UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549


FORM 10-K
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2004

Commission File Number 333-59348


MIDWEST GENERATION, LLC
(Exact name of registrant as specified in its charter)

Delaware   33-0868558
(State or other jurisdiction of incorporation or organization)   (I.R.S. Employer Identification No.)
One Financial Place
440 South LaSalle Street, Suite 3500
Chicago, Illinois
  60605
(Address of principal executive offices)   (Zip Code)

Registrant's telephone number, including area code: (312) 583-6000

Securities registered pursuant to Section 12(b) of the Act:

None
  Not Applicable
(Title of Class)   (name of each exchange on which registered)

Securities registered pursuant to Section 12(g) of the Act:

None
(Title of Class)


       Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. YES ý    NO o

       Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant's knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K ý

       Indicate by check mark whether the registrant is an accelerated filer (as defined in Rule 12b-2 of the Exchange Act). YES o    NO ý

       Aggregate market value of the registrant's Membership Interests held by non-affiliates of the registrant as of June 30, 2004: $0. Number of units outstanding of the registrant's Membership Interests as of March 10, 2005: 100 units (all units held by an affiliate of the registrant).

DOCUMENTS INCORPORATED BY REFERENCE

       Portions of the following documents listed below have been incorporated by reference into the parts of this report so indicated.

(1)   Designated portions of Edison Mission Energy's Form 10-K for the year ended December 31, 2004   Part III

(2)

 

Designated portions of the Joint Proxy Statement relating to Edison International's 2005 Annual Meeting of Shareholders

 

Part III





TABLE OF CONTENTS

 
   
  Page
PART I
Item 1.   Business   1
Item 2.   Properties   16
Item 3.   Legal Proceedings   17
Item 4.   Submission of Matters to a Vote of Security Holders   17

PART II
Item 5.   Market for Registrant's Common Equity and Related Stockholder Matters   18
Item 6.   Selected Financial Data   19
Item 7.   Management's Discussion and Analysis of Financial Condition and Results of Operations   20
Item 7a.   Quantitative and Qualitative Disclosures about Market Risk   64
Item 8.   Financial Statements and Supplementary Data   65
Item 9.   Changes in and Disagreements with Accountants on Accounting and Financial Disclosure   65
Item 9A.   Controls and Procedures   65
Item 9B.   Other Information   65

PART III
Item 10.   Managers and Executive Officers of the Registrant   105
Item 11.   Executive Compensation   106
Item 12.   Security Ownership of Certain Beneficial Owners and Management   106
Item 13.   Certain Relationships and Related Transactions   107
Item 14.   Principal Accounting Fees and Services   107

PART IV
Item 15.   Exhibits and Financial Statement Schedules   108

 

 

Signatures

 

114

i



PART I

ITEM 1.    BUSINESS

The Company

       Midwest Generation, LLC, which is referred to as Midwest Generation in this annual report, was formed on July 12, 1999 as a Delaware limited liability company with Edison Mission Midwest Holdings Co. as the sole owner. Edison Mission Midwest Holdings is a wholly owned subsidiary of Midwest Generation EME, LLC, which is in turn a wholly owned subsidiary of Edison Mission Energy, which is referred to as EME in this annual report. EME is a wholly owned subsidiary of Mission Energy Holding Company and is an indirect wholly owned subsidiary of Edison International. Midwest Generation was formed for the purpose of owning or leasing, making improvements to, and operating and selling the capacity and energy of, the power generation assets it purchased from Commonwealth Edison Company (Commonwealth Edison), which are referred to as the Illinois Plants. Midwest Generation acquired the Illinois Plants on December 15, 1999 for a purchase price of approximately $4.9 billion, with adjustments for changes in the book value of inventories and pro-rations related to specific items, including but not limited to taxes, rents and fees. Prior to the acquisition of the Illinois Plants, Midwest Generation had no significant business activity.

       Concurrent with the acquisition of the Illinois Plants, Midwest Generation assigned its right to purchase the Collins Station, a 2,698 MW gas and oil-fired generating station located in Illinois, to four third-party entities. After this assignment, and the purchase of the facility by the third parties, an affiliate of Midwest Generation leased and Midwest Generation subleased the Collins Station. Each of the leases and subleases had an initial term of 33.75 years. In April 2004, Midwest Generation terminated the Collins Station lease through a negotiated transaction with the lease equity investor and received title to the Collins Station as part of the transaction. On September 30, 2004, Midwest Generation permanently ceased operations at the Collins Station and decommissioned the plant by the fourth quarter of 2004. See "—Management's Overview, Risks Related to the Business and Critical Accounting Estimates—Management's Overview—Termination of the Collins Station Lease" in "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional discussion regarding the lease termination.

       In September 2004, management completed an analysis of future competitiveness in the expanded PJM marketplace of eight of Midwest Generation's small peaking units in Illinois. Based on this analysis and regulatory approval, planning efforts are in progress to decommission six of its eight remaining small peaking units.

       As of December 31, 2004, Midwest Generation owned or leased 5,876 megawatts (MW) of operating power plants consisting of the following:

six coal-fired generating plants consisting of 5,621 MW, which include the Powerton, Joliet, Will County, Waukegan, Crawford and Fisk Stations; and

the Fisk and Waukegan on-site generating peakers consisting of 255 MW, based on summer net dependable capacity.

       Midwest Generation has entered into a contract with Edison Mission Marketing & Trading, Inc., a marketing affiliate, to sell energy and capacity into the wholesale market, to engage in hedging activities and to provide scheduling and other services. In April 2004, Midwest Generation entered into a revolving credit agreement with Edison Mission Marketing & Trading in order to make revolving loans to, or have

1



letters of credit issued on behalf of, Edison Mission Marketing & Trading, in order to provide credit support for forward contracts. Edison Mission Marketing & Trading also purchases natural gas and has the ability to enter into fuel hedging arrangements on Midwest Generation's behalf. Midwest Generation has also entered into an agreement with another affiliate, Edison Mission Energy Services, Inc., to provide fuel and transportation services related to coal and fuel oil.

       In August 2000, Midwest Generation completed a sale-leaseback transaction with respect to the Powerton and Joliet power facilities to third-party lessors for an aggregate purchase price of $1.367 billion. In connection with this transaction, Midwest Generation facilitated the issuance of $333.5 million 8.30% Series A Pass-Through Certificates due 2009 and $813.5 million 8.56% Series B Pass-Through Certificates due 2016 through a private placement. In 2001, these certificates were subsequently exchanged for certificates that were registered with the Securities and Exchange Commission, and are identical in all material respects to the privately held certificates, pursuant to an exchange offer.

