Attached files

file filename
EX-32.2 - Wind Works Power Corp.exhibit322.htm
EX-31.1 - Wind Works Power Corp.exhibit311.htm
EX-31.2 - Wind Works Power Corp.exhibit312.htm
EX-32.1 - Wind Works Power Corp.exhibit321.htm


UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C.  20549


(MARK ONE)

FORM 10-Q


[]

QUARTERLY  REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934


FOR THE QUARTERLY PERIOD ENDED  MARCH 31, 2010


OR


[ ]

TRANSITION REPORT UNDER SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934


FOR THE TRANSITION PERIOD FROM __________________ TO __________________________

COMMISSION FILE NUMBER: 333-113296


WIND WORKS POWER CORP.

(Name of registrant as specified in its charter)


AMMEX GOLD MINING CORP.

                           (Former Name of Registrant)


NEVADA

98-0409895

(State or other jurisdiction of incorporation or organization)

(I.R.S. Employer Identification No.)


346 Waverley Street  Ottawa, Ontario, Canada

K2P OW5

(Address of principal executive offices)

(Zip Code)


(613)226-7883

(Registrant's telephone number, including area code)



N/A

(Former name, former address and former fiscal year, if changed since last report)


Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.   Yes [X]  No [  ]


Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of “large accelerated filer,” “accelerated filer,” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.


Large accelerated Filer

[  ]

Accelerated Filer

Non-accelerated Filer

[  ]

Small Reporting  Company  [X]


Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act Yes [  ]   No[X]


APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY

PROCEEDINGS DURING THE PRECEDING FIVE YEARS


      

Indicate by check mark whether the Registrant has filed all documents and reports required to be filed by Section 12, 13, or 15 (d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.      Yes ____X_______      No___________


APPLICABLE ONLY TO CORPORATE ISSUERS:


Indicate the number of shares outstanding of each of the issuer’s classes of Common Stock as of the latest practicable date:  29,559,046 shares of Common Stock as of May 17, 2010.     

 


 

 

 

PART I. - FINANCIAL INFORMATION

Item 1.

Financial Statements

 

Item 2.

Management's Discussion and Analysis of Financial Condition and Results of Operations.

 

Item 3.

Quantitative and Qualitative Disclosures About Market Risk.

 

Item 4.

Controls and Procedures.

 

PART II - OTHER INFORMATION

Item 1.

Legal Proceedings.

 

Item 1A.

Risk Factors.

 

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds.

 

Item 3.

Defaults Upon Senior Securities.

 

Item 4.

Submission of Matters to a Vote of Security Holders.

 

Item 5.

Other Information.

 

Item 6.

Exhibits.

 



CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS


Certain statements in this quarterly report on Form 10-Q contain or may contain forward-looking statements that are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Generally, the words “believes”, “anticipates,” “may,” “will,” “should,” “expect,” “intend,” “estimate,” “continue,” and similar expressions or the negative thereof or comparable terminology are intended to identify forward-looking statements which include, but are not limited to, statements concerning the Company’s expectations regarding its working capital requirements, financing requirements, business prospects, and other statements of expectations, beliefs, future plans and strategies, anticipated events or trends, and similar expressions concerning matters that are not historical facts. These forward-looking statements were based on various factors and were derived utilizing numerous assumptions and other factors that could cause our actual results to differ materially from those in the forward-looking statements. These factors include, but are not limited to, economic, political and market conditions and fluctuations, government and industry regulation, interest rate risk, U.S. and global competition, and other factors. Most of these factors are difficult to predict accurately and are generally beyond our control. You should consider the areas of risk described in connection with any forward-looking statements that may be made herein. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this report. Readers should carefully review this quarterly report in its entirety, including but not limited to our financial statements and the notes thereto. Except for our ongoing obligations to disclose material information under the Federal securities laws, we undertake no obligation to release publicly any revisions to any forward-looking statements, to report events or to report the occurrence of unanticipated events. For any forward-looking statements contained in any document, we claim the protection of the safe harbor for forward-looking statements contained in the Private Securities Litigation Reform Act of 1995.


 

PART 1 - FINANCIAL INFORMATION


Item 1.

Financial Statements.


 









 





Wind Works Power Corp.


(A Continuation of Zero Emission People LLC)



Unaudited

Consolidated Financial Statements



Period ended March 31, 2010 and 2009















MANAGEMENT’S RESPONSIBILITY FOR CONSOLIDATED FINANCIAL STATEMENTS



To the shareholders of Wind Works Power Corp. (A Continuation of Zero Emission People LLC)


The consolidated financial statements and the notes thereto are the responsibility of the management of Wind Works Power Corp. (A Continuation of Zero Emission People LLC). These consolidated financial statements have been prepared in accordance with United States generally accepted accounting principles.


Management has developed and maintained a system of internal controls to provide reasonable assurance that all assets are safeguarded and to facilitate the preparation of relevant, reliable and timely financial information.


The Board of Directors is responsible for ensuring that management fulfills its responsibilities for financial reporting and internal control.




 “Ingo Stuckmann”






Ingo Stuckmann

President





Wind Works Power Corp.

(Formerly AmMex Gold Mining Corp. – An Exploration Stage Company)

 Consolidated Balance Sheets (Unaudited)

As at March 31, 2010 and June 30, 2009

(Expressed in United States dollars, unless otherwise stated)



Assets

March 31, 2010

June 30, 2009


Current Assets

 

Cash and Cash Equivalents

$

71,058

 

$

-

 

 

Prepaid Expenses

 

 4,404

 

 

 -

 

 

Accounts Receivable

 

 2,498

 

 

 1,500

 

Due from shareholder

 

 1,850

 

 

 12,350

 

 

 

 79,810

 

 

 13,850

 

 

 

 

 

 

 

 

Long Term Assets

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capitalized lease costs

 

 41,414

 

 

 49,554

 

 

Wind Projects (Note 10)

 

 2,409,118

 

 

 -

 

 

Fixed assets (Note 6)

 

 3,966

 

 

 -

 

 

 

$

 2,534,308

 

 

 63,404

 

 

 

 

 

 

 

 

 

Liabilities and Stockholders’ Deficiency

Liabilities

 


 

 


 

Current Liabilities

 


 

 


 

 

Accounts Payable and Accrued Liabilities

$

 2,052,616

 

$

7,738

 

Other Short Term Loans  (Note 7)

 

 361,170

 

 

 -

 

 

 

 2,413,786

 

 

 7,738

 

 

 

 

 

 

 

 

                                                                                                                                     

Stockholders’ Deficiency

 

 

 

 

 

 

 

  Common Stock (Note 8)

 

 27,054

 

 

 5,000

 

 

  Additional Paid-in Capital  

 

 503,550

 

 

 105,000

 

 

  Contributed Surplus

 

 88,309

 

 

 -

 

Deficit Accumulated during the Development Stage

 

 (498,391)

 

 

 (54,334)

 

 

 

 120,522

 

 

 55,666

 

 

$

2,534,308

 

$

 63,404

 



Going concern (Note 1), Contingencies (Note 11), Commitments (Note 12)



The accompanying notes are an integral part of the consolidated financial statements.



Wind Works Power Corp.
(Formerly AmMex Gold Mining Corp. – An Exploration Stage Company)

Consolidated Statement of Operations (Unaudited)

For the Period Ended March 31, 2010 and 2009

(Expressed in United States dollars, unless otherwise stated)


 

Three Month
Period Ended
March 31,
2010

Nine Month
Period Ended
March 31,
2010

Three Month
Period Ended
March 31,
2009

Nine Month
Period Ended
March 31,
2009

Cumulative Since May 2008 to March 31, 2010

Revenue

 

 

 

 

 

Interest Income

$

-

$

-

$

-

$

-

$

-

Expenses

 

 

 

 

 

Advertising and Promotion

2,578

2,578

-

-

2,578

Consulting Fees   

29,661

29,661

-

-

75,661

Depreciation

230

230

-

-

230

Office and Miscellaneous

890

890

-

-

890

Professional Fees

47,474

47,474

1,875

2,875

55,561

Rent

1,547

1,547

-

-

1,547

Stock-based Compensation

88,311

88,311

-

-

88,311

Interest and Service charges

186,345

186,401

96

96

186,497

Project Development Costs

40,384

40,384

-

-

40,384

Foreign exchange

368

368

 

 

368

Incorporation costs

-

-

-

150

150

Operating lease costs

-

8,140

-

-

8,140

Lease expense

-

38,074

-

-

38,074

Total Operating Expenses

397,788

444,058

1,971

3,121

498,391

Net Loss for the period

397,788

444,058

1,971

3,121

498,391

Comprehensive Loss for the Period

$

397,788

$

444,058

$

1,971

$

3,121

$

498,391

Basic and Diluted Loss per Share

$

(0.01)

$

(0.02)

 

(0.01)

 

(0.01)

 

Weighted Average Number of Shares Outstanding

26,925,236

21,393,115

5,000,000

5,000,000

 






Wind Works Power Corp.

(Formerly AmMex Gold Mining Corp.  - an Exploration Stage Mining Company)

Consolidated Statement of Cash Flows (Unaudited)

For the Period Ended March 31, 2010 and 2009

(Expressed in United States dollars, unless otherwise stated)


 

 

Period ended March 31, 2010

 

Period  Ended  March 31,  2009

 

May 2008 (Date of Inception) to March 31, 2010

Cash Flows from Operating Activities

 

 

 

 

 

 

   Net loss for the period

$

(444,059)

 

(54,334)

$

(498,393)

Add (deduct) non-cash items:

 

 

 

 

 

 

 Depreciation

 

230

 

 

 

230

Lease amortization

 

8,140

 

 

 

8,140

 Loan interest

 

161,176

 

 

 

161,176

      Shares issued for services

 

 

 

 

 

 

      Stock based compensation

 

88,311

 

 

 

88,311

Write-off of accounts receivable

 

 

 

 

 

 

      Loss on disposal of assets

 

 

 

 

 

 

      Gain on forgiveness of debt

 

 

 

 

 

 

      Foreign exchange

 

-

 

 

 

 

Changes in non-cash working capital items:

 

 

 

 

 

 

      Accounts receivable

 

(500)

 

(1,500)

 

(2,000)

      Prepaid expenses

 

3,388

 

-

 

3,388

      Accounts payable and       accrued liabilities

 

134,680

 

(4,612)

 

130,068

 

$

(48,634)

$

(60,446)

 

(109,080)

Cash Flows from Investing Activities

 

 

 

 

 

 

Cash acquired on reverse take-over

 

34,192

 

 

 

34,192

Leases

 

 

 

(49,554)

 

(49,554)

 

$

34,192

$

(49,554)

 

$                    (15,362)

 

 

 

 

 

Cash Flows from Financing Activities

 

 

 

 

 

 

Capital stock issued

 

-

 

110,000

 

110,000

Convertible debentures

 

75,000

 

 

 

75,000

Advances from related parties

 

10,500

 

 

 

10,500

Subscriptions payable

 

 

 

 

 

 

Long term debt

 

-

 

 

 

 

 

$

85,500

$

110,000

 

195,000

Increase (decrease) in cash from continuing operations

 

71,058

 

-

 

71,058

Cash, beginning of the year

 

-

 

 

 

 

Cash, end of the period

$

71,058

$

-

 

-


Supplemental disclosure of non-cash transactions (Note 4)

The accompanying notes are an integral part of the consolidated financial statement



Wind Works Power Corp.

