Exhibit 99.1
 
 
Fleet Status Report 16 February 2012 ENSCO 8506 ENSCO 8506 was contracted to Anadarko Petroleum ahead of its scheduled shipyard delivery in third quarter 2012. This is the third rig contracted by Anadarko in the ENSCO 8500 Series®. Repeat customers are confirmation of Ensco’s operational excellence.
 
 
 

 
 
  Ensco plc
Fleet Status Report
16 February 2012
 
Monthly Changes
Bolded rig names and underlined text signify changes in rig status from previous report.
Segment /  
Region / Rig
  Design   Water
Depth' (1)
  Customer/ Status   Day Rate
 $000′s US
  Location  
Est. Avail /
Contract
Change
  Comments
 
Deepwater
 
North & South America (excluding Brazil)
ENSCO DS-5
 
 
 
Drillship, DP3 Samsung
 
 
 
10000/12000
 
 
 
Petrobras
 
 
 
Mid 430s
 
 
 
U.S. Gulf of Mexico
 
 
 
Jul. 16
 
 
 
Zero rate for 27 days in Jan. 12. Eligible for bonus opportunity up to 17%, plus cost adjustments
 
 
ENSCO 8500
 
 
Semisubmersible DP
 
 
8500/10000
  Anadarko/Eni
 
 
High 290s
 
  U.S. Gulf of Mexico
 
 
Aug. 13
 
 
Lump sum payment of $20 million and one-time reimbursable costs of $27 million amortized over primary contract term, which equals approx. $31,000 per day.  Plus cost adjustments and four 1-year same-rate options
ENSCO 8501
 
Semisubmersible DP
  8500/10000   Nexen/Noble Energy  
High 370s
  U.S. Gulf of Mexico  
Jun. 13
 
Currently executing Noble's drilling program. Mob and upgrade costs are reimbursed by Noble and Nexen at approx. $19,000 per day over primary contract term.  Plus cost adjustments and unpriced options
ENSCO 8502
 
Semisubmersible DP
  8500/10000   Nexen  
Mid 490s
  U.S. Gulf of Mexico  
Jun. 13
 
Next sublet to Apache Apr. 12 for 60 to 220 days at same rate. Plus approx. $35,000 per day for reimbursable mobilization expenses and upgrades amortized over 2-year term contract. Plus cost adjustments
ENSCO 8503
 
Semisubmersible DP
  8500/10000   Cobalt  
Mid 540s
  U.S. Gulf of Mexico  
Dec. 13
 
Plus approx $54,000 per day for reimbursable expenses and upgrades to be amortized over 2-year term contract
ENSCO 8505
 
Semisubmersible DP
  8500/10000   Delivered/En Route       U.S. Gulf of Mexico  
Jun. 14
 
Contracted to Anadarko/Apache/Noble Energy for longer of two years or two rotations each, mid 470s, with estimated commencement in late 2Q12. Plus two 1-year unpriced options
                             
Brazil
                           
ENSCO DS-4
 
Drillship, DP3 Samsung
  10000/12000  
BP
 
High 540s
  Brazil  
May 16
 
Plus cost adjustments
ENSCO 7500
 
Semisubmersible DP
  8000   Petrobras  
Low 320s
 
Brazil
  Aug. 14
 
 
Eligible for bonus opportunity up to 5%. Plus mob and upgrade costs to be amortized over contract at approx. $20,000 per day. Plus cost adjustments
ENSCO 6001
 
Semisubmersible - DP Amethyst 2
  5700   Petrobras  
Mid 270s
 
Brazil
  Jun. 13
 
 
Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 6002
 
Semisubmersible - DP Amethyst 2
  5700   Petrobras  
Mid 270s
 
Brazil
  Jul. 13
 
 
Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 6003
 
Semisubmersible - DP Amethyst 2
  5700   Petrobras  
Mid 310s
 
Brazil
  Jan. 17  
Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 6004
 
Semisubmersible - DP Amethyst 2
  5700   Petrobras  
Mid 310s
 
Brazil
  Oct. 16  
Eligible for bonus opportunity up to 15%, plus cost adjustments
                             
Europe & Mediterranean
                       
ENSCO 5006
 
Semisubmersible - Conv Bingo 8,000
  6200/7500   Noble Energy  
Mid 270s
 
Israel
  Apr. 12  
Plus cost adjustments and three 1-well same price options
                             
Middle East & Africa
                       
ENSCO DS-1
 
Drillship - DP Gusto 10,000
  6000/10000   TOTAL  
Low 310s
 
Angola
  Mar. 15  
Rate increases Jun. 12 to low 350s. Planned shipyard upgrade and inspection 3Q12 for approx. 80 days at zero rate. Plus options and cost adjustments. Eligible for bonus opportunity up to 5%
ENSCO DS-2
 
