UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549

FORM 10-Q

(MARK ONE)

[X] QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
FOR THE QUARTERLY PERIOD ENDED DECEMBER 31, 2011

OR

[ ] TRANSITION REPORT UNDER SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
FOR THE TRANSITION PERIOD FROM __________________ TO __________________________

COMMISSION FILE NUMBER: 333-113296

WIND WORKS POWER CORP.
(Name of registrant as specified in its charter)

NEVADA 98-0409895
(State or other jurisdiction of incorporation or organization) (I.R.S. Employer Identification No.)

346 Waverley Street Ottawa, Ontario, Canada K2P OW5
(Address of principal executive offices) (Zip Code)

613-226-1983
(Registrant's telephone number, including area code)

N/A
(Former name, former address and former fiscal year, if changed since last report)

     Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes [X] No [ ]

     Indicate by check mark whether the registrant has submitted electronically and posted on its corporate web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes[ ] No [X]

     Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer,” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

Large accelerated Filer [ ] Accelerated Filer [ ]
Non-accelerated Filer [ ] Small Reporting Company [X]

     Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act
Yes [ ] No[X]

APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY PROCEEDINGS DURING THE PRECEDING FIVE YEARS

     Indicate by check mark whether the Registrant has filed all documents and reports required to be filed by Section 12, 13, or 15 (d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.
Yes _________ No ___________

APPLICABLE ONLY TO CORPORATE ISSUERS:

     Indicate the number of shares outstanding of each of the issuer’s classes of Common Stock as of the latest practicable date: 58,383,594 shares of Common Stock as of February 15, 2012.


  PART I. - FINANCIAL INFORMATION
Item 1. Financial Statements
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations.
Item 3. Quantitative and Qualitative Disclosures About Market Risk.
Item 4. Controls and Procedures.
  PART II - OTHER INFORMATION
Item 1. Legal Proceedings.
Item 1A. Risk Factors.
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.
Item 3. Defaults Upon Senior Securities.
Item 4. Removed and Reserved
Item 5. Other Information.
Item 6. Exhibits.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

     Certain statements in this quarterly report on Form 10-Q contain or may contain forward-looking statements that are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Generally, the words “believes”, “anticipates,” “may,” “will,” “should,” “expect,” “intend,” “estimate,” “continue,” and similar expressions or the negative thereof or comparable terminology are intended to identify forward-looking statements which include, but are not limited to, statements concerning the Company’s expectations regarding its working capital requirements, financing requirements, business prospects, and other statements of expectations, beliefs, future plans and strategies, anticipated events or trends, and similar expressions concerning matters that are not historical facts. These forward-looking statements were based on various factors and were derived utilizing numerous assumptions and other factors that could cause our actual results to differ materially from those in the forward-looking statements. These factors include, but are not limited to, economic, political and market conditions and fluctuations, government and industry regulation, interest rate risk, U.S. and global competition, and other factors. Most of these factors are difficult to predict accurately and are generally beyond our control. You should consider the areas of risk described in connection with any forward-looking statements that may be made herein. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this report. Readers should carefully review this quarterly report in its entirety, including but not limited to our financial statements and the notes thereto. Except for our ongoing obligations to disclose material information under the Federal securities laws, we undertake no obligation to release publicly any revisions to any forward-looking statements, to report events or to report the occurrence of unanticipated events. For any forward-looking statements contained in any document, we claim the protection of the safe harbor for forward-looking statements contained in the Private Securities Litigation Reform Act of 1995.


PART 1 - FINANCIAL INFORMATION

Item 1. Financial Statements.


 

Wind Works Power Corp.
 
(A Continuation of Zero Emission People LLC)
 
Consolidated Interim Financial Statements
 
Period ended December 31, 2011 and 2010
 
(Unaudited)

 

 



MANAGEMENT’S RESPONSIBILITY FOR CONSOLIDATED INTERIM FINANCIAL STATEMENTS

To the shareholders of Wind Works Power Corp. (A Continuation of Zero Emission People LLC)

The consolidated interim financial statements and the notes thereto are the responsibility of the management of Wind Works Power Corp. (A Continuation of Zero Emission People LLC). These consolidated interim financial statements have been prepared in accordance with United States generally accepted accounting principles.

Management has developed and maintained a system of internal controls to provide reasonable assurance that all assets are safeguarded and to facilitate the preparation of relevant, reliable and timely financial information.

The Board of Directors is responsible for ensuring that management fulfills its responsibilities for financial reporting and internal controls.

“Ingo Stuckmann”
 
 
 
 
Ingo Stuckmann
President



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. – An Exploration Stage Company)
Consolidated Interim Balance Sheets
(Expressed in United States dollars, unless otherwise stated)

Assets   December 31, 2011     June 30, 2011  
Current Assets            
Cash and cash equivalents $  70,857   $  180,174  
Prepaid expenses   252,127     112,033  
Accounts receivable   2,330     3,584  
Taxes receivable   226,615     83,739  
Due from shareholder (Note 4)   1,850     1,850  
Other assets   103,799     115,380  
Cost in excess of billings on uncompleted contracts (Note 12)   105,327     77,862  
    762,905     574,621  
             
Capitalized lease costs   22,401     27,868  
Wind projects (Note 11)   4,486,550     3,431,183  
Wind project deposits (Note 13)   10,788,783     7,731,252  
Fixed assets (Note 6)   4,343     4,830  
Investment UW ZE Altenburg GmbH   16,190     18,149  
Loans receivable (Note 4)   17,984     2,904  
    15,336,251     11,216,186  
  $  16,099,156   $  11,790,807  
             
Liabilities and Stockholders’ Equity            
Liabilities            
             
Current Liabilities            
             
Accounts payable and accrued liabilities $  3,676,850   $  2,233,438  
Convertible debentures (Notes 7, 9)   504,879     385,000  
Short term loans (Notes 4, 8)   192,153     202,787  
    4,373,882     2,821,225  
Third Party Loans (Note 9)   12,860,942     8,827,589  
    17,234,824     11,648,814  
             
Stockholders’ Equity            
Common Stock (Note 10)   58,389     47,029  
Additional Paid-in Capital   8,056,125     7,419,568  
Contributed Surplus   244,925     244,925  
Share subscription liability   71,318     71,318  
Deficit Accumulated during the Development Stage   (9,640,327 )   (7,610,653 )
Cumulative translation adjustment   73,902     (30,194 )
    (1,135,668 )   141,993  
  $  16,099,156   $  11,790,807  

Going concern (Note 2), Contingencies (Note 14), Commitments (Note 15), Subsequent Events (Note 16)

The accompanying notes are an integral part of the consolidated interim financial statements.



