

(2)

Average metal prices realized vary from the market metal prices due to final settlement adjustments from our provisional invoices when they are settled. Our average metal prices realized will therefore differ from the market average metal prices in most cases.

(3)

For the three months ended September 30, 2015, precious metal gold equivalent mill production differs from gold equivalent ounces sold due principally to buyer (smelter) concentrate processing and other deductions of approximately 1,204 gold equivalent ounces and a decrease in gold equivalent ounces contained in ending inventory of approximately 121 ounces.

(4)

For the nine months ended September 30, 2015, precious metal gold equivalent mill production differs from gold equivalent ounces sold due principally to buyer (smelter) concentrate processing and other deductions of approximately 3,687 gold equivalent ounces and a decrease in gold equivalent ounces contained in ending inventory of approximately 279 ounces.

(5)

For a reconciliation of this non-GAAP measure to total mine cost of sales, which is the most comparable U.S. GAAP measure, please see Non-GAAP Measures.  

16


 

 

Mine gross profit. For the three months ended September 30, 2015, mine gross profit and mine gross profit percent totaled $4.4 million and 23% compared to $6.8 million and 33% for the same period in 2014. For the nine months ended September 30, 2015, mine gross profit and mine gross profit percent totaled $25.4 million and 36% compared to $39.8 million and 46% for the same period in 2014. The decrease in mine gross profit and mine gross profit percent during the 2015 periods were primarily driven by lower sales, lower realized metal prices and the increase in depreciation and amortization expense since we started capitalizing property, plant and mine development during 2014. 

 

General and administrative expenses. For the three months ended September 30, 2015, general and administrative expenses totaled $2.9 million, compared to $4.4 million for the same period of 2014. For the nine months ended September 30, 2015, general and administrative expenses totaled $8.0 million compared to $9.6 million for the same period of 2014. The decrease in general and administrative expenses for the three and nine months ended September 30, 2015 compared to the same periods in 2014 is primarily due to decreased IT support costs and stock based compensation, partially offset by increased audit fees.

 

Exploration expenses.  For the three months ended September 30, 2015, property exploration expenses totaled $1.8 million, compared to $2.9 million for the same period of 2014. For the nine months ended September 30, 2015, property exploration expenses totaled $6.4 million, compared to $5.8 million during the same period of 2014. The decrease in property exploration expenses for the three months ended September 30, 2015 compared to the same period in 2014 is a result of reduced exploration spending as a cost cutting measure. The increase in property exploration expenses for the nine months ended September 30, 2015 compared to the same periods in 2014 reflects increased exploration activity during the first half of 2015, mainly for underground drilling at the Arista mine and surface drilling at Las Margaritas and Radar. We continued exploration activities at both our Oaxaca and Nevada Mining Units in the third quarter of 2015, although at a reduced rate from the second quarter of 2015 and the third quarter of 2014, as we continue efforts to control costs in the existing commodity price environment.

 

Other (expense) income, net. For the three months ended September 30, 2015, we recorded other expense of $1.0 million compared to other income of $0.1 million during the same period of 2014. For the nine months ended September 30, 2015, we recorded other expense of $2.1 million compared to other income of $0.8 million during the same period of 2014. The change in other (expense) income for the three months ended September 30, 2015 compared to the same period in 2014 was primarily due to foreign currency losses, a decrease in the value of equity investments and write-downs on our gold and silver bullion in the 2015 periods. The change in other (expense) income for the nine months ended September 30, 2015 compared to the same period in 2014 was primarily due to unrealized losses related to a decrease in the value of equity investments and a write-down on our gold and silver bullion.

 

Provision for income taxes. For the three months ended September 30, 2015, income tax expense decreased to a benefit of $0.8 million compared to an expense of $1.1 million for the same period in 2014. For the nine months ended September 30, 2015, income tax expense decreased to $3.5 million compared to $12.3 million for the same period in 2014. See Note 5 to the Condensed Consolidated Financial Statements for additional information.

Net (loss) income. For the three months ended September 30, 2015, net loss was $0.5 million, or $0.01 per basic and diluted share, as compared to net loss of $1.5 million or $0.03 per basic and diluted share, for the same period in 2014. For the nine months ended September 30, 2015, net income was $5.4 million, or $0.10 per basic and diluted share, as compared to $12.9 million or $0.24 per basic and diluted share, for the same period in 2014. The decrease in net income for the year was the result of the matters described above.