       EME, Mission Energy Holding Company and Edison International are each registered with the Securities and Exchange Commission and have financial statements that are filed in accordance with rules enacted by the Securities and Exchange Commission. For more information regarding each of these companies, see their respective annual reports on Form 10-K for the year ended December 31, 2004.

       Midwest Generation's principal executive offices are located at One Financial Place, 440 South LaSalle Street, Suite 3500, Chicago, Illinois 60605, and its telephone number is (312) 583-6000.

       Midwest Generation, LLC's Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and amendments to those reports are electronically filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 and are available on the Securities and Exchange Commission's internet web site at http://www.sec.gov.

Forward-Looking Statements

       This annual report on Form 10-K contains forward-looking statements that reflect Midwest Generation's current expectations and projections about future events based on Midwest Generation's knowledge of present facts and circumstances and assumptions about future events. Other information distributed by Midwest Generation that is incorporated in this annual report, or that refers to or incorporates this annual report, may also contain forward-looking statements. In this annual report and elsewhere, the words "expects," "believes," "anticipates," "estimates," "intends," "plans," "probable" and variations of such words and similar expressions are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ, or that otherwise could impact Midwest Generation, include:

supply and demand for electric capacity and energy, and the resulting prices and dispatch volumes, in the wholesale markets to which Midwest Generation's generating units have access;

the ability of Midwest Generation to provide sufficient collateral in support of its forward sales of electricity and purchases of fuel;

general political, economic and business conditions;

governmental, statutory, regulatory or administrative changes or initiatives affecting Midwest Generation or the electricity industry generally, including environmental regulations that could

2


competition from other power plants, including new plants and technologies that may be developed in the future;

operating risks, including equipment failure, availability, heat rate and output;

the cost and availability of fuel and fuel transportation services;

the cost and availability of transmission services;

the cost and availability of required emission allowances; and

weather conditions, natural disasters and other unforeseen events.

       Additional information about the risk factors listed above and other risks and uncertainties is contained throughout this annual report and in the Notes to Consolidated Financial Statements and Management's Discussion and Analysis of Financial Condition and Results of Operations that appear in Part II of this annual report. Readers are urged to read this entire annual report and carefully consider the risks, uncertainties and other factors that affect Midwest Generation's business. The information contained in this annual report is subject to change without notice, and Midwest Generation is not obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by Midwest Generation with the Securities and Exchange Commission.

Description of Business

Industry Overview

       The United States electric industry, including companies engaged in providing generation, transmission, distribution and ancillary services, has undergone significant deregulation, which has led to increased competition. Until the enactment of the Public Utility Regulatory Policies Act of 1978, or PURPA, utilities and government-owned power agencies were the only producers of bulk electric power intended for sale to third parties in the United States. PURPA encouraged the development of independent power by removing regulatory constraints relating to the production and sale of electric energy by certain non-utilities and requiring electric utilities to buy electricity from specified types of non-utility power producers, known as qualifying facilities, under specified conditions. The passage of the Energy Policy Act of 1992 further encouraged the development of independent power by significantly expanding the options available to independent power producers with respect to their regulatory status and by liberalizing transmission access. As a result, a significant market for electric power produced by independent power producers, such as Midwest Generation, developed in the United States.

       As part of the regulatory developments discussed above, the Federal Energy Regulatory Commission, referred to as the FERC in this annual report, encouraged the formation of independent systems operators (ISOs) and regional transmission organizations (RTOs). In those areas where ISOs and RTOs have been formed, market participants have expanded access to transmission service. ISOs and RTOs may also operate real-time and day ahead energy and ancillary service markets, which are governed by FERC-approved tariffs and market rules. The development of markets into which independent power producers are able to sell has reduced their dependence on bilateral contracts with electric utilities. See further discussion of regulations under "Regulatory Matters—U.S. Federal Energy Regulation."

       Midwest Generation's power plants are located in the control area managed by PJM Interconnection, LLC, commonly referred to as PJM. PJM is the largest centrally dispatched electric control area in North America. As reported on the PJM web site (www.pjm.com) on March 1, 2005, PJM consists of about

3



1,000 generating units with a total installed capacity of approximately 137,490 MW, serves approximately 45.3 million people, and covers portions of Pennsylvania, New Jersey, Maryland, Delaware, the District of Columbia, Illinois, Indiana, Kentucky, Michigan, Ohio, Tennessee, West Virginia and Virginia. PJM operates the wholesale spot energy market and determines the market-clearing price for each hour based on bids submitted by participating generators which indicate the minimum prices a bidder is willing to accept to be dispatched at various incremental generation levels. PJM conducts both day-ahead and real-time energy markets. PJM's energy markets are based on locational marginal pricing, which establishes hourly prices at specific locations throughout PJM. Locational marginal pricing is determined by considering a number of factors, including generator bids, load requirements, transmission congestion and transmission losses. PJM requires all load serving entities to maintain prescribed levels of capacity, including a reserve margin, to ensure system reliability. PJM also determines the amount of capacity available from each specific generator and operates capacity markets. PJM's capacity markets have a single market-clearing price. Load serving entities and generators, such as Midwest Generation, may participate in PJM's capacity markets or transact capacity on a bilateral basis.

Facilities Overview

The Crawford Station

       The Crawford Station is a 542 MW coal-fired power plant located in Cook County, Illinois, and is within the city limits of Chicago. The Crawford Station occupies approximately 72 acres, inclusive of the switchyard. The operating units are referred to as Units 7 and 8 and began operations in 1958 and 1961, respectively.

       Southern Powder River Basin coal is loaded into barges at the Will County Station and delivered by barge primarily on a "just-in-time" basis supported by Crawford's on-site storage. Natural gas is used for ignition and combustion support and for full boiler operation, when economical. Peoples Gas delivers natural gas under a delivery contract that includes balancing storage, which is also shared by the Fisk Station.

The Fisk Station

       The Fisk Station is a 326 MW coal-fired power plant located in Cook County, Illinois, and is within the city limits of Chicago. The Fisk Station is located on approximately 44 acres, inclusive of the switchyard. The operating unit comprising the Fisk Station is referred to as Unit 19 and began operations in 1959.

       Southern Powder River Basin coal is loaded into barges at the Will County Station, delivered by barge on a "just-in-time" basis. Natural gas is used for ignition and combustion support and for full boiler operation, when economical. Peoples Gas delivers natural gas under a delivery contract that includes balancing storage, which is shared by the Crawford Station.

