Exhibit 99.1

TESORO LOGISTICS LP
CONDENSED COMBINED CONSOLIDATED BALANCE SHEETS (a)
(Unaudited)
 
 
March 31,
2012
 
December 31, 2011
 
(Dollars in thousands)
ASSETS
CURRENT ASSETS
 
 
 
Cash and cash equivalents
$
21,015

 
$
18,326

Receivables
 
 
 
Trade
1,549

 
3,369

Affiliate
8,530

 
12,117

Prepayments and other current assets
341

 
778

Total Current Assets
31,435

 
34,590

NET PROPERTY, PLANT AND EQUIPMENT
197,547

 
196,147

OTHER NONCURRENT ASSETS
1,950

 
3,072

Total Assets
$
230,932

 
$
233,809

 
 
 
 
LIABILITIES AND EQUITY
CURRENT LIABILITIES
 
 
 
Accounts payable
 
 
 
Trade
$
4,366

 
$
6,743

Affiliate
3,076

 
2,861

Deferred revenue - affiliate
1,720

 
1,775

Accrued liabilities
2,592

 
3,093

Total Current Liabilities
11,754

 
14,472

OTHER NONCURRENT LIABILITIES
2,641

 
2,665

DEBT
50,000

 
50,000

COMMITMENTS AND CONTINGENCIES (Note K)


 


EQUITY
 
 
 
Equity of Predecessors
56,495

 
57,702

Common unitholders (15,254,890 units issued and outstanding)
250,950

 
250,430

Subordinated unitholders (15,254,890 units issued and outstanding)
(142,500
)
 
(143,048
)
General partner (622,649 units issued and outstanding)
1,592

 
1,588

Total Equity
166,537

 
166,672

Total Liabilities and Equity
$
230,932

 
$
233,809

____________
(a)
Adjusted to include the historical balances of the Martinez crude oil marine terminal and the Long Beach marine terminal and related short-haul pipelines. See Notes A and B for further discussion.


See accompanying notes to condensed combined consolidated financial statements.


1


TESORO LOGISTICS LP
CONDENSED STATEMENTS OF COMBINED CONSOLIDATED OPERATIONS (a)
(Unaudited)

 
Three Months Ended March 31,
 
2012
 
2011
 
(Dollars in thousands, except per unit amounts)
REVENUES
 
Affiliate
$
26,353

 
$
5,562

Third-party
1,910

 
2,130

Total Revenues
28,263

 
7,692

COSTS AND EXPENSES


 


Operating and maintenance expenses
13,086

 
11,295

Depreciation and amortization expenses
2,811

 
2,821

General and administrative expenses
3,575

 
1,562

Loss on asset disposals
236

 
25

Total Costs and Expenses
19,708

 
15,703

OPERATING INCOME (LOSS)
8,555

 
(8,011
)
Interest and financing costs, net
(511
)
 

NET INCOME (LOSS)
8,044

 
(8,011
)
Less: Loss attributable to Predecessors
(3,512
)
 
(8,011
)
Net income attributable to partners
11,556

 

Less: General partner's interest in net income
230

 

Limited partners' interest in net income
$
11,326

 
$

 


 
 
Net income per limited partner unit:


 
 
Common - basic and diluted
$
0.37

 
 
Subordinated - basic and diluted
$
0.37

 
 
 


 
 
Weighted average limited partner units outstanding:

 
 
Common units - basic
15,254,890

 
 
Common units - diluted
15,297,023

 
 
Subordinated units - basic and diluted
15,254,890

 
 
 
 
 
 
Cash distribution per unit
$
0.3775

 
 
____________
(a)
Adjusted to include the historical results of the Martinez crude oil marine terminal and the Long Beach marine terminal and related short-haul pipelines. See Notes A and B for further discussion.


See accompanying notes to condensed combined consolidated financial statements.



2


TESORO LOGISTICS LP
CONDENSED STATEMENTS OF COMBINED CONSOLIDATED CASH FLOWS (a)
(Unaudited)
 
Three Months Ended March 31,
 
2012
 
2011
 
 
 
 
CASH FLOWS FROM (USED IN) OPERATING ACTIVITIES:
(Dollars in thousands)
Net income (loss)
$
8,044

 
$
(8,011
)
Adjustments to reconcile net income (loss) to net cash from (used in) operating activities:
 
 
 
Depreciation and amortization expenses
2,811

 
2,821

Amortization of debt issuance costs
159

 

Unit-based compensation expense
378

 

Loss on asset disposals
236

 
25

Changes in current assets:
 
 
 
Receivables - trade
1,820

 
(406
)
Receivables - affiliate
520

 
4

Prepayments and other current assets
437

 
(156
)
Changes in current liabilities:
 
 
 
Accounts payable - trade
(952
)
 
(295
)
Accounts payable - affiliate
215

 
3

Deferred revenue - affiliate
(55
)
 

Accrued liabilities
(502
)
 
906

Changes in other noncurrent assets and liabilities
1,470

 
(526
)
Net cash from (used in) operating activities
14,581

 
(5,635
)
CASH FLOWS FROM (USED IN) INVESTING ACTIVITIES:
 
 
 
Capital expenditures
(6,278
)
 
(886
)
Capital expenditure reimbursements by Sponsor
3,475

 

Net cash used in investing activities
(2,803
)
 
(886
)
CASH FLOWS FROM (USED IN) FINANCING ACTIVITIES:
 
 
 
Distributions to General Partner
(226
)
 

Distributions to Common unitholders
(5,530
)
 

Distributions to Subordinated unitholders
(5,530
)
 

Financing costs
(532
)
 

Sponsor contributions of equity to the Predecessors
2,305

 
6,521

Capital contributions
424

 

Net cash from (used in) financing activities
(9,089
)
 
6,521

INCREASE IN CASH AND CASH EQUIVALENTS
2,689

 

CASH AND CASH EQUIVALENTS, BEGINNING OF PERIOD
18,326

 

CASH AND CASH EQUIVALENTS, END OF PERIOD
$
21,015

 
$

SUPPLEMENTAL CASH FLOW DISCLOSURE:
 
 
 
Interest paid, net of capitalized interest
$
367

 
$

SUPPLEMENTAL DISCLOSURE OF NON-CASH ACTIVITIES:
 
 
 
Capital expenditures included in accounts payable at period end
$
2,857

 
$
476

____________
(a)
Adjusted to include the historical results of the Martinez crude oil marine terminal and the Long Beach marine terminal and related short-haul pipelines. See Notes A and B for further discussion.
 

See accompanying notes to condensed combined consolidated financial statements.

3



TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

NOTE A - ORGANIZATION AND BASIS OF PRESENTATION

As used in this report, the terms "Tesoro Logistics LP," "TLLP," the "Partnership," "we," "us," or "our" may refer to Tesoro Logistics LP, one or more of its consolidated subsidiaries or all of them taken as a whole. References in this report to "Tesoro" or our "Sponsor" refer collectively to Tesoro Corporation and any of its subsidiaries, other than Tesoro Logistics LP, its subsidiaries and its general partner.

Organization

TLLP is a Delaware limited partnership formed in December 2010 by Tesoro Corporation and its wholly owned subsidiary, Tesoro Logistics GP, LLC ("TLGP"), our general partner. On April 26, 2011, we completed our initial public offering (the "Initial Offering") of 14,950,000 common units representing limited partner interests.

After completion of the Initial Offering, the Partnership includes the assets, liabilities and results of operations of certain crude oil gathering and crude oil and refined products terminalling, transportation and storage assets, previously operated and owned by Tesoro Alaska Company, Tesoro Refining and Marketing Company ("TRMC") and Tesoro High Plains Pipeline Company LLC. 

