FORM 10-Q
[X] Quarterly Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
[ ] Transition report pursuant to Section 13
or 15(d) of the Securities Exchange Act of 1934
For the transition period from _______________ to _______________
| Commission File No. |
Name of Registrant, State of Incorporation, Address of Principal Executive Offices and Telephone No. |
IRS Employer Identification No. |
| 000-49965 | MGE Energy, Inc. (a Wisconsin Corporation) 133 South Blair Street Madison, Wisconsin 53703 (608) 252-7000 |
39-2040501 |
| 000-1125 | Madison Gas and Electric Company (a Wisconsin Corporation) 133 South Blair Street Madison, Wisconsin 53703 (608) 252-7000 |
39-0444025 |
| www.mge.com and/or www.mgeenergy.com (Web sites) |
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months and (2) have been subject to such filing requirements for the past 90 days: Yes [X] No [ ]
Indicate by check mark whether the registrants are an accelerated filer (as defined in Rule 12b-2 of the Exchange Act):
MGE Energy Yes [X] No [ ] Madison Gas and Electric Company Yes [ ] No [X]
| Number of shares outstanding of each class of common stock as of May 10, 2004 | |
| MGE Energy, Inc. | Common stock, $1.00 par value, 18,613,902 shares outstanding. |
| Madison Gas and Electric Company | Common stock, $1.00 par value, 17,347,889 shares outstanding (all of which are owned beneficially and of record by MGE Energy, Inc.). |
PART I. FINANCIAL INFORMATION.
Where to Find More Information
Condensed Consolidated Statements of Income and Comprehensive Income (unaudited)
Condensed Consolidated Statements of Cash Flows (unaudited)
Condensed Consolidated Balance Sheets (unaudited)
Madison Gas and Electric Company
Condensed Consolidated Statements of Income and Comprehensive Income (unaudited)
Condensed Consolidated Statements of Cash Flows (unaudited)
Condensed Consolidated Balance Sheets (unaudited)
MGE Energy, Inc. and Madison Gas and Electric Company
Notes to Condensed Consolidated Financial Statements (unaudited)
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations.
Item 3. Quantitative and Qualitative Disclosures About Market Risk.
Item 4. Controls and Procedures.
Item 6. Exhibits and Reports on Form 8-K.
Signatures - Madison Gas and Electric Company
PART I. FINANCIAL INFORMATION.
This combined Form 10-Q is being filed separately by MGE Energy, Inc. (MGE Energy) and Madison Gas and Electric Company (MGE). MGE is a wholly owned subsidiary of MGE Energy and represents a substantial portion of its assets, liabilities, revenues, expenses, and operations. Thus, all information contained in this report relates to, and is filed by, MGE Energy. Information that is specifically identified in this report as relating solely to MGE Energy, such as its financial statements and information relating to its nonregulated business, does not relate to, and is not filed by, MGE. MGE makes no representation as to that information.
This report, and other documents filed by MGE Energy and MGE with the Securities and Exchange Commission (SEC) from time to time, contain forward-looking statements that reflect management's current assumptions and estimates regarding future performance and economic conditions--especially as they relate to future load growth, revenues, expenses, capital expenditures, financial resources, regulatory matters, and the scope and expense associated with future environmental regulation. These forward-looking statements are made pursuant to the provisions of the Private Securities Litigation Reform Act of 1995. Both MGE Energy and MGE caution investors that these forward-looking statements are subject to known and unknown risks and uncertainties that may cause actual results to differ materially from those projected, expressed, or implied. Some of those risks and uncertainties include:
- Weather, which enters into the calculation of MGE's rates for service and which affects the demand for electricity and gas and the projected and actual need for electric generation capacity to serve customers.
- Economic and market conditions in MGE's service territory, which affect demand for electricity and gas and, consequently, our revenues and expenses as well as capital investment requirements to extend, improve, or reinforce the existing electricity and gas distribution systems.
- Magnitude and timing of capital expenditures, which affect capital needs, financing costs, and operating expenses.
- Regulatory environment in which we operate, which can affect the way in which we do business as well as the accounting treatment of expenses that we incur and our ability to continue carrying specified assets and liabilities on our books.
- Environmental regulation, which can affect the way in which we operate, our operating expenses, and our capital expenditures.
- Availability and cost of power supplies, which affect operating expenses and capital expenditure decisions with respect to sources of new generation.
- Completion of the West Campus Cogeneration Facility at the University of Wisconsin-Madison, which provides MGE Energy with an opportunity if construction is completed on or ahead of schedule, but exposes it to liquidated damages if construction is delayed or the facility fails to operate according to specifications.
Readers are cautioned not to place undue reliance on these forward-looking statements, which apply only as of the date of this report. MGE Energy and MGE undertake no obligation to publicly release any revision to these forward-looking statements to reflect events or circumstances after the date of this report.
Where to Find More Information
The public may read and copy any reports or other information that MGE Energy and MGE file with the SEC at the SEC's public reference room at 450 Fifth Street, NW, Washington, D.C. 20549. The public may obtain information on the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330. These documents are also available to the public from commercial document retrieval services, the Web site maintained by the SEC at http://www.sec.gov, MGE Energy's Web site at http://www.mgeenergy.com, and MGE's Web site at http://www.mge.com. Copies may be obtained from our Web sites free of charge.
Abbreviations, acronyms, and definitions used in the text and notes of this report are defined below.
| AEP | American Electric Power Company Inc. |
| AFUDC | allowance for funds used during construction |
| AMR | automated meter reading |
| ATC | American Transmission Company LLC |
| Alliant | Alliant Energy Corporation |
| Blount | Blount Station |
| BOCM | Banc One Capital Markets, Inc. |
| CPCN | Certificate of Public Convenience and Necessity |
| CO2 | carbon dioxide |
| Columbia | Columbia Energy Center |
| DNR | Wisconsin Department of Natural Resources |
| DOA | Wisconsin Department of Administration |
| EITF | Emerging Issues Task Force |
| EPA | U.S. Environmental Protection Agency |
| EPC | Engineering, Procurement, and Construction |
| FASB | Financial Accounting Standards Board |
| FERC | Federal Energy Regulatory Commission |
| FIN | Financial Interpretation No. |
| FTR | Financial Transmission Rights |
| GCIM | gas cost incentive mechanism |
| interconnection agreement | Generation-Transmission Interconnection Agreement |
| heating degree days | Measure of the extent to which the average daily temperature is below 65 degrees Fahrenheit, increasing demand for heating |
| Kewaunee | Kewaunee Nuclear Power Plant |
| kV | kilovolt |
| kWh | kilowatt-hour |
| LMP | Locational Marginal Pricing |
| MACT | Maximum available control technology |
| MGE Energy | MGE Energy, Inc. |
| MGE Construct | MGE Construct LLC |
| MGE Power West Campus | MGE Power West Campus, LLC |
| MGE | Madison Gas and Electric Company |
| MGE Power | MGE Power LLC |
| Midwest ISO | Midwest Independent System Operator |
| Moody's | Moody's Investors Service, Inc. |
| MW | megawatt |
| Nasdaq | The Nasdaq National Stock Market |
| NOx | nitrogen oxide |
| NOx SIP Call | Nitrogen oxide State Implementation Plan (federal rule 40 CFR Part 96, commonly known as the NOx SIP Call) |
| PGA clause | Purchased Gas Adjustment clause |
| PJM | PJM Interconnection, LLC (a regional transmission organization) |
| PSCW | Public Service Commission of Wisconsin |
| RTO | Regional Transmission Organization |
| S&P | Standard & Poor's Ratings Group, a division of McGraw-Hill Companies, Inc. |
| SEC | Securities and Exchange Commission |
| SFAS | Statement of Financial Accounting Standards (issued by the FASB) |
| SO2 | sulfur dioxide |
| the State | State of Wisconsin |
| UW | University of Wisconsin-Madison |
| VIE | Variable Interest Entity |
| WCCF | West Campus Cogeneration Facility |
| Working capital | current assets less current liabilities |
| WPL | Wisconsin Power and Light Company |
| WPSC | Wisconsin Public Service Corporation |
| Three Months Ended March 31, |
||||
| 2004 | 2003 | |||
| Revenues: | ||||
| Regulated utility operations | $134,599 | $128,494 | ||
| Nonregulated operations | 682 | - | ||
| Total Revenues | 135,281 | 128,494 | ||
| Expenses: | ||||
| Fuel for electric generation | 11,239 | 10,581 | ||
| Purchased power | 11,996 | 14,366 | ||
| Natural gas purchased | 51,715 | 50,813 | ||
| Other operations and maintenance | 27,135 | 26,530 | ||
| Depreciation and amortization | 6,061 | 5,712 | ||
| Other general taxes | 3,310 | 3,041 | ||
| Total Operating Expenses | 111,456 | 111,043 | ||
| Operating Income | 23,825 | 17,451 | ||
| Other income | 1,579 | 894 | ||
| Interest expense | (2,851) | (2,929) | ||
| Income before income taxes | 22,553 | 15,416 | ||
| Income tax provision | (8,909) | (6,041) | ||
| Net Income | $ 13,644 | $ 9,375 | ||
| Total Comprehensive Income | $ 13,644 | $ 9,375 | ||
| Earnings per Share of Common Stock (basic and diluted) | $0.74 | $0.53 | ||
| Dividends paid per share of common stock | $0.338 | $0.336 | ||
| Average Shares Outstanding (basic and diluted) | 18,426 | 17,633 | ||
The accompanying notes are an integral part of the above condensed consolidated financial statements.