The Joliet Station

       The Joliet Station is located in Joliet, Will County, Illinois, approximately 40 miles southwest of Chicago on an approximately 467 acre site. The operating units comprising the Joliet Station are referred to as Units 6, 7 and 8. Only Units 7 and 8 are subject to the leveraged lease transaction described in this annual report. The operation of Units 6, 7 and 8 began in 1959, 1965 and 1966, respectively. Joliet Unit 6 is a 290 MW coal-fired unit located adjacent to, but across the Des Plaines River from, Joliet Units 7 and 8. Joliet Units 7 and 8 are coal-fired and have a combined capacity of 1,044 MW.

4



       The Joliet Station burns Southern Powder River Basin coal which is shipped by rail. With the completion of a new rail spur in early 2003, direct deliveries are received from the Union Pacific Railroad. Natural gas is delivered for the boilers as a startup and stabilizing fuel by Nicor Gas Company under a delivery contract.

The Powerton Station

       The Powerton Station is a 1,538 MW coal-fired station located in Pekin, Tazwell County, Illinois, approximately 16 miles southwest of Peoria or 166 miles from Chicago on an approximately 568-acre site. The Powerton Station is subject to the leveraged lease transaction described in this annual report. The site also includes an approximately 1,440-acre lake. The operating units comprising the Powerton Station are referred to as Units 5 and 6 and began operations in 1972 and 1975, respectively.

       The Powerton Station burns Southern Powder River Basin coal which is shipped by rail by the Illinois and Midland Railroad Company from interchange points with the Union Pacific Railroad.

The Waukegan Station

       The Waukegan Station is a 789 MW coal-fired power plant located in Waukegan, Lake County, Illinois, on Lake Michigan. The Waukegan Station occupies approximately 194 acres, inclusive of the switchyard. The operating units comprising the Waukegan Station are referred to as Units 6, 7 and 8 and began operations in 1952, 1958 and 1962, respectively.

       Unit 6 utilizes oil for ignition and startup, while Unit 7 utilizes oil or natural gas and Unit 8 utilizes natural gas for ignition and startup. The Waukegan Station burns Southern Powder River Basin coal which is shipped by rail by the Union Pacific Railroad.

The Will County Station

       The Will County Station is a 1,092 MW coal-fired power plant located in Romeoville, Will County, Illinois. The Will County Station is located on approximately 215 acres, inclusive of the switchyard. The operating units comprising the Will County Station are referred to as Units 1, 2, 3 and 4 and began operations between 1955 and 1963. Beginning in January 2003, operations at Units 1 and 2, representing 310 MW of capacity, were suspended pending improvement in market conditions. In late 2004, both units were returned to service.

       The Will County Station burns Southern Powder River Basin coal which is shipped by rail by the Elgin, Joliet & Eastern Railway Company from interchange points with the Union Pacific Railroad. The Will County Station uses No. 2 fuel oil for ignition and combustion support, which is delivered by tanker truck to a 100,000 gallon on-site storage tank.

The Collins Station

       On September 30, 2004, Midwest Generation permanently ceased operations at the Collins Station and all units were decommissioned by the fourth quarter of 2004. The Collins Station was a 2,698 MW gas and oil-fired power plant located in Grundy County, near Morris, Illinois. See "—Management's Overview, Risks Related to the Business and Critical Accounting Estimates—Management's Overview—Termination of the Collins Station Lease" in "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" for events leading up to the decommissioning of the Collins Station.

5



On-Site and Off-Site Peaking Facilities

       In September 2004, management completed an analysis of future competitiveness in the expanded PJM marketplace of eight of its small peaking units in Illinois. Based on this analysis and regulatory approval, planning efforts are in progress to decommission six of its eight remaining small peaking units. They are the Crawford and Joliet on-site peaking facilities and the Calumet, Electric Junction, Lombard and Sabrooke off-site peaking facilities. The remaining on-site peaking units consist of Fisk and Waukegan, which were commissioned in 1968.

       The Fisk and Waukegan peaking units burn No. 1 fuel oil (jet fuel). Natural gas is used by the Fisk peaking unit for ignition. Natural gas is purchased in the monthly and daily spot markets and is shipped at the seller's risk to Chicago. Peoples Gas provides delivery services, including balancing storage, to the site under tariffs approved by the Illinois Commerce Commission. Midwest Generation purchases No. 1 fuel oil and No. 2 fuel oil from bids taken annually. Shipments to the various sites are in tanker trucks and inventory is replenished as needed by the site. The oil price is tied to the Oil Price Information Service posted price (the market price) on the date of delivery. Truck delivery charges are at fixed agreed-upon prices.

Power Markets

       In connection with the acquisition of the Illinois Plants, Midwest Generation entered into three separate five-year power purchase agreements with Commonwealth Edison, which were subsequently assigned to its affiliate, Exelon Generation Company LLC (Exelon Generation). The Collins Station power purchase agreement was terminated on September 30, 2004 and the other two power purchase agreements expired on December 31, 2004. During each of 2000, 2001 and 2002, approximately 99% of Midwest Generation's energy and capacity revenues were derived under the power purchase agreements. In 2003 and 2004, the percentage decreased to approximately 65% and 53%, respectively, with the balance coming from sales by Midwest Generation into the wholesale power markets.

       Beginning in 2005, all the energy and capacity from the Illinois Plants are sold under terms, including price and quantity, negotiated by Edison Mission Marketing & Trading, Inc., an affiliate of Midwest Generation engaged in the power marketing and trading business, with customers through a combination of bilateral agreements, forward energy sales and spot market sales. These arrangements generally have terms of two years or less. Thus, Midwest Generation is subject to market risks related to the price of energy and capacity from the Illinois Plants. As discussed further below, sales of electricity from the Illinois Plants now include sales into PJM. Capacity prices for merchant energy sales within PJM are, and are expected in the near term to remain, substantially lower than those Midwest Generation received under the power purchase agreements with Exelon Generation.

       Prior to May 1, 2004, the primary markets available to Midwest Generation for wholesale sales of electricity from the Illinois Plants were direct "wholesale customers" and broker-arranged "over-the-counter customers." Wholesale customer transactions are bilateral sales to regional buyers, including investor-owned utilities, municipal utilities, rural electric cooperatives and retail energy suppliers. Wholesale customer transactions include real-time, daily and longer term structured sales; they are not arranged through brokers and may be tailored to meet the specific requirements of wholesale electricity consumers. Over-the-counter markets are generally accessed through third-party brokers and electronic exchanges, and include forward sales of electricity. The most liquid over-the-counter markets in the Midwest region have historically been sales into the control area of Cinergy, referred to as "Into Cinergy," and, to a lesser extent, sales into the control areas of Commonwealth Edison and American Electric Power, referred to as "Into ComEd" and "Into AEP," respectively. "Into ComEd" and "Into

6



AEP" were bilateral markets for the sale or purchase of electrical energy for future delivery. Due to geographic proximity, "Into ComEd" was the primary market for Midwest Generation.