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. – An Exploration Stage Company)
Consolidated Statement of Operations (Unaudited)
For the Periods Ended December 31, 2011 and 2010
(Expressed in United States dollars, unless otherwise stated)

                            Cumulative  
          Three Month     Six Month     Three Month     from May 2, 2008  
    Six Month     Period     Period     Period     (Inception) to  
    Period Ended     Ended     Ended     Ended     Dec 31  
    Dec 31 ,2011     Dec 31, 2011     Dec 31, 2010     Dec 31,2010     2011  
Income                              
                               
Interest   -     -   $ 529   $ 167   $ 529  
                               
Non-refundable deposit (Note 13)   -     -     97,290     -     97,290  
                               
Total income   -     -   $ 97,819   $ 167   $ 97,819  
                               
Expenses                              
Advertising and promotion $ 18,206   $ 1,455   $ 5,206   $ 3,187   $ 61,358  
Accretion interest (Note 7)   -     -     892,733     394,672     1,575,748  
Consulting fees   582,935     376,956     1,012,291     594,070     2,664,930  
Depreciation   487     244     609     304     2,414  
Office and miscellaneous   17,113     14,326     14,390     13,556     46,858  
Professional fees   137,963     6,318     222,505     129,836     710,374  
Rent   3,438     859     4,921     2,457     17,455  
Interest and service charges   451,623     229,782     82,279     44,156     741,602  
Travel and lodging   18,702     (1,298 )   3,392     -     42,534  
Insurance   -     -     1,256     1,256     3,382  
Project development costs   751,246     394,115     500,864     323,421     2,970,326  
Foreign exchange   (4,560 )   (6,267 )   10,865     21,223     107,052  
Loss on extinguishment of debt   -     -     -     -     564,130  
Lease expense   52,521     26,166     39,965     16,227     229,983  
Total operating expenses   2,029,674     1,042,656     2,791,276     1,544,365     9,738,146  
Net loss for the period $ 2,029,674   $ 1,042,656   $ 2,693,457   $ 1,544,198   $ 9,640,327  
                               
Comprehensive loss (gain)                              
Foreign currency translation                              
adjustment   (104,096 )   14,933     17,032     11,345     (73,902 )
Comprehensive loss for the period $ 1,925,577   $ 1,057,590   $ 2,710,489   $ 1,555,543   $ 9,566,425  
                               
                               
Basic and Diluted Loss per share   (0.04 )   (0.02 )   (0.07 )   (0.04 )      
Weighted Average Number of Shares                              
Outstanding   51,371,994     51,371,994     37,384,135     38,138,693        

The accompanying notes are an integral part of the consolidated interim financial statements.



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp.- an Exploration Stage Mining Company)
Consolidated Statement of Cash Flows (Unaudited)
For the Periods Ended December 31, 2011 and 2010
(Expressed in United States dollars, unless otherwise stated)

                Cumulative from  
    Six month period     Six month period     May 2, 2008  
    Ended Dec. 31,     Ended Dec 31,     (Inception) to  
    2011     2010     to Dec 31, 2011  
Cash Flows from Operating Activities                  
Net loss for the period $ (2,029,674 ) $ (2,693,457 ) $ (9,640,327 )
Add (deduct) non-cash items:                  
           Depreciation   487     609     2,414  
           Lease amortization   -     5,466     22,132  
           Loss on extinguishment of debt   -     -     564,130  
           Accretion interest   -     892,733     1,575,748  
           Interest on debt modification   -     -     451,532  
           Shares issued for services   461,446     896,134     2,123,260  
           Stock based compensation   186,750     95,400     183,710  
           Warrants issued   21,971     -     21,971  
           Foreign exchange translation   104,096     -     104,096  
Changes in non-cash working capital items:                  
           Accounts receivable   1,254     (159,353 )   (334 )
           Taxes receivable   (142,876 )   28,521     (226,615 )
           Prepaid expenses   (140,094 )   (17,519 )   (146,336 )
           Loans receivable   (15,080 )   (2,678 )   (15,080 )
           Costs in excess of billing   (60,230 )   -     (138,092 )
           Other assets   11,581     -     (175,610 )
           Accounts payable and accrued liabilities   1,453,316     787,221     1,326,947  
           Fixed assets   -     -     1,552,829  
           Subtotal: $ (147,054 ) $ (166,923 ) $ (2,413,625 )
Cash flow from investing activities:                  
           Wind project deposits   (3,057,531 )   -     (9,949,163 )
           Cash acquired on reverse takeover   -     -     34,192  
           Purchase of fixed assets   -     -     (2,559 )
           Investments in wind projects   (1,055,367 )   (215,370 )   (1,515,932 )
           Investments in joint ventures   1,960     -     (16,190 )
           Leases   5,466     -     (44,534 )
           Subtotal: $ (4,105,472 ) $ (215,370 ) $ (11,494,186 )
Cash flow from Financing activities                  
           Proceeds from private placement   -     150,000     800,000  
           Issuance of convertible debentures   179,879     150,000     604,879  
           Repayment of convertible debentures   (60,000 )   -     (450,000 )
           Proceeds from loans payable   4,033,353     -     13,060,825  
           Proceeds from short term loans   (10,634 )   -     (110,634 )
           Capital from limited partners   611     -     611  
           Subscriptions payable   -     71,318     71,137  
           Advances from related parties   -     -     1,850  
           Subtotal: $ 4,143,209   $ 371,318   $ 13,978,669  
           Increase (decrease) in cash from continuing   (109,317 )   (10,975 )   70,857  
           operations                  
           Cash, beginning of period   180,174     39,263     -  
           Cash, end of period $ 70,857   $ 28,288   $ 70,857  

Supplemental disclosure of non-cash transactions (Note 5)
The accompanying notes are an integral part of the consolidated financial statement



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Consolidated Statements of Stockholders’ Equity (Audited)
For the Period Ended December 31, 2011
(Stated in US Dollars)

                          Deficit      
                          Accumulated      
          Additional       Share   Cumulative   During the   Total  
          Paid-in   Contributed   Subscription   Translation   Exploration   Stockholders’    
  Common Shares   Capital   Surplus   Liability   Adjustment   Stage   Equity  
  Number   Amount                          
                                 
Capital issued for financing 4,454,454   4,454   95,546   -   -   -   -   100,000  
Net Loss -   -   -   -   -   -   (1,150 ) (1,150 )
Balance June 30, 2008 4,454,454   4,454   95,546   -   -   -   (1,150 ) 98,850  
                                 
Capital issued for financing 545,546   546   9,454   -   -   -   -   10,000  
Net Loss -   -   -   -   -   -   (53,184 ) (53,184 )
Balance June 30, 2009 5,000,000   5,000   105,000   -   -   -   (54,334 ) 55,666  
                                 
Recapitalization (Note 1) 22,053,117   22,053   1,245,394   -   -   -   -   1,267,451  
Capital issued for financing 1,080,000   1,080   538,920   -   -   -   -   540,000  
Capital issued for services 1,501,500   1,502   902,849   -   -   -   -   904,350  
Capital issued for wind projects 1,750,000   1,750   -   -   -   -   -   1,750  
Stock based Compensation -   -   -   88,085   -   -   -   88,085  
Fair value of warrants -   -   364,071   -   -   -   -   364,071  
Beneficial conversion feature -   -   842,650   -   -   -   -   842,650  
Conversion of convertible debenture 62,500   63   24,937   -   -   -   -   25,000  
Translation adjustment -   -   -   -   -   (701 ) -   (701 )
Net Loss -   -   -   -   -   -   (2,477,370 ) (2,477,370 )
Balance June 30, 2010 31,447,117   31,448   4,023,824   88,085   -   (701 ) (2,531,704 ) 1,610,952  