(Formerly AmMex Gold Mining Corp.  - an Exploration Stage Company)

Consolidated Statements of Stockholders’ Deficiency (Unaudited)

March 31, 2010

(Stated in US Dollars)


 

 

 

 

 

 

 

 


 






Common Shares

Additional Paid-in

Capital





Contributed Surplus


Deficit Accumulated During the Exploration Stage

Total Stockholders’ Deficiency

 

Number

Amount

 

 

 

 

 

 

 

 

 

 

 

Capital issued for financing

4,454,454

4,454

95,546

-

-

100,000

Net Loss

                   -

              -

 -

 -

(1,150)

(1,150)

Balance June 30, 2008

4,454,454

      4,454

95,546

 -

(1,150)

       98,850

 

 

 

 

 

 

 

Capital issued for financing

545,546

 546

9,454

-

-

10,000

Net Loss

                   -

-                    

-                     

-

   (53,184)

(53,184)

Balance, June 30, 2009

5,000,000

5,000

105,000

-

 (54,334)

    55,666

 

 

 

 

 

 

 

Recapitalization (Note 1)

22,053,117

22,053

342,139

-

-

364,192

Beneficial conversion feature

-

-

56,411

-

-

56,411

Stock based Compensation

-

-

-

88,309

-

88,309

Net Loss

-

-

-

-

(444,058)

(444,058)

Balance March 31, 2010

27,053,117

27,054

503,550

88,309

(498,392)

(120,520)




SEE ACCOMPANYING NOTES





1.

Basis of Presentation


AmMex Gold Mining Corp. changed its name to Wind Works Power Corp. (the “Company”) on March 25, 2009.  The Company, incorporated under the laws of the State of Nevada, was primarily engaged in the acquisition and exploration of mining properties, but has since modified its business plan to focus on alternate energy.  


Effective January 31, 2010, the Company completed the acquisition of Zero Emissions People LLC. According to accounting principles generally accepted in the United States, the above noted acquisition is considered to be a capital transaction in substance, rather than a business combination. That is, the acquisition is equivalent to the issuance of stock by Zero Emissions People LLC for the net monetary assets of the Company accompanied by a recapitalization and is accounted for as a change in capital structure. Accordingly, the accounting for the acquisition is identical to that resulting from a reverse acquisition, except that no goodwill or intangible asset is recorded. All material inter-company balances and transaction have been eliminated. The March 31, 2009 comparative figures are the March 31, 2009 financial statements of Zero Emissions People LLC.


The accompanying unaudited consolidated financial statements and notes thereto of Wind Works Power Corp have been prepared pursuant to the rules and regulations of the Securities and Exchange Commission. Accordingly, certain footnote disclosures normally included in financial statements prepared in accordance with accounting principles generally accepted in the United States (“GAAP”) have been omitted. The accompanying unaudited consolidated financial statements and notes thereto should be read in conjunction with the consolidated financial statements and notes thereto included in the Company’s June 30, 2009 Annual Report on Form 10-K.


In the opinion of management, these unaudited consolidated financial statements reflect all adjustments necessary to present fairly the Company’s consolidated financial position at March 31, 2010 and the consolidated results of operations and consolidated statements of cash flows for the period ended March 31, 2010. The results of operations for the three and nine months periods ended March 31, 2010 are not necessarily indicative of the results to be expected for the entire fiscal year.


Going Concern


These financial statements have been prepared with the on-going assumption that the Company will be able to realize its assets and discharge its liabilities in the normal course of business. However, certain conditions noted below currently exist which raise substantial doubt about the Company’s ability to continue as a going concern. These financial statements do not include any adjustments to the amounts and classifications of assets and liabilities that might be necessary should the Company be unable to continue as a going concern.


The operations of the Company have primarily been funded by the sale of common stock. Continued operations of the Company are dependent on the Company’s ability to complete additional equity financings or generate profitable operations in the future. Management’s plan in this regard is to secure additional funds through future equity financings.


 

 

 

 

March 31

 2010

June 30 2009

Deficit accumulated during the exploration stage

498,391

54,334

Working capital (deficiency)

(2,333,976)

6,112









2.

Significant Accounting Policies


The consolidated financial statements are prepared by management in accordance with generally accepted accounting principles of the United States of America.  Actual results could differ from these estimates. The principal accounting policies followed by the Company are as follows:


Cash and cash equivalents


Cash and cash equivalents include cash and highly liquid investments with an original maturity of three months or less.


Fair Value of Financial Instruments


The fair market value of the Company’s financial instruments comprising cash, accounts receivable, and accounts payable and accrued liabilities were estimated to approximate their carrying values due to immediate or short-term maturity of these financial instruments.  The Company maintains cash balances at financial institutions which at times, exceed federally insured amounts. The Company has not experienced any material losses in such accounts


Capitalized Lease Cost


Capitalized lease cost represents the cost of taking over land leases located on the Company’s Grey Highlands Wind Park. Capital lease cost is amortized over the term of the operating leases taken over.


Fixed Assets


Fixed Assets are capitalized at cost.  Amortization is recorded on a declining balance basis at a rate of 20% per annum.  


Use of Estimates


The preparation of financial statements requires management to make estimates and assumptions that affect the reported amount of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements and the reported amount of revenues and expenses during the period.  Actual results could differ from these estimates.


Wind Farm Developmental Properties

 

The Company has not yet realized any revenues from its planned operations.  It was primarily engaged in the acquisition and exploration of mining properties, but has since modified its business plan to focus on alternate energy.  The Company expenses all costs related to the maintenance and exploration of developmental wind farms in which it has secured rights prior to establishment of commercial feasibility.  To date, the Company has not established the commercial feasibility of its projects; therefore, all costs are being expensed.  Developmental wind farm acquisition costs are initially capitalized when incurred . The Company assesses the carrying cost for impairment under ASC 360-10  “Accounting for Impairment or Disposal of Long Lived Assets” at each fiscal quarter end.  When it has been determined that a wind farm property can be economically developed, the costs then incurred to develop such property are capitalized.  Such costs will be amortized using the units-of-production method over the estimated life of the project.  If developmental wind farm properties are subsequently abandoned or impaired, any capitalized costs will be charged to operations.









2.

Significant Accounting Policies (Continued)


Income Taxes


The Company records income taxes in accordance with ASC 740, using the asset and liability method.  Pursuant to ASC 340 the company is required to compute tax asset benefits for net operating losses carried forward.  Potential benefits of net operating losses have not been recognized in these financial statements because the Company cannot be assured it is more likely than not it will utilize the net operating losses carried forward in future period and accordingly is offset by a valuation allowance. ASC 340 prescribes a recognition threshold and measurement attribute for financial statement recognition and measurement of tax positions taken into in tax returns.


To the extent interest and penalties may be assessed by taxing authorities on any underpayment of income tax, such amounts would have been accrued and are classified as a component of income tax expense in the Consolidated Statements of Operations.


Foreign Currency Translation


The Company’s functional currency is the United States dollar. The consolidated financial statements of the Company are translated to United States dollars in accordance with ASC 830. Monetary assets and liabilities denominated in foreign currencies are translated using the exchange rate prevailing at the consolidated balance sheet date. Gains and losses arising on translation or settlement of foreign currency denominated transactions or balances are included in the determination of income. Foreign currency transactions are primarily undertaken in Mexican pesos and Peruvian sols. The Company has not, to the date of these financial statements, entered into derivative instruments to offset the impact of foreign currency fluctuations.

 

The functional currency of the Company’s wholly-owned subsidiary is the Mexican peso. The financial statements of the subsidiary are translated to United States dollars in accordance with ASC 830 using period-end rates of exchange for assets and liabilities, and average rates of exchange for the period for revenues and expenses. Translation gains (losses) are recorded in accumulated other comprehensive income (loss) as a component of stockholders’ equity. Foreign currency transaction gains and losses are included in the statement of operations.


Comprehensive Income


ASC 220, “Reporting Comprehensive Income” establishes standards for the reporting and display of comprehensive income and its components in the financial statements.  As at March 31, 2010, the company had no elements of comprehensive income.








2.

Principal Accounting Policies (Continued)

Asset Retirement Obligation

The Company has adopted ASC 410-20, “Accounting for Asset Retirement Obligations”, which requires that an asset retirement obligation (“ARO”) associated with the retirement of a tangible long-lived asset be recognized as a liability in the period in which it is incurred and becomes determinable, with an offsetting increase in the carrying amount of the associated asset. The cost of the tangible asset, including the initially recognized ARO, is depleted, such that the cost of the ARO is recognized over the useful life of the asset. The ARO is recorded at fair value, and accretion expense is recognizable over time as the discounted liability is accreted to its expected settlement value. The fair value of the ARO is measured using expected future cash flow, discounted at the Company’s credit-adjusted-risk-free interest rate. To date, no material asset retirement obligation exists due to the early stage of the Company’s mineral exploration. Accordingly, no liability has been recorded.

Environmental Protection and Reclamation Costs

The operations of the Company have been, and may in the future be affected from time to time in varying degrees by changes in environmental regulations, including those for future removal and site restoration costs. Both the likelihood of new regulations and their overall effect upon the Company may vary from region to region and are not predictable.

Environmental expenditures that relate to ongoing environmental and reclamation programs are charged against statements of operations as incurred or capitalized and amortized depending upon their future economic benefits. The Company does not anticipate any material capital expenditures for environmental control facilities.

Basic and Diluted Net Loss Per Share

The Company computes net income (loss) per share in accordance with ASC 260, “Earnings per Share”. ASC 260 requires presentation of both basic and diluted earnings per share (EPS) on the face of the income statement. Basic EPS is computed by dividing net income (loss) available to common shareholders (numerator) by the weighted average number of shares outstanding (denominator) during the period. Diluted EPS give effect to all dilutive potential common shares outstanding during the period using the treasury stock method. In computing diluted EPS, the average stock price for the period is used in determining the number of shares assumed to be purchased from the exercise of stock options or warrants. Diluted EPS excludes all dilutive potential shares if their effect is anti dilutive.


Stock Issued in Exchange for Services

The valuation of the Company’s common stock issued in exchange for services is valued at an estimated fair market value as determined by officers and directors of the Company based upon trading prices of the Company’s common stock on the dates of the stock transactions.  The corresponding expense of the services rendered is recognized over the period that the services are performed.








2.

Principal Accounting Policies (Continued)

Stock Based Compensation


The Company has adopted the provisions of ASC 718, “Share-Based Payment” which establishes accounting for equity instruments exchanged for employee services. Under the provisions of SFAS ASC 718, stock-based compensation cost is measured at the grant date, based on the calculated fair value of the award, and is recognized as an expense over the employees’ requisite service period (generally the vesting period of the equity grant).


