Attached files
file | filename |
---|---|
8-K - ROWAN COMPANIES PLC | v189082_8k.htm |
EX-99.1 - ROWAN COMPANIES PLC | v189082_ex99-1.htm |
ROWAN COMPANIES,
INC.
LAND RIG FLEET AND CONTRACT
STATUS
As of June 25,
2010
|
ONSHORE
RIGS
|
Maximum
|
Contract
Status
|
||||||||||||||
Horsepower
|
Drilling
|
Estimated
|
||||||||||||||
Name
|
Type
|
Drawworks
|
Mud
Pumps
|
Depth
(feet)
|
Location
|
Customer
|
Duration
|
Comments
|
||||||||
Rig
9
|
SCR
diesel electric
|
2,000
|
3,200
|
20,000
|
Louisiana
|
Midstates
Petroleum
|
July
2010
|
|||||||||
Rig
12
|
SCR
diesel electric
|
1,500
|
2,600
|
18,000
|
Texas
|
EOG
|
July
2010
|
|||||||||
Rig
14
|
AC
electric
|
3,000
|
3,200
|
35,000
|
Texas
|
Out
of Service
|
||||||||||
Rig
15
|
AC
electric
|
3,000
|
3,200
|
35,000
|
Texas
|
Available
|
||||||||||
Rig
18
|
SCR
diesel electric
|
2,000
|
4,400
|
25,000
|
Texas
|
Out
of Service
|
||||||||||
Rig
26
|
SCR
diesel electric
|
2,000
|
4,800
|
25,000
|
Texas
|
BBX
|
September
2010
|
|||||||||
Rig
29
|
SCR
diesel electric
|
1,500
|
2,600
|
18,000
|
Texas
|
Shipyard
|
||||||||||
Rig
30
|
AC
electric
|
2,000
|
2,600
|
20,000
|
Louisiana
|
Chesapeake
|
December
2010
|
|||||||||
Rig
31
|
SCR
diesel electric
|
3,000
|
4,400
|
35,000
|
Texas
|
Available
|
||||||||||
Rig
33
|
SCR
diesel electric
|
1,500
|
3,200
|
18,000
|
Texas
|
EOG
|
July
2010
|
|||||||||
Rig
34
|
SCR
diesel electric
|
2,000
|
4,400
|
25,000
|
Texas
|
Out
of Service
|
||||||||||
Rig
35
|
SCR
diesel electric
|
1,500
|
4,400
|
18,000
|
Texas
|
Cabot
|
July
2010
|
|||||||||
EXCO
Resources
|
August
2011
|
|||||||||||||||
Rig
51
|
SCR
diesel electric
|
2,000
|
4,400
|
25,000
|
Texas
|
Newfield
|
August 2010
|
|||||||||
Krescent
|
November
2010
|
|||||||||||||||
Rig
52
|
SCR
diesel electric
|
2,000
|
4,400
|
25,000
|
Texas
|
Krescent
|
November 2010
|
|||||||||
Rig
53
|
SCR
diesel electric
|
2,000
|
4,400
|
25,000
|
Louisiana
|
Chesapeake
|
December
2010
|
|||||||||
Rig
54
|
SCR
diesel electric
|
2,000
|
4,400
|
25,000
|
Louisiana
|
Chesapeake
|
November
2010
|
|||||||||
Rig
59
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Louisiana
|
EnCana
|
August
2012
|
|||||||||
Rig
60
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
Devon
|
April
2011
|
|||||||||
Rig
61
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EnCana
|
June
2015
|
|||||||||
Rig
62
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
Devon
|
March
2011
|
|||||||||
Rig
63
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EnCana
|
November
2014
|
|||||||||
Rig
64
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Louisiana
|
EnCana
|
October 2010
|
|||||||||
Rig
65
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Louisiana
|
EnCana
|
January
2011
|
|||||||||
Rig
66
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EnCana
|
September
2010
|
|||||||||
Rig
67
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EnCana
|
October
2010
|
|||||||||
Rig
68
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Alaska
|
Pioneer
|
September
2010
|
Rig
is on standby at a reduced rate.
|
||||||||
Rig
76
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Louisiana
|
EnCana
|
April
2011
|
|||||||||
Rig
77
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EnCana
|
December
2012
|
|||||||||
Rig
84
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EnCana
|
June 2011
|
|||||||||
Rig
85
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EXCO
Resources
|
October
2010
|
|||||||||
Rig
86
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Louisiana
|
EnCana
|
February
2012
|
|||||||||
Rig
87
|
AC
electric
|
2,000
|
3,200
|
25,000
|
Texas
|
EXCO
Resources
|
May
2012
|
Rigs 9
through 35 were constructed at various dates between 1960 and 1982, utilizing
new as well as used equipment, and have since been substantially
rebuilt. Rigs 14, 18 and 34 are not currently being
marketed. Rigs 51, 52, 53 and 54 were constructed during 2001-02.
Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007,
Rigs 84 and 85 in 2008 and Rigs 86 and 87 in 2009. All but Rig 29 are
equipped with a top-drive drilling system. Operating day rates range
from $15,500 to
$27,000. Estimated contract durations reflect either stated drilling
periods expected time required for the contracted well or
wells. Estimated number of idle days during May 2010 was 226 (77% utilization).
ROWAN
HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE
AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME. THE
INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY
DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH
ABOVE.
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission. |
Revisions to Fleet Status
Report Noted in Bold