Principles of Combination and Consolidation and Basis of Presentation

The financial statements presented herein contain the unaudited condensed combined financial results of Tesoro Logistics LP Predecessor ("TLLP Predecessor"), our predecessor for accounting purposes, and the unaudited condensed consolidated financial results of TLLP for the three months ended March 31, 2012. The TLLP Predecessor includes the financial results of the initial net assets acquired from Tesoro during the initial public offering for the three months ended March 31, 2011.

Effective April 1, 2012, we entered into a transaction (the "Martinez Marine Terminal Acquisition") with Tesoro and TLGP pursuant to which TLLP acquired from Tesoro the Martinez crude oil marine terminal assets (collectively, the "Martinez Crude Oil Marine Terminal"). Effective September 14, 2012, we entered into a transaction (the "Long Beach Assets Acquisition") with Tesoro and TLGP pursuant to which TLLP acquired from Tesoro the Long Beach marine terminal assets and related short-haul pipelines, including the Los Angeles ("LA") short-haul pipelines (collectively, the "Long Beach Assets"). These transactions were transfers between entities under common control. Accordingly, the accompanying financial statements and related notes of the TLLP Predecessor and TLLP have been retrospectively adjusted to include the historical results of the Martinez Crude Oil Marine Terminal and the Long Beach Assets for all periods presented. We refer to the historical results of the TLLP Predecessor, the Martinez Crude Oil Marine Terminal and the Long Beach Assets, collectively as our "Predecessor(s)." Our Predecessors did not record revenue for intercompany trucking, terminalling, storage and short-haul pipeline transportation services. See Note B for additional information regarding subsequent events, including further information regarding the acquisitions.

Transfers of a business between entities under common control are accounted for as if the transfer occurred at the beginning of the period, and prior periods are retrospectively adjusted to furnish comparative information. As an entity under common control with Tesoro, we record the assets that we acquire from Tesoro on our balance sheet at Tesoro's historical basis instead of fair value. Additionally, the accompanying financial statements and related notes present the combined financial position, results of operations, cash flows and equity of our Predecessors at historical cost. The financial statements of our Predecessors have been prepared from the separate records maintained by Tesoro and may not necessarily be indicative of the conditions that would have existed or the results of operations if our Predecessors had been operated as an unaffiliated entity. All intercompany accounts and transactions have been eliminated.

The interim condensed combined consolidated financial statements and notes thereto have been prepared by management without audit according to the rules and regulations of the Securities and Exchange Commission ("SEC") and reflect all adjustments that, in the opinion of management, are necessary for a fair presentation of results for the periods presented. Such adjustments are of a normal recurring nature, unless otherwise disclosed.


4


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Certain information and notes normally included in financial statements prepared in accordance with accounting principles generally accepted in the United States of America ("U.S. GAAP") have been condensed or omitted pursuant to the SEC's rules and regulations. However, management believes that the disclosures presented herein are adequate to present the information fairly. The accompanying interim condensed combined consolidated financial statements and notes should be read in conjunction with our annual audited financial statements included in a Form 8-K filed with the SEC on December 14, 2012, which retrospectively adjust our historical financial statements to include the activities of the Long Beach Assets.

We prepare our condensed combined consolidated financial statements in conformity with U.S. GAAP, which requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the periods presented. We review our estimates on an ongoing basis using currently available information. Changes in facts and circumstances may result in revised estimates, and actual results could differ from those estimates. The results of operations of the Partnership, or our Predecessors, for any interim period are not necessarily indicative of results for the full year. Certain prior year balances have been aggregated or disaggregated in order to conform to the current year presentation.

We have evaluated subsequent events through the filing of this Form 8-K. See Note O for additional information related to subsequent events, including the acquisition of the Anacortes rail unloading facility assets (collectively, the "Anacortes Rail Facility") from Tesoro.

We record our financial instruments including cash and cash equivalents, receivables, accounts payable and certain accrued liabilities at their carrying value. We believe the carrying value of our financial instruments approximates fair value. Our fair value assessment incorporates a variety of considerations, including:

the short term duration of the instruments (less than three percent of our trade receivables and payables are outstanding for greater than 90 days); and
the expected future insignificance of bad debt expense, which includes an evaluation of counterparty credit risk.

Additionally, our debt approximates fair value in the fair value hierarchy as our borrowings are under a revolving credit facility, which includes a variable interest rate.

NOTE B - ACQUISITIONS

Martinez Marine Terminal Acquisition

Effective April 1, 2012, we entered into the Martinez Marine Terminal Acquisition with Tesoro and TLGP. The Martinez Marine Terminal Acquisition was made in exchange for consideration of $75.0 million, comprised of $67.5 million in cash financed with borrowings under our amended revolving credit facility (the "Amended Revolving Credit Facility") and the issuance of equity with a fair value of $7.5 million. The equity is comprised of 206,362 common units, representing an approximate 1% limited partner interest in the Partnership, and 4,212 general partner units. The Martinez crude oil marine terminal assets included in the Martinez Marine Terminal Acquisition include a single-berth dock, which has an estimated throughput capacity of approximately 145,000 barrels per day ("bpd"), five associated crude oil storage tanks with a combined capacity of 425,000 barrels, five short-haul pipelines and two firewater tanks with 48,000 barrels of shell capacity.

The single-berth dock and related leasehold improvements are situated on an offshore parcel of land that is currently being leased by TRMC from the California State Lands Commission under a term lease (the "Martinez Terminal Lease"). The Martinez Terminal Lease, related leasehold improvements and the short-haul pipelines will be legally transferred to TLLP when the Martinez Terminal Lease is renewed and extended, and the transfer is approved by the California State Lands Commission. We consider our acquisition date to be April 1, 2012, which is the date we commenced operating the Martinez Crude Oil Marine Terminal under the agreements between the Partnership and Tesoro.
 
Martinez Terminal Use and Throughput Agreement. The Partnership entered into a 10-year use and throughput agreement with Tesoro in connection with the Martinez Marine Terminal Acquisition, effective April 1, 2012, which obligates Tesoro to transport an average of at least 65,000 bpd of crude oil per month at a throughput and tankage fee of $0.55 per barrel. An excess volume throughput fee of $0.10 per barrel will be charged for monthly average volumes in excess of 70,000 bpd. In addition, Tesoro will pay a $30,000 per month fee for unlimited use of the refined products pipeline from Tesoro's Martinez refinery to a third-party terminal. The fees under the agreement are indexed for inflation and the agreement gives Tesoro the option to renew for two five-year terms.

5


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Long Beach Assets Acquisition

Effective September 14, 2012, we purchased the Long Beach Assets from Tesoro in exchange for total consideration of $210.0 million, comprised of $189.0 million in cash and the remaining $21.0 million in partnership units. The equity is comprised of 462,825 common units, representing an approximate 1% limited partner interest in the Partnership, and 9,446 general partner units.

The Long Beach marine terminal includes a wharf with a two-vessel berth dock that receives and loads crude oil, intermediate feedstocks and refined products, six storage tanks with a combined capacity of 235,000 barrels and three related short-haul pipelines that connect our Long Beach marine terminal to Tesoro's Wilmington refinery (the "Wilmington Refinery"). The LA short-haul pipelines consist of two short-haul pipelines that transport refined products from the Wilmington Refinery to other third-party facilities and one short-haul pipeline that is currently leased to a third party. The total throughput capacity for the Long Beach marine terminal is estimated to be approximately 200,000 bpd, and the aggregate short-haul pipeline throughput capacity is estimated to be approximately 70,000 bpd. TRMC currently leases the Long Beach marine terminal from the City of Long Beach.