 

Non-GAAP Measures

 

Reconciliation of Non-GAAP Measures to Total Mine Cost of Sales

 

Throughout this report, we have provided information prepared or calculated according to U.S. GAAP, as well as referenced some non-GAAP performance measures. Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. Accordingly, these measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with U.S. GAAP.

17


 

In the table below, we have reconciled total cash cost, before by-product credits and total cash cost, after by-product credits to total mine cost of sales, which is a reported U.S. GAAP measure. Total cash cost, before by-product credits, includes all direct and indirect operating cash costs related to our production of precious metals which includes mining, milling and other plant facility costs, smelter treatment and refining charges, royalties, and general and administrative costs.

We use total cash cost, after by-product credits per precious metal gold equivalent ounce sold (including royalties) as one indicator for comparative monitoring of our mining operations from period-to-period and believe that investors also find this information helpful when evaluating our performance. By-product credits include revenues earned from all metals other than the primary precious metals sold. Management also uses this measurement for the comparative monitoring of performance of our mining operations period-to-period from a cash flow perspective. Total cash cost, after by-product credits, per precious gold equivalent ounce sold is a measure developed by the Gold Institute in an effort to provide a uniform standard for comparison purposes. However, there can be no assurance that our reporting of this non-GAAP measure is similar to that reported by other mining companies.

 

The following tables present a reconciliation between the non-GAAP measures of total cash cost, before by-product credits and total cash cost, after by-product credits to the U.S. GAAP measure of total mine cost of sales and depreciation, accretion, reclamation and stock-based compensation for our operations at the Aguila Project.

 

Total Cash Costs after By-Product Credits (Non-GAAP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

    

2015

    

2014

 

2015

    

2014

 

 

(in thousands, except ounces sold and cost per precious metal gold equivalent ounce sold)

Total cash cost (before by-product credits) (1)

 

$

15,972

 

$

15,792

 

$

48,312

 

$

50,984

By-product credits (2)

 

  

(8,258)

 

 

(11,440)

 

  

(24,979)

 

 

(27,836)

Total cash cost (after by-product credits)

 

  

7,714

 

 

4,352

 

  

23,333

 

 

23,148

Divided by precious metal gold equivalent ounces sold (3)

 

  

12,773

 

 

11,923

 

  

46,183

 

 

53,194

Total cash cost (before by-product credits) per precious metal gold equivalent ounce sold (including royalties)

 

 

1,250

 

 

1,324

 

 

1,046

 

 

958

By-product credits per precious metal gold equivalent ounces sold (2)

 

 

(647)

 

 

(960)

 

 

(541)

 

 

(524)

Total cash costs, after by-product credits, per precious metal gold equivalent ounce sold (including royalties)

 

$

603

 

$

364

 

$

505

 

$

434

(1)

Includes all direct and indirect operating cash costs related to our production of metals including mining, milling and other plant facility costs, smelter treatment and refining charges, royalties, and site general and administrative costs.

(2)

See table below for a summary of our by-product revenue and by-product credit precious metal equivalent ounces sold.

(3)

Gold ounces sold, plus gold equivalent ounces of silver ounces sold converted to gold ounces using our realized gold price per ounce to silver price per ounce ratio.

18


 

The following table reconciles our non-GAAP measure of total cash costs to total mine cost of sales, the most comparable U.S. GAAP measure from our condensed consolidated financial statements:

 

Reconciliation to U.S. GAAP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

    

2015

    

2014

 

 

2015

    

 

2014

 

 

(in thousands)

Total cash costs (after by-product credits)

 

$

7,714

 

$

4,352

 

$

23,333

 

$

23,148

Treatment and refining charges

 

  

(2,973)

 

 

(3,526)

 

  

(8,869)

 

 

(9,600)

By-product credits

 

  

8,258

 

 

11,440

 

  

24,979

 

 

27,836

Depreciation and amortization

 

  

1,579

 

 

1,180

 

  

5,195

 

 

2,969

Accretion

 

  

6

 

 

 -

 

  

36

 

 

 -

Stock-based compensation

 

 

412

 