Fair value measurement


In September 2006, the Financial Accounting Standards Board (“FASB”) issued ASC 820, "Fair Value Measurement" ("ASC 820"). The Statement provides guidance for using fair value to measure assets and liabilities. The Statement also expands disclosures about the extent to which companies measure assets and liabilities at fair value, the information used to measure fair value, and the effect of fair value measurement on earnings.


This Statement applies under other accounting pronouncements that require or permit fair value measurements. This Statement does not expand the use of fair value measurements in any new circumstances. Under this Statement, fair value refers to the price that would sell an asset or paid to transfer a liability in an orderly transaction between market participants in the market in which the entity transacts. ASC 820 is effective for the Company for fair value measurements and disclosures made by the Company in its fiscal period beginning on July 1, 2008.  


The Fair Value Option for Financial Assets and Financial Liabilities


On July 1, 2008, the Company adopted ASC 820 as it relates to financial assets and financial liabilities. In February 2008, the FASB staff issued ASC 845. ASC 845 delayed the effective date of ASC 820 for nonfinancial assets and nonfinancial liabilities, except for items that are recognized or disclosed at fair value in the financial statements on a recurring basis (at least annually). The provisions of ASC 845 are effective for the Company’s fiscal year beginning July 1, 2009.

 

ASC 820 defines fair value, establishes a framework for measuring fair value in generally accepted accounting principles, and expands disclosures about fair value measurements. ASC 820 defines fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. This standard is now the single source in GAAP for the definition of fair value, except for the fair value of leased property as defined in ASC 820. ASC 820 establishes a fair value hierarchy that distinguishes between (1) market participant assumptions developed based on market data obtained from independent sources (observable inputs) and (2) an entity’s own assumptions about market participant assumptions developed based on the best information available in the circumstances (unobservable inputs). The fair value hierarchy consists of three broad levels, which gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). The three levels of the fair value hierarchy under ASC 820  are described below:









2.

Principal Accounting Policies (Continued)



Level 1

Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities.

Level 2

Inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly, including quoted prices for similar assets or liabilities in active markets; quoted prices for identical or similar assets or liabilities in markets that are not active; inputs other than quoted prices that are observable for the asset or liability (e.g., interest rates); and inputs that are derived principally from or corroborated by observable market data by correlation or other means.

Level 3

Inputs that are both significant to the fair value measurement and unobservable.

 

 



The fair value of cash and cash equivalents and accounts receivables for all periods presented approximate their respective carrying amounts.


3.

Recent Accounting Pronouncements:


(i)

Business Combinations


In December 2007, the FASB issued FASB ASC 805 (revised 2007), “Business Combinations” (“ASC 805”).  ASC 805 significantly changes the accounting for business combinations in a number of areas including the treatment of contingent consideration, pre acquisition contingencies, transaction costs, in-process research and development, and restructuring costs. In addition, under ASC 805, changes in an acquired entity's deferred tax assets and uncertain tax positions after the measurement period will impact income tax expense. ASC 805 is effective for fiscal periods beginning after December 15, 2008. The Company has adopted ASC 805 on July 1, 2009. This standard will change the accounting treatment for business combinations on a prospective basis.


In December 2007, the FASB issued ASC 810, “No controlling Interests in Consolidated  Financial Statements – an amendment of Accounting Research Bulletin No. 51” (“ASC 810”), which establishes accounting and reporting standards for ownership interests in subsidiaries held by parties other than the parent, the amount of consolidated net income attributable to the parent and to the non controlling interest, changes in a parent’s ownership interest and the valuation of retained non-controlling equity investments when a subsidiary is deconsolidated.  The Statement also establishes reporting requirements that clearly identify and distinguish between the interests of the parent and the interests of the non-controlling owners.  ASC 810 is effective for fiscal periods beginning after December 15, 2008.  The Company has adopted ASC 810 on July 1, 2009. Adoption of this standard did not have a material impact on the Company’s financial position, results of operations, or cash flows.


(ii)

ASC 815


In March 2008, the FASB issued ASC 815, “Disclosures about Derivative Instruments and Hedging Activities” (“ASC 815”). ASC 815 requires qualitative disclosures about objectives and strategies for using derivatives, quantitative disclosures about fair value amounts of gains and losses on derivative instruments, and disclosures about credit-risk-related contingent features in derivative agreements. This statement is effective for financial statements issued for fiscal periods beginning after November 15, 2008. The Company has adopted ASC 815 on July 1, 2009. Adoption of this standard


3.

Recent Accounting Pronouncements: (Continued)


did not have a material impact on the Company’s financial position, results of operations, or cash flows.


(iii)   ASC 460


In May 2008, the FASB issued ASC 460, "Accounting for Financial Guarantee Insurance Contracts - an interpretation of FASB Statement No. 60." (“ASC 460”)  requires that an insurance enterprise recognize a claim liability prior to an event of default (insured event) when there is evidence that credit deterioration has occurred in an insured financial obligation.  This Statement also clarifies how Statement 60 applies to financial guarantee insurance contracts, including the recognition and measurement to be used to account for premium revenue and claim liabilities.  Those clarifications will increase comparability in financial reporting of financial guarantee insurance contracts by insurance enterprises.  This Statement requires expanded disclosures about financial guarantee insurance contracts.  The accounting and disclosure requirements of the Statement will improve the quality of information provided to users of financial statements.  ASC 460 will be effective for financial statements issued for fiscal years beginning after December 15, 2008.  


The Company adopted ASC 460 on July 1, 2009. Adoption of this standard did not have a material impact on the Company’s financial condition or results of operation.


(iv) ASC 855


In May 2009, the FASB issued ASC 855, "Subsequent Events," which establishes general standards for accounting for, and disclosures of, events that occur after the balance sheet date, but before the financial statements are issued or are available to be issued. The pronouncement requires the disclosure of the date through which an entity has evaluated subsequent events and the basis for that date and whether that date represents the date the financial statements were issued or were available to be issued. ASC 855 is effective with interim and annual financial periods ending after June 15, 2009. The Company adopted ASC 855on July 1, 2009. Adoption of this standard did not have an impact on the Company's results of operations, financial position, or cash flows.


(v) ASC 860


In June 2009, the FASB issued ASC 860, “Accounting for Transfers of Financial Assets—an amendment of FASB Statement” (“ASC 860”).  ASC 860 is intended to establish standards of financial reporting for the transfer of assets to improve the relevance, representational faithfulness, and comparability. ASC 860 is effective for financial statements issued for fiscal years and interim periods beginning after November 15, 2009. The Company will adopt ASC 860 on July 1, 2010. The Company has determined that the adoption of ASC 860 will have no impact will have on its consolidated financial statements.


(vi) ASC 810


In June 2009, the FASB issued ASC 810, “Amendments to FASB Interpretation No. 46(R)” (“ASC 810”). ASC 810 eliminates the exception to consolidate a qualifying special-purpose entity, changes the approach to determining the primary beneficiary of a variable interest entity, and requires companies to more frequently re-assess whether they must consolidate variable interest entities.  Under the new guidance, the primary beneficiary of a variable interest entity is identified qualitatively as the enterprise that has both (a) the power to direct the activities of a variable interest entity that most significantly impact the entity’s economic performance, and (b) the obligation to absorb losses of the entity that could potentially be significant to the variable interest entity or the right to receive benefits from the entity that could potentially be significant to the variable interest entity. ASC 810

3.

Recent Accounting Pronouncements: (Continued)


becomes effective for the Company’s fiscal 2011 year-end and interim reporting periods thereafter.  The Company does not expect ASC 810  to have a material impact on its financial statements.


(vii) ASC 105-10-05


In July 2009, the FASB issued ASC 105-20-05, "FASB Accounting Standards Codification" ("ASC 105-10-05"), as the single source of authoritative nongovernmental U.S. generally accepted accounting principles (GAAP). The Codification is effective for interim and annual periods ending after September 15, 2009. All existing accounting standards are superseded as described in ASC 105-

10-05. All other accounting literature not included in the Codification is non-authoritative.

Management is currently evaluating the impact of the adoption of ASC 105-10-05 but does not expect the adoption of ASC 105-10-05 to impact the Company's results of operations, financial position, or cash flows.


(viii)

ASC 470-20

In May 2008, the FASB issued FSP No. APB 14-1, “Accounting for Convertible Debt Instruments That May Be Settled in Cash upon Conversion (Including Partial Cash Settlement)” (“FSP 14-1”). FSP 14-1 applies to convertible debt instruments that, by their stated terms, may be settled in cash (or other assets) upon conversion, including partial cash settlement, unless the embedded conversion option is required to be separately accounted for as a derivative under FASB Statement No. 133. Convertible debt instruments within the scope of FSP 14-1 are not addressed by the existing APB 14. FSP 14-1 would require that the liability and equity components of convertible debt instruments within the scope of FSP 14-1 be separately accounted for in a manner that reflects the entity’s nonconvertible debt borrowing rate. This will require an allocation of the convertible debt proceeds between the liability component and the embedded conversion option (i.e., the equity component). The difference between the principal amount of the debt and the amount of the proceeds allocated to the liability component would be reported as a debt discount and subsequently amortized to earnings over the instrument’s expected life using the effective interest method. FSP APB 14-1 is effective for the Company’s fiscal year beginning July 1, 2009 and will be applied retrospectively to all periods presented. Adoption of this standard is not expected to have a material impact on the Company’s financial position, results of operations, or cash flows.


4.

Related Party Transactions


During the period ended March 31, 2010 the Company had a balance owing from a shareholder of $1,850 (2009 – nil) pertaining to funds held in trust.


During the period ended June 30, 2009, the Company had a balance owing from a shareholder of $13,850. This balance represents funds held in trust.


At March 31, 2010, the Company had a payable to related parties for shares granted of 1,400,000 common shares (2009 – nil) for services rendered, for total consideration of $1,316,000 (2009 – nil).


At March 31, 2010, the Company had a payable to a company related by way of directors in common of $225,000 (2009 – nil) related to the acquisition of a 50% interest in the Settlers Landing wind development project (Note 10).


At March 31, 2010, the Company had a payable to a company related by way of directors in common of $286,650(2009 – nil) related to the acquisition of a 50% interest in the Settlers Landing wind development project (Note 10).


All transactions with related parties are made in the normal course of business and measured at carrying value.


5.

Non-Cash Transactions


There were no income taxes paid during 2010 or 2009. During the period ended March 31, 2010, the company entered into certain non-cash operating activities as follows:



6.

Fixed Assets



 

 

 

 

Cost

Opening Balance

Accumulated Depreciation

Net Book Value at March 31, 2010

Net Book Value at June 30, 2009

 

 

 

 

$           8 ,102         

  $           4,136

 $               3,966

$                    -


During the period ended March 31, 2010, total additions to property, plant and equipment were $ nil (2009- $ nil).  During the period ended March 31, 2010 the Company recorded depreciation of $230.