Long Beach Terminal Operating Agreement. The Partnership entered into an operating agreement (the "Operating Agreement") with Tesoro, effective September 14, 2012, which governs the Partnership's operation of the Long Beach marine terminal on behalf of Tesoro beginning on September 14, 2012 until the later of the date of the: (i) assignment or sublease of the Long Beach terminal lease; or (ii) Partnership's issuance of the Certificate of Financial Responsibility to the California Department of Fish and Game. Under the Operating Agreement, Tesoro will be subject to the same throughput commitments and fees as outlined below in the Long Beach Berth Access, Use and Throughput Agreement.

Long Beach Berth Access, Use and Throughput Agreement. The Partnership entered into a 10-year berth access, use and throughput agreement with Tesoro in connection with the Long Beach Assets Acquisition, to be effective on the date of the assignment or sublease of the Long Beach terminal lease (the "Commencement Date"). The agreement obligates Tesoro to transport an average of at least 50,000 bpd of crude oil per month across the berth at a throughput fee of $0.40 per barrel. Tesoro is also obligated to throughput (i) an average volume of 30,000 bpd of crude oil and refined products between the Long Beach marine terminal and the Wilmington Refinery, each at a fee of $0.10 per barrel, from the Commencement Date through December 31, 2014 and (ii) an average volume of 50,000 bpd of crude oil and refined products per month between the Long Beach marine terminal and the Wilmington Refinery from January 1, 2015 through the termination of the agreement, each at a fee of $0.10 per barrel. Tesoro is subject to (i) a $0.15 per barrel use fee for marine vapor recovery throughput at the Long Beach marine terminal and (ii) a $0.70 per barrel storage and transportation fee based on shell capacity of 235,000 barrels for the use of the six storage tanks.

Transportation Services Agreement (LA short-haul pipelines). The Partnership entered into a 10-year transportation services agreement with Tesoro in connection with the Long Beach Assets Acquisition, under which Tesoro is obligated to throughput an average of at least 15,000 bpd per month of refined petroleum product at a throughput fee of $0.15 per barrel.

The fees under the berth access, use and throughput agreement and the transportation services agreement are indexed for inflation, and the agreements give Tesoro the option to renew for two five-year terms, or Tesoro may modify the term of the agreements to a twenty-year term by providing notice in accordance with each agreement.

If Tesoro fails to transport aggregate volumes under the agreements in connection with the Martinez Marine Terminal Acquisition or the Long Beach Assets Acquisition equal to its minimum throughput commitment during any calendar month, Tesoro will owe the Partnership a shortfall payment equal to the volume of the shortfall multiplied by the throughput and tankage fee. The amount of any shortfall payment paid by Tesoro will be credited against any amounts owed by Tesoro for the transportation of volumes in excess of its minimum throughput commitment during any of the succeeding three months after the shortfall occurs.

Tesoro retained any current assets, current liabilities and environmental liabilities related to the Martinez Crude Oil Marine Terminal and Long Beach Assets as of the dates of each acquisition. The only historical balance sheet item that transferred to the Partnership in the acquisitions was property, plant and equipment, which was recorded by TLLP at historical cost of $38.1 million as of April 1, 2012 for the Martinez Crude Oil Marine Terminal and $22.3 million as of September 14, 2012 for the Long Beach Assets. Costs of $0.1 million associated with the Martinez Marine Terminal Acquisition are included in general and administrative expenses for the three months ended March 31, 2012.

See Note C for information regarding amendments to other agreements with related parties in connection with the Martinez Marine Terminal Acquisition and the Long Beach Assets Acquisition.

6


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Financial Results

Our historical financial statements have been retrospectively adjusted to reflect the results of operations, financial position, cash flows and equity attributable to the Martinez Crude Oil Marine Terminal and the Long Beach Assets as if we owned the assets for all periods presented. The results of the Martinez Crude Oil Marine Terminal and the Long Beach Assets are included in the Terminalling, Transportation and Storage segment.

The results of the Martinez Crude Oil Marine Terminal and Long Beach Assets operations have been included in the Martinez Crude Oil Marine Terminal (Predecessor) results and Long Beach Assets (Predecessor) results, respectively, in the tables below.

Condensed Combined Consolidated Balance Sheet as of March 31, 2012
 
 
Tesoro Logistics LP (As previously reported)
 
 
Martinez Crude Oil Marine Terminal (Predecessor)
 
Long Beach Assets (Predecessor)
 
Tesoro Logistics LP (As currently reported)
 
 
(Dollars in thousands)
ASSETS
CURRENT ASSETS
 
 
 
 
 
 
 
 
 
Cash and cash equivalents
 
$
21,015

 
 
$

 
$

 
$
21,015

Receivables
 
 
 
 
 
 
 
 

Trade
 
466

 
 

 
1,083

 
1,549

Affiliate
 
7,972

 
 

 
558

 
8,530

Prepayments and other current assets
 
242

 
 

 
99

 
341

Total Current Assets
 
29,695

 
 

 
1,740

 
31,435

NET PROPERTY, PLANT AND EQUIPMENT
 
137,418

 
 
38,059

 
22,070

 
197,547

OTHER NON-CURRENT ASSETS
 
1,950

 
 

 

 
1,950

Total Assets
 
$
169,063

 
 
$
38,059

 
$
23,810

 
$
230,932

 
 
 
 
 
 
 
 
 
 
LIABILITIES AND EQUITY
CURRENT LIABILITIES
 
 
 
 
 
 
 
 
 
Accounts payable
 
 
 
 
 
 
 
 
 
Trade
 
$
3,673

 
 
$
380

 
$
313

 
$
4,366

Affiliate
 
2,986

 
 
45

 
45

 
3,076

Deferred revenue - affiliate
 
1,720

 
 

 

 
1,720

Accrued liabilities
 
597

 
 
1,174

 
821

 
2,592

Total Current Liabilities
 
8,976

 
 
1,599

 
1,179

 
11,754

OTHER NONCURRENT LIABILITIES
 
45

 
 
2,596

 

 
2,641

DEBT
 
50,000

 
 

 

 
50,000

EQUITY
 

 
 

 
 
 

Equity of Predecessors
 

 
 
33,864

 
22,631

 
56,495

Common unitholders
 
250,950

 
 

 

 
250,950

Subordinated unitholders
 
(142,500
)
 
 

 

 
(142,500
)
General partner
 
1,592

 
 

 

 
1,592

Total Equity
 
110,042

 
 
33,864

 
22,631

 
166,537

Total Liabilities and Equity
 
$
169,063

 
 
$
38,059

 
$
23,810

 
$
230,932



7


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Condensed Statement of Combined Consolidated Operations for the Three Months Ended March 31, 2012
 
 
Tesoro Logistics LP (As previously reported)
 
 
Martinez Crude Oil Marine Terminal (Predecessor)
 
Long Beach Assets (Predecessor)
 
Tesoro Logistics LP (As currently reported)
REVENUES
 
(Dollars in thousands)
Affiliate
 
$
26,353

 
 
$

 
$

 
$
26,353

Third-party
 
732

 
 

 
1,178

 
1,910

Total Revenues
 
27,085

 
 

 
1,178

 
28,263

COSTS AND EXPENSES
 

 
 

 
 
 

Operating and maintenance expenses
 
9,687

 
 
1,558

 
1,841

 
13,086

Depreciation and amortization expenses
 
2,001

 
 
526

 
284

 
2,811

General and administrative expenses
 
3,330

 
 
97

 
148

 
3,575

Loss on asset disposal
 

 
 
236

 

 
236

Total Costs and Expenses
 
15,018

 
 
2,417

 
2,273

 
19,708

OPERATING INCOME (LOSS)
 
12,067

 
 
(2,417
)
 
(1,095
)
 
8,555

Interest expense, net
 
(511
)
 
 

 

 
(511
)
NET INCOME (LOSS)
 
11,556

 
 