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Consolidated Statements of Stockholders’ Equity (Audited)
December 31, 2011
(Stated in US Dollars)

                          Deficit      
                          Accumulated      
          Additional       Share   Cumulative   During the   Total  
          Paid-in   Contributed   Subscription   Translation   Exploration   Stockholders’    
  Common Shares   Capital   Surplus   Liability   Adjustment   Stage   Equity  
  Number   Amount                          
                                 
Balance June 30, 2010 31,447,117   31,448   4,023,824   88,085   -   (701 ) (2,531,704 ) 1,610,952  
                                 
Capital issued for financing 375,000   375   149,625   -   -   -   -   150,000  
Capital issued for wind projects 550,000   550   235,950   -   -   -   -   236,500  
Capital issued for settlement of
acquisition agreement
9,000,000   9,000   (9,000 ) -   -   -   -   -  
Conversion of convertible debenture 1,889,298   1,890   691,298   -   -   -   -   693,188  
Capital issued for services 2,366,250   2,366   948,590   -   -   -   -   950,956  
Capital issued for debt settlement 1,400,000   1,400   1,314,600   -   -   -   -   1,316,000  
Fair value of warrants -   -   51,356                   51,356  
Warrant bifurcation -   -   (61,440 ) 61,440   -   -   -   -  
Beneficial conversion feature -   -   63,750   -   -   -   -   63,750  
Stock based compensation -   -   -   67,400   -   -   -   67,400  
Options revaluation -   -   -   28,000   -   -   -   28,000  
Modification of convertible debentures -   -   10,350   -   -   -   -   10,350  
Share subscription liability -   -   -   -   71,318   -   -   71,318  
Translation adjustment -   -   -   -   -   (29,523 ) -   (29,523 )
Net Loss -   -   -   -   -   -   (5,078,948 ) (5,078,948 )
Balance June 30, 2011 47,027,665   47,029   7,419,568   244,925   71,318   (30,194 ) (7,610,653 ) 141,993  

The accompanying notes are an integral part of the consolidated interim financial statements



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Consolidated Statements of Stockholders’ Equity (Unaudited)
December 31, 2011
(Stated in US Dollars)

                          Deficit      
                          Accumulated      
          Additional       Share   Cumulative   During the   Total  
          Paid-in   Contributed   Subscription   Translation   Exploration   Stockholders’    
  Common Shares   Capital   Surplus   Liability   Adjustment   Stage   Equity  
  Number   Amount                          
                                 
Balance June 30, 2011 47,027,665   47,029   7,419,568   244,925   71,318   (30,194 ) (7,610,653 ) 141,993  
                                 
Capital issued Germany -   -   611   -   -   -   -   611  
Fair value of warrants -   -   21,971                   21,971  
Translation adjustment -   -   -   -   -   (14,933 ) -   (14,903 )
Net Loss -   -   -   -   -   -   (987,019 ) (987,019 )
                                 
Balance Sep 30, 2011 47,027,665   47,029   7,441,486   244,925   71,318   (45,127 ) (8,597,671 ) (838,040 )
                                 
Capital issued for services 2,360,000   2,360   623,640                   626,000  
Capital issued for settlement of
acquisition agreement
9,000,000   9,000   (9,000 ) -   -   -   -   -  
Translation adjustment -   -   -   -   -   119,029   -   119,029  
Net Loss -   -   -   -   -   -   (1,042,656 ) (1,042,656 )
                                 
Balance Dec 31, 2011 58,387,665   58,389   8,056,126   244,925   71,318   73,902   (9,640,327 ) (1,135,668 )

The accompanying notes are an integral part of the consolidated interim financial statements



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

1.

Nature of Organization and Business:

     
i) Organization
     

Wind Works Power Corp. formerly known as AmMex Gold Mining Corp. (herein referred to as ”WWPC”, “Wind Works”, or “the Company”)) was incorporated under the laws of the State of Nevada, was primarily engaged in the acquisition and exploration of mining properties, but has since modified its business plan to focus on alternate energy.

     
ii) Business
     

The Company intends to develop wind parks. It will assemble land packages, secure requisite environmental permitting, provide wind testing by erecting towers to measure wind speed. Subject to favorable wind testing results, it will then apply for a power contract for the number of megawatts (MW) that the project will allow. Once it secures power contracts, management believes that it will be able to lease or sell the wind parks to operating utility companies or companies desiring to purchase wind turbines and erect the necessary power lines.

     
2.

Basis of Presentation and going concern

     

The unaudited condensed consolidated interim financial statements included herein have been prepared by the Company pursuant to the rules and regulations of the Securities and Exchange Commission. The financial statements reflect all adjustments that are, in the opinion of management, necessary for a fair statement of such information. All such adjustments are of a normal recurring nature. Certain information and footnote disclosures, including a description of significant accounting policies normally included in financial statements prepared in accordance with accounting principles generally accepted in the United States of America, have been condensed or omitted pursuant to such rules and regulations. The year-end balance sheet data was derived from audited financial statements, but does not include all disclosures required by accounting principles generally accepted in the United States of America. These consolidated interim financial statements should be read in conjunction with the consolidated financial statements and the notes thereto included in the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2011, which was filed with the United States Securities and Exchange Commission on October 28, 2011. The results of operations for the six months ended December 31, 2011 are not necessarily indicative of the results for any subsequent periods or the entire fiscal year ending June 30, 2012.

     

Going Concern

     

These accompanying consolidated financial statements have been prepared on a going concern basis which assumes that the Company will be able to realize its assets and discharge its liabilities in the normal course of business for the foreseeable future. If the going concern assumption were not appropriate for these financial statements then adjustments would be necessary in the carrying value of assets and liabilities, the reported revenue and expenses and the balance sheet classifications used.

     

The operations of the Company have primarily been funded by the sale of common stock and the issuance of convertible debentures. Continued operations of the Company are dependent on the Company’s ability to complete additional equity financings or generate profitable operations in the future. Management’s plan in this regard is to secure additional funds through future equity financings. While the Company has been successful in the past at raising funds, there can be no assurance that it will be able to do so in the future.




Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

    December 31, June 30,
    2011 2011
  Deficit accumulated during the development stage 9,617,435 7,610,653
       
  Working capital (deficiency) (3,588,115) (2,246,604)

Use of Estimates

   

Conformity with United States generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the consolidated financial statements, and the reported amounts of revenue and expenses during the reporting period. Actual results could differ from those estimates.

   
3.