| Three Months Ended March 31, |
|||
| 2004 | 2003 | ||
| Operating Activities: | |||
| Net income | $13,644 | $ 9,375 | |
| Items not affecting cash: | |||
| Depreciation and amortization | 6,061 | 5,712 | |
| Deferred income taxes | 430 | 855 | |
| Amortization of investment tax credits | (125) | (129) | |
| Other | (141) | (104) | |
| Equity in earnings of ATC | (1,096) | (888) | |
| Dividend income from ATC | 674 | 580 | |
| Prepayment to ATC | - | 5,000 | |
| Gain on the sale of property | 579 | - | |
| Changes in working capital, excluding cash equivalents, current long-term debt maturities, and short-term debt: |
|||
| Decrease in current assets | 24,215 | 8,085 | |
| (Decrease)/increase in current liabilities | (9,111) | 12,943 | |
| Other noncurrent items, net | 1,277 | 5,179 | |
| Cash Provided by Operating Activities | 36,407 | 46,608 | |
| Investing Activities: | |||
| Capital expenditures | (18,260) | (29,778) | |
| ATC - capital call | (891) | - | |
| Other | 695 | 16 | |
| Cash Used for Investing Activities | (18,456) | (29,762) | |
| Financing Activities: | |||
| Issuance of common stock | 6,810 | 4,006 | |
| Cash dividends on common stock | (6,239) | (5,923) | |
| Short-term debt (repayments)/borrowings, net | (10,500) | 138 | |
| Cash Used for Financing Activities | (9,929) | (1,779) | |
| Change in Cash and Cash Equivalents | 8,022 | 15,067 | |
| Cash and cash equivalents at beginning of period | 2,020 | 685 | |
| Cash and cash equivalents at end of period | $10,042 | $15,752 | |
The accompanying notes are an integral part of the above condensed consolidated financial statements.
| |
March 31, 2004 |
Dec. 31, 2003 |
|
| ASSETS | |||
| Current Assets: | |||
| Cash and cash equivalents | $ 10,042 | $ 2,020 | |
| Restricted cash | 2,613 | 3,364 | |
| Accounts receivable, less allowance for doubtful accounts of $2,844 and $2,735, respectively |
40,966 |
37,713 |
|
| Unbilled revenues | 16,969 | 21,644 | |
| Materials and supplies, at lower of average cost or market | 8,344 | 7,851 | |
| Fossil fuel, at lower of average cost or market | 4,578 | 5,054 | |
| Stored natural gas, at lower of average cost or market | 3,713 | 18,598 | |
| Prepaid taxes | 6,908 | 14,063 | |
| Other prepayments | 1,386 | 2,156 | |
| Total Current Assets | 95,519 | 112,463 | |
| Deferred Charges | 42,152 | 40,420 | |
| Property, Plant, and Equipment, Net | 454,563 | 449,022 | |
| Construction work in progress | 91,901 | 88,489 | |
| Total Property, Plant, and Equipment | 546,464 | 537,511 | |
| Other Property and Investments | 32,615 | 31,293 | |
| Total Assets | $716,750 | $721,687 | |
| LIABILITIES AND CAPITALIZATION | |||
| Current Liabilities: | |||
| Long-term debt - due within one year | $ 20,000 | $ 20,000 | |
| Short-term debt | 21,180 | 31,680 | |
| Accounts payable | 25,763 | 35,043 | |
| Accrued taxes | 4,235 | - | |
| Accrued interest | 3,533 | 2,968 | |
| Other current liabilities | 11,243 | 15,874 | |
| Total Current Liabilities | 85,954 | 105,565 | |
| Other Credits: | |||
| Deferred income taxes | 75,955 | 75,525 | |
| Investment tax credit - deferred | 4,766 | 4,891 | |
| Regulatory liabilities | 29,895 | 34,469 | |
| Other deferred liabilities | 40,678 | 35,963 | |
| Total Other Credits | 151,294 | 150,848 | |
| Capitalization: | |||
| Common stockholders' equity | 277,285 | 263,070 | |
| Long-term debt | 202,217 | 202,204 | |
| Total Capitalization | 479,502 | 465,274 | |
| Commitments and contingencies | - | - | |
| Total Liabilities and Capitalization | $716,750 | $721,687 |
The accompanying notes are an integral part of the above condensed consolidated financial statements.
| Three Months Ended March 31, |
|||
| 2004 | 2003 | ||
| Operating Revenues: | |||
| Regulated electric revenues | $59,911 | $56,099 | |
| Regulated gas revenues | 74,688 | 72,395 | |
| Total Operating Revenues | 134,599 | 128,494 | |
| Operating Expenses: | |||
| Fuel for electric generation | 11,239 | 10,581 | |
| Purchased power | 11,996 | 14,366 | |
| Natural gas purchased | 51,715 | 50,813 | |
| Other operations and maintenance | 27,064 | 26,515 | |
| Depreciation and amortization | 6,061 | 5,712 | |
| Other general taxes | 3,303 | 3,040 | |
| Income tax provision | 8,108 | 5,722 | |
| Total Operating Expenses | 119,486 | 116,749 | |
| Net Operating Income | 15,113 | 11,745 | |
| Other Income and Deductions: | |||
| AFUDC - equity funds | 141 | 104 | |
| Equity earnings in ATC | 1,096 | 888 | |
| Income tax provision | (325) | (324) | |
| Other deductions | (293) | (159) | |
| Total Other Income and Deductions | 619 | 509 | |
| Income before interest expense | 15,732 | 12,254 | |
| Interest Expense: | |||
| Interest on long-term debt | 2,815 | 2,893 | |
| Other interest | 38 | 32 | |
| AFUDC - borrowed funds | (56) | (54) | |
| Net Interest Expense | 2,797 | 2,871 | |
| Net Income | $12,935 | $ 9,383 | |
| Total Comprehensive Income | $12,935 | $ 9,383 | |
The accompanying notes are an integral part of the above condensed consolidated financial statements.