7.

Other short term loans


On November 25, 2009 the Company issued $992,000 of convertible debt in a subscription agreement between the Company and a group of investors. The debt carries an interest rate of 10% annually, due upon the maturity date, November 30, 2010. The debt may be converted into shares of common stock at a conversion price of $0.70 per share. In conjunction with the debt, the Company also issued warrants to purchase 1,000,000 warrants with an exercise price of $1.00 per share that expire on November 30, 2011. The fair value of the warrants is $0.53 per share as calculated using the Black-Scholes method. Assumptions include the stock price at $1.14 with a maturity date of 1 year and effective interest rate of .48%.


On March 31, 2010 the Company issued $275,000 of convertible debt in a subscription agreement between the Company and a group of investors. The debt carries an interest rate of 10% annually, due upon the maturity date, March 31, 2011. The debt may be converted into shares of common stock at a conversion price of $0.40 per share. In conjunction with the debt, the Company also issued warrants to purchase 687,500 warrants with an exercise price of $0.75 per share that expire on March 31, 2012. The fair value of the warrants is $0.21 per share as calculated using the Black-Scholes method. Assumptions include the stock price at $0.59 with a maturity date of 1 year and effective interest rate of .96%.


Both debt issuances carry a beneficial conversion feature, which along with the relative fair value of the warrants, resulted in a debt discount of $659,356, which will be recorded against the convertible debt and offset to additional paid in capital. This discount will be amortized as interest expense over the life of the debt which resulted in amortization of approximately $207,910 for the nine months ended March 31, 2010.








8.

Share Capital


Total authorized share capital of the Company is as follows:


200,000,000 Common shares with a par value of $0.001


The following share purchase warrants and agent compensation warrants were outstanding at March 31, 2010:


  

 

Exercise price

 

Number
of warrants

 

Remaining
contractual life (years)

Warrants

 

.85

 

150,000

 

2.76

Warrants

 

.85

 

150,000

 

4.76

Warrants

 

.85

 

100,000

 

2.76

Warrants

 

1.00

 

1,000,000

 

1.67

Warrants

 

.75

 

687,500

 

2.00

Outstanding and exercisable at March 31, 2010

 

 

 

2,087,500

 

 


The Company uses the Black-Scholes option valuation model to value warrants granted. The Black-Scholes model was developed for use in estimating the fair value of traded warrants. The model requires management to make estimates, which are subjective and may not be a representative of actual results. Changes in assumptions can materially affect estimates of fair values. For purposes of the calculation, the following assumptions were used:

 

March 31, 2010

March 31, 2009

Risk free interest rate

0.48% - 0.96%

N/A

Expected life of warrants

1 year

N/A

Expected stock price volatility

110.8%

N/A

Expected dividend yield

0%

N/A


9.

Employee Stock Option Plan


On July 12, 2007, the board and shareholders approved the 2007/2008 Stock Incentive & Compensation Plan thereby reserving 6,000,000 common shares for issuance to employees, directors and consultants. The significant details of the plan are as follows:


·

All employees and consultants of the company are eligible to be granted stock options;

·

May issue up to 6,000,000 common shares;

·

Options shall not be priced at less than 100% of the FMV of common stock at the date of grant;

·

Maximum life of option is 10 periods;

·

Options are non-transferable, may only be exercised;

·

Options expire on termination of employment.


On November 29, 2007, the board granted 500,000 stock options expiring December 31, 2009 to a director of the company vesting on January 1, 2008.   As at June 30, 2009, all options to purchase common stock were cancelled by the board of directors.


On October 19, 2009, the board granted 1,000,000 stock options expiring December 31, 2012 to officers and directors of the company vesting immediately at an exercise price of $0.85.


Changes in the Company’s stock options for the period ended March 31, 2010 are summarized below:


 

 

 

 

Number

Weighted Avg. Exercise Price

Balance, beginning of Year

-

$ -

Cancelled

-

-

Issued

1,000,000

0.85

Balance, March 31, 2010

1,000,000

$ 0.85



Stock Based Compensation


The Company uses the Black-Scholes option valuation model to value stock options granted. The Black-Scholes model was developed for use in estimating the fair value of traded options that have no vesting restrictions and are fully transferable. The model requires management to make estimates, which are subjective and may not be representative of actual results. Changes in assumptions can materially affect estimates of fair values. For purposes of the calculation, the following assumptions were used:


 

March 31, 2010

March 31, 2009

Risk free interest rate

0.60%

0.40%

Expected dividend yield

0%

0%

Expected stock price volatility

106.1%%

110%

Expected life of options

1 year

2 to 5 years



During the period ended March 31, 2010 the Company recognized stock based compensation expense in the amount of $ 84,838 (2009: nil).

10.

Acquisitions, Option Agreements and Power Contract Applications


On October 23, 2009 the Company announced it had signed an agreement to acquire a 70% controlling interest in Skyway 126 Wind Energy Inc. in exchange for two million restricted shares of Wind Works’ common stock.  Skyway 126 is a 10 megawatt (MW) project located in Grey-Highlands Township, Ontario, Canada.


On October 28, 2009 the Company announced it had signed a share exchange agreement whereby it will acquire all of the outstanding equity interests in Zero Emission People (“ZEP”), which includes 10 wind energy development projects totaling 375 megawatts (MW).  As consideration, the Company will issue thirty-one million shares of its common stock pursuant to the following schedule (Note 13):

 

 















































10.Acquisitions, Option Agreements and Power Contract Applications (Continued)


- 5,000,000 shares of common stock on January 15, 2010


- 9,000,000 shares of common stock on August 15, 2010

 

- 9,000,000 shares of common shares on August 15, 2011

 

- 8,000,000 shares of common shares on August 15, 2012


The acquisition by Wind Works of Zero Emissions People is deemed to be a reverse acquisition. Wind Works (the legal acquirer) is considered the accounting acquiree and Zero Emissions People (the legal acquiree) is considered the accounting acquirer. The combined financial statements of the combined entity are in substance be those of Zero Emissions People, with the assets and liabilities, and revenues and expenses of Wind Works being included effective from the date of consummation of Share Exchange Transaction. Wind Works is deemed to be a continuation of business of Zero Emissions People. The outstanding common stock of Wind Works prior to the Share Exchange Transaction will be accounted for at their net book value and no goodwill will be recognized.


On November 5, 2009 the Company announced it had signed an agreement to acquire an additional 50% interest in the Settlers Landing Wind Park to give it a 100% interest in the project.  As part of the acquisition of Zero Emission People, announced October 28, 2009, the Company acquired an initial 50% interest in Settlers Landing, a 10 megawatt wind energy project located near Pontypool, in Ontario, Canada. The agreement calls for the issuance of 300,000 restricted common shares of the Company’s stock, and the payment in cash of $450,000, the latter subject to milestones. The affect of payment is as follows:


Milestone 1:

The payment of $225,000 upon the earlier of: within 30 days of award of FIT/power contract or latest July 30, 2010 (Note 4).


Milestone 2:

The payment of $225,000 within 90 days upon award of a FIT/power contract.


As at March 31, 2010, the restricted common shares have not yet been issued nor the cash payment been made.

 

On November 9, 2009 the Company announced it had signed an option agreement to acquire a 100% interest in Honelles, a 10 megawatt wind energy project located in Belgium. In consideration for the 100% interest, Wind Works will make an initial cash payment of $100,000 on January 15, 2010 and a further cash payment of $375,000 on March 15, 2010.  On Feb. 10, 2010 the option was extended and payments deferred to June 1, 2010.

 

On November 11, 2009 the Company announced it had signed an option agreement to acquire a 100% interest in Ecsed, a 50 megawatt wind energy project located in Hungary. In consideration for the 100% interest, the Company will make an initial cash payment of $125,000 on January 15, 2010 and a further cash payment of $375,000 on March 15, 2010.  On Feb. 10, 2010 the option was extended and payments deferred to June 1, 2010.

 

On November 27, 2009 the Company signed an agreement whereby it  acquired a 50% interest in another 6 wind energy projects totaling 80 megawatts (MW) located in Ontario, with an option to increase its interests to 100%. All 6 projects submitted power contract applications on November 30th under the new Feed-in Tariff program of the Ontario Power Authority. The agreement calls for the issuance of 1,200,000 restricted common shares of the Company’s stock, and payment in cash of $300,000 CDN on April 30, 2010 (Note 3). The restricted common shares have not yet been issued and the cash payment has not yet been made.


On February 3, 2010 the Company announced that it had successfully closed the acquisition of Zero Emissions People effective Jan. 31, 2010.  On January 31, 2010, in an addendum to the share exchange agreement between the Company and Zero Emission People LLC, it was agreed that any provisions in regards to considerations in shares made in the joint venture agreement and option agreements entered into on September 18, 2009 will be superseded by the share exchange agreement of October 28, 2009.  Both parties further acknowledged that any amount of shares issued by the Company as consideration as per provisions contained in any of the previous agreements shall be subtracted from the overall amount of shares due under the share exchange agreement if such a previous issuance does concern a project that is part of both the agreement under which the shares were issued previously and the share exchange agreement.


11.

Contingencies


The Company has a contingent liability of $100,000 CAD due thirty days upon signing a Feed-In Tariff contract with Ontario Power Authority pertaining to its Grey-Highlands wind energy project. The amount is payable to a company that originally owned the Grey-Highlands property operating lease agreement.


The Company may be required to make additional lease payments based on (a) the number of meteorological towers and/or (b) megawatt of turbine installed on its land leases. The contingent payments are not determinable at this time.


The Company has royalty payments contingent on gross revenue from the sale of units of electricity sold pertaining to its land leases. Total contingent payments required to be made under this agreement are not determinable at this time.


12.

Commitments


The following are expected lease payments regarding the Company’s operating land leases:


 

 

2010

$     84,698

2011

$     69,348

2012

$     32,937

2013

$       8,923

2014

$       5,961

There after

$   118,720










13.

Subsequent events


On April 1, 2010 the Company signed an exclusive option agreement to purchase a 100MW wind energy project by June 1, 2010 in exchange for 250,000 restricted shares.


On April 1, 2010 the Company signed an addendum to the Nov. 6, 2009 agreement deferring the $450,000 payment for 50% of Settler’s Landing to June 30, 2010.


On April 1, 2010 the Company signed an addendum to the Nov. 27, 2009 agreement deferring the $300,000 payment for 50% of the six wind energy projects to June 30,2010.


On April 13, 2010 the Company announced it had been offered seven power purchase agreements totaling 80 MW by the Ontario Power Authority.






Item 2.  Management’s Discussion and Analysis of Financial Condition and Results of Operation


THE FOLLOWING DISCUSSION OF THE RESULTS OF OUR OPERATIONS AND FINANCIAL CONDITION SHOULD BE READ IN CONJUNCTION WITH OUR FINANCIAL STATEMENTS AND THE NOTES THERETO INCLUDED ELSEWHERE IN THIS REPORT.