Significant Accounting Policies

   

Wind Farm Developmental Properties

   

The Company expenses all costs related to the maintenance and exploration of developmental wind farms in which it has secured rights prior to establishment of commercial feasibility. Developmental wind farm acquisition costs are initially capitalized when incurred. The Company assesses the carrying cost for impairment under ASC 360-10 “Accounting for Impairment or Disposal of Long Lived Assets”. When it has been determined that a wind farm property can be economically developed, the costs then incurred to develop such property are capitalized. Such costs will be amortized using the units-of-production method over the estimated life of the project. If developmental wind farm properties are subsequently abandoned or impaired, any capitalized costs will be charged to operations.

   

Revenue Recognition

   

The Company recognizes revenue when persuasive evidence of an arrangement exists, services have been rendered, the sales price is fixed or determinable, and collectability is reasonably assured.

   

Revenues from fixed-price construction contracts are recognized on the completed-contract method due to undependable estimates that cause forecasts to be doubtful. The completed-contract method recognizes revenue and costs upon contract completion, and all project costs and revenues are reported as deferred items on the balance sheet until that time. A contract is considered complete when all costs except insignificant items have been incurred and the installation is operating according to specifications or has been accepted by the customer.

   

Contract costs include all direct material and labour costs and those indirect costs related to contract performance, such as indirect labour, supplies, tools, and repairs costs. General and administrative costs are charged to expense as incurred. Provisions for estimated losses on uncompleted contracts are made in the period in which such losses are determined. Claims are included in revenues when received.

   

Costs in excess of amounts billed are classified as current assets under costs in excess of billings on uncompleted contracts. Billings in excess of costs are classified under current liabilities as billings in excess of costs on uncompleted contracts. Contract retentions are included in prepaid expenses and other current assets.




Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

Equity Method Investments

   

The Company accounts for its ownership interest in UW ZE Altenburg GmbH under the equity method of accounting in accordance with ASC Topic No. 323 “Investments-Equity Method and Joint Venture” (“ASC 323”) as a result of the Company’s ability to exercise significant influence over the operating and financial policies of UW ZE Altenburg GmbH. Under ASC 323, investments of this nature are recorded at original cost and adjusted periodically to recognize the Company’s proportionate share of the entity’s net income or losses after the date of investments. When net losses from an investment accounted for under the equity method exceed its carrying amount, the investment’s carrying amount may be reduced to a negative value.

   
4.

Related Party Transactions

   

At December 31, 2011, the Company had a balance owing from a shareholder of $1,850 (June 30, 2011 – $1,850) pertaining to funds held in trust. The amount is due on demand, unsecured, and bears no interest.

   

At December 31, 2011, the Company had a loan payable to an officer of $1,733 (June 30, 2011 - $102,787). The amount is due on demand, unsecured, and bears a 5% interest rate and is included in short term loans. The company accrued $ nil (June 30, 2011 – $11,663) toward interest on this loan which is included in accounts payable and accrued liabilities.

   

At December 31, 2011, the Company had a loan receivable from an officer of $8,402 (June 30, 2011 – nil). The amount is due on demand, unsecured, and bears no interest.

   

During the period ended December 31, 2011, officers and directors received no payments (2010 – $24,080) for services rendered.

   

At December 31, 2011, the Company had payables to officers and directors of $191,748 (June 30, 2011 – $252,976) for services rendered which was included in accounts payable.

   

All transactions with related parties are made in the normal course of business and measured at carrying value.

   
5.

Non-Cash Transactions

   

There were no income taxes paid during 2011 or 2010. During the quarter ended December 31, 2011, the company entered into certain non-cash operating activities as follows:

   

During the three month period ending December 31, 2011, the Company recognized $388,893 in consulting fees related to the issuance of shares for services.

   
6.

Fixed Assets


  Cost Additions During Accumulated Net Book Value at Net Book Value at
  Opening Balance the Year Depreciation December 31, 2011 June 30, 2011
           
  $4,830 - $487 $4,343 $6,038

During the six month period ended December 31, 2011, total additions to property, plant and equipment were $ nil (2010 - $ nil). During the six month period ended December 31, 2011 the Company recorded depreciation of $487 (2010 - $609).



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

7.

Convertible Debentures

   

September 25, 2009 / April 29, 2010 issuance

   

On November 25, 2009 the Company issued $992,300 of convertible debt in a subscription agreement between the Company and a group of investors. The debt carries an interest rate of 10% annually, due upon the maturity date, November 30, 2010. The debt may be converted into shares of common stock at a conversion price of $0.70 per share. In conjunction with the debt, the Company also issued warrants to purchase 1,000,000 warrants with an exercise price of $1.00 per share that expire on November 30, 2011. The debt carries a beneficial conversion feature, which along with the relative fair value of the warrants, resulted in a debt discount of $967,076 which was recorded against the convertible debt and offset in additional paid in capital.

   

On April 29, 2010, the Company agreed to modify the terms of the convertible debentures listed above. Under the modified debentures, the conversion price of the debentures was reduced to $0.40 per share. In addition, the warrant exercise price was reduced to $0.50 per share and the expiry date of the warrants was extended to November 30, 2012.

   

The discount on this debt is fully accreted at September 30, 2011, and the remaining debt of $300,000 is past due. The Company accrued a further $7,562 in interest expense for this debt during the period. Total accrued interest for this debt at December 31, 2011 is $62,960.

   

March 31, 2010 issuance

   

On March 31, 2010 the Company issued $275,000 of convertible debt in a subscription agreement between the Company and a group of investors. The debt carries an interest rate of 10% annually, due upon the maturity date, March 31, 2011. The debt may be converted into shares of common stock at a conversion price of $0.40 per share. In conjunction with the debt, the Company also issued warrants to purchase 575,000 common shares with an exercise price of $0.75 per share that expire on March 31, 2012. The debt carries a beneficial conversion feature, which along with the relative fair value of the warrants, resulted in a debt discount of $214,421 which was recorded against the convertible debt and offset in additional paid in capital. The discount on this debt is fully accreted at September 30, 2011.

   

The Company repaid $60,000 of this debt during the period ending September 30, 2011 and $25,000 remains past due at December 31, 2011. The Company accrued a further $630 in interest expense for this debt during the period. Total accrued interest for this debt at December 31, 2011 is $12,019.

   

September 30, 2011 issuance

   

On September 30, 2011, the Company issued $200,000 of convertible debt in a subscription agreement between the Company and a group of investors. The debt carries an interest rate of 10% annually, due upon the maturity date, September 30, 2014. The debt may be converted into shares of common stock at a conversion price of $0.23 per share. In conjunction with the debt, the Company also issued warrants to purchase 860,000 common shares with an exercise price of $0.50 per share that expire on September 30, 2014. The debt carries a beneficial conversion feature, which along with the relative fair value of the warrants, resulted in a debt discount of $21,971 which was recorded against the convertible debt and offset in additional paid in capital. During the period ending December 31, 2011 $1,850 of the discount has been accreted.