(2,417
)
 
(1,095
)
 
8,044

Less: Loss attributable to Predecessors
 

 
 
(2,417
)
 
(1,095
)
 
(3,512
)
Net income attributable to partners
 
$
11,556

 
 
$

 
$

 
$
11,556


Condensed Statement of Combined Operations for the Three Months Ended March 31, 2011 (Predecessors)
 
 
Tesoro Logistics LP (As previously reported)
 
Martinez Crude Oil Marine Terminal (Predecessor)
 
Long Beach Assets (Predecessor)
 
Tesoro Logistics LP (As currently reported)
REVENUES
 
(Dollars in thousands)
Affiliate
 
$
5,562

 
$

 
$

 
$
5,562

Third-party
 
708

 

 
1,422

 
2,130

Total Revenues
 
6,270

 

 
1,422

 
7,692

COSTS AND EXPENSES
 

 

 
 
 

Operating and maintenance expenses
 
8,708

 
1,319

 
1,268

 
11,295

Depreciation and amortization expenses
 
2,017

 
510

 
294

 
2,821

General and administrative expenses
 
1,359

 
102

 
101

 
1,562

Loss on asset disposals
 

 
25

 

 
25

Total Costs and Expenses
 
12,084

 
1,956

 
1,663

 
15,703

NET LOSS
 
$
(5,814
)
 
$
(1,956
)
 
$
(241
)
 
$
(8,011
)


8


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

NOTE C - RELATED-PARTY TRANSACTIONS

Commercial Agreements. The Partnership has various long-term, fee-based commercial agreements with Tesoro under which we provide pipeline transportation, trucking, terminal distribution and storage services to Tesoro, and Tesoro commits to provide us with minimum monthly throughput volumes of crude oil and refined products.

If, in any calendar month, Tesoro fails to meet its minimum volume commitments under these agreements, it will be required to pay us a shortfall payment. These shortfall payments may be applied as a credit against any amounts due above their minimum volume commitments for up to three months after the shortfall occurs. We believe the terms and conditions under these agreements, as well as our other agreements with Tesoro described below, are generally no less favorable to either party than those that could have been negotiated with unaffiliated parties with respect to similar services. These commercial agreements with Tesoro include the following in effect since the Initial Offering:
 
a 10-year pipeline transportation services agreement under which Tesoro pays the Partnership fees for gathering and transporting crude oil on our High Plains system;
a crude oil trucking transportation services agreement under which Tesoro pays the Partnership fees for trucking related services and scheduling and dispatching services that we provide through our High Plains truck-based crude oil gathering operation, which was amended effective January 1, 2012 to extend the agreement to five years and convert fees to mileage-based rates;
a 10-year master terminalling services agreement under which Tesoro pays the Partnership fees for providing terminalling services at our eight refined products terminals;
a 10-year pipeline transportation services agreement under which Tesoro pays the Partnership fees for transporting crude oil and refined products on our five Salt Lake City ("SLC") short-haul pipelines; and
a 10-year SLC storage and transportation services agreement under which Tesoro pays the Partnership fees for storing crude oil and refined products at our SLC storage facility and transporting crude oil and refined products between the storage facility and Tesoro's Utah refinery through interconnecting pipelines on a dedicated basis.

In addition, we entered into the following agreements during 2012:

a 10-year terminal use and throughput agreement, effective April 1, 2012, under which Tesoro pays the Partnership fees for providing terminalling services at the Martinez Crude Oil Marine Terminal (see Note B for additional information);
a 10-year berth access, use and throughput agreement, effective September 14, 2012, under which Tesoro pays the Partnership fees for providing terminalling services at the Long Beach marine terminal (see Note B for additional information);
a 10-year pipeline transportation services agreement, effective September 14, 2012, under which Tesoro pays the Partnership fees for transporting refined products on two LA short-haul pipelines from the Wilmington Refinery to a third-party terminal (see Note B for additional information); and
a 10-year track use and throughput agreement, effective November 15, 2012, under which Tesoro pays the Partnership fees for transporting and offloading crude oil through the Anacortes rail unloading facility assets (see Note O for additional information).

Each of these agreements, other than the SLC storage and transportation services agreement, contain minimum volume commitments. Except for the amended trucking transportation services agreement, the fees under each agreement are indexed for inflation, and the agreements give Tesoro the option to renew for two five-year terms. The fees under the amended trucking transportation services agreement are adjusted annually on July 1 as a result of a competitive bidding process, and the agreement will renew automatically for one five-year term unless earlier terminated by us or Tesoro. The berth access, use and throughput agreement associated with the Long Beach marine terminal and the pipeline transportation services agreement associated with the LA short-haul pipelines further allow Tesoro the option to modify the term of the agreements to a twenty-year term by providing notice in accordance with each agreement.


9


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Amended and Restated Omnibus Agreement.  The Partnership entered into an omnibus agreement with Tesoro at the closing of the Initial Offering. The agreement has been amended for each acquisition from Tesoro including the September 14, 2012 amendment, which was entered into in connection with the Long Beach Assets Acquisition (the "Amended Omnibus Agreement"). The annual fee payable to Tesoro under the Amended Omnibus Agreement remained $2.5 million for the provision of various general and administrative services. Additionally, under the Amended Omnibus Agreement, Tesoro indemnifies us for certain matters, including environmental, title and tax matters associated with the ownership of our assets at or before the closing of the Initial Offering on April 26, 2011 and the subsequent acquisitions. The aggregate annual deductible for each type (unknown environmental liabilities or title matters) of liability was $0.5 million before we are entitled to indemnification in any calendar year in consideration of the Martinez Marine Terminal Acquisition and the Long Beach Assets Acquisition. The aggregate annual deductible in effect at December 31, 2011 was $0.25 million. See Note K for further discussion of the indemnification provisions and Note O for additional information related to the Amended Omnibus Agreement.

Amended and Restated Operational Services Agreement.  The Partnership entered into an operational services agreement with Tesoro at the closing of the Initial Offering. The agreement has been amended for each acquisition from Tesoro including the September 14, 2012 amendment, which was entered into in connection with the Long Beach Assets Acquisition (the "Amended Operational Services Agreement"), and considers the additional resources required to operate the Martinez Crude Oil Marine Terminal and the Long Beach Assets, primarily for wharf support and security personnel. Under the Amended Operational Services Agreement, the annual fee we pay Tesoro was $1.7 million for support services performed by certain of Tesoro's field-level employees in support of our pipelines, terminals and storage facilities. The fee in effect at December 31, 2011 was $0.3 million. Additional amounts are charged in accordance with the agreement as necessary. See Note O for additional information related to the Amended Operational Services Agreement.

TLLP Transactions. Revenues from affiliates consist of revenues from commercial agreements we entered into with Tesoro under which Tesoro pays us fees for gathering crude oil and distributing, transporting and storing crude oil and refined products. Pursuant to our Amended Omnibus Agreement, we pay Tesoro an annual corporate services fee, payable in equal monthly installments, in the amount of $2.5 million, for the provision of various centralized corporate services including executive management, legal, accounting, treasury, human resources, health, safety and environmental, information technology, insurance coverage, administration and other corporate services.

Predecessors' Transactions. Related-party transactions of our Predecessors were settled through equity. The balance in receivables and accounts payable from affiliated companies represents the amount owed from or to Tesoro related to certain affiliate transactions. Revenues from affiliates in the combined statements of operations of our Predecessors consist of revenues from gathering and transportation services to Tesoro and its affiliates based on regulated tariff rates for the Federal Energy Regulatory Commission ("FERC") regulated portions of our High Plains system.