 

759

 

 

1,019

 

 

1,723

Total mine cost of sales

 

$

14,996

 

$

14,205

 

$

45,693

 

$

46,076

The following table summarizes our by-product revenue and by-product credit per precious metal gold equivalent ounce sold:

 

Summary of By-Product Revenue and By-Product Credit per Precious Metal Gold Equivalent Ounces Sold

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

    

2015

    

2014

 

 

 

(in thousands)

 

By-product credits by dollar value:

 

  

 

 

 

 

 

  

 

 

 

 

 

Copper sales

 

$

1,619

 

$

1,616

 

$

4,769

 

$

5,188

 

Lead sales

 

  

1,698

 

 

2,696

 

  

5,020

 

 

6,336

 

Zinc sales

 

  

4,941

 

 

7,128

 

  

15,190

 

 

16,312

 

Total sales from by-products

 

$

8,258

 

$

11,440

 

$

24,979

 

$

27,836

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

Nine months ended September 30, 

 

 

    

2015

    

2014

    

2015

    

2014

 

 

 

(in thousands)

 

By-product credits per precious metal gold equivalent ounce sold:

 

  

 

 

 

 

 

  

 

 

 

 

 

Copper sales

 

$

127

 

$

136

 

$

103

 

$

98

 

Lead sales

 

  

133

 

  

226

 

  

109

 

  

119

 

Zinc sales

 

  

387

 

  

598

 

  

329

 

  

307

 

Total by-product precious metal gold ounces sold

 

$

647

 

$

960

 

$

541

 

$

524

 

 

Adjusted Cash Flow from Mine Site Operations

 

Adjusted cash flow from mine site operations is furnished to provide additional information and is a non-GAAP measure. This measure should not be considered in isolation or as a substitute for measures of performance prepared in accordance with U.S. GAAP, as it does not include all adjustments necessary for such presentation. We believe that certain investors use this measure as a basis to assess mine performance and we use it as a measure for our targeted distributions to shareholders. Dividends may vary in amount and consistency or be discontinued at management’s discretion depending on variables including but not limited to operational cash flows, development requirements, strategies, construction, spot gold and silver prices, taxation, general market conditions and other factors described in our public filings.

 

19


 

The following table provides a reconciliation of adjusted cash flow from mine site operations to mine gross profit (a U.S. GAAP measure) as presented in the condensed consolidated statements of operations:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended  September 30, 

 

 

Nine months ended September 30, 

 

    

2015

    

2014

 

 

2015

 

2014

 

 

(in thousands)

Mine gross profit

 

$

4,441

 

$

6,847

 

$

25,389

$

39,797

Stock-based compensation

 

  

412

 

 

759

 

 

1,019

 

1,723

Depreciation and amortization

 

  

1,579

 

 

1,180

 

 

5,195

 

2,969

Reclamation and remediation

 

  

6

 

 

 -

 

 

36

 

 -

Adjusted cash flow from mine site operations

 

$

6,438

 

$

8,786

 

$

31,639

$

44,489

 

Liquidity and Capital Resources

 

As of September 30, 2015, we had working capital of $17.8 million, consisting of current assets of $36.2 million and current liabilities of $18.4 million. This represents a decrease of $11.5 million from the working capital balance of $29.3 million at December 31, 2014. Our working capital balance fluctuates as we use cash to fund our operations, including exploration, mine development, income taxes and our dividends.

 

For the nine months ended September 30, 2015, we declared dividends of $4.9 million, which was unchanged from the same period in 2014.

 

Cash and cash equivalents as of September 30, 2015 decreased to $14.1 million from $27.5 million as of December 31, 2014, a net decrease in cash of $13.4 million. The decrease is due to lower cash flow from operating activities and higher investing activities, as discussed in the paragraphs below.

 

Net cash provided by operating activities for the nine months ended September 30, 2015 was $14.5 million compared to $26.3 million during the same period in 2014, a  decrease of $11.8 million. The decrease is primarily due to lower operating income and the payment of Mexican mining taxes during the nine months ended September 30, 2015, compared to the same period in 2014.