       On May 1, 2004 and October 1, 2004, respectively, operational control of the control area systems of Commonwealth Edison and AEP was transferred to PJM, which is now the primary market available to Midwest Generation. This transfer resulted in the conversion of the "Into ComEd" and "Into AEP" trading hubs to locational marginal pricing, which has further facilitated transparency of prices and provided liquidity to support risk management strategies. Performance of transactions in these markets is subject to contracts that generally provide for liquidated damages supported by a variety of credit requirements, which may include independent credit assessment, parent company guarantees, letters of credit and cash margining arrangements. However, liquidity in all of these markets has been adversely affected by the financial problems of trading and marketing entities.

       Following the transfer of control of the control area systems of Commonwealth Edison and AEP to PJM, sales of electricity from the Illinois Plants now include bilateral and spot sales into PJM, with spot sales being based on locational marginal pricing. These sales, into the expanded PJM, replaced sales previously made as bilateral sales and spot sales "Into ComEd" and "Into AEP." The Northern Illinois Hub is the primary trading hub for Midwest Generation produced power due to geographic proximity and high pricing correlation to the plants' output locations.

       The Midwest Independent Transmission System Operator, a Regional Transmission Organization (RTO) authorized pursuant to the FERC's Order No. 2000, commonly referred to as the MISO, which will control the former control areas of Alliant Energy Corporation (Wisconsin Power and Light Co. and Interstate Power and Light Co.), Aquila Inc., Ameren Corporation, Cinergy Corp., Kentucky Utilities Company, LG&E Energy LLC, Vectren Corporation and Xcel Energy, Inc., among others, is scheduled to begin operation of its locational marginal pricing market on April 1, 2005. It is anticipated that the opening of the MISO market will provide increased liquidity in the Midwest electricity markets. "Into Cinergy" will become a locational marginal pricing location in MISO at that time. See "Regulatory Matters" for a more detailed discussion of recent developments regarding Commonwealth Edison and AEP joining PJM. See "—Transmission" below for additional discussion.

       For a discussion of the risks related to Midwest Generation's sale of electricity, see "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations—Market Risk Exposures."

Transmission

       Station units at Will County, Crawford, Waukegan, and Joliet Unit 6 are connected to Commonwealth Edison's 138kV transmission system. The Fisk Station is connected via various circuit breakers and transformers to transmission substations. The Joliet Units 7 and 8, subject to the leveraged lease transactions, and the two Powerton units deliver their power into Commonwealth Edison's 345kV transmission system.

       Historically, sales of power produced by Midwest Generation required using transmission that had to be obtained from Commonwealth Edison. An independent system operator did not yet oversee operations of the Commonwealth Edison control area; however, effective May 1, 2004 such operations were placed under the control of PJM. Furthermore, the transmission system of AEP was integrated into PJM on October 1, 2004, which linked the Northern Illinois and eastern portions of the PJM system and permitted improved access from the Illinois Plants into the broader PJM market. In addition, a number of other utilities in the region participate in the MISO where a bilateral market with a single rate for transmission within the RTO already exists. The regional market is further supported by open access

7



transmission under various utility company transmission tariffs that are not within the MISO. The open access transmission tariffs of the MISO and others in the region allow Midwest Generation to utilize their transmission and distribution systems to sell power at wholesale on a non-discriminatory basis relative to the system's owners. Such tariffs are vital to allow Midwest Generation to compete in the deregulated electricity markets because they provide a uniform set of prices and standards of transmission service that have been approved by regulatory agencies and are publicly available.

       On November 18, 2004, the FERC issued an order eliminating regional through and out transmission rates in the region encompassed by PJM (as recently expanded) and the MISO. The effect of this order was to eliminate so-called rate pancaking between PJM and the MISO. Rate pancaking occurs when energy must move through multiple, separately priced transmission systems to travel from its point of production to its point of delivery, and each transmission owner along the line charges separately for the use of its system. At the same time, the FERC also imposed a transitional revenue recovery mechanism which has created controversy and some continuing uncertainty as to the impact of such mechanism on transactions in the region. The mechanism required the filing of tariffs by PJM and the MISO imposing a "Seams Elimination Cost Adjustment" (SECA) to be in effect until May 1, 2006, to compensate the "new PJM companies"—AEP, Commonwealth Edison and Dayton Power & Light, among others—for lost revenues attributable to such elimination. On November 30, 2004, the FERC clarified that SECAs can be recovered for lost revenues associated with elimination on intra-RTO pancaking.

       The response to the November 18 and November 30 orders from the parties liable for the SECAs has been strongly negative, and a rehearing has been sought by a broad range of interests that are opposed to the imposition of SECAs. Although both PJM and the MISO have made tariff filings with the FERC that purport to comply with such order and eliminate through and out transmission rates as of December 1, 2004, numerous protests to such filings have been made, challenging SECAs on legal and equitable grounds and demanding evidentiary hearings by the FERC. In its tariff filing, PJM imposes SECAs only on load-serving entities, and not on other transmission customers such as Midwest Generation, but the MISO tariff provision imposes SECAs on all such customers. That provision does not directly affect Midwest Generation because it is not a transmission customer of the MISO; however, the issue of which entities should bear SECAs is one of the many points that have been raised in the protests described above and have become the subject of hearings ordered by the FERC.

       Pending further orders of the FERC and/or the outcome of the hearings described above, under the provisions of the PJM tariff as filed, Midwest Generation is currently not subject to SECAs with respect to its sales of power within PJM. It is not possible, however, to predict the outcome of the hearings or to rule out the possibility that Midwest Generation could be ordered in the future to pay SECAs with respect to sales within PJM after December 1, 2004.

       For further discussion of the market risks related to Midwest Generation's transmission service, see "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations—Market Risk Exposures."

Significant Customer

       In the past three fiscal years, Midwest Generation derived a significant source of its revenues from the sale of energy and capacity to Exelon Generation primarily under three power purchase agreements which began on December 15, 1999. The Collins Station power purchase agreement was terminated on September 30, 2004 and the other power purchase agreements expired on December 31, 2004. Exelon Generation accounted for approximately 54%, 68% and 99% of Midwest Generation's energy and capacity revenues for the years ended December 31, 2004, 2003 and 2002, respectively.