   

The above three convertible debenture liabilities are as follows:




Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

      December 31,     June 30,  
      2011     2011  
  March 31, 2010 convertible debentures payable $ 275,000   $ 275,000  
  April 29, 2010 convertible debentures payable   992,300     992,300  
  September 30, 2011 convertible debentures payable   200,000     -  
  Conversion of March 31, 2010 convertible debentures   (150,000 )   (150,000 )
  Conversion of April 29, 2010 convertible debentures   (492,300 )   (492,300 )
  Repayment of April 29 2010 convertible debentures   (200,000 )   (200,000 )
  Repayment of March 31, 2010 convertible debentures   (100,000 )   (40,000 )
  Total convertible debentures payable   525,000     385,000  
  Less: Unamortized discount on December 31, 2011   (20,121 )   -  
  convertible debentures payable            
  Net convertible debentures payable $ 504,879   $ 385,000  

8.

Short Term Loan

   

Short term loans of $192,153 are unsecured, non-interest bearing and are due on demand except for $91,680 which bears interest at 5% per annum.

   
9.

Long Term Debt

   

Wind Works Power Corp has received a 6.64% simple interest loan from a third party (the “lender”). The Company has borrowed $12,876,107 as of December 31, 2011. The maturity date of the loan is the earliest of (i) an event of default or (ii) January 31, 2013 at which time the company is required to repay all principal and accrued interest. The loan is senior to all indebtedness of the company and is secured by any existing registered security on the assets of the company up to an aggregate amount of $1,500,000 for each bridge loan provided that any indebtedness relating to the registered security may not be re-financed, re-borrowed or increased in any way. There were 8 bridge loans outstanding at year-end secured by an aggregate amount of $9,000,000. Until the loan is repaid in full the company may not, without the prior consent of the lender, (1) incur any indebtedness or grant any security that would rank prior to the loan, other than: (i) normal trade payables; and (ii) secured debts and obligations owed to secured lenders providing financing for the construction of the Wind Projects. or (2) incur or commit to any single expense over CAD $20,000 or any series of related expense over a cumulative amount of CAD $30,000. The Company has signed promissory notes guaranteeing the amount of the loan.

   

Four parties entered into a convertible debenture agreement first and then entered into bridge loan agreements prior to the Closing date. The cumulative amount of financing available under the convertible debenture agreement is $8,500,000 in Canadian funds. Closing shall occur on such date as may be agreed to by the Company and the lender and upon closing the promissory notes shall be returned to the Company and a debenture shall be issued by the Company in an amount equal to the value of the notes then outstanding. The debentures shall carry a yield equal to 6.64% per annum, with interest calculated quarterly. At the lender’s sole option, and at a date of its choosing, all principal and accrued interest under the debentures may be converted into an equity interest in any of the projects that were funded using this financing. In such a case the lender would earn up to a 49% interest in those specific wind projects. Following conversion the Company would have the option to repurchase the project equity upon thirty days notice.

   

Under the terms of the loan agreement the Company commits to purchasing all wind turbines for the wind projects from the lender.

   

For the period ended December 31, 2011, $213,256 (2010 - $nil) of interest was accrued on the outstanding principal and included in accrued liabilities.




Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

10.

Share Capital

   

Total authorized share capital of the Company is 200,000,000 common shares with a par value of $0.001.

   

During the period, the Company entered into agreements to issue 2,360,000 shares in exchange for consulting services to be received during the period and in the future. The Company has determined the total fair value of these shares to be $626,000 using the Company’s share price on the agreement dates. $388,893 has been recognized as share based compensation related to consulting work for the period, including work performed in prior periods, representing the portion of the total expected services that were received. The remaining fair value of the issuance will be expensed in the period in which the related services are received. These shares were issued on November 10, 2011.

   

Warrants

   

During the six month period ending December 31, 2011, the Company issued 860,000 warrants attached to the convertible debentures. The Company allocated the proceeds received from the issuance based on the fair value of the warrants relative to the total fair value of the issuance. The Company determined the fair value of these warrants to be $21,971 using the following assumptions:

   

For purposes of the calculation, the following assumptions were used:


Exercise price $ 0.50  
Expiration date   Sept. 30, 2014  
Risk free interest rate   0.25%  
Expected life of warrants   1 year  
Expected stock price volatility   110%  
Expected dividend yield   0%  

11.

Wind Projects and Option Agreements

   

As at December 31, 2011, the Company had capitalized wind development project costs as follows:


    December 31, 2011     June 30, 2011  
             
Skyway 126   1,997,468     1,997,468  
Zero Emissions People   -     -  
Developer C   286,650     286,650  
Settlers Landing   450,000     450,000  
Burg I   1,320,279     403,637  
Burg II   236,500     236,500  
Raberg   64,564     54,905  
Roecken   9,066     -  
EFI Joint Venture   -     -  
5MW Ontario project   1,023     1,023  
Thunder Spirit (Note 11i)   121,000     1,000  
    4,486,550     3,431,183  

Significant changes during the period are as follows:

   
(i)

Thunder Spirit




Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

In April 2011, the Company acquired a 75% interest in Thunder Spirit, a 150MW project located in North Dakota. The acquisition agreement stipulates a $1,000 acquisition price, which has been capitalized, and obligates Wind Works to perform the following: 

   a) Fund all project-related costs;
   b) Assume any related expense associated with a letter or credit which may be required to secure project interconnection; and
   c) Reimburse the vendor for $260,000 of Midwest ISO deposits, $120,000 of which was due within 45 days of closing, and $140,000 of which was due within 90 days of closing. Both payments are subject to prior invoicing by the vendor.
     

During the period, the Company accrued $120,000 for the first Midwest ISO deposit.

   
12.

Cost in excess of billings on uncompleted contracts

   

In April 2011, the Company entered into an agreement for the sale of 50% of its interest in the Burg I project. Pursuant to this sale, the Company entered into a turn-key agreement for the construction of a wind turbine, in accordance with specifications outlined in the contract.

   

The Company is obligated to erect and transfer ownership of an operational wind turbine, including all project rights, by December 31, 2011. Should the construction not be completed prior to this date, the Company is subject to compensate the buyer for interest lost for funding of the project, up to a maximum of 40,000 Euros. Failure to complete the project by April 30, 2012 will subject the Company to further monthly penalties of up to 15,625 Euros.

   

The agreed sale price for the turn-key construction contract is fixed, as specified in the construction contract. For the period ending December 31, 2011, the costs incurred and billings received are summarized as follows:


Total billings related to turn-key construction agreement   (2,008,420 )
Project acq. costs reclassified as construction costs   373,715  
Construction costs   1,772,797  
Cost in excess of billings on uncompleted contracts   138,092  

Included in the total billings of $2,008,420 is $315,957 in construction costs that were directly paid for by the investor and are credited against further milestone payments to be received per turnkey contract.

13.