| Three Months Ended March 31, |
|||
| 2004 | 2003 | ||
| Operating Activities: | |||
| Net income | $12,935 | $ 9,383 | |
| Items not affecting cash: | |||
| Depreciation and amortization | 6,061 | 5,712 | |
| Deferred income taxes | 429 | 855 | |
| Amortization of investment tax credits | (125) | (129) | |
| AFUDC - equity funds | (141) | (104) | |
| Equity in earnings of ATC | (1,096) | (888) | |
| Dividend income from ATC | 674 | 580 | |
| Prepayment to ATC | - | 5,000 | |
| Changes in working capital, excluding cash equivalents, current long-term debt maturities, and short-term debt: |
|||
| Decrease in current assets | 25,085 | 7,827 | |
| (Decrease)/increase in current liabilities | (9,228) | 15,335 | |
| Other noncurrent items, net | 1,692 | 5,145 | |
| Cash Provided by Operating Activities | 36,286 | 48,716 | |
| Investing Activities: | |||
| Capital expenditures | (18,260) | (13,592) | |
| AFUDC - borrowed funds | (56) | (54) | |
| ATC - capital call | (891) | - | |
| Other | 751 | 70 | |
| Cash Used for Investing Activities | (18,456) | (13,576) | |
| Financing Activities: | |||
| Equity contributions from parent | 4,478 | 4,900 | |
| Cash dividends to parent | (6,171) | (11,804) | |
| Affiliate financing of WCCF | 7,669 | - | |
| Short-term debt repayments | (15,500) | (13,500) | |
| Other | (82) | - | |
| Cash Used for Financing Activities | (9,606) | (20,404) | |
| Change in Cash and Cash Equivalents | 8,224 | 14,736 | |
| Cash and cash equivalents at beginning of period | 450 | 218 | |
| Cash and cash equivalents at end of period | $ 8,674 | $14,954 | |
The accompanying notes are an integral part of the above condensed consolidated financial statements.
Madison Gas and Electric Company
| ASSETS |
March 31, 2004 |
Dec. 31, 2003 |
|
| Utility Plant (At Original Cost, in Service): | |||
| Electric | $582,050 | $573,326 | |
| Gas | 234,081 | 232,401 | |
| Gross plant in service | 816,131 | 805,727 | |
| Less accumulated provision for depreciation | (361,568) | (356,705) | |
| Net plant in service | 454,563 | 449,022 | |
| Construction work in progress | 91,901 | 88,489 | |
| Total Utility Plant | 546,464 | 537,511 | |
| Other property and investments | 2,727 | 2,679 | |
| Investment in ATC | 29,199 | 27,886 | |
| Total Other Property and Investments | 31,926 | 30,565 | |
| Current Assets: | |||
| Cash and cash equivalents | 8,674 | 450 | |
| Restricted cash | 2,613 | 3,364 | |
| Accounts receivable, less allowance for doubtful accounts of $2,844 and $2,735, respectively |
37,064 |
34,453 |
|
| Unbilled revenues | 16,969 | 21,644 | |
| Materials and supplies, at lower of average cost or market | 8,344 | 7,851 | |
| Fossil fuel, at lower of average cost or market | 4,578 | 5,054 | |
| Stored natural gas, at lower of average cost or market | 3,713 | 18,598 | |
| Prepaid taxes | 6,908 | 14,305 | |
| Other prepayments | 1,372 | 2,128 | |
| Total Current Assets | 90,235 | 107,847 | |
| Special billing projects | 17,042 | 14,574 | |
| Regulatory assets | 9,239 | 8,241 | |
| Other deferred charges | 15,807 | 17,334 | |
| Total Assets | $710,713 | $716,072 | |
| CAPITALIZATION AND LIABILITIES | |||
| Common stockholder equity | $268,060 | $256,819 | |
| Long-term debt | 202,217 | 202,204 | |
| Total Capitalization | 470,277 | 459,023 | |
| Current Liabilities: | |||
| Long-term debt - due within one year | 20,000 | 20,000 | |
| Short-term debt - commercial paper | - | 15,500 | |
| Accounts payable | 24,280 | 32,826 | |
| Affiliate payables | 26,587 | 18,918 | |
| Accrued taxes | 3,517 | - | |
| Accrued interest | 3,532 | 2,967 | |
| Other current liabilities | 10,894 | 15,658 | |
| Total Current Liabilities | 88,810 | 105,869 | |
| Other Credits: | |||
| Deferred income taxes | 76,035 | 75,606 | |
| Investment tax credit - deferred | 4,766 | 4,891 | |
| Regulatory liabilities | 29,895 | 34,469 | |
| Pension liability | 33,060 | 29,947 | |
| Other deferred liabilities | 7,870 | 6,267 | |
| Total Other Credits | 151,626 | 151,180 | |
| Commitments and contingencies | - | - | |
| Total Capitalization and Liabilities | $710,713 | $716,072 |
The accompanying notes are an integral part of the above condensed consolidated financial statements.
Basis of Presentation - MGE Energy and MGE.
This report is a combined report of MGE Energy and MGE. References in this report to "MGE Energy" are to MGE Energy, Inc. and its subsidiaries. References in this report to "MGE" are to Madison Gas and Electric Company.
The accompanying condensed consolidated financial statements as of March 31, 2004, and for the three months then ended are unaudited, but include all adjustments that MGE Energy and MGE management consider necessary for a fair presentation of their respective financial statements. All adjustments are of a normal, recurring nature except as otherwise disclosed. The year-end consolidated balance sheet information was derived from the audited balance sheet appearing in MGE Energy's and MGE's annual reports on Form 10-K for the year ended December 31, 2003, but does not include all disclosures required by generally accepted accounting principles. These notes should be read in conjunction with the financial statements and the notes on pages 55 through 84 of the 2003 Form 10-K. Certain amounts in prior periods' financial statements and related notes have been reclassified to conform to the 2004 presentation.
1. Basis of Consolidation - MGE.
MGE Power West Campus was created for the purpose of owning new generating assets including WCCF. These new generating assets are for the primary benefit of MGE's customers. The long-term lease arrangement between MGE and MGE Power West Campus creates a VIE relationship under FIN No. 46R (see Footnote 8c.). MGE is considered the primary beneficiary to this VIE because it will absorb a majority of the entity's expected losses, residual returns, or both. Therefore, MGE Power West Campus has been consolidated into MGE in accordance with FIN No. 46R as of December 31, 2003.
The consolidation of MGE Power West Campus resulted in an increase to construction work in progress of $56.2 million, an increase in long-term debt of $30.0 million, and affiliate payables of $26.6 million at March 31, 2004. As MGE Power West Campus had no significant operations, the consolidation of this entity by MGE did not have a material impact on the consolidated statements of income for the three months ended March 31, 2004.
2. Per-Share Amounts - MGE Energy.
Earnings per share of MGE Energy common stock are computed on the basis of the weighted average of the daily number of shares outstanding in accordance with SFAS No. 128. For the three months ended March 31, 2004 and 2003, respectively, there were 18,426,065 and 17,633,459 shares outstanding. Dividends declared and paid per share of common stock for the same three-month periods were $0.338 and $0.336, respectively.