 

Net cash used in investing activities for the nine months ended September 30, 2015 was $21.2 million compared to $10.6 million during the same period in 2014. Cash used in investing activities during the nine months ended September 30, 2015 was primarily used for mine development and the construction of the now completed third phase tailings facility.  Our major investing activity was mine development at our Aguila Project. Our planned development drilling expenditures are discretionary and could be significantly more or less depending on variables including available capital and the ongoing results from the drilling programs and market conditions. Development drilling to further delineate and define our Arista deposit are considered mine development.

 

Net cash used in financing activities for the nine months ended September 30, 2015 was $6.0 million compared to $5.9 million during the same period in 2014. Cash used in financing activities during the nine months ended September 30, 2015 was the result of payments for dividends and capital leases.

 

We believe that our liquidity and capital resources are adequate to fund our operations and corporate activities for the foreseeable future.

 

Critical Accounting Estimates

 

There have been no changes in our critical accounting estimates since December 31, 2014.

 

20


 

Forward-Looking Statements

 

This report contains or incorporates by reference “forward-looking statements,” as that term is used in federal securities laws, about our financial condition, results of operations and business. These statements include, among others: 

 

·

statements about our future exploration drilling and plans for development of our properties;

·

statements concerning the benefits that we expect will result from our business activities and certain transactions that we contemplate or have completed, such as receipt of proceeds, decreased expenses and avoided expenses and expenditures; and

·

statements of our expectations, beliefs, future plans and strategies, our targets, exploration activities, anticipated developments and other matters that are not historical facts.

 

These statements may be made expressly in this document or may be incorporated by reference from other documents that we will file with the SEC. You can find many of these statements by looking for words such as “believes,” “expects,” “targets,” “anticipates,” “estimates,” or similar expressions used in this report or incorporated by reference in this report.

 

These forward-looking statements are subject to numerous assumptions, risks and uncertainties that may cause our actual results to be materially different from any future results expressed or implied in those statements. Because the statements are subject to risks and uncertainties, actual results may differ materially from those expressed or implied. We caution you not to put undue reliance on these statements, which speak only as of the date of this report. Further, the information contained in this document or incorporated herein by reference is a statement of our present intention and is based on present facts and assumptions, which may change at any time and without notice, based on changes in such facts or assumptions.

 

Risk Factors Impacting Forward-Looking Statements

 

The important factors that could prevent us from achieving our stated goals and objectives include, but are not limited to, those set forth in other reports we have filed with the SEC, including our Form 10-K for the year ended December 31, 2014 and the following:

 

·

Decisions of foreign countries and banks within those countries;

·

Unexpected changes in business and economic conditions, including the rate of inflation;

·

Changes in interest rates and currency exchange rates;

·

Timing and amount of production;

·

Technological changes in the mining industry;

·

Our costs;

·

Changes in exploration and overhead costs;

·

Access and availability of materials, equipment, supplies, labor and supervision, power and water;

·

Results of current and future feasibility studies;

·

The level of demand for our products;

·

Changes in our business strategy, plans and goals;

·

Interpretation of drill hole results and the geology, grade and continuity of mineralization;

·

Rock formations, faults and fractures, water flow and possible CO2 gas exhalation or other unanticipated geological situations;

·

Acts of God such as floods, earthquakes and any other natural disasters;

·

The uncertainty of mineralized material estimates and timing of mine construction expenditures;

·

Commodity price fluctuations; and

·

Mine protests and work stoppages.

 

21


 

We undertake no responsibility or obligation to update publicly these forward-looking statements, but may do so in the future in written or oral statements. Investors should take note of any future statements made by or on our behalf.

ITEM 3: Quantitative and Qualitative Disclosures about Market Risk

 

Our exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, foreign currency exchange rates, provisional sales contract risks, changes in interest rates, equity price risks and country risk. We do not use derivative financial instruments as part of an overall strategy to manage market risk; however, we may consider such arrangements in the future as we evaluate our business and financial strategy.

 

Commodity Price Risk

 

The results of our operations depend in large part upon the market prices of gold and silver. Gold and silver prices fluctuate widely and are affected by numerous factors beyond our control. The level of interest rates, the rate of inflation, the world supply of and demand for gold and silver and the stability of exchange rates, among other factors, can all cause significant fluctuations in commodity prices. Such external economic factors are in turn influenced by changes in international investment patterns, monetary systems and political developments. The price of gold and silver has fluctuated widely in recent years, and future price declines could cause a mineral project to become uneconomic, thereby having a material adverse effect on our business and financial condition. We have not entered into derivative contracts to protect the selling price for gold or silver. We may in the future more actively manage our exposure through derivative contracts or other commodity price risk management programs, although we have no intention of doing so in the near-term.