Wind Project Deposits

   

As at December 31, 2011, the Company had capitalized wind project deposits as follows:


      December 31, 2011     June 30, 2011  
  OPA Feed-In Tariff Contract Deposits:            
           Zero Emissions People   570,760     570,760  
           Developer C   285,000     285,000  
           Settlers Landing   47,500     47,500  
      903,260     903,260  
               
  Hydro One Networks Inc. (“HONI”)            
  Connection Cost Deposits:            
           Whispering Woods Wind Farm   781,124     823,624  
           5MW Ontario Project   781,124     823,624  
           Cloudy Ridge / Skyway 126   793,346     836,511  
           Settlers Landing Wind Park   768,901     810,736  
           Clean Breeze Wind Park Grafton   781,124     823,624  
           Grey Highlands ZEP   2,570,041     2,709,873  
           Snowy Ridge   3,402,865     -  
      9,878,525     6,827,992  
  Total Wind Project Deposits $ 10,781,785   $ 7,731,252  
               
  The OPA Feed-In Tariff Contract deposits represent refundable deposits with the Ontario Power Authority for the projects listed above.
   
  The HONI Connection Cost deposits represent deposits for the work required to connect the Company’s projects to HONI’s distribution system. If the Company gives HONI notice to proceed with connection, the deposits will be applied against HONI’s costs.



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

14.

Contingencies

   

At June 30, 2010, the Company had accrued a contingent liability of $100,000CAD pertaining to its Grey-Highlands project, which was due thirty days upon signing a Feed-In Tariff contract with the Ontario Power Authority. The amount is payable to a company that originally owned the Grey- Highlands property operating lease agreement. During the year ended June 30, 2011, the Company issued a payment of $25,000CAD. During the period ending September 30, 2011 the Company issued a payment of $75,000CAD, reducing the contingent liability to nil.

   

The Company may be required to make additional lease payments based on (a) the number of meteorological towers and/or (b) megawatt of turbine installed on its land leases. The contingent payments are not determinable at this time.

   

The Company has royalty payments contingent on gross revenue from the sale of units of electricity sold pertaining to its land leases. Total contingent payments required to be made under this agreement are not determinable at this time.

   
15.

Commitments

   

On January 27, 2011, the Company signed a financing, marketing and construction organization agreement with EFI Energy Farming International GmbH for Project Burg 1, with payments of 220,000 Euros according to development milestones.

   

For the wind projects being developed under the Developer C joint ventureand all other Canadian projects jointly held with resident partners, the Company has agreed to share all income in accordance with the respective partnership agreements.

   

Under the terms of the loan agreement (Note 9) the Company commits to purchasing all wind turbines for the wind projects from the lender.

   

The following are expected lease payments regarding the Company’s operating land leases:


2012 $  35,247  
2013 $  9,062  
2014 $  5,961  
Thereafter $  118,720  
Total $  168,990  



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. - an Exploration Stage Company)
Notes to the Unaudited Consolidated Interim Financial Statements
For the period ended December 31, 2011
(Stated in US Dollars)

16.

Subsequent events

   

Subsequent to the period ending December 31, 2011 the Company sold its remaining 50% interest in Wind Park Burg I, a 4 megawatt (MW) wind project located in Germany. Wind Park Burg I is currently under construction by its wholly-owned affiliate, Wind Works Development GmbH. The turnkey sales price, inclusive of all construction and equipment costs, for 100% of Wind Park Burg I is $12,000,000 and is payable according to construction milestones. The Company will earn a 1% royalty on gross revenues of the wind farm, with the potential to increase the royalty to 2% based on the actual performance of the wind farm.



Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operation

     THE FOLLOWING DISCUSSION OF THE RESULTS OF OUR OPERATIONS AND FINANCIAL CONDITION SHOULD BE READ IN CONJUNCTION WITH OUR FINANCIAL STATEMENTS AND THE NOTES THERETO INCLUDED ELSEWHERE IN THIS REPORT.

Background

     Our business strategy is to pursue opportunities in wind energy. We intend to develop wind farms We will assemble land packages (“Wind Farms”), secure requisite environmental permitting, provide wind testing for a one year period by erecting towers to measure wind speed. Subject to favorable wind testing results, we then apply for power contracts for the number of megawatts (MW) that our land position will allow. Once we secure power contracts, we believe that we will be able to lease or sell the Wind Farms to operating utility companies or companies desiring to purchase wind turbines and erect the necessary power lines.

     The development of a wind farm involves many steps and can take years before coming to fruition. Development in this context means the securing and maintenance of land sites for the proposed turbine locations by ways and according to the terms of the respective land lease or easement agreements, planning and conducting of all necessary environmental studies such as environmental screenings, noise assessments, visual assessments and avian and floral assessments assemblance which is required for the Environmental approval. Environmental approval is necessary to obtain building permit for the wind farms. Further development encompasses liaison with various Aboriginal and First Nations groups as well as consultations with provincial and federal agencies in order to obtain any permits that may be required for any such project.

     In addition to environmental approval and consultations we have to engage in the planning and commissioning of all technical reports and engineering drawings and layouts of the planned projects in regards to the construction of the actual wind farm and any auxiliary structures such as transmission lines that are necessary to operate the wind farm. Wind energy engineers must prepare a three stage site implementation program

     The first stage of the program involves locating the ideal placement for the wind turbines and determining which type of wind turbine can provide the optimal results for the wind farms. The second stage of the program involves building access roads to the property and constructing transmission lines which can be connected to the power grid. The final stage of the site implementation program is determining the final yield assessment which occurs after a power purchase agreement is signed with a local utility.

     After we have secured the required licensing, and paid any required fees we intend to secure power contracts with local utilities. At this time, we do not intend to become a wind energy producer. Rather, we will develop the wind park for sale to wind energy producers. Our business model is to assemble a land package, secure regulatory approval, provide engineering studies, build the required infrastructure and finally enter into power purchase agreements with local utilities. When we sell our wind farms, we will be offering buyers a complete turnkey package. Purchasers will be required to purchase the wind turbines. Following the installation of the wind turbines, purchasers will then be able to sell wind power electricity pursuant to the terms and conditions of the power purchase agreements. We are currently in negotiations for the sale of several of our wind parks.


WIND POWER

Industry Overview

     In today’s society, wind power and alternative energy are becoming a fast growing force along with the “Go Green” attitude. Renewable energy is produced using resources that are naturally replenished, such as wind, sunlight, geothermal heat, tides and biofuels. Technologies that produce energy from these renewable sources (other than biofuels) are often referred to as “clean” or “green” as they produce few, if any, pollutants that negatively impact the environment. Comparatively, fossil fuels such as coal, natural gas and oil are exhaustible and release greenhouse gases such as carbon dioxide or other pollutants into the atmosphere during energy production. As a result of increased environmental awareness, the deployment of renewable energy technologies has grown rapidly during the past several years. According to the Energy Information Administration, 37% of new U.S. power generation capacity in 2007 consisted of renewable technologies, compared with only 2% in 2003. This increase is expected to continue in both the United States and Canada. It is anticipated that renewable energy capacity in North America is expected to grow by a compounded annual growth rate between 9% and 11% through 2025. At this rate, the United States and Canada could supply 25% of its electrical energy requirements with renewable energy by 2025.