3. Rate Matters - MGE.
On May 5, 2004, MGE filed with the PSCW a request to increase electric rates by 8.5% and decrease gas rates by 1.0%. The electric rate request includes costs of commercial operation of WCCF and increased transmission expenses. The PSCW is conducting its audit during the three-month period ended July 2004. An order is expected in the beginning of 2005.
Under the fuel rules, if electric fuel costs are outside a 3.0% range higher or lower than the level set by the PSCW, MGE can apply for a fuel surcharge or may be required to return a fuel credit to its customers. MGE is allowed to retain fuel savings 3% under and may collect from customers fuel costs 3% over the level set in its most recent order. During 2003, MGE submitted an application for a fuel cost credit. On August 14, 2003, the PSCW approved an interim fuel cost credit of $.00099 per kWh. The PSCW also required a full review of the actual and forecasted costs for 2003 with MGE's fuel rates subject to refund. The fuel credit began on August 14, 2003, and ended on January 13, 2004. The fuel credit from January 1 through January 13, 2004, totaled $0.4 million. The total fuel credit through March 31, 2004, totaled $4.4 million, of which $1.3 million represents the interim fuel credit and $3.1 million is the estimate for the additional fuel credit to be refunded to customers. The additional fuel credit of $3.1 million was credited to customers in the first quarter of 2004.
On January 14, 2004, the PSCW authorized MGE to increase annual revenues by $12.8 million. The increase covers rising fuel costs for electric generation and addresses increased system demands for both gas and electric.
Effective March 1, 2003, the PSCW authorized MGE to increase annual revenues by $27.1 million. The increase covered rising fuel costs and addressed increased system demands and costs to complete a new AMR project.
Effective October 24, 2002, the PSCW authorized an electric rate surcharge of $4.5 million to recover deferred costs associated with forming ATC and ongoing incremental transmission costs during 2001 and 2002. The surcharge was in effect for a twelve-month period ended October 23, 2003 (see Footnote 10 for additional information on ATC).
4. Capitalization Matters - MGE Energy.
On August 15, 2003, MGE Energy entered into a Distribution Agreement (Agreement) with BOCM. Under the terms of this Agreement, MGE Energy may periodically offer and sell up to 1,600,000 shares of its common stock through BOCM as its sales agent or to BOCM as principal. The sales will be made pursuant to a shelf registration statement MGE Energy filed with the SEC and has been declared effective.
Under the Agreement, MGE Energy has sold 80,000 shares of its common stock during the three months ended March 31, 2004, for net proceeds of $2.4 million.
MGE Energy also issues new shares of its common stock through its Dividend Reinvestment and Direct Stock Purchase Plan. For the three months ended March 31, 2004, MGE Energy has issued 145,000 new shares of common stock under this plan for net proceeds of $4.4 million.
5. Supplemental Cash Flow Information - MGE Energy and MGE.
Cash payments for interest, net of amounts capitalized, and cash payments/receipts for income taxes were as follows:
| MGE Energy (In thousands) |
Three Months Ended March 31, |
||
|
2004
|
2003
|
||
| Interest paid, net of amounts capitalized |
$2,368
|
$2,395
|
|
| Income taxes paid |
-
|
750
|
|
| Income taxes refunded |
-
|
3,159
|
|
| MGE (In thousands) |
Three Months Ended March 31, |
||
|
2004
|
2003
|
||
| Interest paid, net of amounts capitalized |
$2,283
|
$2,395
|
|
| Income taxes paid |
-
|
750
|
|
| Income taxes refunded |
-
|
3,159
|
|
6. Property, Plant, and Equipment - MGE Energy.
MGE Energy, through its subsidiary MGE Power West Campus, calculates capitalized interest in accordance with SFAS No. 34, Capitalizing Interest Costs, on construction projects for periods where financing is provided by MGE Energy through interim debt. The interest rate capitalized is based upon the monthly short-term borrowing rate MGE Energy incurs for such funds and the interest rate related to MGE Power West Campus' long-term debt. For the three months ended March 31, 2004, MGE Energy recorded $0.5 million in capitalized interest related to the cogeneration facility being constructed on the west campus of the UW.
7. Pension and Postretirement Plans - MGE.
MGE has elected to recognize the cost of its transition obligation (the accumulated postretirement benefit obligation as of January 1, 1993) by amortizing it on a straight-line basis over 20 years.
| Three Months Ended March 31, | |||||||
| Pension Benefits | Postretirement Benefits | ||||||
| (In thousands) |
2004
|
2003
|
2004
|
2003
|
|||
| Components of net periodic benefit cost: | |||||||
| Service cost | $1,264 | $ 816 | $ 519 | $ 430 | |||
| Interest cost | 2,680 | 1,915 | 868 | 774 | |||
| Expected return on assets | (2,805) | (1,677) | (208) | (149) | |||
| Amortization of: | |||||||
| Transition obligation | 76 | 25 | 107 | 104 | |||
| Prior service cost | 128 | 115 | 47 | 45 | |||
| Actuarial gain | 263 | 345 | 302 | 275 | |||
| SFAS 87 cost | $1,606 | $1,539 | $1,635 | $1,479 | |||
| SFAS 88 charges: | |||||||
| Special termination benefit | - | 67 | - | - | |||
| Net periodic benefit cost | $1,606 | $1,606 | $1,635 | $1,479 | |||
8. Adoption of Accounting Principles and Recently Issued Accounting Pronouncements
- MGE Energy and MGE.
a. SFAS No. 143.
In 2001, the FASB issued SFAS No. 143, Accounting for Asset Retirement Obligations. SFAS No. 143 provides accounting requirements for retirement obligations associated with tangible long-lived assets. MGE Energy and MGE were required to adopt SFAS No. 143 as of January 1, 2003. Retirement obligations associated with long-lived assets included within the scope of SFAS No. 143 are those for which there is a legal obligation under existing or enacted law, statute, written or oral contract, or by legal construction under the doctrine of promissory estoppel.
Effective January 1, 2003, MGE recorded an obligation for the fair value of its legal liability for asset retirement, obligations associated with removing an electric substation, a combustion turbine generating unit, wind generating facilities, and the photovoltaic generating facilities, all of which are located on property not owned by MGE. At March 31, 2004, this liability is estimated at $1.4 million and included in other deferred liabilities.
At the point the liability for asset retirement is incurred, SFAS No. 143 requires capitalization of the costs to the related asset, property, plant, and equipment, net. For asset retirement obligations existing at the time of adoption, the statement requires capitalization of costs at the level that existed at the point of incurring the liability. These capitalized costs are depreciated over the same period as the related property. At the date of adoption, the depreciation expense for past periods was recorded as a regulatory asset in accordance with SFAS No. 71 because MGE believes the PSCW will allow it to recover these costs in future rates. Current depreciation of the asset retirement cost is also being deferred as a regulatory asset under SFAS No. 71. MGE applies SFAS No. 71 and recognizes regulatory assets or liabilities for the timing differences between when we recover legal asset retirement obligations in rates and when MGE would recognize these costs under SFAS No. 143.
The initial liability is accreted to its present value each period. MGE defers this accretion as a regulatory asset based on its determination that these costs can be collected from customers.
MGE also may have asset retirement obligations relating to various assets, such as combustion turbine generating units, small distributed generating units, aboveground and underground storage tanks, facilities located at Columbia (co-owned with Alliant and WPSC), and certain electric and gas distribution facilities. These facilities are generally located on property owned by third parties, on which MGE is permitted to operate by lease, permit, easement, license, or service agreement, but also include some facilities located on property owned by MGE. The asset retirement obligations associated with these facilities cannot be reasonably determined due to the indeterminate life of the related assets.