Drillship - DP Gusto 10,000
  6000/10000   TOTAL  
Mid 460s
 
Angola
  Jul. 13  
Eligible for bonus opportunity up to 5%, plus cost adjustments
ENSCO DS-3
 
Drillship, DP3 Samsung
  10000/12000  
BP/Petrobras
 
Low 520s
 
Angola
 
Jun. 16
 
Sublet to Petrobras to Jul. 12. Plus approx $35,000 per day for reimburseable mobilization expenses amortized through Jun. 12. Next return to BP in U.S Gulf of Mexico, high 480s. Plus cost adjustments
ENSCO 5001
 
Semisubmersible - Conv Sonat
  5000/6500   Maersk  
Mid 270s
 
Angola
  Jun. 12  
Next to PetroSA in South Africa to Jun. 14, mid 270s. Plus two 1-well options, low 320s
                             
Asia & Pacific Rim
                       
ENSCO 8504
 
Semisubmersible DP
  8500/10000   TOTAL/Shell  
Mid 420s
 
Brunei
    Jan. 13  
Next sublet to Shell June 12 to Jan. 13, mid 420s. TOTAL retains another three options for a total of six wells at escalating rates. Mob and upgrade costs amortized over initial 6 month contract term and Feb. 12 at approx. $94,000 per day
ENSCO DS-6 (2)
 
Drillship, DP3 Samsung
  10000/12000  
Delivered/Shipyard
      Singapore   
4Q12
 
See footnote below
                             
Under Construction
                       
ENSCO DS-7
 
Drillship, DP3 Samsung
  10000/12000  
Under construction 
      South Korea  
2H13
   
ENSCO 8506
 
Semisubmersible DP
  8500/10000  
Under construction/
Contracted
     
Singapore 
  4Q12  
Contracted to Anadarko in US GOM to Jun. 15, low 530s plus cost adjustments, with estimated commencement in 4Q12
 
(1) For rigs that may be modified to drill in deeper water depths, both the currently outfitted and maximum upgrade capabilities are shown.
 
(2) Ensco has entered into an interim agreement with a customer that states the intention of both parties to sign a five-year-term contract for ENSCO DS-6 by 1 April 2012. The terms of the proposed five-year-term drilling contract are expected to add more than $1 billion to Ensco’s revenue backlog.

Under the terms of the interim agreement, preparations for the customer’s requested and funded rig modifications will begin immediately in Singapore.

Under the terms of the proposed five-year-term contract, upon completion of these modifications, the rig would mobilize to its first drilling location and a mobilization fee would be paid by the customer in a lump sum upon completion of acceptance testing. The location of the first drilling assignment and the name of the customer will be announced at a later date if the parties enter into the intended five-year-term contract. Based upon current estimates to complete the customer’s modifications to the rig, ENSCO DS-6 would commence the proposed five-year-term contract in fourth quarter 2012. Collectively, the modification reimbursements, mobilization fee and other revenue would be amortized over the primary five-year contract term.
 
 
Page 1 of 5

 
 
 
Ensco plc
Fleet Status Report
16 February 2012
 
Segment /  
Region / Rig
 
Design
  Water
Depth' (1)
 
Customer/ Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail / Contract
Change
 
Comments
                             
Midwater
                           
                             
Brazil
                           
ENSCO 5000
 
Semisubmersible - Conv Neptune Pentagon
  2300/2650  
Petrobras
 
High 230s
 
Brazil
 
Jul. 13
 
Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 5002
 
Semisubmersible - Conv Aker H-3
  1000   OGX  
Low 200s
 
Brazil
 
Nov. 13
 
Planned shipyard stay early Jan. 12 for approx. 67 days. Initial 16 days in low 30s, zero rate for remaining 51 days. Rate increases mid Nov. 12 to low 220s
ENSCO 5004
 
Semisubmersible - Conv  F & G Enhanced Pacesetter
  1500   OGX  
Low 220s
 
Brazil
 
Nov. 13
 
Rate increases mid Nov. 12 to mid 230s
ENSCO 5005
 
Semisubmersible - Conv  F & G Enhanced Pacesetter
  1500/1700  
Petrobras
 
Mid 230s
 
Brazil
 
Apr. 13
 
Planned shipyard stay late 3Q12 for approx. 110 days. Eligible for bonus opportunity up to 10%, plus cost adjustments
ENSCO 6000
 