8



Fuel Supply

       Coal is used to fuel 5,621 MW of Midwest Generation's generating capacity. The coal is purchased from several suppliers that operate mines in the Southern Powder River Basin of Wyoming. The coal is purchased under a number of supply agreements ranging from one year to four years in length. The total volume of coal consumed annually is largely dependent on the amount of generation and ranges between 16 million to 20 million tons.

       All coal is transported under long-term transportation agreements with the Union Pacific Railroad and various delivering carriers. As of December 31, 2004, Midwest Generation leased approximately 3,800 railcars to transport the coal from the mines to the generating stations and the leases have remaining terms that range from as short as 6 months up to 15 years, with options to extend the leases for or purchase some railcars at the end of the lease terms. The coal is transported nearly 1,200 miles from the mines to the stations.

       Coal for the Fisk and Crawford Stations is first shipped by rail to the Will County Station where it is transferred from the railcars, blended as necessary to meet station specifications, and loaded into river barges. These barges are towed by an independent contractor under a transportation agreement with Midwest Generation to the stations.

       Midwest Generation has approximately 255 MW of peaking capacity in the form of simple cycle combustion turbines at Fisk and Waukegan Stations. These units are fueled with distillate fuel oils.

       See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations—Contractual Obligations, Commitments and Contingencies," for additional discussion of contractual commitments related to Midwest Generation's fuel supply and coal transportation contracts.

Emission Allowances

       Certain state and federal environmental laws require power plant operators to hold or obtain emission allowances equal, on an annual basis, to their plants' emissions of nitrogen oxide or sulfur dioxide. Emission allowances were acquired as part of the acquisition of the Illinois Plants. Additional allowances are purchased by Midwest Generation when operations make this necessary and are sold by Midwest Generation when it has more than needed for planned levels of operation.

       See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources—Environmental Matters and Regulations" for a discussion of environmental regulations related to emissions.

Insurance

       Midwest Generation maintains insurance policies consistent with those normally carried by companies engaged in similar business and owning similar properties. Midwest Generation's insurance program includes all-risk property insurance, including business interruption, covering real and personal property, including losses from boilers, machinery breakdowns, and the perils of earthquake and flood, subject to specific sublimits. Midwest Generation also carries general liability insurance covering liabilities to third parties for bodily injury or property damage resulting from operations, automobile liability insurance and excess liability insurance. Limits and deductibles in respect of these insurance policies are comparable to those carried by other electric generating facilities of similar size. However, no assurance can be given that Midwest Generation's insurance will be adequate to cover all losses.

9



Seasonality

       In the past, Midwest Generation's electric revenues were substantially higher during the June through September months because Midwest Generation received significantly higher capacity payments during those months under the terms of the power purchase agreements with Exelon Generation. Midwest Generation expects that future electric revenues from sales into the wholesale markets will be higher in the third quarter of each year due to higher demand for energy resulting from warmer weather in the summer months.

Competition

Federal

       The Energy Policy Act of 1992 laid the groundwork for a competitive wholesale market for electricity. Among other things, the Energy Policy Act expanded the FERC's authority to order electric utilities to transmit third-party electricity over their transmission lines, thus allowing qualifying facilities under PURPA, power marketers and those qualifying as exempt wholesale generators under the Public Utility Holding Company Act of 1935, or PUHCA, to compete more effectively in the wholesale market. In an order dated November 9, 1999, the FERC determined that, based on the facts stated in Midwest Generation's application, Midwest Generation is an exempt wholesale generator.

       In 1996, the FERC issued Order No. 888, also known as the Open Access Rules, which require utilities to offer eligible wholesale transmission customers non-discriminatory open access on utility transmission lines on a comparable basis to the utilities' own use of the lines. In addition, the Open Access Rules directed jurisdictional public utilities that control a substantial portion of the nation's electric transmission networks to file uniform, non-discriminatory open access tariffs containing the terms and conditions under which they would provide such open access transmission service. The FERC subsequently issued Order Nos. 888-A, 888-B and 888-C to clarify the terms that jurisdictional transmitting utilities are required to include in their open access transmission tariffs. The FERC also issued Order No. 889, which required those transmitting utilities to abide by specified standards of conduct when using their own transmission systems to make wholesale sales of power, and to post specified transmission information, including information about transmission requests and availability, on a publicly available computer bulletin board.

       In December 1999, the FERC issued Order No. 2000, which required all jurisdictional transmission-owning utilities to file by December 15, 2000, a statement of their plans with respect to placing functional control over their transmission assets under an RTO meeting certain criteria set forth in the Order. Although Order No. 2000 did not mandate that a utility join an RTO, it set forth various incentives for voluntary joining and required utilities to explain in detail their reasons for deviating from the objectives set forth in the Order. RTOs meeting the FERC's criteria in Order No. 2000 were required to be operationally independent of the transmission-owning utilities whose assets they controlled and to possess other essential attributes, such as regional scope and configuration, the authority to receive and rule upon requests for service, a separate tariff governing all transactions of the RTO, a market monitoring capability, and other features.

       In subsequent orders, the FERC has progressively tightened its policies in favor of RTO formation, including an explicit proposal that approvals of market-based rate authority for affiliates of utilities owning transmission should be tied to the utilities' placing functional control over their transmission assets in an RTO meeting the criteria of Order No. 2000. On January 15, 2003, the FERC proposed to allow additional percentage points on a utility's return on equity in its transmission rates when it

10



participates in an RTO, divests its RTO-operated transmission assets, or pursues additional measures that promote efficient operation and expansion of the transmission grid. As outlined below, the FERC has also proposed to establish a standard market design that would govern transmission service and energy trading arrangements in all regions of the country.

       On July 31, 2002, the FERC issued a Notice of Proposed Rulemaking having the stated purpose of remedying the remaining opportunities for undue discrimination in transmission and establishing a standardized transmission service and wholesale market design, or SMD, that would provide a "level playing field" for all entities that seek to participate in wholesale electric markets. The SMD proposal included a number of features that, taken together, should provide a flexible transmission service and an open and transparent spot market design that convey the right pricing signals for investment in transmission and generation facilities, and for other purposes. Comments on certain features of the SMD proposal were filed by interested parties in October 2002 and during the first quarter of 2003. The SMD proposal has also engendered considerable comment, and in some cases opposition, including in the U.S. Congress.

       In April 2003, the FERC attempted to address some more controversial aspects of its SMD proposal in a "White Paper," which set forth the elements of its SMD proposal that it regarded as the most fundamental features of a sound wholesale market "platform" and modified its proposal as to other aspects that it regarded as subject to regional variation. Currently, the SMD policies are being implemented in different degrees and on different schedules in various parts of the country, and are the subject of active consideration and focus by stakeholders in wholesale markets in the Midwest. These and other regulatory initiatives by the FERC are ongoing, and it is not possible to predict the extent of future developments or how they might affect the wholesale power business.