   

Background



Our business strategy is to pursue opportunities in the alternative energy field with a particular emphasis on wind energy. We intend to develop wind farms  We will assemble land packages (“Wind Farms”), secure requisite environmental permitting, provide wind testing for a one year period  by erecting towers to measure wind speed.  Subject to favorable wind testing results, we will then apply for a power contract for the number of megawatts (MW) that our land position will allow. Once we secure power contracts,  we believe that we will be able to lease or sell the Wind Farms to operating utility companies or companies desiring to purchase wind turbines and erect the necessary power lines.

 

We are no longer pursuing mining activities.  

 

In order to implement our  new business plan, on January 31, 2010,  we acquired all of the outstanding equity interests in Zero Emission People LLC  (“Zero Emission”) an entity controlled by Ingo Stuckmann, our recently appointed chief executive officer.   We also appointed  new officers and directors.


 Zero Emission owns equity interests in wind energy projects in Canada and the United States.  Through its years of experience, we hope to capitalize on the expertise and strategic alliances that Zero Emissions has forged to date.

 

The development of a wind farm involves many steps and can take years before coming to fruition.  Development in this context means the securing and maintenance of land sites for the proposed turbine locations by ways and according to the terms of the respective land lease or easement agreements, planning and conducting of all necessary environmental studies  such as environmental screenings, noise assessments, visual assessments and avian and floral assessments assemblance  which is  required for the Environmental approval.   Environmental approval is necessary to obtain  building permit for the wind farms. Further  development encompasses liaison with various Aboriginal and First Nations groups as well as consultations with provincial and federal agencies in order to obtain any permits that may be required for any such project.

 

 

In addition to  environmental approval and consultations we have to engage in the planning and commissioning of all technical reports and engineering drawings and layouts of the planned projects in regards to the construction of the actual wind farm and any auxiliary structures such as transmission lines that are necessary to operate the wind farm. Wind energy engineers must prepare a three stage site implementation program

 

The first stage of the program involves locating the ideal placement for the wind turbines and determining which type of wind turbine can provide the optimal results for the wind farms.  The second stage of the program involves building access roads to the property and constructing transmission lines which can be connected to the power grid.  The final stage of the site  implementation program is determining the final yield assessment which occurs after a power purchase agreement is signed with a local utility.

 

After we have secured the required licensing, and paid any required fees  we intend to secure power contracts with local utilities.    At this time, we do not intend to become a wind energy producer.  Rather, we will develop the wind park for sale to wind energy producers.   Our business model is to assemble a land package, secure regulatory approval,  provide  engineering studies,  build the required infrastructure and finally enter into power purchase agreements with local utilities.  When we sell our wind farms, we will be offering buyers a complete turnkey package.  Purchasers will be required to purchase the wind turbines.  Following the installation of the wind turbines, purchasers will then be able to sell wind power electricity pursuant to the terms and conditions of the power purchase agreements.


Following is a brief description of the Company’s wind projects.


1.  

Grey Highlands Wind Park: WWPC holds 100% interest the Grey Highlands Project. The Grey Highlands Wind Park project is a 10 MW* project 25kms south of Georgian Bay, Ontario, Canada which is an area that benefits from the westerly winds crossing from Lake Huron.  Annual mean wind speeds are modeled at over 6.5 meters per second at an 80 meter hub height, modeled meaning a finding based on data as per the Canadian Wind Atlas for that area . The project area has been secured by the execution of option and surface lease agreements with various landowners. Environmental studies are near completion.


2.  

Snowy Ridge Wind Park: WWPC holds a 100% interest in the Snowy Ridge Project. Snowy Ridge Wind Park Project is a 10 MW project in the vicinity of the village of Bethany, Ontario.  The project has been developed in an area of high elevation that can optimize the wind resources to their maximum.   Annual mean wind speeds are modeled at over 6.7 metres per second at an 80 metre hub height.  The project area has been secured by the execution of option to a lease and easement agreement with various land owners.

 

3.  

Grand Prairie Wind Park: WWPC holds a 100% in the Grand Prairie Project . The Grand Prairie Wind Park project is a 75 MW project located in the state of Illinois.  This project has been developed in an area of crop fields that can optimize the wind resources. Annual mean wind speeds are measured at over 7 meters per second at a 100 m hub height.

 

 4.  

Baker Wind Park: WWPC holds 90% interest in the Baker Wind Project. The Baker Wind Park project, a 200MW project located in the state of Montana.   This project has been developed in an area of crop fields that can optimize the wind resources. Annual mean wind speeds are measured at over 8 meters per second at an 80 m hub height.

 

5.  

Polar Bear Wind Park: WWPC holds a 50% interest (with an option to increase to 100%) in the Polar Bear Project. The Polar Bear Project is a 20MW project located in Ontario, Canada. Annual mean wind speeds are modelled at over 8 meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements with various landowners. Environmental studies are near completion.     


6.  

Pleasant Bay Wind Park: WWPC holds a 50% interest (with an option to increase to 100%) in the Pleasant Bay Project. The Pleasant Bay Project is a 20MW project located in an area just north of the shores of Lake Ontario that has one of the best wind regimes in Ontario. The project area has been secured by the execution of option for wind farm easement agreements with various landowners. Annual mean wind speeds are modeled at over 8.0 meters per second at an 80 m hub height.  Environmental studies are near completion.   

  

7.  

Settlers Landing Wind Park: WWPC holds a100% interest in the Settlers Landing Project. The Settlers Landing Project is a 10MW project located near Pontypool, Ontario, Canada. This project has been developed in an area of high elevation. Annual mean wind speeds are modeled at over 6.8 meters per second at an 80 m hub height.

 

8.  

Zorra Festival Wind Park: WWPC holds a 50% interest in the Zorra Wind Park Project . The Zorra Wind Park Project is a 10MW project located northwest of Woodstock, Ontario, Canada. Annual mean wind speeds are modeled at over 7.0 meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements  with various landowners.

 

9.  

Clean Breeze Wind Park: WWPC holds a 50% interest (with an option to increase to 100%) in the Clean Breeze Wind Park Project . The Clean Breeze Wind Park is a 10MW project located in Ontario, Canada in the Northumberland Hills. This project has been developed only 5kms from the north shore of Lake Ontario in an area of high elevation that can optimize the wind resources to a maximum. The project area has been secured by the execution of option for wind farm easement agreements with various landowners. Annual mean wind speeds are modeled at over 6.7 meters per second at an 80 m hub height. Environmental studies are near completion.   

 

10.  

Whispering Woods Wind Park: WWPC holds a 50% interest (with an option to increase to 100%) in the Whispering Woods . The Whispering Woods Wind Park Project is a 10MW project located near Millbrook, Ontario, Canada. Annual mean wind speeds are modeled at over 6.7 meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements with various landowners. Environmental studies are near completion.  

 

  

11.  

Ganaraska Wind Park: WWPC holds a 50% interest (with an option to increase to 100%) in  the Ganaraska Project. The Ganaraska Wind Park project is a 20MW project located near Kirby, Ontario, Canada. Annual mean wind speeds are modelled at over 6,5 meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements with various landowners. Environmental studies are near completion and the project is eligible for a Feed-in Tariff application during the Ontario Power Authority launch period.  


12.  

Stonetown Wind Park: 50% interest (with an option to increase to 100%) in the Stonetown Wind Project. The Stonetown Wind  Park project is a 10MW project located near St. Mary, Ontario. Annual mean wind speeds are modeled at over 6,7 meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements with various landowners. Environmental studies are near completion.    


13.  

Lakeside Breezes Wind Park: WWPC holds a 50% interest in two 10MW projects located near Iona Station, Ontario, Canada. This project has been developed in an area of high elevation. Annual mean wind speeds are modeled at over 6,5  meters per second at an 80 m hub height. The project area has been secured by the execution of option and surface lease agreements with various landowners. The project is eligible for a Feed-in Tariff application during the Ontario Power Authority launch period.  

 

14.  

Pioneer Wind Park: WWPC holds a 50% interest (with an option to increase to 100%) in a 10MW project located near Iona Station, Ontario, Canada. Annual mean wind speeds are modeled at over 6,5  meters per second at an 80 m hub height. The project area has been secured by the execution of option and surface lease agreements with various landowners.  

  

15.  

Beaconsfield Wind Park: 50% interest (with an option to increase to 100%) in a 10MW project located in Ontario, Canada. Annual mean wind speeds are measured at over 6,7  meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements with various landowners  Environmental studies are near completion and the project is eligible for a Feed-in Tariff application during the Ontario Power Authority launch period.  


16.  

Cloudy Ridge Skyway 126 Wind Park: WWPC holds a 70% interest in a 10 MW project located in Grey Highlands, Ontario, Canada. Annual mean wind speeds are measured at over 6,5  meters per second at an 80 m hub height. The project area has been secured by the execution of option for wind farm easement agreements with various landowners  Environmental studies are near completion and the project is eligible for a Feed-in Tariff application during the Ontario Power Authority launch period.  

 

We have submitted  Fee-In-Tariff (“FIT”) Power Purchase Contracts fixed at a basic rate of C$135.00/MWh, that can potentially be increased to C$145.00/MW under certain conditions (community or aboriginal price adder), over a 20-year term for each of our wind parks located in Ontario, Canada.


On April 8, 2010 we were notified by the Ontario Power Authority that Grey Highlands, Snowy Ridge, Settlers Landing, Clean Breeze, Whispering Winds, Ganaraska, Cloudy Ridge and Skyway 126 will be offered a FIT contract.


On April 26, 2010 we received the formal offers for FIT contracts from the Ontario Power Authority for the projects described above.


On May 3, 2010 we executed on all agreements for FIT contracts from the Ontario Power Authority for the projects described above.


Also on April 8, 2010, we were notified by the Ontario Power Authority that Polar Bear, Pleasant Bay, Zorra Festival, Stonetown, Lakeside Breeze, Pioneer and Beaconsfield will be undergoing Economic Connection Testing before a further decision in a FIT contract award can be made by the Ontario Power Authority.



WIND POWER

Industry Overview

 

In today’s society, wind power and alternative energy are becoming a fast growing force along with the “Go Green” attitude.  Renewable energy is produced using resources that are naturally replenished, such as wind, sunlight, geothermal heat, tides and biofuels. Technologies that produce energy from these renewable sources (other than biofuels) are often referred to as “clean” or “green” as they produce few, if any, pollutants that negatively impact the environment. Comparatively, fossil fuels such as coal, natural gas and oil are exhaustible and release greenhouse gases such as carbon dioxide or other pollutants into the atmosphere during energy production. As a result of increased environmental awareness, the deployment of renewable energy technologies has grown rapidly during the past several years. According to the Energy Information Administration, 37% of new U.S. power generation capacity in 2007 consisted of renewable technologies, compared with only 2% in 2003. This increase is expected to continue in both the United States and Canada. It is anticipated that renewable energy capacity in North America is expected to grow by a compounded annual growth rate between 9% and 11% through 2025.  At this rate, the United States and Canada could supply 25% of its electrical energy requirements with renewable energy by 2025.