     Wind energy is the fastest-growing renewable energy generation technology worldwide due to its cost efficiency, technological maturity and the wide availability of wind resources. It has been suggested that wind power has the greatest potential among all renewable energy technologies for further growth in North America. Although the United States and Canada have hydroelectric and geothermal resources, many potential hydroelectric sites have already been developed and geothermal production is confined by geographical limitations to only certain areas. In contrast, the available untapped wind resources across North America remain vast. Additionally, other renewable energy technologies, such as solar power, are currently less economically attractive than wind energy, and others, such as biofuels, emit particulates which have a greater negative impact on the environment than wind energy.

Wind Energy Fundamentals

     The term “wind energy” refers to the process used to generate electricity through wind turbines. The turbines convert wind’s kinetic energy into electrical power by capturing it with a three blade rotor mounted on a nacelle that houses a gearbox and generator. When the wind blows, the combination of the lift and drag of the air pressure on the blades spins the blades and rotor, which turns a shaft through the gearbox and generator to create electricity.

     Wind turbines are typically grouped together in what are often referred to as “wind parks.” Electricity from each wind turbine travels down a cable inside its tower to a collection point in the wind park and is then transmitted to a substation for voltage step-up and delivery into the electric utility transmission network, or “grid.” Today’s wind turbines can efficiently generate electricity when the wind speed is between 11 and 55 miles per hour.

     A key factor in the success of any wind park is the profile and predictability of the wind resources at the site. Extensive studies of historical weather and wind patterns have been performed across North America and many resources, in the forms of charts, graphs and maps, are available to wind energy developers. The most attractive wind park sites offer a combination of land accessibility, power transmission, proximity to construction resources and strong and dependable winds.

     When wind energy developers identify promising sites, they perform detailed studies to provide greater certainty with respect to the long-term wind characteristics at the site and to identify the most effective turbine strategy. The long- term annual output of a wind park is assessed through the use of on-site wind data, publicly available reference data and sophisticated software. Wind speeds are estimated in great detail for specific months, days or even hours, and are then correlated to turbine manufacturers’ specifications to identify the most efficient turbine for the site. Additional calculations and adjustments for turbine availability (which is principally affected by planned and unplanned maintenance events), wake effects (wind depletion caused by turbines sited upwind), blade soiling and icing and other factors are made to arrive at an estimate of net expected annual kilowatt hour electricity production at the site.


     Wind development determines the MW capacity of a project. Generally, MW for projects are decided as follows: Generally, the location (land) where the wind farm is located allows for a certain number of turbines to be fitted on to the projects land due to setbacks from houses roads and other buildings or infrastructure items. Also turbines create a noise parameter which circles out a portion of the land and which parameter has to be fitted in with the setbacks towards any structure. (Generally, in Ontario at least 550m from a house. Most ordinances prohibit more than 45 decibel in an inhabited structure at any time). Wind turbines have a nameplate capacity of generally 1.5 -2.5 MW. By using the land and the turbine model you create a layout which is used to determine whether these turbines fit within the layout and how many turbine sites must be secured under an easement agreement.

Wind Farm Development:

     The development of a wind farm involves many steps and can take years before coming to fruition. Development in this context means the securing and maintenance of land sites for the proposed turbine locations by ways and according to the terms of the respective land lease or easement agreements, planning and conducting of all necessary environmental studies such as environmental screenings, noise assessments, visual assessments and avian and floral assessments assemblance which is required for the Environmental approval. Environmental approval is necessary to obtain building permit for the wind farms. Further development encompasses liaison with various Aboriginal and First Nations groups as well as consultations with provincial and federal agencies in order to obtain any permits that may be required for any such project.

     In addition to environmental approval and consultations we have to engage in the planning and commissioning of all technical reports and engineering drawings and layouts of the planned projects in regards to the construction of the actual wind farm and any auxiliary structures such as transmission lines that are necessary to operate the wind farm. Wind energy engineers must prepare a three stage site implementation program

     The first stage of the program involves locating the ideal placement for the wind turbines and determining which type of wind turbine can provide the optimal results for the wind farms. The second stage of the program involves building access roads to the property and constructing transmission lines which can be connected to the power grid. The final stage of the site implementation program is determining the final yield assessment which occurs after a power purchase agreement is signed with a local utility.

     After we have secured the required licensing, and paid any required fees we intend to secure power contracts with local utilities. At this time, we do not intend to become a wind energy producer. Rather, we will develop the wind park for sale to wind energy producers. Our business model is to assemble a land package, secure regulatory approval, provide engineering studies, build the required infrastructure and finally enter into power purchase agreements with local utilities. When we sell our wind farms, we will be offering buyers a complete turnkey package. Purchasers will be required to purchase the wind turbines. Following the installation of the wind turbines, purchasers will then be able to sell wind power electricity pursuant to the terms and conditions of the power purchase agreements.

Financings:

     The development of any wind farm involves a significant capital commitment. Licensing, infrastructure build-out, equipment and professional fees can run into the millions of dollars. In order to finance these operations, we received a simple interest loan from a third party lender which accrues interest at the rate of 6.64% per annum. As of December 31, 2011we have borrowed $12,876,3092. The loan is senior to all other indebtedness and is secured by any existing registered security on our assets up to an aggregate amount of $1,500,000 for each bridge loan. There were 8 bridge loans outstanding at year-end secured by an aggregate amount of $9,000,000. Wind Works has guaranteed these loan obligations even though Wind Works does not own all of the outstanding equity in the wind parks.


Financial Statements

Revenue

     For the three and six months ended December 31, 2011 we did not generate any revenues of any kind. For the three and six months ended December 31, 2010 we generated $167 and $529 in interest income. All other revenue for the six months ended December 31, 2010 represents a non-refundable deposit totaling $97,290.

Operating Expenses

     For the three and six months ended December 31, 2011 our operating expenses totaled $1,042,656 and $2,029,674 as compared to $1,544,365 and $2,791,276  for the comparable periods in 2010.  Total expenses since May 2, 2008 (“Inception”) were $9,738,146.   The significant increase in expenses is primarily attributable to the development and financing of our wind parks.

     Project development costs continue to increase and will likely increase in the future as we devote more resources to our wind farms.  For the three and six months ended December 31, 2011 and 2010 these fees  totaled $394,115and, $751,246 as compared to $323,421 and $500,864 in 2010  Project development costs since Inception totaled $2,970,326.

     In connection with developing our wind parks we have incurred significant consulting fees.  For the three and six month period ended 2011 and 2010 these fees totaled $376,956 and $582,935 in 2011 and $594,070 and $1,012,291 in 2010. Since Inception consulting fees totaled $2,664,930.  We pay a portion of these fees with our common stock in order to retain as much cash as possible for developmental activities.

     Interest on our outstanding debt and related service charges are significant totaling $229,782 and $451,623 for the three and six months ended December 31, 2011 as compared to $44,156 and $82,279 in 2010. The reason for the significant increase is attributable to our increasing debt obligation.

     We have reduced costs associated with professional for the three and six months ended December 31, 2011 as compared to 2010. During 2011 these expenses totaled $6,318 and $137,963 as compared to $129,836 and $222,505 in 2010.

     Our leasehold expenses totaled $26,166 and $52,521 for the three and six months ended December 31, 2011 as compared to $16,227 and $39,965 in 2010.