       Over the past few years, the U.S. Congress has considered various legislative proposals to restructure the electric industry that would require, among other things, retail customer choice, repeal of PUHCA and reform of PURPA. A number of other proposals have been introduced in Congress that relate to restructuring electricity markets. Different versions of such legislation passed both houses of Congress late in the 108th Congress (2003-2004) but no comprehensive energy legislation was enacted. Similar comprehensive legislation has been introduced in the 109th Congress (2005-2006), but the chances for passage of such legislation remain unclear at this time. Efforts were made in the 108th Congress to enact portions of the comprehensive energy bill on an individual basis, but with the exception of certain tax provisions, they were unsuccessful because the Congressional leadership and administration opposed such efforts. Similar efforts are possible in the 109th Congress, but their chances for success remain unclear at this time.

State

       In response to pressure from retail electric customers, particularly large industrial users, the state commissions or state legislatures of many states have considered whether to open the retail electric power market to competition. Retail competition is possible when a customer's local utility agrees, or is required, to unbundle its distribution service (for example, the delivery of electric power through its local distribution lines) from its transmission and generation service (for example, the provision of electric power from the utility's generating facilities or wholesale power purchases). Several state commissions and legislatures have issued orders or passed legislation requiring utilities to offer unbundled retail distribution service, which is called retail wheeling. Volatility in California and other regional power markets has resulted in several states slowing, and in some cases reversing or reassessing, their plans to allow retail competition. Retail competition in Illinois commenced on October 1, 1999 for mostly large commercial and industrial customers, and full access, for residential customers, occurred by May 1, 2002

11



under the Illinois electric restructuring act of 1997. However, as noted above, Midwest Generation sells power only into the wholesale market.

Regulatory Matters

General

       Federal laws and regulations govern, among other things, transactions by and with purchasers of power, including utility companies, the operations of a power plant and the ownership of a power plant. Under limited circumstances where exclusive federal jurisdiction is not applicable or specific exemptions or waivers from state or federal laws or regulations are otherwise unavailable, federal and/or state utility regulatory commissions may have broad jurisdiction over non-utility owned electric power plants. Energy-producing projects are also subject to federal, state and local laws and regulations that govern the geographical location, zoning, land use and operation of a project. Federal, state and local environmental requirements generally require that a wide variety of permits and other approvals be obtained before the commencement of construction or operation of an energy-producing facility and that the facility then operate in compliance with these permits and approvals.

       Midwest Generation is subject to a varied and complex body of laws and regulations that are in a state of flux. Intricate and changing environmental and other regulatory requirements could necessitate substantial expenditures and could create a significant risk of expensive delays or significant loss of value in a power plant if Midwest Generation were to become unable to function as planned due to changing requirements or local opposition.

12


U.S. Federal Energy Regulation

       The FERC has ratemaking jurisdiction and other authority with respect to interstate wholesale sales and transmission of electric energy under the Federal Power Act and with respect to certain interstate sales, transportation and storage of natural gas under the Natural Gas Act of 1938. The Securities and Exchange Commission has regulatory powers with respect to upstream owners of electric and natural gas utilities under PUHCA. The enactment of PURPA and the adoption of regulations under that Act by the FERC provided incentives for the development of cogeneration facilities and small power production facilities using alternative or renewable fuels by establishing certain exemptions from the Federal Power Act and PUHCA for the owners of qualifying facilities. The passage of the Energy Policy Act in 1992 further encouraged independent power production by providing additional exemptions from PUHCA for exempt wholesale generators, such as Midwest Generation. An "exempt wholesale generator" under PUHCA is an entity determined by the FERC to be exclusively engaged, directly or indirectly, in the business of owning and/or operating specified eligible facilities and selling electric energy at wholesale or, if located in a foreign country, at wholesale or retail.

Federal Power Act

       The Federal Power Act grants the FERC exclusive jurisdiction over the rates, terms and conditions of wholesale sales of electricity and transmission services in interstate commerce, including ongoing, as well as initial, rate jurisdiction. This jurisdiction allows the FERC to revoke or modify previously approved rates after notice and opportunity for hearing. These rates may be based on a cost-of-service approach or, in geographic and product markets determined by the FERC to be workably competitive, may be market based. Exempt wholesale generators and other non-qualifying facility independent power projects are subject to the Federal Power Act and to the FERC's ratemaking jurisdiction thereunder, but the FERC typically grants exempt wholesale generators the authority to charge market-based rates to purchasers which are not affiliated electric utility companies as long as the absence of market power is shown. In addition, the Federal Power Act grants the FERC jurisdiction over the sale or transfer of jurisdictional facilities, including wholesale power sales contracts, and in some cases, jurisdiction over the issuance of securities or the assumption of specified liabilities and some interlocking directorates. In granting authority to make sales at market-based rates, the FERC typically also grants blanket approval for the issuance of securities and partial waiver of the restrictions on interlocking directorates.

       Midwest Generation is subject to the FERC ratemaking regulation under the Federal Power Act. In addition, the FERC's order, as is customary with market-based rate schedules, reserved the right to revoke Midwest Generation's market-based rate authority on a prospective basis if it is subsequently determined that Midwest Generation or any of its affiliates possess excessive market power. If the FERC were to revoke Midwest Generation's market-based rate authority, it would be necessary for Midwest Generation to file, and obtain the FERC's acceptance of, its rate schedule as a cost-of-service rate schedule. In addition, the loss of market-based rate authority would subject Midwest Generation to the accounting, record keeping and reporting requirements that are imposed on utilities with cost-based rate schedules.

Public Utility Holding Company Act of 1935

       Edison International, Midwest Generation's ultimate parent company, is a holding company because it owns Southern California Edison Company, an electric utility company. However, Edison International and its subsidiaries are exempt for all provisions, except Section 9(a)(2), of PUHCA on the basis that Edison International and Southern California Edison are incorporated in the same state and their utility businesses are predominantly intrastate in character and carried on substantially in their state of

13



incorporation. Section 9(a)(2) provides, in substance, that Edison International may not directly or indirectly acquire 5% or more of the voting securities of a public utility company other than Southern California Edison, unless the acquisition has been approved by the Securities and Exchange Commission. Consequently, Midwest Generation is not a subsidiary of a registered holding company under PUHCA so long as Edison International continues to be exempt from registration pursuant to Section 3(a)(1) or another of the exemptions enumerated in Section 3(a). Midwest Generation is not a holding company under PUHCA, because it does not own interests in any other company.