The following table shows costs as of December 31, 2003, and changes to the asset retirement obligation and accumulated depreciation during the three months ended March 31, 2004.
|
(In thousands) |
(a)
Original Asset |
(b)
Accumulated |
(c) (a + b) Asset Retirement Obligation |
(d)
Accumulated | |||
| Balance, December 31, 2003 | $686 | $675 | $1,361 | $175 | |||
| Changes through March 31, 2004 | - | 21 | 21 | 6 | |||
| Balance, March 31, 2004 | $686 | $696 | $1,382 | $181 |
As of March 31, 2004, MGE's regulatory asset, included in deferred charges, is the total accumulated accretion ($696,000) and accumulated depreciation ($181,000) or $877,000.
MGE made a significant reclassification related to the reporting of accumulated costs of removal that are non-SFAS 143 obligations. The reclassification removed the costs from accumulated depreciation and recorded them as a regulatory liability.
b. FIN No. 45.
In November 2002, the FASB issued FIN No. 45, Guarantor's Accounting and Disclosure Requirements for Guarantees, Including Indirect Guarantees of Indebtedness of Others. This interpretation provides the disclosures to be made by a guarantor in interim and annual financial statements about obligations under certain guarantees. The interpretation also clarifies that a guarantor is required to recognize, at the inception of a guarantee, a liability for the fair value of the obligation.
MGE makes available to qualifying customers a financing program for the purchase and installation of energy-related equipment that will provide more efficient use of utility service at the customer's property. MGE is party to a chattel paper purchase agreement with a financial institution under which it can sell or finance an undivided interest with recourse, in up to $7.5 million of the financing program receivables, until February 28, 2005. Loans totaling less than $0.1 million have been sold to the financial institution during 2004. The liability for the fair value of the obligation associated with these loans is not material.
MGE would be required to perform under the guarantee if the customer defaulted on its loan. The energy-related equipment installed at the customer sites is used to secure the customer loans. The length of the MGE guarantee to the financial institution varies from one to ten years depending on the term of the customer loan. Principal payments for the next five years on the loans are $0.7 million in 2004, $0.9 million in 2005, and $0.8 million in 2006, 2007, and 2008.
c. FIN No. 46R.
In January 2003, the FASB issued FIN No. 46, Consolidation of Variable Interest Entities - An Interpretation of ARB No. 51. In December 2003, the FASB issued the updated and final interpretation FIN No. 46R. FIN No. 46R requires that an equity investor in a VIE have significant equity at risk (generally a minimum of 10%, which is an increase from 3% required under the previous guidance) and hold a controlling interest, evidenced by voting rights, and absorb a majority of the entity's expected losses, receive a majority of the entity's expected returns, or both. If the equity investor is unable to evidence these characteristics, the entity that retains these ownership characteristics will be required to consolidate the VIE as the primary beneficiary. FIN No. 46 was applicable immediately to VIEs created or obtained after January 31, 2003. FIN No. 46R was effective on December 31, 2003, for interests in entities that were previously considered special purpose entities under then existing authoritative guidance.
MGE Power West Campus is a VIE pursuant to FIN No. 46R, as the equity investment at December 31, 2003, was not sufficient to permit the entity to finance its activities without additional support. MGE concluded a VIE relationship exists due to the long-term lease arrangement between MGE and MGE Power West Campus. MGE Power West Campus will lease a major portion of its assets, a power plant, to MGE, pursuant to this leasing arrangement and MGE will absorb a majority of the expected losses, residual, or both. The VIE was consolidated into MGE as of December 31, 2003.
d. SFAS No. 149.
On April 30, 2003, the FASB issued SFAS No. 149, Amendment of SFAS No. 133 on Derivative Instruments and Hedging Activities. This statement amends and clarifies accounting for derivative instruments including certain derivative instruments embedded in other contracts for hedging activities. SFAS No. 149 amends certain other existing pronouncements. The amendments will result in a more consistent reporting of contracts that are derivatives in their entirety or that contain embedded derivatives that warrant separate accounting. SFAS No. 149 is effective for contracts entered into or modified after June 30, 2003. Adoption of this statement did not have a material impact on the consolidated financial statements.
e. SFAS No. 150.
In May 2003, the FASB issued SFAS No. 150, Accounting for Certain Financial Instruments with Characteristics of both Liabilities and Equity. This statement establishes standards for how an issuer classifies and measures certain financial instruments with characteristics of both liabilities and equity. It requires that an issuer classify a financial instrument that is within the scope of SFAS No. 150 as a liability (or an asset in some circumstances). Many of those instruments were previously classified as equity. SFAS No. 150 is effective for interim periods beginning after June 15, 2003, for financial instruments entered into or modified after May 31. 2003, except for mandatorily redeemable financial instruments of nonpublic entities which will be effective for interim periods beginning after December 15, 2003. Adoption of this statement did not have a material impact on the consolidated financial statements.
f. EITF 03-11.
The EITF of the FASB reached a consensus on Issue No. 03-11, "Reporting Realized Gains and Losses on Derivative Instruments That are Subject to FASB Statement No. 133" and "Not Held for Trading Purposes" as Defined in Issue No. 02-3. Issue No. 03-11 specifies that whether realized gains and losses on physically settled derivative contracts not held for trading purposes should be reported in the income statement on a gross or net basis is a matter of judgement that depends on the relevant facts and circumstances. EITF No. 03-11 had no impact on the consolidated financial statements.
9. West Campus Cogeneration Facility - MGE Energy and MGE.
MGE Energy, through MGE Power, MGE Power West Campus, and MGE Construct, is building a natural gas-fired cogeneration facility on the UW campus. As planned, the facility will have capacity to produce 20,000 tons of chilled water, 500,000 pounds per hour of steam, and approximately 150 MW of electricity. The UW and MGE Power West Campus will jointly own the facility. The UW will own a controlling interest in the chilled-water and steam plants, which will be used to meet the growing needs for air-conditioning and steam-heat capacity for the UW campus. MGE Power West Campus will own a controlling interest in the electric generation plant, which will be used to provide electricity to MGE's customers. MGE will lease the assets owned by MGE Power West Campus and will operate the entire facility. MGE Construct will be responsible for the construction of the facility. A PSCW order approving the issuance of a CPCN for the WCCF was received on October 9, 2003. The ownership, construction, and operation of the facility have received various other state approvals, and the parties have entered into definitive agreements including a construction agreement. Construction on the project commenced in October 2003, and it is estimated that the project will be completed by spring 2005. In the first quarter of 2004, MGE Construct received a service fee of $0.7 million (pretax) from the State in relation to its role as EPC contractor for WCCF. The total fee of $5.0 million will be recognized as services are rendered and will be collected over a 22-month period.
Pursuant to the WCCF lease, MGE Power West Campus began billing MGE for carrying costs on WCCF. The carrying costs billed to MGE started on January 29, 2004, the date MGE received approval from the PSCW to defer these costs, and will continue through construction of the project. Carrying costs totaled $1.1 million in the first quarter of 2004.
MGE Energy, MGE Power West Campus, and MGE Construct have assumed certain risks related to some of the executed agreements. In the EPC Agreement, MGE Power West Campus is responsible for cost overruns and MGE Construct is responsible for the construction process of the entire facility, including paying liquidated damages relating to failure to achieve the Mechanical Completion Date Guarantee and/or the Acceptance Test Capacity Guarantee. MGE Energy is the guarantor of MGE Construct's obligations under the EPC Agreement.