 

In addition to adversely affecting our reserve estimates, results of operations and/or our financial condition, declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation of a project.

 

Foreign Currency Risk

 

Fluctuations in currency rates, particularly the relative strength of the Unites States dollar (“USD”), affect our results of operations and cash flows. The USD is our functional currency. The foreign currency that primarily impacts our results of operations is the Mexican peso (“MXN”). During the nine months ended September 30, 2015, the MXN was relatively weaker than the USD compared to the same period in 2014. Such fluctuations may give rise to foreign currency exposure, which may affect future financial results.

 

We have not utilized market-risk sensitive instruments to manage our exposure to foreign currency exchange rates but may in the future actively manage our exposure to foreign currency exchange rate risk.

 

Provisional Sales Contract Risk

 

We enter into concentrate sales contracts with a third-party smelter. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates determined at the average forward prices at the time of sale. The embedded derivative, which is the final settlement based on a future price, does not qualify for hedge accounting and is marked-to-market through operations each period prior to final settlement.

 

22


 

The following table summarizes the quantities of metals committed under forward sales contracts at September 30, 2015:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gold

    

Silver

 

Copper

 

Lead

 

Zinc

 

 

(ounces)

 

(ounces)

 

(tonnes)

 

(tonnes)

 

(tonnes)

 

 

 

 

 

 

 

 

 

 

 

Under contract

 

3,674

 

498,213

 

334,451

 

1,050,754

 

1,904,425

Average price

$

1,110.82

$

14.71

$

5,058.98

$

1,668.62

$

1,691.96

 

Interest Rate Risk

 

Our outstanding debt consists of leased equipment classified as capital leases. Accordingly, we consider our interest rate risk exposure to be insignificant at this time.

 

 Equity Price Risk 

 

We have, in the past, sought and may, in the future, seek to acquire additional funding by sale of common stock and other equity. The price of our common stock has been volatile in the past and may also be volatile in the future. As a result, there is a risk that we may not be able to sell our common stock at an acceptable price should the need for new equity funding arise.

 

Country Risk

 

Most of our mineral properties are located in Mexico. In the past, that country has been subject to political instability, increasing crime, changes and uncertainties which may cause changes to existing government regulations affecting mineral exploration and mining activities including taxes. Civil or political unrest or criminal activities could disrupt our operations at any time. Our exploration and mining activities may be adversely affected in varying degrees by changing government regulations relating to the mining industry or shifts in political conditions that could increase the costs related to our activities or maintaining our properties. Additionally, Mexico’s status as a developing country may make it more difficult for us to obtain required financing for our properties.

 

ITEM 4: Controls and Procedures

 

(a)

Evaluation of Disclosure Controls and Procedures

 

The Company’s disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports that are filed under the Securities Exchange Act of 1934, as amended (the "Exchange Act") is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC, and that such information is accumulated and communicated to the Company’s management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

 

The Chief Executive Officer and the Chief Financial Officer, with assistance from management, have evaluated the effectiveness of disclosure controls and procedures as of September 30, 2015. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the Company’s disclosure controls and procedures were not effective as a result of the material weakness described below.

 

A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the Company's annual or interim financial statements will not be prevented or detected on a timely basis.

 

As of December 31, 2014, we did not maintain effective controls over the accounting for income taxes, including the income tax provision and related tax assets and liabilities. Specifically, the process level controls over the reconciliation of the income tax receivable account were not performed, and management’s review of the income tax provision and related accounts was not designed or operating at a sufficient level of precision to identify material misstatements.

23


 

 

These deficiencies resulted in errors in the amortization of an asset and an incorrect balance sheet classification in the condensed consolidated financial statements. These errors were not material and were corrected in our condensed consolidated financial statements as of and for the year ended December 31, 2014. 