Summary of Transactions. A summary of revenue and expense transactions with Tesoro, including expenses directly charged and allocated to our Predecessors, are as follows (in thousands):
 
Three Months Ended
March 31,
 
2012
 
2011
 
 
 
 
Revenues
$
26,353

 
$
5,562

Operating and maintenance expenses (a)
4,530

 
11,295

General and administrative expenses
2,758

 
1,562

____________ 
 
 
(a)
Operating and maintenance expenses include imbalance settlement gains of $2.5 million and $1.1 million for the three months ended March 31, 2012 and 2011, respectively.

In accordance with our partnership agreement, our common and subordinated units and general partner interest are entitled to receive quarterly distributions of available cash. In February 2012, we paid a quarterly cash distribution, of which $5.9 million was paid to Tesoro. On April 19, 2012, we declared a quarterly cash distribution, of which $6.2 million was paid to Tesoro on May 14, 2012. See Note O for information on cash distributions declared or paid to Tesoro related to our quarterly financial results subsequent to the quarter ended March 31, 2012.


10


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

NOTE D - NET INCOME PER UNIT

We use the two-class method when calculating the net income per unit applicable to limited partners because we have more than one participating security. Our participating securities consist of common units, subordinated units, general partner units and incentive distribution rights ("IDRs"). We base our calculation of net income per unit on the weighted-average number of common units outstanding during the period. The basic weighted-average number of units outstanding has not changed since the completion of the Initial Offering and remains equal to the total number of units outstanding as of March 31, 2012. We did not calculate net income per unit for the three months ended March 31, 2011, because there were no units outstanding prior to the Initial Offering.

Net income attributable to the Partnership is allocated between the limited, subordinated and general partners in accordance with our partnership agreement. Distributions for the first quarter of 2012 include distributions for units issued as part of the Martinez Marine Terminal Acquisition. See Notes B and O for additional information regarding subsequent events including the issuance of common and general partner units to Tesoro.

Diluted net income per unit includes the effects of potentially dilutive units on our common units, consisting of unvested service and performance phantom units. Basic and diluted net income per unit applicable to subordinated limited partners are the same because there are no potentially dilutive subordinated units outstanding.


11


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

The calculation of net income per unit is as follows (in thousands, except unit and per unit amounts):
 
Three Months Ended
 
March 31, 2012
Net income attributable to partners
$
11,556

Less: General partner's distribution
236

Less: Limited partners' distribution
5,835

Less: Subordinated partner's distribution
5,759

Distributions in excess of earnings
$
(274
)
 
 
General partner's earnings:
 
Distributions
$
236

Allocation of distributions in excess of earnings
(6
)
Total general partner's earnings
$
230

 
 
Limited partners' earnings:
 
Distributions
$
5,835

Allocation of distributions in excess of earnings
(134
)
Total limited partners' earnings
$
5,701

 
 
Subordinated partner's earnings:
 
Distributions
$
5,759

Allocation of distributions in excess of earnings
(134
)
Total subordinated partner's earnings
$
5,625

 
 
Weighted average limited partner units outstanding:
 
Common units - basic
15,254,890

Common unit equivalents
42,133

Common units - diluted
15,297,023

 
 
Subordinated units - basic and diluted
15,254,890

 
 
Net income per limited partner unit:
 
Common - basic
$
0.37

Common - diluted
$
0.37

Subordinated - basic and diluted
$
0.37


NOTE E - PROPERTY, PLANT AND EQUIPMENT

Property, plant and equipment, at cost, is as follows (in thousands):
 
March 31,
2012
 
December 31,
2011
 
 
 
 
Crude Oil Gathering
$
99,432

 
$
97,249

Terminalling, Transportation and Storage
185,920

 
184,000

Gross Property, Plant and Equipment
285,352

 
281,249

Less: Accumulated depreciation
87,805

 
85,102

Net Property, Plant and Equipment
$
197,547

 
$
196,147



12


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

NOTE F - ACCRUED LIABILITIES

Accrued liabilities are as follows (in thousands):
 
March 31,
2012
 
December 31,
2011
Environmental liabilities
$
1,368

 
$
1,311

Taxes other than income taxes
742

 
942

Accrued vacation
164

 
230

Utilities
143

 
143

Interest and financing costs
5

 
18

Deferred revenue - trade
5

 
10

Other
165

 
439

Total Accrued Liabilities
$
2,592

 
$
3,093


For further discussion related to environmental liabilities, see Note K.

NOTE G - OTHER NONCURRENT LIABILITIES

Other noncurrent liabilities are as follows (in thousands):

 
March 31,
 2012
 
December 31, 2011
Environmental liabilities
$
2,596

 
$
2,621

Asset retirement obligations
45

 
44

Total Other Noncurrent Liabilities
$
2,641

 
$
2,665


For further discussion related to environmental liabilities, see Note K.

NOTE H - BENEFIT PLANS

Employees supporting our operations participate in the benefit plans and the employee thrift plan of Tesoro. The Predecessors were allocated expenses for costs associated with the benefit plans primarily based on the percentage of the Predecessors' allocated salaries compared to Tesoro's total salaries. Tesoro, subsequent to the Initial Offering, allocates expense for costs associated with the benefit plans based on the salaries of TLGP employees that provide services to TLLP as a percentage of total Tesoro salaries. These employee benefit plan expenses and the related payroll costs are included in operating expenses and general and administrative expenses and include amounts allocated to the Predecessors. Our portion of our Sponsor's employee benefit plan expenses were $0.7 million and $0.3 million for the three months ended March 31, 2012 and 2011, respectively.

NOTE I - MAJOR CUSTOMER AND CONCENTRATIONS OF CREDIT RISK
 
TRMC, a wholly owned subsidiary of Tesoro, accounted for 93% of our total revenues for the three months ended March 31, 2012. Historically, TRMC was a customer of the Crude Oil Gathering segment and accounted for 72% of the TLLP Predecessor's total revenues in the three months ended March 31, 2011. These percentages are not comparable as no revenue was recorded for the Predecessors for transactions with TRMC in the Terminalling, Transportation and Storage segment or for trucking services in the Crude Oil Gathering segment prior to the Initial Offering.


13


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

NOTE J - DEBT

The Amended Revolving Credit Facility became effective March 30, 2012. Concurrent with the execution of the amendment, and pursuant to the terms of the original agreement, we exercised our option to increase the total loan availability from $150.0 million to an aggregate of $300.0 million. The amendment allows us to request that the availability be increased up to an aggregate of $450.0 million, subject to receiving increased commitments from the lenders, compared to the original agreement, which allowed an aggregate capacity of $300.0 million. The Amended Revolving Credit Facility is non-recourse to Tesoro, except for TLGP, and is guaranteed by all of our subsidiaries and secured by substantially all of our assets. Borrowings available under the Amended Revolving Credit Facility are up to the total available revolving capacity of the facility. We had $50.0 million of borrowings and $0.3 million in letters of credit outstanding under the Amended Revolving Credit Facility, resulting in a total unused credit availability of $249.7 million, or 83%, of the borrowing capacity as of March 31, 2012. The Amended Revolving Credit Facility is scheduled to mature on April 25, 2014. See Note O for information regarding subsequent events including an amendment to the Amended Revolving Credit Facility.

Our Amended Revolving Credit Facility, as of March 31, 2012, was subject to the following expenses and fees:
Credit Facility
 
30 day Eurodollar (LIBOR) Rate
 
Eurodollar Margin
 
Base Rate
 
Base Rate Margin
 
Commitment Fee
(unused portion)
TLLP Revolving Credit Facility (a)
 
0.24%
 
2.50%
 
3.25%
 
1.50%
 
0.50%
____________
(a) We have the option to elect if the borrowings will bear interest at either a base rate plus the base rate margin, or a Eurodollar rate, for the applicable period, plus the Eurodollar margin at the time of the borrowing. Letters of credit outstanding under the Amended Revolving Credit Facility incur fees at the Eurodollar margin rate.