       Under the Energy Policy Act, a company engaged exclusively in the business of owning and/or operating a facility used for the generation of electric energy exclusively for sale at wholesale may be exempted from regulation under PUHCA as an exempt wholesale generator. On November 9, 1999, the FERC issued an order determining that, based on the facts stated in Midwest Generation's application, Midwest Generation is an exempt wholesale generator.

       If a "material change" occurs in facts that might affect Midwest Generation's continued eligibility for exempt wholesale generator status, Midwest Generation must within 60 days of this material change:

file a written explanation of why the material change does not affect its exempt wholesale generator status,

file a new application for exempt wholesale generator status, or

notify the FERC that it no longer wishes to maintain exempt wholesale generator status.

       If Midwest Generation were to lose its exempt wholesale generator status, it would become an electric utility company under PUHCA. This could cause EME to become a holding company subject to registration and regulation under PUHCA. It also could cause Edison International to lose its exemption from regulation, and require it to register, under PUHCA. This additional regulation would be difficult to comply with and could require EME and Edison International to restructure their operations significantly to achieve compliance. Loss of exempt wholesale generator status also could trigger defaults under the covenants in Midwest Generation's agreements. If loss of exempt wholesale generator status by Midwest Generation were to subject EME and/or Edison International to registration and regulation under PUHCA on a retroactive basis, it could subject them to penalties or other burdens and could cause certain agreements and contracts they have entered into to become voidable.

Natural Gas Act

       Midwest Generation's peaking units have the dual capability of burning natural gas or oil. Under the Natural Gas Act, the FERC has jurisdiction over certain sales of natural gas and over transportation and storage of natural gas in interstate commerce. The FERC has granted blanket authority to all persons to make sales of natural gas without restriction but continues to exercise significant oversight with respect to transportation and storage of natural gas services in interstate commerce.

State Energy Regulation

       The Illinois Commerce Commission does not have jurisdiction over Midwest Generation. Midwest Generation is not considered a public utility for purposes of Illinois state law, nor is Midwest Generation certified by the Illinois Commerce Commission as an alternative retail electric supplier.

       Some states that have restructured their electric industries require generators to register to provide electric service to customers. Many states are currently undergoing significant changes in their electric statutory and regulatory frameworks that result from restructuring the electric industries that may affect

14



generators in those states. Although the FERC generally has exclusive jurisdiction over the rates charged by a non-qualifying facility independent power project to its wholesale customers, a state's public utility commission has the ability, in practice, to influence the establishment of these rates by asserting jurisdiction over a purchasing utility's ability to pass the resulting cost of purchased power through to its retail customers. In addition, states may assert jurisdiction over the siting and construction of independent power projects and, among other things, the issuance of securities, related party transactions and the sale or other transfer of assets by these facilities. The actual scope of jurisdiction over independent power projects by state public utility commissions varies from state to state. See "Midwest Deregulation Status" below.

       Although state public utility commissions do not have jurisdiction to modify the terms of wholesale power sales, Midwest Generation cannot provide assurance that its power sales contracts will not be subject to adverse consequences as a result of regulatory actions by a state commission even though it sells power exclusively at wholesale.

Midwest Deregulation Status

Illinois Restructuring

       In December 1997, the Governor of Illinois signed into law the Electric Service Customer Choice and Rate Relief Law of 1997. Midwest Generation refers to this law as the Illinois Electric Law. The Illinois Electric Law required electric utilities to file delivery services implementation plans for non-residential retail customers no later than March 1, 1999 and for residential customers no later than August 1, 2001 and allowed utilities to recover the costs associated with the provision of delivery services. The Illinois Electric Law also required the Illinois Commerce Commission to adopt reliability rules for the transmission and distribution systems of Illinois utilities. These rules have been adopted and include reporting and penalty provisions that apply to Commonwealth Edison.

       Illinois' transition to retail electric competition was conducted in phases with approximately one-third of non-residential customers having had the opportunity to purchase electricity from alternative retail electric suppliers or electric utilities serving retail customers outside their service areas, effective October 1, 1999. Choice of suppliers is now available to all non-residential customers, and the retail market for residential electric customers was opened to competition on May 1, 2002. Currently, there are no alternative retail electric suppliers certified to sell electricity to residential customers in Illinois. Alternative retail electric suppliers include any person or company, other than an Illinois electric utility, that sells electricity to one or more retail electric customers in Illinois.

       During the transition period that runs until the end of 2006, customers that switch to alternative retail electric suppliers or electric utilities serving retail customers outside their service areas may be required to pay transition charges, also known as "stranded cost" charges, to compensate the utilities that previously supplied these customers for past investments, including investments in generating plants. The Illinois Electric Law calls for these transition charges to end no later than December 31, 2006.

       Commonwealth Edison and the Ameren Illinois utilities have filed rate proceedings at the Illinois Commerce Commission. The rate proceedings propose the adoption of what is known as a New Jersey style full requirement auction process for the procurement of power for the utilities' bundled customers after 2006. This filing is expected to take place in the first quarter of 2005. The proposed process could potentially allow Midwest Generation to secure multi-year power supply contracts through a competitive transparent process. The final outcome of these regulatory proceedings and the extent to which Midwest Generation might participate in any subsequent auction cannot be determined at this time.

15



Transmission of Wholesale Power

       Midwest Generation utilizes power lines owned by others for the transmission of electricity. The prices and other terms and conditions of transmission contracts are regulated by the FERC when the entity providing the transmission service is a jurisdictional public utility under the Federal Power Act, Order No. 2000, and subsequent orders. The FERC has issued a proposal, referred to as Standard Market Design or SMD, that would provide a "level playing field" for all entities that seek to participate in wholesale electric markets. This proposal has engendered considerable comment. See "Transmission," above, for more details on these matters.

Environmental Matters and Regulations

       See the discussion on environmental matters and regulations in "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources—Environmental Matters and Regulations."

Employees

       At December 31, 2004, Midwest Generation employed 960 employees, approximately 727 of whom are covered by a collective bargaining agreement governing wages, certain benefits and working conditions. This collective bargaining agreement is due to expire on December 31, 2005. Midwest Generation also has a separate collective bargaining agreement governing retirement, health care, disability and insurance benefits that expires on June 15, 2006. Most of Midwest Generation's employees were employees of Commonwealth Edison prior to Midwest Generation's acquisition of its power generation assets from Commonwealth Edison.


ITEM 2.    PROPERTIES

       As of December 31, 2004, Midwest Generation owned a fee interest in the Illinois Plants, with the exception of the Powerton Station and the Joliet Units 7 and 8, as more particularly described below.