 

A reasonable possibility exists that these control deficiencies could result in misstatements of the aforementioned accounts and disclosures that would result in a material misstatement to the condensed consolidated financial statements that would not be prevented or detected in a timely manner. Accordingly, we determined that these control deficiencies, in the aggregate, constitute a material weakness. 

 

Because of this material weakness, management concluded that we did not maintain effective internal control over financial reporting as of December 31, 2014.

 

Management’s Plans for Remediation of the Material Weakness

 

Management is continuing to implement changes in our internal control over financial reporting to remediate the control deficiencies that gave rise to material weaknesses. We are undertaking the following remediation plans and actions:

 

·

Designing and implementing additional controls, and enhancing existing controls, related to the review and reconciliation of income taxes.

·

Improving management’s oversight and monitoring of its income tax provision process by enhancing its quarterly discussions with our outside tax advisors to anticipate any business developments that could affect the determination or presentation of income tax expense.

 

We will continue to evaluate, monitor and test these controls to ensure they are remediated in accordance with our remediation plan. As management implements these plans, management may determine that additional steps may be necessary to remediate the material weaknesses. We intend to have the remediation plan fully implemented in fiscal year 2015.

 

(b)     There have been no changes in our internal controls over financial reporting during the most recent fiscal quarter that have materially affected, or that are reasonably likely to materially affect, our internal control over financial reporting other than addressing the control deficiency discussed above.

24


 

PART II – OTHER INFORMATION

 

ITEM 2:Unregistered Sales of Equity Securities and Use of Proceeds

 

(c) Issuer Purchases of Equity Securities

 

In September 2011, our Board of Directors authorized a share repurchase of up to $20.0 million with no pre-established end date. During the nine months ended September 30, 2015 we did not repurchase any shares of Gold Resource Corporation common stock on the open market.

 

 

ITEM 6: Exhibits

 

The following exhibits are filed or furnished herewith:

 

 

 

 

Exhibit
Number

 

Descriptions

 

 

 

31.1

 

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Jason D. Reid.

 

 

 

31.2

 

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for John A. Labate.

 

 

 

32*

 

Certification pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 for Jason D. Reid and John A. Labate.

 

 

 

101

 

Financial statements from the Quarterly Report on Form 10-Q of Gold Resource Corporation for the nine months ended September 30, 2015, formatted in XBRL: (i) the Unaudited Condensed Consolidated Balance Sheets, (ii) the Unaudited Condensed Consolidated Statements of Operations, (iii) the Unaudited Condensed Consolidated Statements of Cash Flows, and (iv) the Notes to the Unaudited Condensed Consolidated Financial Statements.

 


*This document is not being “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. Registration Statements or other documents filed with the SEC shall not incorporate this exhibit by reference, except as otherwise expressly stated in such filing.

 

25


 

SIGNATURES 

 

In accordance with Section 13 or 15(d) of the Exchange Act of 1934, the Company has caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

 

 

 

 

 

GOLD RESOURCE CORPORATION

 

 

 

 

Dated:  November 3, 2015

 

 

/s/ Jason D. Reid

 

 

By:

Jason D. Reid,

 

 

 

Chief Executive Officer and President

 

 

 

 

 

 

 

 

GOLD RESOURCE CORPORATION

 

 

 

 

Dated:  November 3, 2015

 

 

/s/ John A. Labate

 

 

By:

John A. Labate,

 

 

 

Chief Financial Officer

 

 

26


 

Exhibit Index

 

The following exhibits are filed or furnished herewith:

 

Exhibit
Number

 

Descriptions

 

 

 

31.1

 

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Jason D. Reid.

 

 

 

31.2

 

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for John A. Labate.

 

 

 

32*

 

Certification pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 for Jason D. Reid and John A. Labate.

 

 

 

101

 

Financial statements from the Quarterly Report on Form 10-Q of Gold Resource Corporation for the nine months ended September 30, 2015, formatted in XBRL: (i) the Unaudited Condensed Consolidated Balance Sheets, (ii) the Unaudited Condensed Consolidated Statements of Operations, (iii) the Unaudited Condensed Consolidated Statements of Cash Flows, and (iv) the Notes to the Unaudited Condensed Consolidated Financial Statements.

 


*This document is not being “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. Registration Statements or other documents filed with the SEC shall not incorporate this exhibit by reference, except as otherwise expressly stated in such filing.

27