The expected cost to construct WCCF is approximately $185 million in total, of which $105 million is MGE Power West Campus' estimated portion. As of March 31, 2004, MGE Power West Campus had incurred $56.2 million of costs on the project, which is reflected in construction work in progress on MGE Energy's consolidated balance sheets. These costs represent amounts paid for equipment as well as other costs associated in construction of the facility.
10. ATC - MGE.
As of March 31, 2004, MGE holds a 5% interest in ATC and accounts for the investment under the equity method of accounting due to its ability to exercise significant control over management activities. MGE has a seat on the board of directors and owns 20% of the voting stock of ATC Management, Inc., which manages and operates ATC. MGE records as equity in earnings of the investee its share of ATC's earnings, amortization of the SFAS No. 109 regulatory liability, and deferred investment tax credits related to the transmission assets transferred to ATC. During the first quarter of 2004, MGE recorded equity earnings from its investment in ATC of $1.1 million (pretax). MGE recorded transmission expense from ATC of $3.3 million for the three months ended March 31, 2004.
On November 21, 2002, MGE and ATC entered into an interconnection agreement related to transmission system upgrades for WCCF. MGE issued to ATC a "Notice to Proceed for the Procurement of the Equipment" for the system upgrades. MGE has advanced funds for construction to ATC for transmission equipment related to WCCF in the amounts of $1.6 million for the three months ended March 31, 2004. The total advanced to ATC for this project is $12.1 million as of March 31, 2004. MGE will be reimbursed by ATC upon completion of the project.
MGE has agreed to make an additional capital commitment to ATC in 2004. In the first quarter of 2004, MGE made its first of four capital installments to ATC of $0.9 million and has committed to a total of $3.6 million.
11. Segment Information - MGE Energy and MGE.
MGE Energy and MGE operate in three business segments: electric utility operations, gas utility operations, and nonregulated energy operations. The electric utility business generates and distributes electricity and contracts for transmission service. The gas utility business purchases and distributes natural gas and contracts for the transportation of natural gas.
The nonregulated energy operations are conducted through MGE Energy; MAGAEL, LLC; Central Wisconsin Development Corporation; MGE Power; MGE Power West Campus; and MGE Construct. These subsidiaries have been formed to own and construct new electric generating capacity and are currently undertaking the construction of WCCF, a 150-MW cogeneration plant on the UW campus. Construction on this facility started in the fall of 2003. The table below shows key information about all three of these segments, including the distribution of net assets, for the three months ended March 31, 2003 and 2004.
MGE's general corporate expenses include the cost of executive management, corporate accounting and finance, information technology, risk management, human resources and legal functions, and employee benefits that are allocated to electric and gas based on formulas prescribed by the PSCW. Identifiable assets are those used in MGE's operations in each segment. Corporate assets consist primarily of cash and cash equivalents and deferred taxes.
The following table shows segment information for MGE Energy's operations:
| MGE Energy Three Months Ended March 31, 2004 |
Electric |
Gas |
Nonregulated |
Total | |||
| Gross operating revenues | $ 60,022 | $ 77,680 | $ 682 | $ 138,384 | |||
| Interdepartmental revenues | (111) | (2,992) | - | (3,103) | |||
| Depreciation and amortization | (4,256) | (1,805) | - | (6,061) | |||
| Other operating expenses | (48,506) | (64,919) | (879) | (114,304) | |||
| Operating income | $ 7,149 | $ 7,964 | $(197) | $ 14,916 | |||
| Three Months Ended March 31, 2003 | |||||||
| Gross operating revenues | $ 56,206 | $ 74,400 | $ - | $ 130,606 | |||
| Interdepartmental revenues | (107) | (2,005) | - | (2,112) | |||
| Depreciation and amortization | (4,008) | (1,704) | - | (5,712) | |||
| Other operating expenses | (48,009) | (63,028) | (335) | (111,372) | |||
| Operating income | $ 4,082 | $ 7,663 | $(335) | $ 11,410 | |||
The electric and gas utility operations segments represent all of the revenue-generating segments for MGE and a majority of the revenue for MGE Energy. The following table shows segment information for MGE's operations:
| MGE Three Months Ended March 31, 2004 |
Electric |
Gas |
Nonregulated |
Total | |||
| Gross operating revenues | $ 60,022 | $ 77,680 | $ - | $ 137,702 | |||
| Interdepartmental revenues | (111) | (2,992) | - | (3,103) | |||
| Depreciation and amortization | (4,256) | (1,805) | - | (6,061) | |||
| Other operating expenses | (48,506) | (64,919) | - | (113,425) | |||
| Operating income | $ 7,149 | $ 7,964 | $ - | $ 15,113 | |||
| Three Months Ended March 31, 2003 | |||||||
| Gross operating revenues | $ 56,206 | $ 74,400 | $ - | $ 130,606 | |||
| Interdepartmental revenues | (107) | (2,005) | - | (2,112) | |||
| Depreciation and amortization | (4,008) | (1,704) | - | (5,712) | |||
| Other operating expenses | (48,009) | (63,028) | - | (111,037) | |||
| Operating income | $ 4,082 | $ 7,663 | $ - | $ 11,745 |
| Three Months Ended March 31, | |||
| MGE Energy | 2004 | 2003 | |
| Electric operating income | $ 7,149 | $4,082 | |
| Gas operating income | 7,964 | 7,663 | |
| Nonregulated operating loss | (197) | (335) | |
| Consolidated operating income | 14,916 | 11,410 | |
| Other income, net | 1,579 | 894 | |
| Interest expense | (2,851) | (2,929) | |
| Net income | $13,644 | $9,375 | |
| MGE | |||
| Electric operating income | $ 7,149 | $4,082 | |
| Gas operating income | 7,964 | 7,663 | |
| Nonregulated operating income | - | - | |
| Consolidated operating income | 15,113 | 11,745 | |
| Equity earnings in ATC | 1,096 | 888 | |
| Other income and deductions | (477) | (379) | |
| Interest expense, net | (2,797) | (2,871) | |
| Net income | $12,935 | $9,383 | |
MGE Energy |
Electric |
Gas |
Assets not Allocated |
Non- regulated |
Total |
||||
| Assets: | |||||||||
| March 31, 2004 | $448,433 | $147,674 | $57,760 | $62,883 | $716,750 | ||||
| December 31, 2003 | 445,728 | 165,577 | 55,839 | 54,543 | 721,687 | ||||
| Capital Expenditures: | |||||||||
| Three Months ended March 31, 2004 | 9,126 | 1,566 | - | 7,568 | 18,260 | ||||
| Year ended December 31, 2003 | 40,833 | 13,875 | - | 28,262 | 82,970 | ||||
| MGE | |||||||||
| Assets: | |||||||||
| March 31, 2004 | $448,433 | $147,674 | $57,760 | $56,846 | $710,713 | ||||
| December 31, 2003 | 445,728 | 165,577 | 55,839 | 48,928 | 716,072 | ||||
| Capital Expenditures: | |||||||||
| Three Months ended March 31, 2004 | 9,126 | 1,566 | - | 7,568 | 18,260 | ||||
| Year ended December 31, 2003 | 40,833 | 13,875 | - | 28,262 | 82,970 |
12. Commitments and Contingencies - MGE Energy and MGE.
a. Coal Contracts.
MGE has no coal contracts that contain demand obligations for Blount. Fuel procurement for MGE's jointly owned Columbia is handled by Alliant, the operating company. If any demand obligations must be paid under these contracts, management believes such obligations would be considered costs of service and recoverable in rates.
b. Purchased Power Contracts.