Semisubmersible - DP Amethyst
  3400/4000  
Petrobras
 
Low 150s
 
Brazil
 
Feb. 12
 
Currently outfitted for workover activity. Eligible for bonus opportunity up to 18%, plus cost adjustments
                             
Middle East & Africa
                       
ENSCO 5003
 
Semisubmersible - Conv Aker H-3
  1000   Available       Namibia        
 
(1) For rigs that may be modified to drill in deeper water depths, both the currently outfitted and maximum upgrade capabilities are shown.
 
 
Page 2 of 5

 
 
 
Ensco plc
Fleet Status Report
16 February 2012
 
Segment /    
Region / Rig
 
Design
 
Water
Depth'
 
Customer/ Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail /
Contract
Change
 
Comments
                             
Jackups
                           
                             
North & South America (excluding Brazil)
                   
                             
U.S. Gulf of Mexico
                       
ENSCO 59
 
F&G
  300  
Cold stacked
      Gulf of Mexico      
ENSCO 68
 
MLT 84-CE
  400  
Chevron
 
Mid 110s
 
Gulf of Mexico
 
Jul. 12
 
Day rate does not include certain extra reimbursable costs
ENSCO 69
 
MLT 84-Slot
  300  
Cold stacked
 
   
  Gulf of Mexico      
ENSCO 75
 
MLT Super 116-C 
  400  
Apache 
 
Mid 110s
 
Gulf of Mexico 
 
Apr. 12
 
Plus cost adjustments
ENSCO 81
 
MLT 116-C 
  350  
Walter
 
Mid 80s
 
Gulf of Mexico
 
Mar. 12
 
Next to Dynamic to Mar. 13, low 90s. Plus unpriced options
ENSCO 82
 
MLT 116-C 
  300  
Chevron 
 
Mid 80s
 
Gulf of Mexico 
 
Jul. 12
 
Day rate does not include certain extra reimbursable costs
ENSCO 86
 
MLT 82 SD-C
  250  
Apache
 
Mid 60s
 
Gulf of Mexico
 
Apr. 12
   
ENSCO 87
 
MLT 116-C
  350  
Apache
 
Mid 80s
 
Gulf of Mexico
 
Apr. 12
   
ENSCO 90
 
MLT 82 SD-C 
  250  
Energy XXI
 
Mid 60s
 
Gulf of Mexico 
 
Jun. 12
   
ENSCO 99
 
MLT 82 SD-C
  250  
Energy XXI
 
Mid 60s
 
Gulf of Mexico 
 
Apr. 12
   
Pride Wisconsin
 
MLT-Slot
  300  
Cold stacked
      Gulf of Mexico      
                           
 
Mexico
                           
ENSCO 83
 
MLT 82 SD-C
  250  
Pemex
 
Low 110s
 
Mexico
 
Nov. 12
 
Planned shipyard inspection 2Q12 for approx 21 days at zero rate. Plus cost adjustments
ENSCO 89
 
MLT 82 SD-C
  250  
Pemex
 
Low 90s
 
Mexico
 
Mar. 12
 
Planned shipyard inspection 2Q12 for approx 21 days at zero rate
ENSCO 93
 
MLT 82 SD-C
  250  
Pemex
 
Mid 90s
 
Mexico
 
Mar. 12
 
Planned shipyard inspection 3Q12 for approx 28 days at zero rate. Rates adjust to global index rate every 3 months (next Mar. 12)
ENSCO 98
 
MLT 82 SD-C
  250  
Pemex
 
Low 110s
 
Mexico
 
Apr. 12
 
Planned shipyard inspection 2Q12 for approx 21 days at zero rate. Plus cost adjustments
                             
Europe
                           
                             
North Sea
                           
ENSCO 70
 
Hitachi K1032N
  250  
Tullow
 
Low 90s
 
UK
 
Mar. 12
 
Next to RWE Dea to Feb. 13, high 80s. Plus five 1-well unpriced options
ENSCO 71
 
Hitachi K1032N
  225  
Maersk
 
High 80s
 
Denmark
 
Mar. 13
 
Rate increases Mar. 12 to low 110s. In 3Q12 in shipyard for upgrade at zero rate for approx. 90 days. Plus two 1-year options at escalating day rates
ENSCO 72
 