NOTE K - COMMITMENTS AND CONTINGENCIES
 
Indemnification

Under the Amended Omnibus Agreement, Tesoro indemnifies us for certain environmental liabilities and title and tax matters associated with the ownership or operation of our assets and arising at or before the closing of the Initial Offering on April 26, 2011 and the subsequent acquisitions. With respect to assets that we acquired from Tesoro, indemnification for unknown environmental and title liabilities is limited to pre-closing conditions identified prior to the earlier of the date that Tesoro no longer controls our general partner or five years after the date of purchase. Under the Amended Omnibus Agreement, which became effective September 14, 2012, the aggregate annual deductible for each type (unknown environmental liabilities or title matters) of liability was $0.5 million before we are entitled to indemnification in any calendar year in consideration of the Martinez Marine Terminal Acquisition and the Long Beach Assets Acquisition. The aggregate annual deductible in effect at December 31, 2011 was $0.25 million.

We have agreed to indemnify Tesoro for events and conditions associated with the ownership or operation of our assets that occur after the closing of the Initial Offering and the subsequent acquisitions and for environmental liabilities related to our assets to the extent Tesoro is not required to indemnify us for such liabilities. See Notes C and O for additional information regarding the Amended Omnibus Agreement.

Contingencies

In the ordinary course of business, we may become party to lawsuits, administrative proceedings and governmental investigations, including environmental, regulatory and other matters. The outcome of these matters cannot always be predicted accurately, but the Predecessors and TLLP have accrued liabilities for certain of these matters based on their best estimates and applicable accounting guidelines and principles if the amount is probable and can be reasonably estimated. Contingencies arising from conditions existing before the Initial Offering and the subsequent acquisitions from Tesoro that have been identified after the closing of each transaction will be recorded in accordance with the indemnification terms set forth in the Amended Omnibus Agreement, while any contingencies arising from events after the Initial Offering and the subsequent acquisitions from Tesoro will be fully recognized by TLLP. We did not have any outstanding lawsuits, administrative proceedings or governmental investigations as of March 31, 2012.


14


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Environmental Liabilities

Our Predecessors recorded environmental liabilities when environmental assessments and/or remedial efforts were probable and could be reasonably estimated. Environmental liabilities of $4.0 million and $3.9 million were accrued as of March 31, 2012 and December 31, 2011, respectively, for groundwater and soil remediation projects at the Martinez Crude Oil Marine Terminal and the Long Beach Assets. The liabilities associated with the initial assets were retained by Tesoro at the closing of the Initial Offering and the liabilities associated with the Martinez Crude Oil Marine Terminal and Long Beach Assets were retained by Tesoro at the closing of the Martinez Marine Terminal Acquisition and the Long Beach Assets Acquisition, respectively. Further, the Predecessors capitalized environmental expenditures that extended the life or increased the capacity of assets as well as expenditures that prevented environmental contamination.

NOTE L - EQUITY

We had 14,950,000 common public units outstanding as of March 31, 2012. Tesoro owned 304,890 of our common units, 15,254,890 of our subordinated units and 622,649 of our general partner units (the 2% general partner interest) as of March 31, 2012, which together constitutes a 52% ownership interest in us. There have not been any changes to the number of outstanding units since the closing of the Initial Offering through March 31, 2012. See Notes B and O for information regarding the subsequent events related to equity issuances subsequent to March 31, 2012.

Equity Activity. The summarized changes in the carrying amount of our equity are as follows (in thousands):
 
Equity of Predecessors
 
 
Common
 
Subordinated
 
General Partner
 
Total
Balance at December 31, 2011
$
57,702

 
 
$
250,430

 
$
(143,048
)
 
$
1,588

 
$
166,672

Sponsor contributions of equity to the Predecessors
2,305

 
 

 

 

 
2,305

Loss attributable to Predecessors
(3,512
)
 
 

 

 

 
(3,512
)
Cash distributions

 
 
(5,530
)
 
(5,530
)
 
(226
)
 
(11,286
)
Capital contributions

 
 
9

 
415

 

 
424

Partnership earnings

 
 
5,663

 
5,663

 
230

 
11,556

Unit-based compensation

 
 
378

 

 

 
378

Balance at March 31, 2012
$
56,495

 
 
$
250,950

 
$
(142,500
)
 
$
1,592

 
$
166,537


Allocations of Net Income. Our partnership agreement contains provisions for the allocation of net income and loss to the unitholders and the general partner. For purposes of maintaining partner capital accounts, the partnership agreement specifies that items of income and loss shall be allocated among the partners in accordance with their respective percentage interest. Normal allocations according to percentage interests are made after giving effect, if any, to priority income allocations in an amount equal to incentive cash distributions allocated 100% to the general partner. As there were no incentive distributions earned during the three months ended March 31, 2012, net income applicable to the general partner is equivalent to 2% of net income.

Cash distributions. Our partnership agreement, as amended, sets forth the calculation to be used to determine the amount and priority of cash distributions that the common and subordinated unitholders and general partner will receive. In accordance with our partnership agreement, on April 19, 2012, we declared a quarterly cash distribution, based on the results of the first quarter, totaling $11.8 million, or $0.3775 per unit. This distribution was paid on May 14, 2012, to unitholders of record on May 4, 2012. On February 13, 2012, we paid a quarterly cash distribution totaling $11.3 million, or $0.3625. See Note O for information on distributions declared or paid related to our quarterly financial results subsequent to the quarter ended March 31, 2012.


15


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

The allocation of total quarterly cash distributions to general and limited partners is as follows for the three months ended March 31, 2012. Our distributions are declared subsequent to quarter end; therefore, the table represents total cash distributions applicable to the period in which the distributions are earned (in thousands, except per unit amounts):
 
Three Months Ended
March 31, 2012
General partner's interest
$
236

 
 
Limited partners' distribution:
 
Common
5,835

Subordinated
5,759

Total Cash Distributions
$
11,830

Cash distributions per unit
$
0.3775


NOTE M - EQUITY-BASED COMPENSATION
 

Unit-based compensation expense related to the Partnership that was included in our condensed statements of combined consolidated operations was as follows (in thousands):
 
Three Months Ended
March 31, 2012
Service phantom units
$
29

Performance phantom units
349

Total Unit-Based Compensation Expense
$
378


Service Phantom Unit Awards. During the three months ended March 31, 2012, our general partner issued service phantom unit awards with tandem distribution equivalent rights to certain directors under the 2011 TLLP Long-Term Incentive Plan. The fair value of each phantom unit on the grant date is equal to the market price of our common unit on that date. The estimated fair value of our phantom units is amortized over the vesting period using the straight-line method. Non-employee director awards vest at the end of a one-year service period and employee awards granted in 2011 vest ratably over a three-year service period. Total unrecognized compensation cost related to our nonvested service phantom units totaled $0.3 million as of March 31, 2012, which is expected to be recognized over a weighted-average period of 1.4 years. The fair value of nonvested service phantom units outstanding as of March 31, 2012, totaled $0.6 million.

A summary of our service phantom unit award activity for the three months ended March 31, 2012, is set forth below:
 
Number of Service Phantom Units
 
Weighted-Average Grant Date Fair Value
Nonvested at January 1, 2012
14,073

 
$
23.24

Granted
5,554

 
36.44

Forfeited
(3,557
)
 
28.52

Nonvested at March 31, 2012
16,070

 
26.63


Performance Phantom Unit Awards. Our general partner granted performance phantom unit awards to certain officers in February 2012. These performance phantom unit awards represent the right to receive a TLLP common unit at the end of the approximate three-year performance period depending on the Partnership's achievement of pre-established performance measures. The value of the award ultimately paid will be based on our relative total unitholder return against the performance peer group over the performance period. The performance phantom unit awards can range from 0% to 200% of the targeted award value. The estimated weighted-average payout for these awards was 175% based on results through March 31, 2012. The fair value of each performance phantom unit award is estimated at the grant date using a Monte Carlo simulation model. The estimated fair value is amortized over the vesting period, generally three years, using the straight-line method. Total unrecognized compensation cost related to our nonvested performance phantom units totaled $1.9 million as of March 31, 2012, which is expected to be recognized over a weighted-average period of 2.4 years.