       Midwest Generation purchased all the properties, with the exception of the Collins Station, from Commonwealth Edison in December 1999. Midwest Generation assigned the right to purchase the Collins Station to third parties, who purchased the Collins Station, and entered into leases with an affiliate of Midwest Generation, who in turn subleased the plant to Midwest Generation. In April 2004, Midwest Generation terminated the Collins Station lease through a negotiated transaction with the lease equity investor and received title to the Collins Station as part of the transaction. On September 30, 2004, Midwest Generation permanently ceased operations at the Collins Station and decommissioned the plant by the fourth quarter of 2004. In December 1999, Commonwealth Edison sold only a portion of its then owned properties related to the Illinois Plants to Midwest Generation and retained the remaining portions of the properties for its own uses. Midwest Generation and Commonwealth Edison have various reciprocal permanent and temporary easements over Midwest Generation's respective parcels for the location, use, maintenance and repair of those facilities and equipment that are used in connection with the operations of Midwest Generation and Commonwealth Edison. On December 30, 2004, Midwest Generation acquired additional property adjacent to the Collins Station from Commonwealth Edison in exchange for easements Midwest Generation granted to Commonwealth Edison at the Will County, Joliet and Powerton Stations.

       In conjunction with the sale-leaseback of the Powerton Station and Joliet Units 7 and 8 in August 2000, Midwest Generation leased substantially all the property on which the generating units are located to the owner trusts under site leases, and the owner trusts in turn subleased their undivided

16


ground interest in the property back to Midwest Generation under site subleases. The terms of the site subleases are 33.75 years for the Powerton property and 30 years for the Joliet property, with renewal options. Rent is paid on each January 2 and July 2.

Description of Properties

Operating Plant or Site

  Location

  Leased/
Owned

  Fuel
  Megawatts
 
Electric Generating Facilities                  
Crawford Station   Chicago, Illinois   owned   coal   542  
Fisk Station   Chicago, Illinois   owned   coal   326  
Joliet Unit 6   Joliet, Illinois   owned   coal   290  
Joliet Units 7 and 8   Joliet, Illinois   leased   coal   1,044  
Powerton Station   Pekin, Illinois   leased   coal   1,538  
Waukegan Station   Waukegan, Illinois   owned   coal   789  
Will County Station   Romeoville, Illinois   owned   coal   1,092 (1)

Peaking Units

 

 

 

 

 

 

 

 

 
Fisk   Chicago, Illinois   owned   oil/gas   163  
Waukegan   Waukegan, Illinois   owned   oil/gas   92  
               
 
            Total   5,876  
               
 

Other Plant or Site


 

 


 

 


 

 


 

 


 
Collins Station(2)   Grundy County, Illinois   owned          
Crawford peaker(3)   Chicago, Illinois   owned          
Joliet peaker(3)   Joliet, Illinois   owned          
Calumet peaker(3)   Chicago, Illinois   owned          
Bloom peaker(4)   Chicago Heights, Illinois   owned          
Electric Junction peaker(3)   Aurora, Illinois   owned          
Lombard peaker(3)   Lombard, Illinois   owned          
Sabrooke peaker(3)   Rockford, Illinois   owned          

(1)
Operations at Will County Station Units 1 and 2 (310 MW) were returned to service in late 2004 after being suspended since January 2003.

(2)
Since September 30, 2004, all Collins Station units ceased operations and were decommissioned by the fourth quarter of 2004.

(3)
In September 2004, management completed an analysis of future competitiveness in the expanded PJM marketplace of eight of its small peaking units in Illinois. Based on this analysis and regulatory approval, planning efforts are in progress to decommission six of its eight remaining small peaking units.

(4)
Bloom peaking units were decommissioned in 2003.


ITEM 3.    LEGAL PROCEEDINGS

       No material legal proceedings are presently pending against Midwest Generation.


ITEM 4.    SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS

       Not applicable.

17



PART II

ITEM 5.    MARKET FOR REGISTRANT'S COMMON EQUITY AND RELATED STOCKHOLDER MATTERS

       All the outstanding membership interest is, as of the date hereof, owned by Edison Mission Midwest Holdings, which is an indirect wholly owned subsidiary of Edison International. There is no market for the membership interest.

       Dividends on the membership interest will be paid when declared by Midwest Generation's board of managers. Midwest Generation paid cash dividends to Edison Mission Midwest Holdings totaling $88 million in 2004 and $0 in 2003 and 2002.

18



ITEM 6.    SELECTED FINANCIAL DATA

       The selected financial data was derived from Midwest Generation's audited financial statements and is qualified in its entirety by the more detailed information and financial statements, including the notes to the financial statements, included in this report.

 
  Years Ended December 31,
 
 
  2004
  2003
  2002
  2001
  2000
 
 
  (in millions)

 
INCOME STATEMENT DATA                                

Operating revenues

 

$

1,057.7

 

$

1,052.3

 

$

1,148.7

 

$

1,057.5

 

$

1,089.2

 
Operating expenses                                
  Fuel and plant operations     759.9     723.7     745.7     756.4     745.9  
  Loss on lease termination, asset impairment and other charges and credits(1)     104.6     1,025.3     (0.3 )        
  Depreciation and amortization     169.9     171.7     175.6     166.7     167.7  
  Administrative and general     21.6     23.8     25.4     30.2     22.4  
   
 
 
 
 
 
      1,056.0     1,944.5     946.4     953.3     936.0  
   
 
 
 
 
 
Operating income (loss)     1.7     (892.2 )   202.3     104.2     153.2  
Interest and other expense     (138.5 )   (233.4 )   (227.6 )   (258.3 )   (311.3 )
   
 
 
 
 
 
Loss before income taxes     (136.8 )   (1,125.6 )   (25.3 )   (154.1 )   (158.1 )
Benefit for income taxes     58.2     436.9     9.5     56.4     61.7  
   
 
 
 
 
 
Loss before accounting change     (78.6 )   (688.7 )   (15.8 )   (97.7 )   (96.4 )
Cumulative effect of change in accounting, net of tax         (0.1 )            
   
 
 
 
 
 
Net loss   $ (78.6 ) $ (688.8 ) $ (15.8 ) $ (97.7 ) $ (96.4 )
   
 
 
 
 
 

(1)
See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations—Management's Overview" for more information regarding loss on lease termination, asset impairment and other charges in 2004 and 2003.

 
  As of December 31,
 
 
  2004
  2003
  2002
  2001
  2000
 
 
  (in millions)

 
BALANCE SHEET DATA                                
Assets   $ 5,683.5