 

Wind energy is the fastest-growing renewable energy generation technology worldwide due to its cost efficiency, technological maturity and the wide availability of wind resources. It has been suggested that wind power has the greatest potential among all renewable energy technologies for further growth in North America.  Although the United States and Canada have hydroelectric and geothermal resources, many potential hydroelectric sites have already been developed and geothermal production is confined by geographical limitations to only certain areas.  In contrast, the available untapped wind resources across North America remain vast. Additionally, other renewable energy technologies, such as solar power, are currently less economically attractive than wind energy, and others, such as biofuels, emit particulates which have a greater negative impact on the environment than wind energy.



Wind Energy Fundamentals

 

The term “wind energy” refers to the process used to generate electricity through wind turbines. The turbines convert wind’s kinetic energy into electrical power by capturing it with a three blade rotor mounted on a nacelle that houses a gearbox and generator. When the wind blows, the combination of the lift and drag of the air pressure on the blades spins the blades and rotor, which turns a shaft through the gearbox and generator to create electricity.

 

Wind turbines are typically grouped together in what are often referred to as “wind parks.” Electricity from each wind turbine travels down a cable inside its tower to a collection point in the wind park and is then transmitted to a substation for voltage step-up and delivery into the electric utility transmission network, or “grid.” Today’s wind turbines can efficiently generate electricity when the wind speed is between 11 and 55 miles per hour.

  

A key factor in the success of any wind park is the profile and predictability of the wind resources at the site. Extensive studies of historical weather and wind patterns have been performed across North America and many resources, in the forms of charts, graphs and maps, are available to wind energy developers. The most attractive wind park sites offer a combination of land accessibility, power transmission, proximity to construction resources and strong and dependable winds.

  

When wind energy developers identify promising sites, they perform detailed studies to provide greater certainty with respect to the long-term wind characteristics at the site and to identify the most effective turbine strategy. The long-term annual output of a wind park is assessed through the use of on-site wind data, publicly available reference data and sophisticated software. Wind speeds are estimated in great detail for specific months, days or even hours, and are then correlated to turbine manufacturers’ specifications to identify the most efficient turbine for the site. Additional calculations and adjustments for turbine availability (which is principally affected by planned and unplanned maintenance events), wake effects (wind depletion caused by turbines sited upwind), blade soiling and icing and other factors are made to arrive at an estimate of net expected annual kilowatt hour electricity production at the site.


Wind development determines the MW capacity of a project.  Generally, MW for  projects are decided as follows: Generally, the location (land) where the wind farm is located allows for a certain number of turbines to be fitted on to the projects land due to setbacks from houses roads and other buildings or infrastructure  items. Also turbines create a noise parameter which circles out a portion of the land and which parameter has to be fitted in with the setbacks towards any structure. (generally in Ontario at least 550m from a house - most ordinances prohibit more than 45 decibels in an inhabited structure at any time). Wind turbines have a nameplate capacity of generally 1.5-2.5 MW.  By using the land and the turbine model you create a layout which is used to determine whether these turbines fit within the layout and how many turbine sites must be secured under an easement agreement. 


Proposed Financing:


We have signed an Investment Agreement with Kodiak Capital Group, Inc. (“Kodiak”).  Kodiak has committed to purchase up to $10,000,000 (the "Facility") of our Common Stock over the course of 36 months ("Facility Period"), after a registration statement has been declared effective by the SEC (the "Effective Date"). We have filed a registration statement to register up to $3 million of shares of our common stock.  The registration statement has not been declared effective.  Since we will only register $3million of our common stock we will not be able to draw down on the entire dollar amount of the equity credit line without filing either an amendment to this registration statement or a new registration statement for additional shares of common stock.


 

The amount that we will be entitled to request from each of the purchase "Puts", shall be equal to either (1) $1,000,000or (2) 200% of the average daily volume (U.S market only) ("ADV") of our Common Stock for the three trading days prior to the "Put" notice, multiplied by the average of the 3 daily closing prices immediately preceding the Put Date.   The Pricing Period shall be the five (5) consecutive trading days immediately after the Put Date. The Market Price shall be the lowest closing bid price of the Common Stock during the Pricing Period. The Purchase Price shall be set at 95% of the Market Price. The Put Date shall be the date that the Investor receives a Put Notice of draw down by us of a portion of the Facility. There are put restrictions applied on days between the Put Date and the Closing Date with respect to that Put. During this time, we shall not be entitled to deliver another Put Notice  Kodiak has indicated that it will resell those shares in the open market, resell our shares to other investors through negotiated transactions, or hold our shares in its portfolio.  


As we draw down on the Equity Line of Credit, shares of our common stock will be sold into the market by Kodiak.  The sale of these additional shares could cause our stock price to decline. In turn, if the share price declines and we issue more puts, more shares will come into the market, which could cause a further drop in the stock price.  You should be aware that there is an inverse relationship between the market price of our common stock and the number of shares to be issued under the Equity Line of Credit.  If our stock price declines, we will be required to issue a greater number of shares under the Equity Line of Credit.  We have no obligation to utilize the full amount available under the Equity Line of Credit.

 

 

In connection with the execution of the Investment Agreement, we issued 75,000 shares of our common stock and paid Kodiak a commitment of $10,000.  We will also be obligated to pay Kodiak  2.5% of the Facility Amount, whereby the total Commitment Fee of $250,000 is payable half on the first draw-down and the balance on the earlier of the second draw-down or six months from execution of the Term Sheet (December 19, 2009).  

 

Financial Statements


On January 31, 2010 we acquired all of the outstanding equity interests in Zero Emissions. We have treated this transaction as a reverse merger with by Zero Emissions, as the former shareholders of Zero Emissions now own a majority of the Company’s issued and outstanding shares of common stock.   As a result of the foregoing transaction, the acquisition is considered to be a capital transaction in substance, rather than a business combination.


Accordingly, the accounting for the acquisition is identical to that resulting from a reverse acquisition, except that no goodwill or intangible asset is recorded. All material inter-company balances and transaction have been eliminated and the financial statements presented are those of Zero Emissions.  Wind Works is deemed to be a continuation of the business of Zero Emissions.


As a result of the foregoing transaction with Zero Emission, it will be very difficult for you to assess the prior operations of Wind Works with the information presented herein.

Comparison of Operating Results for the Nine Months ended March 31, 2010 and 2009 and from May 2008  (“Inception”) to March 31, 2010.  


Revenues


Since Inception we have not earned any revenues of any kind or nature.  


Operating Expenses


For the three and nine months ended March 31, 2010 our operating expenses totaled $397,788 and $444,058.  We had limited operations for the comparable periods in 2009 and as a result our operating expenses were $1,971 and $3,121 respectively.  Total operating expenses since inception were $498,391.   


Our largest expense for the three and nine months ended March 31, 2010 were interest and service fees totaling $186,345 and $188,401.  Interest and service charges in 2009 were negligible.  The interest and service charges were primarily attributable to the issuance of our convertible debt and warrants.  Other fees and costs incurred for the three and nine months ended March 31, 2010 were professional fees totaling $47,474, stock based compensation totaling $186,345, project development costs totaling $40,384 and consulting fees totaling $29,661.


All other line item expenses that we incurred for the quarter ended March 31, 2010 represented less than 1% of our total expenses for the year.   


Net Income (loss)  


Our Net Loss for the three and nine months ended March 31, 2010 totaled $(397,788) and $(444,058).  Net loss for the comparable period in 2009 were $(1,971) and $( 3,121) which  reflect the company’s limited operations.   


Net Loss per share for the three and nine months ended March 31, 2010 and 2009 was $(0.01) and $(0.02) as compared to $(0.01) for the three and nine months ended March 31, 2009.  


We will require additional capital to fully implement our business plan.  Our sources of potential capital include our $10 million equity credit line with Kodiak and the exercise any outstanding options.  There can be no assurance that we will be able to secure additional capital or if available, on commercially acceptable terms.  Until such time as we can fully implement our business plan, it is unlikely that we will be able to reverse our continuing losses, in which case an investor could lose their entire investment.  





Liquidity and Capital Resources


Assets and Liabilities            


At March 31, 2010 we had cash and cash equivalents totaling $71,058 and prepaid expenses totaling $4,404.  Our total current assets were $79,810.  Total current assets at June 30, 2009 were $13,850 consisting primarily of a shareholder receivable.


Our fixed assets (inclusive of our wind projects) at March 31, 2010 totaled $2,409,118.  We had no capitalized costs with respect to wind projects at June 30, 2009.  Total assets at March 31, 2010 were $2,534,308 as compared to $63,404 at June 30, 2009.  


Our current liabilities at March 31, 2010 totaled $2,413,786 consisting of accounts payable totaling $2,052,616 and short term loans totaling $361,170   as compared to total current liabilities of $7,738 at June 30, 2009.  


 We have a working capital deficit   at March 31, 2010 (current assets less current liabilities) of $2,333,976 as compared to a working capital surplus of $6,112 at June 30, 2009.   Unless we secure additional funding to meet our short term capital requirements, there can be no assurance that we will be able to implement our business plan. If we are unable to pay our liabilities as they become due, and our creditors are not willing to defer payments, we may be required to secure protection from creditor claims.    



Off-Balance Sheet Arrangements


We are not currently a party to, or otherwise involved with, any off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.


Item 3.

Quantitative and Qualitative Disclosure About Market Risk

Not applicable.









Item 4.

Controls and Procedures

(a)

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our Chief Executive Officer and our Chief Financial Officer, evaluated the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) and determined that our disclosure controls and procedures were effective as of the end of the period covered by this Quarterly Report on Form 10-Q. The evaluation considered the procedures designed to ensure that the information required to be disclosed by us in reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and communicated to our management as appropriate to allow timely decisions regarding required disclosure.

(b)

Changes in Internal Control over Financial Reporting

During the period covered by this Quarterly Report on Form 10-Q, there was no change in our internal control over financial reporting (as such term is defined in Rules 13a-15(d) and 13d-15(d) under the Exchange Act) that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

(c)

Inherent Limitations of Disclosure Controls and Internal Controls over Financial Reporting

Because of its inherent limitations, internal controls over financial reporting may not prevent or detect misstatements. Projections of any evaluation or effectiveness to future periods are subject to risks that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Item 4t.

The information required by Item 4t is contained in Item 4.


PART II. OTHER INFORMATION


 Item 1.


Legal Proceedings.


None.




Item 1A.  RISK FACTORS



RISKS ASSOCIATED WITH THE COMPANY'S PROSPECTIVE BUSINESS AND OPERATIONS

 

The following risk factors were not identified in our annual report for the period ended June 30, 2010and reflect risks that are directly related to our acquisition of Zero Emission People and the Company’s new business operations.


It is unlikely that we will be able to sustain profitability in the future.