16


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

A summary of our performance phantom unit award activity for the three months ended March 31, 2012, is set forth below:
 
Number of Performance Phantom Units
 
Weighted-Average Grant Date Fair Value
Nonvested at January 1, 2012
36,800

 
$
32.99

Granted
36,000

 
39.19

Nonvested at March 31, 2012
72,800

 
36.06


Sponsor's Stock-based Compensation. Certain Tesoro employees supporting the Predecessors' operations were historically granted long-term incentive compensation awards under Tesoro's stock-based compensation programs, which primarily consist of stock options, restricted common stock and stock appreciation rights. The Predecessors were allocated expenses for stock-based compensation costs. These costs are included in the Predecessors' general and administrative expenses. The Predecessors' allocated expense was $0.7 million for the three months ended March 31, 2011. There was an immaterial amount of stock-based compensation related to the Predecessors in the three months ended March 31, 2012. The Partnership has not been allocated these stock-based compensation costs as they are included with the services provided under the Amended Omnibus Agreement.

NOTE N - SEGMENT DISCLOSURES

Our revenues are derived from two operating segments: Crude Oil Gathering and Terminalling, Transportation and Storage. Upon completion of the Martinez Marine Terminal Acquisition and the Long Beach Assets Acquisition, our assets consist of a crude oil gathering system in the Bakken Shale/Williston Basin area of North Dakota and Montana, eight refined products terminals in the midwestern and western United States, a crude oil and refined products storage facility and five related short-haul pipelines in Utah and two marine terminals, including storage tanks and related short-haul pipelines in California. Our revenues are generated from existing third-party contracts and from commercial agreements we entered into with Tesoro at the closing of the Initial Offering, and subsequent to the Initial Offering, under which Tesoro pays us fees for gathering crude oil and distributing, transporting and storing crude oil and refined products. The commercial agreements with Tesoro are described in Note C. We do not have any foreign operations.

Our operating segments are strategic business units that offer different services and are managed separately, because each segment requires different industry knowledge, technology and marketing strategies. We evaluate the performance of each segment based on its respective operating income.

Crude Oil Gathering.  Our crude oil gathering system in North Dakota and Montana, which we refer to as our High Plains system, includes an approximate 27,000 bpd truck-based crude oil gathering operation and approximately 700 miles of common carrier pipeline and related storage assets. The High Plains system has the capacity to deliver up to 85,000 bpd to Tesoro's North Dakota refinery, which is presently limited to processing 60,000 bpd of shipments, and 9,000 bpd into a third-party pipeline at Richey, Montana. This system gathers and transports crude oil produced in the Williston Basin including production from the Bakken Shale formation. We refer to this area, a significant portion of which is serviced by our High Plains system, as the Bakken Shale/Williston Basin area.

Terminalling, Transportation and Storage.  We own and operate eight refined products terminals with aggregate truck and barge delivery capacity of approximately 239,000 bpd. The terminals provide distribution primarily for refined products produced at Tesoro's refineries located in Los Angeles and Martinez, California (the Los Angeles and Martinez refineries, respectively); Salt Lake City, Utah (the Utah refinery); Kenai, Alaska (the Alaska refinery); Anacortes, Washington (the Washington refinery); and Mandan, North Dakota (the North Dakota refinery). We also own and operate assets that exclusively support Tesoro's Utah refinery, including a refined products and crude oil storage facility with total shell capacity of approximately 878,000 barrels and three short-haul crude oil supply pipelines and two short-haul refined product delivery pipelines connected to third-party interstate pipelines.

Effective April 1, 2012, we acquired the Martinez Crude Oil Marine Terminal, which provides services primarily to Tesoro's Martinez refinery. Effective September 14, 2012, we acquired the Long Beach Assets, which provide services primarily to the Wilmington Refinery. See Notes B and O for additional information regarding subsequent events, including further information regarding the Martinez Marine Terminal Acquisition and the Long Beach Assets Acquisition.



17


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Segment information is as follows (in thousands):
 
Three Months Ended
March 31,
 
2012
 
2011
REVENUES
 
 
 
Crude Oil Gathering:
 
 
 
Affiliate (a)
$
13,979

 
$
5,562

Third-party
123

 
25

Total Crude Oil Gathering
14,102

 
5,587

Terminalling, Transportation and Storage:

 

Affiliate (a)
12,374

 

Third-party
1,787

 
2,105

Total Terminalling, Transportation and Storage
14,161

 
2,105

Total Segment Revenues
$
28,263

 
$
7,692

 

 

OPERATING AND MAINTENANCE EXPENSES

 

Crude Oil Gathering
$
6,844

 
$
4,715

Terminalling, Transportation and Storage
6,242

 
6,580

Total Segment Operating and Maintenance Expenses
$
13,086

 
$
11,295

 

 

DEPRECIATION AND AMORTIZATION EXPENSES
 

Crude Oil Gathering
$
783

 
$
785

Terminalling, Transportation and Storage
2,028

 
2,036

Total Segment Depreciation and Amortization Expenses
$
2,811

 
$
2,821

 

 

GENERAL AND ADMINISTRATIVE EXPENSES
 

Crude Oil Gathering
$
711

 
$
154

Terminalling, Transportation and Storage
705

 
259

Total Segment General and Administrative Expenses
$
1,416

 
$
413

 

 

LOSS ON ASSET DISPOSALS
 
 
 
Crude Oil Gathering
$

 
$

Terminalling, Transportation and Storage
236

 
25

Total Segment Loss on Asset Disposals
$
236

 
$
25

 
 
 
 
OPERATING INCOME (LOSS)

 

Crude Oil Gathering
$
5,764

 
$
(67
)
Terminalling, Transportation and Storage
4,950

 
(6,795
)
Total Segment Operating Income (Loss)
10,714

 
(6,862
)
Unallocated general and administrative expenses
(2,159
)
 
(1,149
)
Interest and financing costs, net
(511
)
 

NET INCOME (LOSS)
$
8,044

 
$
(8,011
)
____________ 
 
 
(a)
Historically, no affiliate revenue was recognized by our Predecessors in the Terminalling, Transportation and Storage segment. Our FERC and North Dakota Public Service Commission regulated pipelines were our source of affiliate revenues in the Crude Oil Gathering segment. No affiliate revenue was recognized by the TLLP Predecessor for trucking services in the Crude Oil Gathering segment.


18


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Capital expenditures by operating segment were as follows (in thousands):
 
Three Months Ended
March 31,
 
2012
 
2011
Capital Expenditures
 
 
 
Crude Oil Gathering
$
2,621

 
$
3

Terminalling, Transportation and Storage
2,231

 
742

Total Capital Expenditures
$
4,852

 
$
745


Total identifiable assets by operating segment were as follows (in thousands):
Identifiable Assets
March 31,
2012
 
December 31,
2011
Crude Oil Gathering
$
69,446

 
$
72,795

Terminalling, Transportation and Storage
138,240

 
140,323

Other
23,246

 
20,691

Total Identifiable Assets
$
230,932

 
$
233,809


NOTE O - SUBSEQUENT EVENTS

Cash distributions. The table below summarizes the quarterly distributions related to our quarterly financial results subsequent to the quarter ended March 31, 2012:
Quarter Ended
 
Total Quarterly Distribution Per Unit
 
Total Cash Distribution (in thousands) (a)
 
Date of Distribution
 
Unitholders Record Date
June 30, 2012 (b)
 
$
0.4100

 
$
12,960

 
August 14, 2012
 
August 3, 2012
September 30, 2012 (b)
 
0.4550

 
16,966

 
November 14, 2012
 
November 2, 2012
________
(a) The total cash distribution includes $6.8 million and $8.2 million paid to Tesoro for the quarters ended June 30 and September 30, 2012, respectively.
(b) Total cash distribution includes the general partner's IDRs.