Hitachi K1025N
  225  
Maersk
 
High 80s
 
Denmark
 
Jul. 13
 
Rate increases Jul. 12 to low 110s. Plus two 1-year options at escalating day rates
ENSCO 80
 
MLT 116-CE
  225  
Wintershall
 
Low 90s
 
UK
 
Feb. 12
 
Next to Dana to May 12, low 100s. Then to Perenco to Nov. 12, mid 90s. Then to EOG to Jul. 13, high 90s. Rate increases Jun. 13 to low 130s, plus one 1-well unpriced options
ENSCO 92
 
MLT 116-C
  225  
RWE Dea
 
High 80s
 
UK
 
Oct. 12
 
Plus three 1-well unpriced options. Next to Tullow to Jan. 13, low 130s. Plus one 1-well unpriced option
ENSCO 100
 
MLT 150-88-C
  350  
E.ON
 
High 150s
 
UK
 
Nov. 12
 
Next to Ithaca to Feb. 14, low 160s, plus three 1-well options
ENSCO 101
 
KFELS MOD V-A
  400  
Maersk
 
Low 200s
 
UK
 
Jul. 12
 
Plus cost adjustments and one unpriced option. Next to Tullow to Nov. 12, mid 210s
ENSCO 102
 
KFELS MOD V-A
  400  
ConocoPhillips
 
Low 200s
 
UK
 
Jun. 16
 
Rate firm for 8 wells (est. 3 years) thereafter at mutually agreed rate. Plus unpriced options
 
 
Page 3 of 5

 
 
 
Ensco plc
Fleet Status Report
16 February 2012
 
Segment /    
Region / Rig
 
Design
 
Water
Depth'
 
Customer/ Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail /
Contract
Change
 
Comments
                             
Jackups
                           
                             
Middle East & Africa
                       
                             
Middle East
                           
ENSCO 54
 
F&G L-780 Mod II-C
  300  
ADOC/QPD/Bunduq
 
High 50s
 
UAE/Qatar
 
Jun. 12
 
Rate increases Feb. 12 to high 60s. Plus cost adjustments and well-to-well unpriced options
ENSCO 58
 
F&G L-780 Mod II
  250  
Saudi Aramco
 
Mid 60s
 
Saudi Arabia
 
Dec. 13
 
Plus one 1-year same rate option
ENSCO 76
 
MLT Super 116-C
  350  
Saudi Aramco
 
Low 100s
 
Saudi Arabia
 
Jun. 14
 
Plus one 1-year option, high 150s
ENSCO 84
 
MLT 82 SD-C
  250  
Saudi Aramco
 
Low 60s
 
Saudi Arabia
 
Nov. 14
 
Planned shipyard upgrade May 12 for approx. 80 days at zero rate. Plus one 1-year option, mid 70s
ENSCO 88
 
MLT 82 SD-C
  250  
Ras Gas
 
Mid 60s
 
Qatar
 
Dec. 12
 
Plus multiple options at escalating rates
ENSCO 91
 
Hitachi
  270  
Saudi Aramco
 
High 60s
 
Saudi Arabia
 
Jul. 14
 
Planned shipyard upgrade early Mar. 12 for approx. 90 days at zero rate. Plus one 1-year option, mid 90s
ENSCO 94
 
Hitachi 250-C
  250  
Ras Gas
 
Mid 60s
 
Qatar
 
Dec. 12
 
Plus multiple options at escalating rates
ENSCO 96
 
Hitachi 250-C
  250  
Saudi Aramco
 
Low 60s
 
Saudi Arabia
 
Nov. 14
 
Planned shipyard upgrade 2Q12 for approx. 80 days at zero rate. Plus one 1-year option, mid 70s
ENSCO 97
 
MLT 82 SD-C
  250  
Saudi Aramco
 
Low 60s
 
Saudi Arabia
 
Nov. 14
 
Planned shipyard upgrade 3Q12 for approx. 80 days at zero rate. Plus one 1-year option, mid 70s
Pride Hawaii
 
Levingston
  300  
Cold stacked
     
Bahrain
       
Pride Pennsylvania
 
MLT
  300  
Cold stacked
     
Bahrain
       
                             
Africa
                           
ENSCO 61
 
Levingston
  300  
Perenco
 
Low 100s
 
Cameroon
 
Mar. 12
   
                             
Asia & Pacific Rim
                       
                             
Southeast Asia / Australia
                       
ENSCO 52
 
F&G L-780 Mod II-C
  300  
Petronas Carigali
 
Mid 70s
 
Malaysia
 
Apr. 14
 
Assigned to Murphy for remaining term, mid 70s. Late 1Q12 10-day inspection, mid 30s. Plus cost adjustments and one 1-year unpriced option
ENSCO 53
 