We had no other significant expenses.

Net Income (loss)

     Our Net Loss for the three and six months ended December 31, 2011 totaled $(1,042,656) and $(2,029,674) as compared to a Net Loss of $(1,544,198) and $(2,693,457). Our Net Loss since Inception totaled $(9,640,327) Net loss per share during these periods was $(.02) and $(.04) in 2011 as compared to $(.04) and $(.07) in 20010.

     We will require additional capital to fully implement our business plan. There can be no assurance that we will be able to secure additional capital or if available, on commercially acceptable terms. Until such time as we can fully implement our business plan, it is unlikely that we will be able to reverse our continuing losses in which case you may lose your entire investment.


Liquidity and Capital Resources

Assets and Liabilities

     At December 31, 2011 we had cash and cash equivalents totaling $70,857, prepaid expenses totaling $252,127, VAT tax receivable totaled $226,615, costs in excess of billings of $105,327 and other assets totaling $103,799. Current assets totaled $762,905. At June 30, 2011 our current assets totaled $574,621 consisting primarily of cash totaling $180,174, prepaid expenses totaling $112,033, other assets totaling $115,380 and taxes receivable totaling $83,739.

     Prepaid expenses consist primarily of common stock issued for services to be rendered and represent the primary reason for the increase in our current assets.

     Our long term assets at December 31, 2011 totaled $15,336,251 consisting primarily of wind projects of $4,486,550 and wind project deposits totaling $10,788,783. This compares to total assets at June 30, 2011 totaling $11,216,186 consisting of $3,431,183 in wind projects and $7,731,252 in wind project deposits.

     Our current liabilities at December 31, 2011 totaled $17,234,824 consisting primarily of accounts payable totaling $3,676,850, convertible debentures totaling $504,879, short term loans totaling $192,153 and third party loans totaling $12,860,942. Our current liabilities at June 30, 2011 totaled $11,648,814, consisting primarily of accounts payable totaling $2,233,438, convertible debentures totaling $385,000, short term loans totaling $202,787 and third party loans totaling $8,827,589. The significant increase in our third party loans is attributable to required wind park deposits that we were required to make in order to retain our wind farm contracts.

     We have a working capital deficit at December 31, 2011 (current assets less current liabilities) of $16,471,919 as compared to a working capital deficit of $10,074,193 at June 30, 2011. Continued operations are dependent on our ability to secure additional debt or equity financings or generate profitable operations. While we have been successful in the past at raising funds, there can be no assurance that it will be able to do so in the future.

     Unless we secure additional funding to meet our short term capital requirements, there can be no assurance that we will be able to implement our business plan. If we are unable to pay our liabilities as they become due, and our creditors are not willing to defer payments, we may be required to seek protection from creditor claims.

Off-Balance Sheet Arrangements

     We are not currently a party to, or otherwise involved with, any off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.

Item 3. Quantitative and Qualitative Disclosure About Market Risk Foreign Currency Exchange Rate Risk

     The Company holds cash balances in U.S. and Canadian dollars as well as euros. We transact most of our business in US and Canadian dollars. Expenses incurred with respect to our European operations are denominated in euros. As a result, currency exchange fluctuations may impact our operating costs. We do not manage our foreign currency exchange rate risk through the use of financial or derivative instruments, forward contracts or hedging activities.

Item 4. Controls and Procedures

(a) Evaluation of Disclosure Controls and Procedures

     Our management, with the participation of our Chief Executive Officer and our Chief Financial Officer, evaluated the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) and determined that our disclosure controls and procedures were effective as of the end of the period covered by this Quarterly Report on Form 10-Q. The evaluation considered the procedures designed to ensure that the information required to be disclosed by us in reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and communicated to our management as appropriate to allow timely decisions regarding required disclosure.


(b) Changes in Internal Control over Financial Reporting

     During the period covered by this Quarterly Report on Form 10-Q, there was no change in our internal control over financial reporting (as such term is defined in Rules 13a-15(d) and 13d-15(d) under the Exchange Act) that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

(c) Inherent Limitations of Disclosure Controls and Internal Controls over Financial Reporting

     Because of its inherent limitations, internal controls over financial reporting may not prevent or detect misstatements. Projections of any evaluation or effectiveness to future periods are subject to risks that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

PART II. OTHER INFORMATION

Item 1. Legal Proceedings.

     We have been named as a co-defendant in a lawsuit filed in the District Court of Clark County, Nevada (Case No.A646222). Our involvement with this legal proceeding is primarily attributable to the ownership of our common stock by a shareholder. We intend to issue or reissue the common stock as directed by the court. We believe that we have meritorious defenses as to any other claims that may be brought against us.

Item 1A. Risk Factors

     There have been no material changes in our risk factors from those disclosed in our Annual Report on Form 10-K for the period ended June 30, 2011.

Item 2. Unregistered Sales of Equity Securities.

     During the quarter ended December 31, 2011 we issued a total of 11,360,000 shares of our common stock consisting of 2,360,000 for services rendered and 9,000,000 shares to satisfy our remaining contractual obligations in connection with the acquisition of Zero Emission People, LLC. Zero Emission People is a related entity.

At all times relevant:

- the sale was made to a sophisticated or accredited investor;

- at a reasonable time prior to the sale of securities, we advised the purchaser of the limitations on resale of the securities; and

     In issuing the foregoing securities, we relied on the exemptive provisions of Section 4(2) of the Securities Act.

Item 3. Defaults upon senior securities.

     None

Item 4. Mine Safety Disclosure

     Not applicable


Item 5. Other information

     None.

Item 6. Exhibits

Exhibit No.                                                  Description
-----------                                                  -----------
   
3.1.** Certificate of Incorporation
3.2.** Certificate of Amendment to Certificate of Incorporation
3.3.** Bylaws
3.4** Form of Convertible Debenture
3.5** Form of Warrant
3.6** Form of Option
10.1** Investment Agreement with Kodiak Capital Group, Inc.
10.2** Registration Rights Agreement with Kodiak Capital Group, Inc.
10.3** Share Exchange Agreement between Wind Works Power Corp. and Zero Emission People, LLC
10.4** Addendum to Share Exchange Agreement with Zero Emission
10.5** Joint Venture Agreement with Sunbeam, LLC
10.6** Share Exchange Agreement with Skyway 126 Inc.
14** Code of Business Conduct and Ethics
21** Subsidiaries of Registrant
31.1* Section 302 Certification of the Principal Executive Officer *
31.2 * Section 302 Certification of the Principal Financial Officer *
32.1 * Section 906 Certification of Principal Executive Officer *
32.2 * Section 906 Certification of Principal Financial and Accounting Officer *

*

Filed herewith

**

Previously filed



SIGNATURES

   Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

Wind Works Power Corp.
 
Date: February 20, 2012
 
By: /s/ Ingo Stuckmann
Ingo Stuckmann
Chief Executive Officer

Date: February 20, 2012
 
By:/s/Henrik Woehlk
Henrik Woehlk
Chief Financial Officer