Revolving Credit Facility. Our Amended Revolving Credit Facility was most recently amended on August 17, 2012 to revise certain coverage and leverage ratios.

Senior Notes. Effective September 14, 2012, the Partnership completed a private offering of $350.0 million aggregate principal amount of 5.875% Senior Notes due 2020 (the "Senior Notes"). The proceeds of this offering were used to fund our acquisition of the Long Beach Assets and repay the outstanding balance on our Amended Revolving Credit Facility, with the remaining amounts to be used for general partnership purposes.

The Senior Notes have no sinking fund requirements. We may redeem some or all of the Senior Notes prior to October 1, 2016 at a make-whole price plus accrued and unpaid interest. On or after October 1, 2016, the Senior Notes may be redeemed at premiums equal to 2.938% through October 1, 2017; 1.469% from October 1, 2017 through October 1, 2018; and at par thereafter, plus accrued and unpaid interest in all circumstances. We will have the right to redeem up to 35% of the aggregate principal amount at 105.875% of face value with proceeds from certain equity issuances through October 1, 2015.

The Senior Notes are subject to a registration rights agreement under which we have agreed to exchange the notes for registered publicly-traded notes having substantially identical terms as the Senior Notes. The Senior Notes also contain customary terms, events of default and covenants. The Senior Notes are unsecured and guaranteed by all of our domestic subsidiaries, except Tesoro Logistics Finance Corp., the co-issuer of the Senior Notes.





19


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Equity Offering. On October 5, 2012, we closed an offering of 4,255,000 common units, including 555,000 common units issued pursuant to the exercise of the underwriter's over-allotment option on October 2, 2012, representing limited partner interests, at a public offering price of $41.80 per unit. These common units were issued pursuant to our shelf registration statement, as supplemented by the prospectus supplement filed with the SEC on October 3, 2012. The Partnership intends to use the net proceeds of $170.7 million, including the proceeds from the exercise of the underwriter's over-allotment option, for general partnership purposes.

Anacortes Rail Facility Acquisition. Effective November 15, 2012, we entered into a transaction (the "Anacortes Rail Facility Acquisition") with Tesoro and TLGP pursuant to which TLLP acquired from Tesoro the Anacortes Rail Facility in exchange for total consideration of $180.0 million, comprised of $162.0 million in cash and the issuance of equity with a combined fair value of $18.0 million. The equity is comprised of 93,289 general partner units and 309,838 common units, representing slightly less than a 1% limited partner interest.

The Anacortes Rail Facility includes a four-track unloading platform, two receiving and departing tracks capable of handling a 100-car unit train and two additional short track spurs, as well as other related assets and properties associated with the facility. The facility, which was placed in service in September 2012, has a permitted capacity to deliver up to an average of 50,000 bpd per year of Bakken crude oil to Tesoro's Washington refinery.

We entered into an agreement with Tesoro to lease the real property under the Anacortes Rail Facility for a term of ninety-nine years in connection with the Anacortes Rail Facility Acquisition. We also entered into a right of first refusal, option agreement and agreement of purchase and sale, giving Tesoro the right to repurchase the Anacortes Rail Facility under certain conditions.

Anacortes Track Use and Throughput Agreement. The Partnership entered into a 10-year track use and throughput agreement with Tesoro in connection with the Anacortes Rail Facility Acquisition, effective November 15, 2012, under which Tesoro is obligated to transport an average of at least 40,000 bpd per month of crude oil at a throughput fee of $1.53 per barrel. An excess volume throughput fee of $0.75 per barrel will be charged for monthly average volumes in excess of 40,000 bpd. The fees under the agreement are indexed for inflation and the agreement gives Tesoro the option to renew for two five-year terms.

If Tesoro fails to transport aggregate volumes equal to its minimum throughput commitment during any calendar month, Tesoro will owe the Partnership a shortfall payment equal to the volume of the shortfall multiplied by the throughput fee. The amount of any shortfall payment paid by Tesoro will be credited against any amounts owed by Tesoro for the transportation of volumes in excess of its minimum throughput commitment during any of the succeeding three months.

Amended and Restated Omnibus Agreement. The Partnership entered into a second amended and restated omnibus agreement ("Second Amended Omnibus Agreement") with Tesoro, effective November 15, 2012, in connection with the Anacortes Rail Facility Acquisition. Certain additional acquisitions from Tesoro, including the assets in the Anacortes Rail Facility Acquisition, are governed by the Second Amended Omnibus Agreement. The annual fee payable to Tesoro under the Second Amended Omnibus Agreement remained $2.5 million for the provision of various general and administrative services.

Under the Second Amended Omnibus Agreement, Tesoro indemnifies us for certain matters, including environmental, title and tax matters associated with the ownership of our assets at or before the closing of the Initial Offering on April 26, 2011 and the subsequent acquisitions. As amended, the aggregate annual deductible for each type (unknown environmental liabilities, title or tax matters) of liability is $0.6 million before we are entitled to indemnification in any calendar year in consideration of the Martinez Crude Oil Marine Terminal, the Long Beach Assets and the Anacortes Rail Facility.

Amended and Restated Operational Services Agreement.  The Partnership entered into an Amendment and Restatement of Schedules to the Amended and Restated Operational Services Schedules (the "Amended Operational Services Schedules") on November 15, 2012 in connection with the Anacortes Rail Facility Acquisition. The Amended Operational Services Schedules consider the additional resources required to operate the Anacortes Rail Facility, primarily for electricity and other utilities. As amended, the annual fee we pay Tesoro is $2.0 million for support services performed by certain of Tesoro's field-level employees in support of our pipelines, terminals and storage facilities.


20


TESORO LOGISTICS LP
NOTES TO CONDENSED COMBINED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Chevron Northwest Products System Acquisition. In addition, on December 6, 2012, we executed definitive agreements to purchase Chevron Pipe Line Company's and Northwest Terminalling Company's (collectively, "Chevron") Northwest Products System (the "Northwest Products System") for a total purchase price of $400.0 million. The transaction is subject to regulatory approval and is expected to close during the first quarter of 2013. Upon execution of the purchase agreements, the Partnership paid an aggregate deposit of $40.0 million, which may be retained by Chevron upon certain termination events under the purchase agreements prior to closing.

The Northwest Products System consists of the Northwest Product Pipeline, a 760-mile FERC regulated common carrier products pipeline which extends from Salt Lake City, Utah to Spokane, Washington, and a separate five-mile jet fuel pipeline to the Salt Lake City International Airport and the Northwest Terminalling Company consisting of the Boise and Pocatello, Idaho and Pasco, Washington refined products terminals, which are not subject to FERC regulation. The pipeline receives product from five refineries and one pipeline in the Salt Lake City area and is the primary transportation option from Salt Lake City to Pocatello, Boise, Pasco and Spokane. Delivery volumes on the system averaged approximately 84,000 bpd in 2011. The terminals have a total storage capacity of 1.3 million barrels and delivered approximately 51,000 bpd in 2011. The operations of the Northwest Products System will be reported in our Terminalling, Transportation and Storage segment upon closing.



21