F&G L-780 Mod II-C
  300  
Petronas Carigali
 
High 70s
 
Malaysia
 
Mar. 12
 
Next to Salamander in Thailand to Jul. 12, low 80s. Rate increases mid-May to Jul. 12 low 100s. Then expect to work to Dec. 12, low 100s
ENSCO 56
 
F&G L-780 Mod II-C
  300  
Pertamina
 
Mid 70s
 
Indonesia
 
Apr. 13
 
Planned shipyard time for approx. 15 days in May 12 at zero rate. Plus one 6-month unpriced option
ENSCO 67
 
MLT 84-CE
  400  
Pertamina
 
Low 100s
 
Indonesia
 
Jan. 13
 
Plus one 8-month unpriced option
ENSCO 85
 
MLT 116-C 
  300  
Shipyard
     
Singapore
 
Jun. 12
 
 
ENSCO 104
 
KFELS MOD V-B
  400  
Apache
 
High 140s
 
Australia
 
May 12
 
Plus cost adjustments. Upgrades amortized over Apache's 1-year term contract of approx. $8,000 per day
ENSCO 105
 
 
KFELS MOD V-B
 
 
400
 
 
Talisman
 
 
Mid 120s
 
 
Malaysia
 
Aug. 12
 
 
Planned shipyard time for approx. 14 days in Mar. 12 at zero rate. Two 1-year unpriced options. Upgrades amortized over Talisman's primary contract term of approx. $6,000 per day
ENSCO 106
 
KFELS MOD V-B
  400  
Newfield
 
Mid 120s
 
Malaysia
 
Oct. 12
 
Plus cost adjustments. Upgrades amortized over Newfield's remaining contract term of approx. $4,000 per day
ENSCO 107
 
KFELS MOD V-B
  400  
Premier Oil
 
Low 110s
 
Vietnam
 
Aug. 12
 
Rate increases late Apr. 12 to low 130s and to mid 130s in late May 12. Plus three 1-well options at index rate
ENSCO 108
 
KFELS MOD V-B
 
 
400
 
 
TOTAL
 
 
High 120s
 
 
Brunei
 
 
Feb. 12
 
 
Next to shipyard in Singapore for planned inspection and mob for approx. 32 days at zero rate. Then to PTTEP in Thailand Mar. 12 to Mar. 14, mid 130s. Upgrades amortized over PTTEP's primary contract term of approx. $2,000 per day
ENSCO 109
 
KFELS MOD V-Super B
  350  
PTTEP
 
Low 170s
 
Australia
 
Jul. 12
 
Rate increases late Jun. 12 to high 170s. Next to ENI/Murphy/Vermillion/Santos for work to Feb. 13, mid 170s. Plus one 1-well option at same rate
                             
Under Construction
                       
ENSCO 120
 
 
KFELS Super A
 
 
400
 
 
Under construction/ contracted
     
Singapore
 
2Q13
 
 
Contracted to Nexen in the UK from 4Q13 to Mar. 15, low 230s.  Plus cost adjustments and eleven 1-well options, mid 250s.  Mob fee of $7.5 million to be amortized over primary contract term
ENSCO 121
 
KFELS Super A
  400  
Under construction
     
Singapore
 
4Q13
   
ENSCO 122
 
KFELS Super A
  400  
Under construction
     
Singapore
 
3Q14
   
 
 
Page 4 of 5

 
 
 
Ensco plc
Fleet Status Report
16 February 2012
 
Rig   Design   Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
  Location   Est. Avail / Contract
Change
  Comments
                             
Other
                           
                             
Deepwater Drilling Management
                       
Kizomba
 
Deepwater TLP
Drilling Rig
  5000  
ExxonMobil
 
Mid 80s
 
Angola
 
Apr. 15
  Operations concluding. Rate decreases Jun. 12, high 30s for reduced crew
Thunderhorse
 