MGE has several purchased power and transmission contracts to help meet future electric supply requirements. As of March 31,2004, MGE's total commitments for purchased power contracts for capacity and transmission are estimated to be $16.8 million in 2004, $14.5 million in 2005, $14.6 million in 2006, $11.2 million in 2007, and $9.6 million in 2008. Management expects to recover these costs in future customer rates.
c. Natural Gas Transportation and Storage Contracts.
MGE's natural gas transportation and storage contracts require fixed monthly payments for firm pipeline transportation and storage capacity. The pricing components of the fixed monthly payments for the transportation and storage contracts are established by FERC but may be subject to change. These payments are estimated to be $15.0 million in 2004, $14.0 million in 2005, $14.5 million in 2006, $14.4 million in 2007, and $14.2 million in 2008. Management expects to recover these costs in future customer rates.
d. Environmental.
MGE is subject to local, state, and federal regulations concerning air quality, water quality, and solid waste disposal. Those regulations affect the manner in which MGE conducts its operations, the costs of those operations, as well as some capital and operating expenditures. It can also affect the siting, timing, and cost of new projects or other significant actions affecting the environment. MGE believes it has met the requirements of current environmental regulations. MGE is not able to predict the direction of future regulations or if compliance with any such regulations will involve additional expenditures for pollution control equipment, plant modifications, or curtailment of operations. Such actions could reduce capacity or efficiency at existing plants or delay the construction and operation of future generating facilities.
The EPA and DNR regulate pollution and environmental control matters at MGE's electric generating plants. The DNR has primary jurisdiction over air and water quality as well as solid and hazardous waste standards.
The ongoing issue of global warming could result in significant costs to reduce CO2 emissions. MGE does not yet know the amounts of these expenditures or the period of time over which they may be required.
The National Environmental Policy Act and the Wisconsin Environmental Policy Act require MGE to conduct a complete environmental review and issue a detailed environmental impact statement before obtaining necessary authorizations or permits from regulatory agencies for certain projects. This may apply to new projects such as generating plants, electric transmission lines, or other major actions that could significantly affect the environment.
Air quality
Eight-hour ozone standard. In 1997, the EPA promulgated a new eight-hour ozone ambient air-quality standard. In April 2004, EPA designated Dane County as in attainment with that eight-hour ozone standard based upon data currently showing Dane County air quality to be in attainment with the eight-hour ozone standard. This designation could be revised based upon future air-quality data.
Dane County ozone levels have been increasing over time. MGE is working with the DNR and other Dane County sources to make voluntary reductions of ozone precursor emissions and prevent the county from being classified as a nonattainment area. If Dane County were classified as a nonattainment area, MGE facilities in Dane County may need to meet new limits for ozone precursor emissions.
Proposed and final MACT standards. Section 112 of the 1990 Clean Air Act Amendments requires the EPA to develop standards to control major sources of hazardous air pollutants to levels generally consistent with the lowest-emitting facilities in similar source categories. MGE operates several sources that may be subject to MACT standards including electric steam generating units; combustion turbines; reciprocating internal combustion engines; and industrial, commercial, and institutional boilers. All sources, except Blount and Columbia coal-fired units, are expected to be exempt from implementing additional emission-control strategies. WCCF is subject to the MACT standard for combustion turbines, but no additional controls are anticipated other than those being constructed. The EPA is expected to finalize standards for electric-steam generating units in 2004. It is expected that MGE will be required to comply with new mercury limits by the current proposal date of December 2007. Complying with the MACT standards would likely increase capital expenditures and operating and maintenance expenses. Because the rules are still in the process of being developed, it is not possible to determine exactly what impact this compliance would have for MGE's generation facilities.
NOx SIP Call. On October 27, 1998, the EPA issued the "NOx SIP Call" rule that imposed a NOx emission budget for emission sources in Wisconsin. The NOx SIP Call was premised upon two theories: the downwind contribution of Wisconsin air emissions to existing one-hour ozone nonattainment areas and the downwind contribution of Wisconsin air emissions to potential future eight-hour nonattainment areas.
On March 2, 2000, the Court of Appeals for the District of Columbia held that the EPA "acted unlawfully by including Wisconsin in the [NOx] SIP Call" for purposes of the State's alleged impacts to downwind one-hour ozone nonattainment areas. However, that portion of the rule concerning Wisconsin's alleged impacts on downwind, eight-hour ozone nonattainment areas has been stayed. If that stay is lifted and that portion of the NOx SIP Call concerning eight-hour ozone nonattainment areas is upheld, the resulting NOx emission budget for Wisconsin could potentially affect the level of permissible NOx emissions from Blount, Columbia, and WCCF. The new NOx limits could increase capital expenditures and operating and maintenance expenses at those facilities.
Interstate Air Quality Rule. In December 2003, EPA proposed an Interstate Air Quality rule that would reduce emissions of SO2 and NOx in 29 eastern states and the District of Columbia in two phases. SO2 emissions would be reduced by 3.6 million tons in 2010 (approximately 40% below current levels) and by another 2 million tons per year when the rules are fully implemented (approximately 70% below current levels). Emissions of NOx would be cut by 1.5 million tons in 2010 (approximately 55% below current levels) and 1.8 million tons annually in 2015 (approximately 65% below current levels). The EPA is expected to finalize the rule by the end of 2005. It is expected that MGE will be required to comply with NOx and particulate limits by 2010. Complying with the rule would likely increase capital expenditures and operating and maintenance expenses at Blount and Columbia.
Columbia. In December 2000, February 2001, June 2002, and January 2003, Alliant received Requests for Information from the EPA seeking information concerning Columbia's compliance with the Clean Air Act. The requests appear to be part of an EPA initiative to assess the regulatory consequences of past investments in utility generation, energy efficiency, maintenance, and environmental protection within the utility sector. WPL, the plant operator, has responded to all requests, but MGE has not been informed of any response from the EPA. The plant operator has not informed MGE of any definitive increase in capital expenditures or operating and maintenance expenses arising from the EPA's inquiry.
Water quality
MGE is subject to water quality regulations issued by the DNR. These regulations include categorical-effluent discharge standards and general water quality standards. The regulations limit discharges from MGE's plants into Lake Monona and other Wisconsin waters.
The categorical-effluent discharge standards require each discharger to use effluent-treatment processes equivalent to categorical "best practicable" or "best available" technologies under compliance schedules established under the Federal Water Pollution Control Act. The DNR has published categorical regulations for chemical and thermal discharges from electric-steam generating plants.
In February 2003, Columbia received a Notice of Violation from the DNR for exceeding limits in its Wisconsin Pollutant Discharge Elimination System permit. MGE owns a minority interest in Columbia. That matter was referred to the Wisconsin Department of Justice for prosecution, and on March 25, 2004, the State filed a complaint in state court against the operator, seeking forfeitures, penalties, and injunctive relief. In addition, the plant operator has been named in a Clean Water Act citizen suit action alleging similar violations. MGE is not the plant operator and is not named as a party in either court action. The Columbia plant operator has been working with the DNR to resolve the allegations raised in these proceedings. Resolving these issues may require additional capital expenditures to install and implement new treatment techniques. While it is possible that a court may impose a civil penalty in these proceedings, the operator believes it can resolve these issues in a manner that will not have a material adverse effect on the operator's or co-owners' financial conditions or results of operations.