 

We have incurred significant losses to date and there can be no assurance that we will be able to reverse this trend. We have a working capital deficit.  In addition, we expect to increase our infrastructure and operating expenses to fund our anticipated  growth.  As a result, we do not expect to generate profits in 2010 or thereafter and may not be able to support our operations or otherwise establish a return on invested capital.  We cannot assure you that any of our business strategies will be successful or that significant revenues or profitability will ever be achieved or, if they are achieved, that they can be consistently sustained or increased on a quarterly or annual basis.


We expect our operating losses to continue.

 

We expect to incur increased operating expenses during fiscal year 2010 and 2011. The amount of net losses and the time required for us to reach and sustain profitability is uncertain. The likelihood of our success must be considered in light of the problems, expenses, difficulties, and delays frequently encountered in connection with a new business, including, but not limited to, uncertainty as to development and acquisitions and the time required for the Company’s planned production to become available in the marketplace. There can be no assurance that we  will ever generate increased product revenue or achieve profitability at all or on any substantial basis.









Risks and uncertainties can impact our growth.

 

There are several risks and uncertainties, including those relating to our ability to raise money and grow our business and potential difficulties in integrating new acquisitions. These risks and uncertainties can materially affect the results predicted. Other risks include the Company’s limited operating history in wind energy, the limited financial resources, domestic or global economic conditions, activities of competitors and the presence of new or additional competition, and changes in federal, prvincial or state laws and conditions of equity markets.

 

Our future operating results over both the short and long term will be subject to annual and quarterly fluctuations due to several factors, some of which are outside of our control.   of the Company. These factors include but are not limited to fluctuating market demand for our services, and general economic conditions.


We must submit a competitive bid with respect to the wind power contracts.

   

 We have and will be continue to  submit applications or bids for wind power contracts to various utilities.  If we secure the contracts and have not accurately calculated the return on investment or the costs to generate the wind energy,  we will not maximize the value of the power contracts.  If potential buyers of our wind parks do not believe that the power contracts are not economically viable or represent minimum profitability, we will not be able to sell these wind farms or if we sell these wind parks,  we will not be able to generate the revenues we expect.

 

Our acquisitions were not negotiated at arm’s length.

 

The acquisition of Zero Emission and other projects in which we have an interest were not transactions negotiated at arm’s length.  While we believe that the consideration paid for the acquisitions or investment opportunities, is equivalent to the consideration that would be paid to a third party,  there can be no assurance that in fact we paid fair market value for the acquisitions.   We did not retain an independent analyst to determine the value of any of these acquisitions.


Our Independent Registered Public Accounting Firm has issued a going concern opinion.

 

Due to our operating losses and deficits, our independent registered public accounting firm in their financial statements have raised substantial doubts about our ability to continue as a going concern.  If we are not able to continue as a going concern, our operations will terminate and any investment in the Company will likely become worthless.


We will need to raise additional capital.

 

The commercial exploitation of wind power technology will require additional capital.  The development of the wind farm projects will require significant capital infusion.  There is no commitment in place to secure this additional financing. Any equity financing may be dilutive to shareholders, and debt financing, if available, would increase expenses and may involve restrictive covenants. The Company will be required to raise additional capital, at times and in amounts, which are uncertain, especially under the current capital market conditions. Under these circumstances, if the Company is unable to acquire additional capital or is required to raise it on terms that are less satisfactory than desired, it may have a material adverse effect on its financial condition and you will lose your investment.

 

There are a small number of wind turbine manufacturers, and increased demand may lead to difficulty in obtaining wind turbines and related components at affordable prices or in a timely manner.

 

There are only a small number of companies that have the expertise and access to the necessary components to build multi-megawatt class wind turbines. The rapid growth in the aggregate worldwide wind energy industry has created significantly increased demand for wind turbines and their related components that is currently not being adequately satisfied by suppliers. Wind turbine suppliers have had significant supply backlogs in the past, which tend to drive up prices and delay the delivery of ordered wind turbines and components.   If this continues, our wind farms will become less attractive.

 

The federal government may not extend or may decrease tax incentives for renewable energy, including wind energy, which would have an adverse impact on our development strategy.

 

Tax incentives offered by the United States and other governments make wind energy an attractive business opportunity.  If these incentives are eliminated or reduced,   our wind farms will be less attractive to prospective purchasers.

 

Currently, federal tax incentives applicable to the wind energy industry currently in effect include the production tax credit (“PTC”) and business energy investment tax credit (“ITC”) together with accelerated tax depreciation for certain assets of wind farms. The PTC provides the owner of a wind turbine placed in operation before the end of 2012 with a ten-year credit against its federal income tax obligations based on the amount of electricity generated by the wind turbine. The ITC provides a 30% credit in the form of a tax credit for property placed in service before the end of year 2012, or, alternatively, a 30% cash grant from the U.S. Treasury Department if an application is submitted by October 2011. The accelerated depreciation for certain assets of wind farms provides for a five-year depreciable life for these assets, rather than the 15 to 25 year depreciable lives of many non-renewable energy assets, with an additional 50% bonus depreciation allowed for wind energy assets placed in service by the end of 2009.  

 

The PTC and ITC are scheduled to expire on December 31, 2012, and, unless extended or renewed by the U.S. Congress, will not be available for energy generated from wind turbines placed in service after that date. We cannot assure you that current or any subsequent efforts to extend or renew this tax incentive will be successful or that any subsequent extension or renewal will be on terms that are as favorable as those that currently exist. In addition, there can be no assurance that any subsequent extension or renewal of the PTC and/or ITC would be enacted prior to its expiration or, if allowed to expire, that any extension or renewal enacted thereafter would be enacted with retroactive effect. We also cannot assure you that the tax laws providing for accelerated depreciation of wind farm assets will not be modified, amended or repealed in the future. If the federal PTC or ITC are not extended or renewed, or are extended or renewed at lower rates, financing options for wind farms will be reduced and development plans for additional wind farms will be adversely affected.


 The effect of probable governmental regulation on the business domestically and in foreign countries may adversely affect our operations.

 

As we expand our efforts to develop our business, we will have to remain attentive to relevant federal and state regulations. We intend to comply fully with all laws and regulations, and the constraints of federal, state and provincial restrictions could impact the success of our efforts.

 

Our new business operations and services may become established in multiple states and foreign countries. These jurisdictions may claim that we are required to qualify to do business as a foreign corporation in each such state and foreign country. New legislation or the application of laws and regulations from jurisdictions in this area could have a detrimental effect upon our business. We cannot predict the impact, if any, that future regulatory changes or developments may have on our business, financial condition, or results of operation.

 

At this time no regulatory or additional regulatory approvals are necessary and, to the best knowledge of the officers, we have complied with all laws, rules and regulations.

 

Insufficient transmission capacity might prevent our Ontario projects from realization.

 

A majority of our projects are located in Ontario, Canada.  We have applied for 15 Feed-In-Tariff contracts( FIT contracts) to the Ontario Power Authority.  On April 8th 2010, we were notified that we are being awarded a total of  7 FIT contracts. Even though we have been awarded a FIT contract, there may not be sufficient transmission capabilities to  connect the project.   In the alternative,  if we move forward with the project,  we will incur significant costs  in improving transmission capacity and by devoting these resources to this project,  our other projects and business plan may be adversely affected.  The remainder of our FIT applications, a total of 8 projects, have been placed into the Economic Testing Round as a result of limited connection capacity at the point of interconnection proposed in the application to the Ontario Power Authority.

 

The performance of wind farms is dependent upon meteorological and atmospheric conditions that fluctuate over time.

 

Identifying suitable locations for our wind farms is critical.  The production of electricity generated by wind farms will be highly dependent on meteorological and atmospheric conditions.

 

Site selection requires the evaluation of the quality of the wind resources based upon a variety of factors. The wind data gathered on site and data collected through other sources form the basis of wind resource projections for a wind farm’s performance.  Wind resource projections do not predict the wind at any specific period of time in the future. Therefore, even in the event where prediction of a wind farm’s wind resources becomes validated over time, the wind farm will experience hours, days, months and even years that are below wind resource predictions. Wind resource projections may not predict the actual wind resources observed by the wind farm over a long period of time. Assumptions included in wind resource projections, such as the interference between turbines, effects of vegetation and land use, and terrain effects may not be accurate. Wind resources average monthly and average time of day long-term predictions may not be accurate and, therefore, the energy wind farms produce over time may have a different value than forecast.

 

 

Operational factors may reduce energy production below projections, causing a reduction in revenue.

 

The amount of electricity generated by a wind farm depends upon many factors in addition to the quality of the wind resources, including but not limited to turbine performance, aerodynamic losses resulting from wear on the wind turbine, degradation of other components, icing or soiling of the blades and the number of times an individual turbine or an entire wind farm may need to be shut down for maintenance or to avoid damage due to extreme weather conditions. In addition, conditions on the electrical transmission network can impact the amount of energy a wind farm can deliver to the network. These matters could adversely impact the value of our wind farms.

 

The wind energy industry is extensively regulated and changes in or new regulations or delays in regulatory approval could hurt our business development.

 

Developing our wind farms will be subject to extensive energy and environmental regulation by federal, provincial, state and local authorities. Delay in obtaining, or failure to obtain and maintain in full force and effect, any of the regulatory approvals we need to develop our wind farms, or delay or failure to satisfy any applicable regulatory requirements, could prevent us from fully implementing our business strategy.

  

Various state and provincial governments may not extend or may decrease incentives for renewable energy, including wind energy, which would have an adverse impact on our development strategy.

 

Various types of incentives which support the sale of electricity generated from wind energy presently exist in the United States and Canada.  These incentives can be offered at both the state and provincial level.  We cannot assure you that governmental support for alternative energy sources in the form of RPS programs or RECs recognition and trading will continue at the state or provincial level or that the wind farms that we develop will qualify for such incentives. Any decrease in government   incentives would have an adverse impact on our development strategy.


We will need to locate and develop new sources of wind power in a timely and consistent manner, and failure to do so would adversely affect our operations and financial performance.

 

Our success in the industry requires additional and continuing development to become and remain competitive.  Subject to available working capital, we expect to make substantial investments in development activities. Our future success will depend, in part, on our ability to continue to locate additional wind power sites. Developing a wind farm site is dependent upon, among other things, acquisition of rights to parcels of property and receipt of required local, state and federal permits.   This development activity will require continued investment in order to maintain and grow our market position. We may experience unforeseen problems in our development endeavors. We may not achieve widespread market acceptance of our wind farms.  We may not meet some of these requirements or may not meet them on a timely basis. We may modify plans for the development of a wind farm. We will typically incur substantial expense in the development of wind farms. Many of these expenses, including obtaining permits and legal and other services, are incurred before we can determine whether a site is environmentally or economically feasible. After such a determination is made, significant expenses, such as environmental impact studies, are incurred. A number of factors are critical to a determination of whether a site will ultimately be developed as a wind farm including changes in regulatory environment, changes in energy prices, community opposition, failure to obtain regulatory and transmission approvals and permits. These factors could materially affect our ability to forecast operations and negatively affect our stock price, results of operations, cash flow and financial condition.