Deepwater Semisubmersible
  6000  
BP
 
Mid 80s
 
U.S. Gulf of Mexico
 
Jan. 13
  Plus four 1-year priced options, plus cost adjustments
Mad Dog
 
Deepwater Spar
Drilling Rig
  4500  
BP
 
Low 60s
 
U.S. Gulf of Mexico
 
Jan. 15
  Plus one 1-year priced option, plus cost adjustments
                             
Barge Rig
                           
ENSCO I
 
Barge Rig
     
Cold stacked 
     
Singapore 
       
 
Definitions and Disclaimers
 
Day Rate Definition. The day rates reflected in this Fleet Status Report are the operating day rates charged to customers, which may include estimated contractual adjustments for changes in operating costs and/or reimbursable cost adjustments for ongoing expenses such as crew, catering, insurance and taxes. The day rates, however, do not include certain types of non-recurring revenues such as lump sum mobilization payments, revenues earned during mobilizations, revenues associated with contract preparation and other non-recurring reimbursable items such as mobilizations and capital enhancements, and the impact of the fair market value adjustments to Pride’s drilling contracts in place on the 31 May 2011 acquisition date. Routine and non-routine downtime may reduce the actual revenues recognized during the contract term. Additionally, the Company occasionally negotiates special rates with customers as noted in the comments that reduce revenues recognized during the contract term.
 
Rig Names. We are in the process of completing name changes on some of our rigs, some of which may not be completed for some time. For the purpose of our Fleet Status Report, we are using the new names even when the name change has not been completed. Below is a legend showing the name changes.
 
Legend of rig names changing
 
ENSC DS-1
 
Pride Africa
 
ENSCO 6000
 
Pride South America
 
ENSCO 5002
 
Pride Sea Explorer
 
ENSCO 61
 
Pride Cabinda
ENSC DS-2
 
Pride Angola
 
ENSCO 6001
 
Pride Carlos Walter
 
ENSCO 5003
 
Pride South Seas
 
ENSCO 91
 
Pride Montana
ENSC DS-3
 
Deep Ocean Ascension
 
ENSCO 6002
 
Pride Brazil
 
ENSCO 5004
 
Pride Venezuela
 
Pride Hawaii
 
Pride Hawaii
ENSC DS-4
 
Deep Ocean Clarion
 
ENSCO 6003
 
Pride Rio de Janeiro
 
ENSCO 5005
 
Pride South Atlantic
 
Pride Pennsylvania
 
Pride Pennsylvania
ENSC DS-5
 
Deep Ocean Mendocino
 
ENSCO 6004
 
Pride Portland
 
ENSCO 5006
 
Pride North America
 
Pride Wisconsin
 
Pride Wisconsin
ENSC DS-6
 
Deep Ocean Molokai
 
ENSCO 5000
 
Pride Mexico
 
ENSCO 58
 
Pride North Dakota
       
ENSC DS-7
 
Deep Ocean Marquesas
 
ENSCO 5001
 
Pride South Pacific
 
ENSCO 59
 
Pride Tennesse
       
 
Forward Looking Statement. Statements contained in this Fleet Status Report that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements include words or phrases such as “anticipate,” “believe,” “estimate,” “expect,” “intend,” “plan,” “project,” “could,” “may,” “might,” “should,” “will” and similar words and specifically include statements involving future rig dayrates; cost adjustments; utilization; estimated rig availability; contract duration, status, terms and other contract commitments; customers; rig enhancement projects; new rig commitments; the expected period of time and number of rigs that will be in a shipyard for repairs, maintenance, enhancement or construction; and scheduled delivery dates for new rigs. Such statements are subject to numerous risks, uncertainties and assumptions that may cause actual results to vary materially from those indicated, including the continued impact of the Macondo well incident; governmental regulatory, legislative and permitting requirements affecting drilling operations; changes in worldwide rig supply and demand, competition and technology; future levels of offshore drilling activity; downtime and other risks associated with offshore rig operations, relocations, severe weather or hurricanes; possible cancellation or suspension of drilling contracts as a result of mechanical difficulties, performance or other reasons; risks inherent to shipyard rig construction, repair, maintenance or enhancement; actual contract commencement dates; environmental or other liabilities, risks or losses; our ability to attract and retain skilled personnel on commercially reasonable terms; governmental action, civil unrest and political and economic uncertainties; terrorism, piracy and military action; and the outcome of litigation, legal proceedings, investigations or other claims or contract disputes. In addition to the numerous factors described above, you should also carefully read and consider “Item 1A. Risk Factors” in Part I and “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II of our most recent annual report on Form 10-K, as updated in our subsequent quarterly reports on Form 10-Q, which are available on the SEC’s website at www.sec.gov or on the Investor Relations section of our website at www.enscoplc.com. Each forward-looking statement speaks only as of the date of the particular statement, and we undertake no obligation to publicly update or revise any forward looking statements, except as required by law.
 
 