On February 16, 2004, EPA signed a rule establishing performance standards for cooling water intake structures at large power plants. The rule applies to facilities that can withdraw at least 50 million gallons per day of water and use 25% or more of that withdrawal for cooling. The EPA water rule may have an impact on MGE's Blount plant that may result in additional capital expenditures. MGE cannot predict at this time what the impact would be.
Solid waste
MGE is listed as a potentially responsible party for a site the EPA has placed on the national priorities Superfund list. The Lenz Oil site in Lemont, Illinois, was used for storing and processing waste oil for several years. This site requires clean up under the Comprehensive Environmental Response, Compensation and Liability Act. A group of companies, including MGE, is currently working on cleaning up the site.
Management believes that its share of the final cleanup costs will not result in any materially adverse effects on MGE's operations, cash flows, or financial position. Insurance may cover a portion of the cleanup costs. Management believes that the cleanup costs not covered by insurance will be recovered in current and future rates. At December 31, 2003, MGE accrued a $0.1 million liability for this matter.
As a result of the Blount 69-kV transmission substation expansion, coal tar-contaminated soil and debris within the excavation zone are being removed and disposed of in accordance with a DNR-approved "Removal Action Work Plan." MGE estimates cleanup costs for this site will be $1.1 million. MGE has already paid $0.7 million in expenses related to this cleanup and has a $0.4 million liability remaining with an offsetting regulatory asset (deferred charge). MGE expects to recover cleanup costs in future rates. Carrying costs associated with the cleanup expenditures will not be recoverable.
Environmental Cooperative Agreement
On September 26, 2002, MGE and the DNR signed an Environmental Cooperative Agreement under which MGE committed to work toward superior environmental performance at its Blount plant. Among other things, the five-year agreement requires MGE to evaluate combustion efficiency improvements, enhance new pollution control on Boiler 8, increase use of alternative fuels, attempt to increase beneficial reuse of fly ash and bottom ash, study cogeneration possibilities, and upgrade MGE's environmental management system to be consistent with ISO 14001 Standards. Implementing these and other actions required by the agreement will increase capital expenditures and operating and maintenance expenses over the next five years.
As part of the agreement, MGE conducted a voluntary audit of Blount's compliance with various environmental laws. The auditors identified several conformance exceptions which were addressed and disclosed pursuant to a state statute that provides for qualified civil enforcement immunity. MGE believes that it has adequately responded to the audit's findings and does not anticipate any further action by state regulators.
e. Chattel Paper Agreement - MGE.
MGE makes available to qualifying customers a financing program for purchasing and installing energy-related equipment that will provide more efficient use of utility service at the customer's property. MGE is party to a chattel paper purchase agreement with a financial institution under which it can sell or finance an undivided interest with recourse, in up to $7.5 million of the financing program receivables, until February 28, 2005. At March 31, 2004, MGE had sold an outstanding $6.1 million interest in these receivables, which MGE accounted for as a sale under SFAS No. 140, Accounting for Transfers and Servicing of Financial Assets and Extinguishment of Liabilities - A Replacement of FASB Statement No. 125. MGE retains the servicing responsibility for these receivables.
MGE maintains responsibility for collecting and remitting loan payments from customers to the financial institution and does not retain any interest in the assets sold to the financial institution. As of March 31, 2004, MGE has recorded a servicing asset of $0.2 million.
The loan assets are sold to the financial institution at cost, which approximates fair value in view of their market rates of interest. During the first quarter of 2004 and 2003, MGE received approximately $0.1 million and $0.3 million, respectively, of cash from the financial institution for the sale of loan assets. During those same periods, payments of $0.5 million and $0.6 million, respectively, were made by MGE to the financial institution.
f. West Campus Cogeneration Facility.
Petition for Judicial Review
On November 6, 2003, Friends of Responsible Energy (FORE), an unincorporated citizen association, filed a petition with the Dane County, Wisconsin, Circuit Court seeking judicial review of various decisions made by the PSCW, the DNR, the UW, and the Wisconsin Department of Administration in connection with the WCCF. Those decisions include the grant of a CPCN by the PSCW and various environmental determinations made by the governmental parties. FORE alleges that those decisions were arbitrary, capricious, and contrary to law and seeks to have them set aside or remanded for further review.
MGE Energy, along with MGE and MGE Power West Campus, has intervened as a party to the proceeding. MGE Energy believes the suit is not likely to cause any material adverse change in the WCCF or its construction schedule.
WCCF Purchase Commitments
MGE has entered into various contracts for the purchase of gas and steam turbines and miscellaneous equipment for the WCCF. These contracts have been assigned or are in the process of being assigned to MGE Construct. MGE Construct has entered into a contract to purchase chiller equipment. All contracts are summarized in the following table.
|
|
Contract Total |
Payments through March 31, 2004 |
Remaining Contract Amounts |
||
| Gas turbines | $30,190 | $30,025 | $ 165 | ||
| Steam turbine | 7,805 | 7,805 | - | ||
| Heat-recovery steam generators | 11,993 | 11,993 | - | ||
| Chiller equipment | 6,689 | 3,385 | 3,304 | ||
| Project management | 8,400 | 5,072 | 3,328 | ||
| Miscellaneous equipment | 30,810 | 13,958 | 16,852 | ||
| Total | $95,887 | $72,238 | $23,649 |
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations.
General
MGE Energy is a holding company operating through subsidiaries in three business segments: electric utility operations, gas utility operations, and nonregulated energy operations. Our principal subsidiary is MGE, which conducts our electric utility and gas utility operations. MGE generates and distributes electricity to nearly 132,000 customers in Dane County, Wisconsin, including the city of Madison, and purchases and distributes natural gas to more than 129,000 customers in the Wisconsin counties of Columbia, Crawford, Dane, Iowa, Juneau, Monroe, and Vernon. Other subsidiaries, which constitute our nonregulated energy operations, have been formed to own and construct new electric generating capacity. Those subsidiaries are currently undertaking the construction of a 150-MW, electricity, steam, and chilled-water cogeneration facility on the UW campus.
MGE's electric and gas utility operations represent a substantial part of our assets, liabilities, revenues, and expenses. Our nonregulated operations, relating, principally, to developing a cogeneration project on the UW campus are not significant at this time. Consequently, the following discussion focuses mainly on the results of operations and financial condition of MGE.
Executive Summary - MGE Energy and MGE.
In the first quarter of 2004, our utility operations experienced an increase in electric retail sales of 3.2% while retail gas deliveries decreased 5.1%. Electric revenues increased $3.8 million for the three months ended March 31, 2004, due to the increase in sales. Gas revenues increased $2.3 million due to the higher cost of gas despite the decline in gas deliveries. Purchased power costs decreased $2.4 million because MGE was able to produce more electric generation at its own plants. Operation and maintenance expenses increased due to higher uncollectible accounts and higher distribution and maintenance costs. We also experienced lower interest costs as a result of the generally lower interest rates for our variable-term debt during the quarter.
We anticipate relying on short- and long-term borrowings to support construction of WCCF and the associated capital expenditures. We also anticipate a need for additional equity capital during 2004 beyond the amounts we are able to raise through our Dividend Reinvestment and Direct Stock Purchase Plan.
Our primary focus today and for the foreseeable future is our core utility customers at MGE. MGE continues to face the challenge of providing its customers with reliable power at competitive prices. MGE plans to meet this challenge by building more efficient generation projects and continuing its efforts to control operational costs. We believe it is critical to maintain a strong credit standing and financial strength in MGE as well as the parent company in order to accomplish these goals.
Results of Operations
Substantially all of MGE Energy's results of operations are attributable to the operations of its utility subsidiary MGE. MGE Energy's other significant business activit