 

  

Wind farms can be built only in regions with suitable wind conditions. In addition, certain constraints must be taken into account in connection with the development of each wind farm. These include topographic constraints, landowners’ willingness to grant access to their land, connection capacities of the local transmission network and regulatory constraints associated with the proximity to housing, airports or protected sites.

 

If we cannot locate sufficient available sites on which to develop wind farms, it could have a material adverse effect on our business, results of operations, financial condition, or on our ability to implement our business strategy.


We will face competitive pressures from a variety of competitors.

 

We are a small company, and we will be operating in a highly competitive market, and this competition may accelerate in the future. In both Canada and the United States, large utility companies dominate the energy production industry and coal continues to dominate as the primary resource for electricity production followed by other traditional resources such as nuclear, oil and natural gas. We expect that primary competition for the wind power industry will continue to come from utility company producers of electricity generated from coal and other non-renewable energy sources. Within the wind power market itself, there is also a high degree of competition, with growth opportunities in all sectors of the industry regularly attracting new entrants.

 

There are a limited number of sites desirable for wind farms and a limited supply of wind turbines and other related equipment necessary to operate wind farm facilities. Our competitors may be able to respond more quickly to new or emerging technologies and changes in customer requirements. They may also be able to devote greater resources to the development, promotion and sale of wind farms.  Current and potential competitors may make strategic acquisitions or establish cooperative relationships among themselves or with third parties that enhance their ability to address the needs of our prospective customers. It is possible that new competitors or alliances among competitors may emerge and rapidly gain significant market share. This would in turn reduce our ability to develop wind farms.


Access to, availability and cost of transmission networks are critical to development of wind farms; failure to obtain sufficient network connections for future wind farms would adversely affect our operations and financial performance.

 

Wind farm operators will be dependent on electric transmission facilities owned and operated by third parties to deliver the electricity.  To the extent that these facilities are not readily available, the value of our wind farms will be adversely affected.  The capacity of the local transmission network may be limited or constrained, and the owner of the network may not allow wind farm operators to interconnect without first constructing the system upgrades that the owner requires. For this reason, we may be required to pay some or all of the costs of upgrading the existing transmission facilities to support the additional electricity that a wind farm will be delivering into the network. The location of a wind farm in a particular area therefore depends significantly on whether it is possible to interconnect with the transmission network at a reasonable cost. Many wind farms are located in remote areas with limited transmission networks where intense competition exists for access to, and use of capacity on, the existing transmission facilities. We cannot assure you that we will obtain sufficient network connections for future wind farms within planned timetables and budgetary constraints.

 

  

Public opposition toward wind farms may make it more difficult to obtain the necessary permits and authorizations required to develop or maintain a wind farm.

 

Public attitude towards aesthetic and environmental impacts of wind energy projects impacts the ability to develop our wind farms. In many localities, the environmental impact review process ensures a role for concerned members of the public that can lead to changes in design or layout, extensive impact mitigation requirements, or even the rejection of a project. In such areas, local acceptance is critical to the ability to obtain and maintain necessary permits and approvals. We cannot assure you that any wind farm projects under development will be accepted by the affected population. Public opposition can also lead to legal challenges that may result in the invalidation of a permit or, in certain cases, the dismantling of an existing wind farm as well as increased cost and delays. Reduced acceptance of wind farms by local populations, an increase in the number of legal challenges or an unfavorable trend in the outcome of these challenges could prevent us from achieving our plans, which, in turn, could have a material adverse effect on our business, results of operations and financial condition.


There is an absence of historical price data that you can use to evaluate the likely success of our business model.

 

There is an absence of historical price data that you can use to assess the likelihood that we will be able to recoup the costs of developing the wind parks.  In addition, factors beyond our control may impact our operations including:

 

  

a decrease in prices of other sources of electricity, which would make electricity prices from those other sources more competitive with our wind-powered electricity generating stations,


  

additional supplies of electric energy becoming available from our current competitors or new market entrants, including the development of new generation facilities that may be able to produce energy less expensively than our wind-powered electricity generating stations,

 

 

additional supplies of energy or energy-related services becoming available if there is an increase in physical transmission capacity into the power pool,


  

the extended operation of nuclear generating plants located in adjacent markets or the resumption of generation by nuclear facilities that are currently out of service,


  

weather conditions prevailing in the province of Ontario where the wind power will be generated initially,


  

the possibility of a reduction in the projected rate of growth in electricity usage as a result of factors such as regional economic conditions and the implementation of conservation programs, and


  

our ability to negotiate successfully and enter into advantageous contracts for sales of our electric energy.

 

 

If we cannot satisfy our debt obligations, we may lose several of our projects.

 

In connections with a recent financing, investors were granted  security interests in nine of our Ontario projects (the “Secured Projects”).  If we cannot satisfy the terms and conditions of the financing agreements, investors could foreclose on these security interests in which case we would lose these Secured Projects.

 

Security interests in our Projects may restrict our ability to sell or develop the Projects.

 

The Secured Projects  are covered by a blanket security interest.  If we wish to sell any of these Projects,  our creditors may not release the security interest without payment in full  of the outstanding obligations.   Similarly,   financing on any of these projects will be difficult and/or more costly as lenders will not have a first lien on the Projects.


We may not be able to secure releases for all secured lenders.

 

We have granted security interests to multiple lenders.  Any lender may refuse to execute a release on any of the Secured Projects even if agreed to by other secured lenders.   In such case, our ability to sell or secure financing will be limited



RISKS RELATED TO OUR EQUITY CREDIT LINE


If our registration statement is not declared effective by the Securities and Exchange Commission,  we will not be able to utilize our equity credit  line .  


Kodiak has committed to fund us with up to $10 million subject to the Securities and Exchange Commission declaring the effectiveness of the registration statement that we have submitted.  If we are not successful in having the registration statement declared effective or,  it takes the Company more time than anticipated,  funding for projects will be delayed and we may miss deadlines established by governmental agencies.  

 

A decline in the price of our common stock will require us to issue a significantly larger number of shares of our common stock.

 

The number of shares that Kodiak will receive under its agreement with us is calculated based upon the market price of our common stock prevailing at the time of each "put" - the lower the market price, the greater the number of shares issuable under the agreement. Upon issuance of the shares, to the extent that Kodiak will attempt to sell the shares into the market, these sales may further reduce the market price of our common stock. This in turn will increase the number of shares issuable under the agreement. This may lead to an escalation of lower market prices and ever greater numbers of shares to be issued. A larger number of shares issuable at a discount to continuously declining stock price will expose our shareholders to greater dilution and a reduction of the value of their investment.


Short sales of our common stock could result in further price declines.

 

The sale of our stock under the Kodiak agreement could encourage short sales by third parties, which could contribute to the future decline of our stock price and materially dilute existing stockholders' equity and voting rights.  This is particularly the case if the shares being placed into the market exceed the market's ability to absorb the increased number of shares of stock or if we have not performed in such a manner to show that the equity funds raised will be used by us to grow. Such an event could place further downward pressure on the price of our common stock. Even if we use the proceeds under the agreement to increase our revenues and / or invest in assets, which are materially beneficial to us, the opportunity exists for short sellers and others to contribute to the future decline of our stock price. If there are significant short sales of our stock, the price decline that would result from this activity will cause the share price to decline more so, which, in turn, may cause long holders of the stock to sell their shares thereby contributing to sales of stock in the market. If there is an imbalance on the sell side of the market for the stock, our stock price will decline. If this occurs, the number of shares of our common stock that is issuable pursuant to the Investment Agreement will increase, which will materially dilute existing stockholders' equity and voting rights.


 


Kodiak will pay less than the then-prevailing market price for our common stock.

 

The common stock to be issued to Kodiak pursuant to the Investment Agreement will be purchased at a five percent discount to the lowest closing “best bid” price (the highest posted bid price) of the common stock during the five consecutive trading days immediately following the date of our notice to Kodiak of our election to put shares pursuant to the Investment Agreement.  Kodiak has a financial incentive to sell our common stock immediately upon receiving the shares to realize the profit equal to the difference between the discounted price and the market price.  If Kodiak sells the shares, the price of our common stock could decrease.  If our stock price decreases, Kodiak may have a further incentive to sell the shares of our common stock that it holds.

 


Item 2.

Unregistered Sales of Equity Securities.    


During the quarter ended March 31, 2010 we issued a total of 110,700 shares of our common stock in consideration for services rendered and an additional 75,000 shares of our common stock in connection with our Investment Agreement with Kodiak.   We issued 3.1 million shares for services rendered.   We also issued $1,275,000 (CAD) of our convertible debt and 1,962,500 of our warrants exercisable at various strike prices.  


At all times relevant:


- the sale was made to a sophisticated or accredited investor;


-  we gave the purchaser the opportunity to ask questions and receive answers concerning  the terms and conditions of the offering and to obtain any additional information which we possessed or could acquire without unreasonable effort or expense that is necessary to verify the accuracy of information furnished;


- at a reasonable time prior to the sale of securities, we advised the purchaser of  the  limitations on resale of the securities; and


- neither we nor any person acting on our behalf sold the securities by any form of general solicitation or general advertising


In issuing the foregoing securities,  we relied on the exemptive provisions of Section 4(2), Regulation  D and/or  Reg S of the Securities Act.


Item 3.

Defaults upon senior securities.


None


 Item 4.

Submission of matters to a vote of security holders.


None.




Item 5.

Other information

None.


Item 6.

Exhibits



Exhibit No.    

Description

-----------    

-----------


3.1.** 

Certificate of Incorporation

3.2.** 

Certificate of Amendment to Certificate of Incorporation

3.3.** 

Bylaws

3.4**

Form of Convertible Debenture

3.5**

Form of Warrant

3.6**

Form of Option

10.1**

Investment Agreement with Kodiak Capital Group, Inc.

10.2**

Registration Rights Agreement with Kodiak Capital Group, Inc.

10.3** 

Share Exchange Agreement between Wind Works Power Corp. and Zero Emission People, LLC

10.4** 

Addendum to Share Exchange Agreement with Zero Emission

10.5**

Joint Venture Agreement with Sunbeam, LLC

10.6**

Share Exchange Agreement with Skyway 126 Inc.

14**

Code of Business Conduct and Ethics

21**

Subsidiaries of Registrant

31.1*          

       Section 302 Certification of the Principal Executive Officer *

31.2 *                       Section 302 Certification of the Principal Financial Officer *

32.1 *                       Section 906 Certification of Principal Executive Officer *

32.2 *          

       Section 906 Certification of Principal Financial and Accounting Officer *



* Filed herewith


                 

                  SIGNATURES


  Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.  


                           Wind Works Power Corp.



Date:   May 17, 2010     

                            

   By: /s/ Ingo Stuckmann   

                               --------------------------------

                               Ingo Stuckmann

                               Chief Executive Officer



Date:  May 17, 2010    

  

By:/s/ W. Campbell Birge

---------------------------------

 

Chief Financial Officer